You are on page 1of 9

Machine Translated by Google

General and private specifications

Villa Mr.

All work is carried out in accordance with the general technical specifications of the State of Qatar (SBNQ) and complementary annexes issued by

The Public Works Authority, as well as the specifications of the rest of the state’s bodies and departments, are as follows:

1- Specifications for electricity and water works issued by the Ministry of Electricity and Water in the State of Qatar.

2- Specifications of landline telephone services issued by Ooredoo.

3- Sanitation specifications issued by the Sanitation Department of the Public Works Authority

1- Site planning, excavation and filling works:

1 - The contractor must inspect the land and verify the natural level of the land before contracting, which must include the contract value, i.e.

Excess ordim excavation work and she is not entitled to claim it.

2 - The contract value does not include any water dewatering works or support for the sides of the excavation, and the contractor has the right to demand an additional value for the contract if

The working conditions required this

3- The contractor must provide samples of all materials used in the works for approval before starting supply and installation, and determine locations and levels

according to the architectural plan, as well as make a grid budget for the land location within a week of receiving the land.

4- The contractor must dig until he reaches soil suitable for foundations, and he must perform the necessary tests to ensure the soil’s capacity

He must bear the stress designed for the project at his own expense, which is included in the price submitted by him and must

The depth of the excavation should not be less than 120 cm from the road level, unless otherwise stated in the drawings and depending on the level and nature of

the ground. The excavation must be on one level, unless the work conditions require otherwise, and this is done after obtaining the approval of the supervising

consulting engineer.

5- The contractor must transport the drilling output outside the site and use it with the approval of the consultant.

6- The contractor must supply soil suitable for burial, and the consultant must approve a sample before supplying, and it must be of graded grains and free.

cm for the largest size. Of stones of large sizes, so that its diameter does not exceed 11 cm, the burial is spread

out, immersed in water well, and compacted. 7 - The burial is done in stages so that the depth of each stage does not exceed 51 cm, and the weight of the compaction

must not be less than 3000 kilograms. Each layer is delivered to the consultant and only the second layer begins. after

thickness of the burial layer) Approval of the first layer of the advisory (note: the weight of the compactor is directly proportional to the

The contractor is committed to conducting the necessary tests for the blood at an accredited laboratory.

8- Clean, fresh water free of organic matter and bacteria must be used for use in all required work.

Whether for working, spraying or immersing in water.


Machine Translated by Google

cm from the street (road level) opposite Gate 9 - The architectural zero level mentioned in the drawings increases by 41

Home for the villa.

11- After completing the stage of burying the ground bridges, termite pesticide spraying is carried out.

2- Ordinary and reinforced concrete:

It is made of resistant cement Y All regular or reinforced concrete works below the ground floor level -1

(SRC)

2- A layer of nylon (Polythene Gauge 1000) is placed under any concrete in contact with the soil.

3- The surface of the concrete and bricks is painted below the architectural zero level with two sides of rubber bitumen and then coated.

With a layer of plastic (polythene) with a thickness of 1111 gauges (bitumen and nylon must be approved by the supervising engineer).

Its stress should not be less than 21 Newtons


after 28 days (unless otherwise stated on the maps). 4- Ordinary concrete must be made

for 28 days (unless otherwise stated on the maps). 5- Reinforced concrete must have a stress of not less than 31 Newtons. After 28 days, samples

are taken during the pouring process and sent to the laboratory (approved by the consultant) and tested after seven days, and the rest after 28 days.

One day, with at least three cubes in each stage, and the results are sent to the consultant.

6- Ground concrete is made with a thickness of not less than 11 cm and an iron mesh is placed (diameter according to the maps). The concrete is

Place nylon with a strength of 1111 g under any resistant cement concrete work with a strength of not less than 21 Newtons after 28 days

above the burial ground (unless otherwise stated in the drawings).


!

shown in the construction and architectural drawings, and no increase or decrease is permitted For dimensions and thickness Concrete according to -7 is poured

In sectors.

8- Spray the wooden block with water before starting pouring.

9- All final surfaces of concrete must be smooth and not contain any voids.

11- Clean and sound wood must be used in all wooden formwork above the level of ground bridges.

pouring work, a vibrator in good condition must be available before pouring begins, and the supervisor has the right to 11- When there is any concrete

stop pouring in the event of non-compliance with this.

12- Regular and reinforced concrete is treated with water and sprayed daily for seven consecutive days after pouring. 13-

New black plywood is used in the ceilings. It does not allow for a visible break in the concrete walls and ceilings. The necessary work is done

in the wooden tension joints to prevent the joint from occurring after loosening in the concrete.

Do not dismantle the wooden wrench in the concrete until after the period specified for it: 14-15 days

are required for bases, columns and sides of bridges


!

and stairs (varies according to dimensions and temperature)


-16 21 for the ceiling
One day
Machine Translated by Google

(Varies depending on dimensions and temperature) For cables One day


-17 28

18- In the event that there are any nests in the concrete, the opinion of the supervising engineer shall be taken before proceeding to repair them and any
!
!

Before obtaining
engineer, it will be rejected. The treatment shall beAnddone by breaking the defective the concrete
part of the approval that
of the supervising
has a deformation and re-pour it again, according

to the instructions of the supervising consulting engineer.

19- Cement cubes (biscuits) must be used in all blocks to make a concrete cover for the iron.

