You are on page 1of 11

58 Visqueen Self Adhesive Damp

Proof Membrane
60 Visqueen Gas Resistant Self Adhesive
Damp Proof Membrane
62 Visqueen Torchon Tanking Membrane
64 Visqueen GX Pre Applied Membrane
66 Visqueen Protect&Drain

Tanking
MEMBRANES
Winter applications require a robust material for bonding. Visqueen TorchOn Tanking Membrane
provides an effective waterproof barrier and can be torch bonded to both vertical and horizontal
applications.
tanking
Visqueen Self Adhesive
damp proof Membrane
BBA
BRITISH
BOARD OF
AGREMENT
ASSESSMENT OF PRODUCTS FOR CONSTRUCTION
CERTIFICATE No. 01/3820

—— Self Adhesive waterproofing membrane for above and below ground applications.
—— Tough high performance high density polyethylene membrane provides
resistance to puncture and tearing.
BBA
BRITISH
—— Use with unique Visqueen HP Tanking Primer to obtain best adhesion. BOARD OF
AGREMENT
ASSESSMENT OF PRODUCTS FOR CONSTRUCTION
CERTIFICATE No. 01/3820

DESCRIPTION Application Storage & Handling


Visqueen Self Adhesive Membrane is Visqueen Self Adhesive Membrane is Visqueen Self Adhesive Membrane should
a self adhesive waterproofing system. for use in vertical tanking or horizontal be stored in cartons, on end and kept dry
It can be used as a tanking or damp self adhesive applications, such as above 10ºC at all times. Visqueen Self
proof membrane for both horizontal and underground basements, lift pits Adhesive Membrane is classified as non-
vertical applications. or retaining walls when installed in hazardous when used in accordance with
accordance with BS8102:2009. It is the relevant British Standards.
Visqueen Self Adhesive Membrane has
recommended that substrates are always
BBA Accreditation, Certificate No. Visqueen HP Tanking Primer to be stored
primed with Visqueen HP Tanking Primer,
01/3820. in original unopened containers in a cool
concrete, masonry or steel at or below
dry area. Suitable protective clothing
Visqueen Self Adhesive Membrane ground level. Adequate ventilation must
should be worn during use. See health
prevents the ingress of water and be ensured at all times during application
and safety datasheets at
associated water-borne alkalis present in in accordance with our health & safety
www.visqueenbuilding.co.uk.
some mortar and concrete. datasheet.
Visqueen Self Adhesive Membrane should
be used along with Visqueen HP Tanking
Primer for application on touch dry
concrete or masonry. Substrates should
be primed with Visqueen HP Tanking
Primer prior to application.

typical rc slab edge detail (sw-08)

58
REQUIRED COMPONENTS SPECIFICATION SUPPORT
AVAILABLE AS A DOWNLOAD FROM THE FOLLOWING ITEMS ARE AVAILABLE
VISQUEENBUILDING.CO.UK/TANKING TO VIEW ONLINE OR TO DOWNLOAD FROM
VISQUEENBUILDING.CO.UK/TANKING

visqueen HP tanking primer


Visqueen detailing strip TECHNICAL DATASHEETS
CPD
TYPICAL INSTALLATION CAD DETAILS
visqueen top hat units
H&S HEALTH & SAFETY DATA
P88 Visqueen protection board
CPD Agrément Certificate
P14 Visqueen Zedex Preformed Cavity Tray Units
NBS
H&S
CPD

