Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Table of Contents
3
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
1. System Requirements
1.1 Introduction
Company Responsibility
o System Configuration, Operation and testing.
Bynet
o Advise and check MEI installation.
RAD Mexico o System Elements, cables supply according to the BOM
o The entire system element Installation.
o Supply and installation of all the construction at the
following sites:
Base Station.
MEI Police station.
Camera site at the road.
o Supply a basket crane for the Base Station and for the
camera site pole; for the elements installation
o Supply and drive at the vehicle for the Demo.
Table 1.2- A: Companies responsibility
4
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
The CCO shall be at the police station at Pachuca, the customer need
to coordinate a room for the demonstration.
The CCO shall connect to the system via a PTP Radio Link from the
Base Station at the Mobility area*
Note *) depending LOS Condition between the Base Station to the
Police station
Mobility Area
Coverage area distance - The distance of the road at the POC shall be
approximately 5 [Km] according to figure 1.3.
Vehicle
One Vehicle shall drive along the road on both ways.
Vehicle Speed shall be no more than 200 [Km/h].
One stream of video from the vehicle to the CCO at 2Mbps capacity
One stream of video from a camera site installed along the highway
(Cam Site#1) To CCO at 2Mbps capacity.
5
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
PTP Backhaul
Radio Link
Mobility Area
6
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
The wireless system includes One (1) Base Station (BS) and One (1) vehicle.
Figure 2.1 describe system architecture.
Mobility Mobility
Coverage area Coverage area
Cam Site
PTP Radio Link
Base Station
7
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
General Description
Mobility - Approximately 5 [Km]
Distance Line
PTP – 23 [Km]
Number - One vehicle
Vehicles
Max speed is up to 200 [Km/h]
Mobility - Open area with bridges along the highway
Area Type
PTP – Open area, Urban area
One stream of video from or to the vehicle at 2Mbps capacity.
Application service type:
One stream of video from a pole installed along the highway (Cam Site#1) To CCO at 2Mbps capacity.
Base Station Networking Backbone Connectivity Yes, PtP radio link from Base Station to Police station
Technical Specification
Police
Specification Mobility Base Station
Vehicle Cam Site Station
Mobility = 5.4(1) [GHz] band
Operation Frequency Band PtP Backhaul to the police station = 5.8(1) [GHz]
(1)
Note - The final Operation frequencies shall determine at the sites after site survey and spectrum availability
Mobility and PtP Backhaul to the police station= 10 or 20 (2) [MHz]
Channel Band Width (2)
Note - The final CBW Operation shall determine at the sites after system pretesting.
8
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
9
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Power Supply 110 [V] A.C 10 ÷ 30V D.C 110V A.C 110V A.C
Power Consumption 90 [Watt] for the 2 * HBS + PTP 30 [Watt] 20 [Watt] 30 [Watt]
ODU/POE cable length 25 [m] 3 [m] 5 [m] 100 [m]
RF Coax cable length 1.2 [m] Car Kit No 1.2 [m]
01
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Figure 3.1-A describes the pole for the system elements installation at the Base
Station position of the Base Station on
00
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
The vehicle shall drive along the road at the coverage area only, at both directions of
the road.
Figure 3.2-B is describing the Wireless System Coverage area.
HBS#2 Coverage
area
HBS#1 Coverage
area
5 [Km]
02
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Pole
110V A.C
Cabinet
110V A.C
110V A.C
2m Eth. cable
2m Eth. cable
2m Eth. cable
110V A.C
03
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
04
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
05
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
06
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Figure 3.4 – B describe the pole that MEI need to supply and install for the PTP Radio
link
Position of the
antenna 1" to 2"
1÷2 meter
Position of the
ODU Radio
Pole need to supply
and install
Existing Pole
Figure 3.4 – C describe the T pole that MEI need to supply and install for the Mobility
Radio link, need TWO T poles.
1" to 2"
Connect to the
existing pole
Position of the
20 cm ODU Radio
80 cm
07
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Figure 3.4 – D, describe the outdoor cabinet that MEI need to supply and install at the
existing pole Base Station.
50 cm
30 cm
40 cm
POE
The cabinet shall include a door at the front and shall be installed at the pole.
08
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Table 3.5 describes all the activities for system installation and each responsibility.
The installation shall start at 25/11/2013, Monday morning from 8:00 AM.
MEI shall provide at least two teams at this day, One shall install all the elements at
the Base Station and the second will be install the elements at the police station, after
finishing all the installation the PTP alignments shall done with the two teams.
The two teams need to climb to the poles at the Base Station and the tower at the
police station.
For the installation at the Base station pole, EMI need to bring a basket crane of at
least 15m height.
Bynet engineers (Asher and Shmuel) shall advise and check the installation
connection.
Description Responsibility
Equipment including cable supply RAD Mexico
Construction supply and installation MEI
Installation advise along all the installation Bynet
Installation check Bynet
Elements Configuration Bynet
System Operation Bynet
System Test Bynet
Supply an 15m basket crane at the Base Station road for
elements installation at the pole MEI
All the elements installation according to Bynet engineer
advise MEI
Supply pole of 2m (1" up to 2") for the extension to the
PTP radio link (including antenna and HBS radio),
describe at figure 3.4 - B MEI
Supply two units of T pole for the HBS and two sector
antennas, need TWO T pols, describe at figure 3.4-C MEI
Supply and install the outdoor cabinet to the pole,
describe at figure 3.4-D, including the power 110V A.C
outlets, shelf etc. MEI
Supply power supply of 110V A.C inside the cabinet. MEI
PTP radio link alignments to the Police station MEI
09
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
21
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Pole
20
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
1m
Concrete cube
22
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
1" to 2"
At least 3m
23
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Figure 4.3 – B, describe the outdoor cabinet that MEI needs to supply and install at
the pole.
