SystemReference Code Description Category Item Type SI Code

557 1 Construction Scheduled NA


558 1.1 Civil Works Scheduled NA
559 1.1.1 B&R Scheduled BOQ 01-06
560 1.1.2 Task-2 Scheduled ScheduledItem NA
561 1.1.3 Task-3 Scheduled BOQ NA
562 1.1.4 <New Task>
UoM Quantity Rate Amount Bidder Rate Bidder Amount
NA 0 0 8027639.64 0 8027639.64
NA 0 0 8027639.64 0 8027639.64
Sq. Ft 1644 4567 7508148 4567 7508148
Meters 568 765 434520 765 434520
Liters 54469 1.56 84971.64 1.56 84971.64
0 0 0 0 0