CPD
P8 Visqueen Zedex CPT DPC H&S
H&S

H&S
P66 visqueen Protect&Drain NBS
H&S
NBS
H&S

NBS
H&S

Installation Instructions

Installation Guidelines A suitable drainage system should be After installation the membrane should
Installation should be in accordance with designed and incorporated in accordance be covered as soon as possible with a
BBA Certificate No. 01/3820, BS Code with the requirements of BS8102:2009. sand/cement screed or other protective
of Practice 102 and BS 8102:2009. layer. Visqueen Self Adhesive Membrane
The membrane can be installed in
must be continuous with the DPC in
All surfaces to which the membranes normal site conditions provided the air
surrounding walls.
are to be applied should have a smooth temperature is not below 5°C.
finish, be dry and free from dust, Do not apply the Visqueen HP Tanking
On external applications the membrane
loose particles and frost. The surface Primer below 5°C, during rain and snow
must be protected against puncture
should then be sealed using Visqueen or when fog or mist are present. Very
during backfilling, or subsequently by
HP Tanking Primer and allowed to dry porous surfaces will require two coats.
the backfill by using Visqueen Protection
thoroughly.
Board or Visqueen Protect&Drain Typical details showing good installation
Vertical surfaces of brickwork and which reduces the risk of leaks from practice are available from our website.
blockwork should be dry and rendered hydrostatic water pressure.
to give an even surface. Brickwork
For internal angles, fillets and detailing
and blockwork not rendered should be
strips must be used (see typical details
pointed to give a smooth surface without
for more information).
sudden changes in level.
Visqueen Detailing Strip should be used
All lap joints should be a minimum of IMPORTANT
to reinforce all angles and corners.
150mm and must be pressed and rolled A full technical datasheet
Alternatively strips can be cut from the
to form a continuous bond and ensure is available online
membrane.
watertightness. www.visqueenbuilding.co.uk/tanking

TECHNICAL DATA

Roll Length 20m


Width 1m
Area per Roll 20m2
Weight 32kg
Overall Thickness 1.5mm
Visqueen Detailing Strip
300mm x 10m Gas Resistant Two-Ply Self Adhesive Membrane.
Visqueen HP Tanking Primer
Dry Time 1 - 5 hours at normal temperature
Application Rate - Concrete 6 - 8m2/l
Availability 5L
Visqueen Heavy Duty Protection Board
Thickness 3mm
Dimensions 1m x 2m

WWW.VISQUEENBUILDING.CO.UK | 0845 302 4758 59


tanking
Visqueen GAS Resistant Self Adhesive GR SAM
damp proof Membrane

—— Self Adhesive waterproofing membrane for above and below ground applications.
—— Superior adhesion.
—— Integral aluminium foil for resistance to methane, radon and carbon dioxide.

DESCRIPTION Application Storage & Handling


Visqueen Gas Resistant (GR) Self Visqueen Gas Resistant (GR) Self Visqueen Gas Resistant (GR) Self
Adhesive Membrane is designed to Adhesive Membrane should be used on Adhesive Membrane should be stored
prevent the transmission of carbon any site where carbon dioxide, radon in cartons, on end and kept dry above
dioxide, radon and methane gases in or methane is a problem. Methane and 10ºC. Visqueen Gas Resistant (GR) Self
tanking applications or where hydrostatic carbon dioxide will occur on any sites Adhesive Membrane is classified as non-
pressure is present. previously used for landfill as a result hazardous when used in accordance with
of bacteriological conditions. Such the relevant British Standards.
Resistance to gas is achieved by an
conditions can exist on household,
integral aluminium film. Substrates Visqueen HP Tanking Primer should be
commercial and industrial sites.
should be primed with Visqueen HP stored in original unopened containers
Adequate ventilation must be ensured at
Tanking Primer prior to application. in a cool dry area. Suitable Personal
all times during application.
Visqueen Gas Resistant (GR) Self Protective Equipment (PPE) should be
Adhesive Membrane is compatible with Additionally radon has been identified worn when using in line with our
Visqueen Gas Resistant (GR) DPC and as being present in some 21 counties health and safety datasheet.
other Visqueen Gas Membranes. in England by the National Radiological
Protection Board.

standard detail ground slab perimeter detail (GB-08)

60
REQUIRED COMPONENTS SPECIFICATION SUPPORT
AVAILABLE AS A DOWNLOAD FROM THE FOLLOWING ITEMS ARE AVAILABLE
VISQUEENBUILDING.CO.UK/TANKING TO VIEW ONLINE OR TO DOWNLOAD FROM
VISQUEENBUILDING.CO.UK/TANKING

visqueen HP tanking primer


Visqueen detailing strip TECHNICAL DATASHEETS

visqueen top hat units


CPD
TYPICAL INSTALLATION CAD DETAILS
HEALTH & SAFETY DATA
P88 Visqueen protection board
H&S