30 cm
20 cm
POE
1.5 cm
The cabinet shall include a door at the front and shall be installed at the pole.
24
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Table 4.4 describes all the activities for system installation and each responsibility.
The installation shall start at 25/11/2013, Monday after finishing the Base Station
installation.
The team of that work at the Police Station shall install this site after finishing
installation at the police station.
For the installation at the Base station pole, EMI need to bring a ladder of 3m.
Bynet engineers (Asher and Shmuel) shall advise and check the installation
connection.
Description Responsibility
Equipment including cable supply RAD Mexico
Construction supply and installation MEI
Installation advise along all the installation Bynet
Installation check Bynet
Elements Configuration Bynet
System Operation Bynet
System Test Bynet
Supply an 3m ladder at the site for elements installation
at the pole MEI
All the elements installation according to Bynet engineer
advise MEI
Supply the construction according to figure 4.3-A. MEI
Supply and install the outdoor cabinet to the pole,
describe at figure 4.3-B, including the power 110V A.C
outlets, shelf etc. MEI
Supply power supply of 110V A.C inside the cabinet. MEI
25
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
The Police Station shall be the place for the customer people
demonstration, the Base Station is connected to the Police station via a
Point to Point radio link from the Base Station pole.
The Point to point
Figure 5.1 is describing the System at the Police Station.
Dual Polarization
antenna
To Base Station
ODU Radio
Indoor POE
110V A.C
LCD
110V A.C 110V A.C
26
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Antenna Azimuth
27
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
The antenna and the ODU radio shall install with the mounting (supply with the
antenna) to the pole, the pole is up to 2".
1" to 2"
+ =
28
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Table 5.3 describes all the activities for system installation and each responsibility.
The installation shall start at 25/11/2013, Monday at parallel with the Base Station
Installation.
Description Responsibility
Equipment including cable supply RAD Mexico
Construction supply and installation MEI
All elements and cables Installation, Including Cat-5e
(supply 100m with the equipment) cable from the ODU
Radio to the demonstration room inside the Police Station. MEI
Elements Configuration Bynet
System Operation Bynet
System Test Bynet
Organize a room for demonstration MEI
Supply and install an a LCD for demonstration with a
MEI
cable for a laptop
110V A.C (at least 3 outlets) for power the following
MEI
elements: POE, Laptop, and LCD).
Supply a computer with the following requirements:
Demo-VMS currently works on Windows based PCs
only (both x86 and 64 bit versions).
Demo-VMS has been tested on Windows XP, Windows
Vista, Windows 7 and Windows 8 but may work on
other Windows variants that support the .Net
Framework v4 client.
29
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
All the equipment shall be installed at one (1) cabinet box which shall be
placed at the roof of the vehicle.
Figure 6.1 is describing the System police vehicle.
HMU
RF cable
RF cable
Cat5e cable
12V D.C
12V D.C
12V D.C
31
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Omni Omni
Antenna Box Antenna
50 cm
36 cm
50 cm
20 cm
16 cm
16 cm
Video
Camera
4 Magnets
Omni
Antenna
30
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Omni
Antenna
HMU
Radio
Video
Camera
POE
12 V D.C
Switch Power In
Ethernet
12V D.C
Power IN
Magnets
Magnet
s
32
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Omni
Antenna
HMU
Radio
POE
12 V D.C
Power In
Switch
Ethernet
cable
Video
Camera
Power cable
connected to the
Lighter socket
33
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
34
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
35
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
Table 5.3 describes all the activities for system installation and each responsibility.
The installation shall start at 25/11/2013, Monday.
Description Responsibility
Car kit and equipment including cable supply RAD Mexico
All elements and cables Installation MEI and Bynet
Elements Configuration Bynet
System Operation Bynet
System Test Bynet
Supply a vehicle for demonstration and drive the vehicle
along all the test and demonstration. MEI
36
Mexico City Police
Mobility Communication System
POC Design & Description
Ver. 2.1 11 November 2013
The purpose of the POC trail is to test Mobility Wireless System specifications
including Capacity Vs. Range Vs. Speed with One Base Station consist of Two HBS
Radio Units
- One Base Station including Two HBS radio connecting back to back configuration
- One Vehicle driving along the coverage area map
- Application - Video from the Vehicle to the BS
- Testing Points: at the Vehicle and the second point shall be at the BS near the Pole
Scenario unless there are a networking connectivity from the Pole to the CCO/Building
Description Vehicle Speed: Vehicle shall be driving along the coverage Road with a different
speeds maximum 200 [Km/h] and sending a video from the local existing camera at
the Vehicle to the BS point test, the vehicle shall drive at both directions of the road
System Coverage Range: The vehicle shall drive in both directions of the road until
the wireless connectivity disconnect to test the maximum coverage area of the wireless
system - WITH LOS CONDITION ONLY
System Capacity: The vehicle shall be driving inside the coverage road area and
shall test the maximum capacity and characteristics of the wireless system.
Test Description Results
37
Mexico City Police
Mobility Communication System
POC Design & Description
8. POC Schedule
83