P14 Visqueen Zedex Preformed Cavity Tray Units


CPD
NBS
H&S
CPD

P21 Visqueen Gas Resistant (GR) DPC H&S


H&S

P66 visqueen protect&drain NBS


H&S
NBS
H&S

Installation Instructions

Ensure that the surface to be treated is The material should be brushed on to After installation the membrane should
free from loose particles, dry and frost the surface to ensure good initial bond be covered as soon as possible with a
free. Installation should be in accordance and remove any trapped air. Adjacent sand/cement screed or other protective
with BS 8102:2009. All surfaces should rolls are aligned and overlapped a layer. Any punctures or damaged areas
be sealed using Visqueen HP Tanking minimum 150mm at side and ends and should be cleaned and patched with the
Primer and allowed to dry thoroughly. the overlaps thoroughly rolled with a firm membrane.
constant pressure to ensure a complete
A suitable drainage system should be Visqueen Gas Resistant (GR) Self
and continuous adhesion to achieve gas
designed and incorporated in accordance Adhesive Membrane must be continuous
tight integrity between the layers.
with the requirements of BS8102:2009. with the Visqueen Gas Resistant DPC
To provide complete security of the in surrounding walls and all laps must
All surfaces should be free from ice,
system, care must be taken when be sealed.
frost or condensation.
detailing service penetrations and
Slabs must be surface dry, free from changes of levels. The use of angle
sharp protrusions and any hollows filled fillets and reinforcing strips is essential.
with high strength mortar. All surfaces Visqueen Gas Resistant Self Adhesive
should be primed using Visqueen HP Membrane is fully compatible with
Tanking Primer applied by brush or roller other elements of the Visqueen Gas
and allowed to dry before the application Protection System.
of Visqueen Gas Resistant Self Adhesive
Membrane.
Visqueen Gas Resistant Self Adhesive
Membrane should be laid by peeling back
the protective silicone release paper and
applying the self adhesive face onto the
prepared surface.
TECHNICAL DATA

Roll Length 20m


Width 1m
Area per Roll 20m2
Weight 34kg
Physical Characteristics
Methane Gas Resistance <0.09 mls/m2/24hr
Visqueen HP Tanking Primer
Dry Time 1 - 5 hours at normal temperature
Application Rate - Concrete 6 - 8m2/L
Availability 5L
Heavy Duty Protection Board
Thickness 3mm
Dimensions 1m x 2m

WWW.VISQUEENBUILDING.CO.UK | 0845 302 4758 61


tanking TORCHON TANKING
Visqueen torchon tanking Membrane

—— Robust waterproofing membrane for above & below ground waterproofing applications.
—— Torch bonded laps provide a homogenously sealed junction.
—— Ideal for cold weather application.
—— Used to waterproof basements, lift pits, reinforced concrete Slabs, retaining walls.

DESCRIPTION Application Additional System Components


Visqueen TorchOn Tanking Membrane Visqueen TorchOn Tanking Membrane
—— Visqueen HP Tanking Primer (5L
is a robust waterproofing membrane, should be applied as a two layer system
tin) – for preparation of touch
used for heavy duty tanking applications. when used as a tanking system for
dry concrete and masonry
Visqueen TorchOn Tanking Membrane can below ground structures where medium
surfaces prior to application of the
be used both vertically and horizontally or high levels of hydrostatic (water)
membrane. Please use Visqueen
above and below ground level to prevent pressure exist. Visqueen TorchOn
High Performance Primer for damp
the ingress of water. Visqueen TorchOn Tanking Membrane can be used as a
surfaces. Coverage rate on concrete
Tanking Membrane should be used along single layer system when used as a
is about 6 - 8m² per litre. Drying
with Visqueen HP Tanking Primer on horizontal damp proofing membrane.
time is 1 - 5 hours depending on
touch dry concrete. Substrates should be In this application all laps should be
temperature and ventilation.
primed with Visqueen HP Tanking Primer minimum 150mm. The loading screed
prior to application. Visqueen Heavy or floor slab which is laid on top of the —— Visqueen Heavy Duty Protection
Duty Protection Board should be used membrane should be adequate to resist Board (3mm thick, 1m x 2m board)
horizontally or Visqueen Protect&Drain any hydrostatic water pressure. – for protecting the membrane from
for external vertical applications which damage during backfilling, etc.
protects the membrane from backfill or —— Visqueen Zedex DPC Jointing Tape
site traffic. (100mm x 15m roll) for bonding
Visqueen Heavy Duty Protection
Boards to Visqueen TorchOn Tanking
Membrane.
IMPORTANT
For more information on test results
see visqueenbuilding.co.uk/tanking

TECHNICAL DATA

Nominal Thickness (mm) 4


Roll Length (m) 8
Roll Width (m) 1
Weight BS EN 1849 –1 (Kg/m2) 4.5
Water Vapour Permeability
1.93*
BS 3177 (g/m²/day)
* Temperature Conditions (25ºC / 0 / 75%RH)
Peel Adhesion
2.61
MOAT 27 : 5.1.3 (Nmm–1)
Visqueen HP Tanking Primer
Dry Time 1 - 5 hours at normal temperature
Application Rate - Concrete 6 - 8 m2/L
Availability 5L

62
REQUIRED COMPONENTS SPECIFICATION SUPPORT
AVAILABLE AS A DOWNLOAD FROM THE FOLLOWING ITEMS ARE AVAILABLE
VISQUEENBUILDING.CO.UK/TANKING TO VIEW ONLINE OR TO DOWNLOAD FROM
VISQUEENBUILDING.CO.UK/TANKING

visqueen ZEDEX DPC JOINTING TAPE


visqueen top hat units TECHNICAL DATASHEETS

Visqueen HP TANKING PRIMER
CPD
TYPICAL INSTALLATION CAD DETAILS
HEALTH & SAFETY DATA
p66 visqueen Protect&Drain
H&S

P88 visqueen HEAVY DUTY PROTECTION BOARD


CPD
NBS
H&S
CPD

H&S
H&S

NBS
H&S
NBS
H&S

Installation

Preparation Equipment and bonding Protection and support


Ensure that the surface to be treated The membrane must be fully bonded to In external tanking situations or where
is smooth, clean, dry, free from loose the prepared substrate using the gas there is a risk of damage, Visqueen
particles and is frost free. Concrete torch-on technique. For horizontal work, Heavy Duty Protection Boards should
and renders should be completely an approximate 500mm neck tube and be positioned over the membrane. When
cured. Unrendered masonry must be 50mm diameter propane gas burner is bonding of the boards is required, attach
flush pointed. Installation should be in used and for vertical and detailing work, with strips of Visqueen Zedex DPC
accordance with the recommendation of an approximate 200mm neck tube and Jointing Tape. Internal vertical tanking
BS 8102:2009. 35mm diameter propane gas burner is requires the construction of an internal
appropriate. During bonding, ensure that leaf of masonry to provide support for the
A suitable drainage system should be
a constant flow of bitumen is maintained membrane. A cavity of 50mm minimum
designed and incorporated in accordance
across the full width of the roll and that must be left which is progressively
with the requirements of BS8102:2009.
a bead of bitumen is extruded from each filled with sand/cement mortar as work
Priming edge demonstrating that a correct seal proceeds. When the vertical membrane
All surfaces should be sealed using has been obtained. terminates, the uppermost end should
Visqueen HP Tanking Primer applied be batten fixed or sealed into a chase.
Horizontal bonding
by brush, broom or roller. On concrete Internal horizontal tanking requires
Unroll and position the membrane.
or masonry surfaces, coverage rate loading with sand/cement screed
Roll back half way and starting from
is about 6 - 8m² per litre. Ensure the sufficient to resist hydrostatic water
the middle of the roll, progressively roll
primer is fully dry before application pressure.
forward whilst activating the coating
of the membrane. Drying time is 1 - 5
on the underside of the roll. Repeat for Continuity
hours depending on temperature and
the second half of the roll. Subsequent Installation must ensure continuity of
ventilation. The newly applied primer
rolls should be set out with staggered the tanking system around obstructions
should be protected from contamination.
end laps. such as stanchions and pile caps and the
Angles and corners formation of a minimum 100mm bonded
Vertical bonding
Provide a 50mm – 75mm sand/cement lap with the damp proofing system above
Cut the membrane to the appropriate
fillet. Reinforce all changes of direction ground level.
length and position at the base of the
with a 350mm strip of Visqueen TorchOn
wall. Progressively torch apply to the Storage and handling
Tanking Membrane applied equidistant
substrate working up the wall. Complete Visqueen TorchOn Tanking Membrane
across the junction.
the vertical application by torch bonding must be stored on end and kept dry.
Setting out the remainder of the membrane to the The membrane is classified as
When applying a two layer system, horizontally bonded membrane. non-hazardous when used in accordance
the membrane should be set out with with the relevant British Standard
staggered laps between first and second Code of Practice. Visqueen HP Tanking
layers. Primer should be stored in its original
unopened container in a cool, dry area.
Lap joints
Suitable Personal Protective Equipment
Side lap joints to be minimum 100mm
(PPE) should be worn when using these
and end lap joints to be 150mm. All
materials and suitable fire fighting
lap joints to be fully bonded; a bead of
equipment must be available. Adequate
bitumen should extrude from the joint.
ventilation must be ensured at all times
during application. See health & safety
datasheets available at
www.visqueenbuilding.co.uk.

WWW.VISQUEENBUILDING.CO.UK | 0845 302 4758 63


tanking
Visqueen GX Pre Applied Membrane

—— Heavy duty, high performance membrane.


—— Joints can be tape bonded or welded.
—— Suitable for both damp proofing and tanking applications.
—— Barrier to hazardous ground gases.
—— Barrier to hydrocarbon contamination.
—— Specified for major projects throughout the UK.

DESCRIPTION durability, survivability and robustness


Visqueen GX Pre Applied Membrane is being critical membrane properties.
an advanced high performance, flexible
Visqueen GX Pre Applied Membrane is
HDPE geomembrane. The membrane has
designed to provide a robust solution to
a textured face on one side designed
preventing the ingress of damp, ground
to aid adhesion to cast concrete. The
gas or hydrocarbon contamination.
membrane is 1.5mm thick and supplied
Unlike the smooth surfaced traditional
in roll form 2.95m x 25m.
damp proof membranes, the textured
Application surface of Visqueen GX Pre Applied
Building Regulations require that the Membrane aids adhesion to cast
ground floors of a building should concrete. The membrane can withstand
adequately protect the building, and normal on-site foot traffic and the
people who use the building, from activities associated with the laying of a
the harmful effects caused by ground reinforced concrete slab without the need
moisture. The instances of traditional for additional membrane protection. In
damp proof membranes being damaged addition, when applied with welded joints
by following trades or the process of the membrane can provide protection
positioning spacers and reinforcement On many developments, ground gas against hydrostatic water pressure.
prior to laying a reinforced concrete and hydrocarbon contamination pose a
Visqueen GX Pre Applied Membrane
slab, has resulted in the need for a very serious risk of causing explosion,
can be used in a variety of applications
robust membrane system that greatly asphyxiation or harm. Current industry
including:
reduces the risks of future damp ingress guidance recommend that gas
due to mechanical damage during the membranes are specified on the basis of —— Gas contaminated land.
construction phase. the need to survive construction; —— Hydrocarbon contaminated
brownfield sites.
STANDARD DETAIL: TYPICAL EDGE CONDITION (GXPA-02)
—— Heavy duty reinforced concrete
slabs.
—— Slab edges and permanent
shutter work.
—— Tanking below ground structures
e.g. lift pits.

TECHNICAL DATA

Thickness 1.5mm
Roll Dimensions 2.95m x 25m
Density 0.94g/m³
Tensile Strength at
40N/mm
Break
Elongation at Break 700%
Puncture Resistance 480N
Tear Resistance 187N
Methane Permeability
1.95
(cc/m²/hr)

64
REQUIRED COMPONENTS SPECIFICATION SUPPORT
AVAILABLE AS A DOWNLOAD FROM THE FOLLOWING ITEMS ARE AVAILABLE
VISQUEENBUILDING.CO.UK/TANKING TO VIEW ONLINE OR TO DOWNLOAD FROM
VISQUEENBUILDING.CO.UK/TANKING

Visqueen GX Double Sided Jointing Tape


Visqueen GR Single Sided Lap Tape TECHNICAL DATASHEETS

Visqueen GX Preformed Units


CPD
TYPICAL INSTALLATION CAD DETAILS
HEALTH & SAFETY DATA
Visqueen GX Preformed Top Hat Unit
H&S

Visqueen GX Retaining Discs


CPD
NBS
H&S
CPD

Visqueen Detailing Strip H&S


H&S

Visqueen HP Tanking Primer (5L) NBS


H&S
NBS
H&S

Installation

General section of the retaining disc. The top


Visqueen GX Pre Applied Membrane and edge of the membrane should be trimmed
system components should be installed to approximately 20mm below the top
in accordance with the recommendations edge of the slab.
of the relevant codes of practice and
Once the concrete has set, the oval nails
industry guidance, such as CP102:1973,
should be removed by pulling through
BS8102:2009, BRE414:2001,
from the external face of the shuttering.
CIRIA C665:2007, BR211:2007 and
When the shuttering is removed the
BS8485:2007.
Visqueen Retaining Discs should be
A suitable drainage system should be visible on the external (smooth) face
designed and incorporated in accordance of the membrane. Continuity of the
with the requirements of BS8102:2009. membrane system with the damp or
gas proof course is maintained using
To avoid linear expansion due to Service penetrations,
Visqueen GR Self Adhesive Membrane
temperature change the membrane corners and junctions
(see Visqueen Typical Details).
should not be taken through any masonry All service pipe penetrations should be
wall. The relevant Visqueen damp proof Lap joints fully sealed using welded membrane or
or gas proof course should be taken Visqueen GX Pre Applied Membrane Visqueen Preformed Top Hat Units. The
through and extended beyond the wall has been designed to exhibit superior base and collar of the preformed unit
by a minimum of 250mm where it can be welding properties using hot edge, hot should be bonded using Visqueen GX
jointed to the membrane. air, or extrusion welding. Therefore on- Double Sided Jointing Tape and sealed
site welding of membrane lap joints is with Visqueen GR Single Sided Lap Tape.
When installed horizontally, the The collar should be secured with a
recommended for all applications and
membrane should be applied to a smooth mechanical fastening.
must be employed when hydrostatic
continuous surface of preferably float
water pressure or hydrocarbon
finished concrete blinding or alternatively To ensure system integrity, all internal
contamination is present. Where
sand blinding. The surface should be free and external corners should be provided
required, Visqueen’s network of preferred
from loose aggregates or other sharp with either welded corners or Visqueen
installers can install the membrane and
protrusions. Any standing water should GX Preformed Units bonded to the
offer the client a fully warranted system.
be removed to prevent potential lap joint membrane using Visqueen GX Double
contamination. The membrane should Alternatively, when Visqueen GX Pre Sided Jointing Tape and sealed with
be laid with the textured surface facing Applied Membrane is used for damp Visqueen GR Single Sided Lap Tape.
away from the blinding. proofing, ground gas protection and sites
Complex or awkward junctions should be
where hydrostatic water pressure or
When installed vertically, Visqueen sealed using either welded membrane or
hydrocarbon contamination is of low risk,
GX Pre Applied Membrane should be Visqueen Detailing Strip.
lap joints can be bonded with Visqueen
pre applied to permanent formwork or
GX Double Sided Jointing Tape and then Precautions
the adjoining structure. Visqueen GX
sealed with Visqueen GR Single Sided Visqueen GX Pre Applied Membrane is
Retaining Discs are available to provide
Lap Tape. classified as non-hazardous when used
a means for securing the leading edge
in accordance with the relevant codes of
of the membrane to shuttering. The When using tapes to secure laps, the
practice and industry guidance.
membrane should be installed with the overlap should be minimum 150mm
textured surface facing away from the and the membrane surfaces to be When the weather is cold, Visqueen
shuttering. jointed should be dry and free from jointing tapes and self adhesive
contamination such as dust or sand. materials should be kept in a warm,
Using oval nails, Visqueen GX Retaining
Once the tapes are applied, the lap dry place until needed. Unless
Discs should be mechanically fixed,
should be well rolled with firm pressure to welded, membrane installation is not
at maximum 400mm centres, to the
ensure complete adhesion and continuity. recommended below 5°C.
internal face of the shuttering. Using
a suitable power tool and 6mm drill bit To avoid high linear expansion when
to create a pilot hole in the membrane, installed in hot weather, the membrane
the Visqueen GX Pre Applied Membrane should be covered immediately after
should be secured over the protruding installation with concrete or screed.

WWW.VISQUEENBUILDING.CO.UK | 0845 302 4758 65


PROTECTA-DRAIN

tanking PROTECT &


Visqueen Protect&Drain DRAIN

—— Rapid installation.
—— High puncture resistance protection.
—— High flow capacity to alleviate hydrostatic pressure on below ground structures.
MANUFACTURED
IN THE UK

Description Unroll into position. Adjacent rolls should


Visqueen Protect&Drain consists of a be placed in a similar way to the first REQUIRED COMPONENTS
geotextile filter membrane thermally so the dimpled cores butt together. Available as a download from
bonded to a cuspated HDPE core. The The geotextile filter membrane extends visqueenbuilding.co.uk/dpc
product is 6mm thick and supplied in beyond the width of the dimpled HDPE
rolls 1.1m x 50m. core at one side; this creates an overlap Visqueen Girth jointing Tape
flap which should be secured to the Visqueen Zedex Jointing Tape
Application
adjacent roll with Visqueen DPM Girth
Visqueen Protect&Drain acts as a heavy
Lap Tape. Continue laying further rolls
duty protection medium for Visqueen
until the membrane is protected over its
damp proofing, gas proofing and tanking
entire area.
membranes. In addition, when used SPECIFICATION SUPPORT
in external tanking applications, the Visqueen Protect&Drain can be strip The following items are available
to View Online or TO Download from
product forms a void to collect and bonded to membranes with Visqueen VISQUEENBUILDING.CO.UK/dpc
transmit water into adjacent drainage Zedex DPC Jointing Tape.
outlets or collector pipes. Typical
In external tanking applications, when TECHNICAL DATASHEETS
applications include drainage for
linking to perforated land drains, extend TYPICAL INSTALLATION CAD DETAILS
externally applied tanking and drainage CPD

Visqueen Protect&Drain at the base


behind retaining walls. H&S HEALTH & SAFETY DATA
of the retaining wall sufficiently to
Installation
CPD
allow wrapping of the drainage pipe.
NBS
H&S
CPD

Visqueen Protect&Drain is designed to The product should be covered with H&S


H&S

be installed with the geotextile filter backfill as soon as is practicable. Before H&S
NBS
NBS
H&S

side (white face) of the product facing covering, inspect the installation of
the direction of the water flow, backfill the product to ensure that gaps, open
medium or slab. Rolls can be cut to end or sides where soil, aggregate, etc
length with a sharp knife. can enter the core are wrapped with
geotextile filter membrane and secured
with Visqueen DPM Girth Lap Tape.

TECHNICAL DATA STANDARD DETAIL: EXTERNALLY TANKED LIFT PIT (HIGH RISK OF WATER PENETRATION)

1.1m x 50m x
Roll Dimensions
6mm thick
Roll Weight 39kg
Puncture Resistance 2000N
Maximum In-Plane
1.4 l/s per
Water Flow Capacity
metre width
(EN ISO 12958)
Highly
Chemical Resistance
resistant

66