21 - In the event of the presence of protrusion in the concrete as a result of defects in the wooden formwork, treatment shall be carried out after referring to the supervising consultant and

carrying out the necessary maintenance, and cracking shall be carried out if necessary.

21 - The lintels are made with a size of 21 x 21


cm, with reinforcement steel 2 ø14 mm at the bottom and 2 ø14 mm at the top, and canopies 5 ø8 mm/m.

cm from every direction. If it exceeds the width of the opening by

21-22 cm, any bridges whose depth is more


than 61 cm, 2 ø10 steel shall be placed in the middle unless otherwise stated in the drawings.

23- The responsible engineer or foreman must be present at the site throughout the pouring period, and the supervising engineer has the right to stop work on

If you do not comply with this.

-24
All concrete uses gabbro stone.

-25 Pour the entrance to the parking area, area 25 m2 (8 mm mesh iron + 21 Newton concrete).

-4 Iron works:

Manufacturing of the entire villa and annexes for the foundation stage 1- The iron used is

epoxy 2- The iron used is of the regular type for the columns and roofs stage (villa + annexes)

5- Building works:

1- Construction will be carried out according to the attached drawings and as directed by the consulting engineer

2- The bricks used are regular vacuum cement with a force of 7 Newtons, automatic, with regular angles and sizes throughout the villa and the annex.
!

With double-sided bitumen insulation and covering with plastic Normal external under bridges and completely filled with concrete 3- Bricks are built

according to the consultant’s instructions.

Neighbor wall with 12mm Slotex. 4- If the neighbor’s buildings are already standing, the contractor must leave a 2 cm gap. 5- The

bricks must be sprayed with water immediately before construction.

6- Government washed sand is used in the brick mixture.

-7 It is not necessary to build more than seven rows in one day, and they must be in the form of horizontal courses

8- Walls that were built for three days should be sprayed twice every day, starting from the day after they were built.

9- The external walls under the ground bridges are filled with concrete (at a rate of 311 kg cement/m3). 11- A grid is placed with

At the horizontal and vertical connections between concrete and buildings in the case of fringe construction. poison a width of no less than 21

-11 When there is a crack in the walls, the void must be filled with concrete, and then a 21 cm wide mesh must be placed over the cracked areas.
Machine Translated by Google

12- The horizontal and vertical seams between the bricks must be unloaded from both sides.

13- Air conditioner bases and water tanks for roofs are made of brick and prepared for waterproofing.

With the size of the base, a layer of concrete of not less than 11-14 cm is made. A base for the main tank is made of bricks only.

-6 Plastering works:

The contractor must do all the plastering work for the entire project (internal and external plastering, including bathrooms and kitchen).

For the entire project (+ plaster work for the fence adjacent to the neighbors in the event that there is no building for the fence. List of neighbors

the rest is 1- Plastering is done for all internal walls, as well as for the roof, with a thickness of 1.5-2.1 cm, provided that

The surfaces are flat and smooth, and if they do not comply with this, plastering will be done according to the consultant’s instructions.
!

Electrical pipe openings Galvanized mesh before starting spraying work when the bricks connect to the concrete and also 2- Air conditioner

pipes and pipes are installed after they are closed.

3- All external facades were made with veneer with a thickness of 3.1-2.1 cm.

4- Plastering is done with cement and sand mortar at a ratio of 351 kg/m3, and fine sand free of impurities is used.

And dust.

5- A splash is made with cement mortar and washed government sand, and the mortar is strongly thrown onto the surfaces without liquefying the mortar.

It is sprayed with water.

6- The eyelet and strings are made before plastering, and the distance between the eyelet and the last must not exceed 151 cm.
!

Mldda Daily - 7 - plaster is sprayed -


One week and all work is handed over to the consultant.

8 - iron corners are placed on prominent walls.

The surface is prepared for insulation, wall corners are made, and coverings are applied if necessary.
-9

-11 Plastering works for the horde bricks for the ceiling

-5 Works of insulating layers:

• Water and thermal insulation of surfaces, as well as entire bathrooms, must be carried out by a specialized company approved by

Consultant , according to the owner’s choice , with a warranty certificate of 11


years. Samples of all materials used in insulation are provided for approval by the consultant.

Specifications

A- The concrete surface is painted with two sides of rubberized bitumen

B- A waterproof layer is made of 3200 Bit Derma (or its equivalent) with a thickness of 4 mm.

T- A layer of thermal insulation 5 cm thick (Extrude Polystyrene) is made.


Machine Translated by Google

Apply cm to the entire surfaces and leave them for two days. After that, the consultant examines the waterproofing by applying water and

submerging it to a height of 21 meters.

C- A separating layer of nylon (Sheet Separation Polythene Gauge 1000) between the thermal insulation and the saccharide.

At least cm with slopes and expansion joints every 9 m2 and filling them H- A layer of ascaride is made with a medium thickness of 7

With plastic material.

-6 Painting works:

• Any cracks in the plaster must be repaired before starting work.

• Dyeing is not done until at least (11) days have passed after the completion of plastering.

The walls and ceilings are cleaned well,


and a sample (color) of the paint is prepared for approval by the owners and consultant.
!

Before starting work. The walls are well bricked •


The surface


of the primer is rubbed with the same type of dye according to the manufacturer’s instructions from the supplier.


The first paste of the same type of dye is made on the face, left to dry, and handed over to the consultant for approval.


Two sides of the paste of the same type of dye are made, left to dry and handed over to the consultant for approval.


The walls and ceilings are then painted first to indicate the areas that need to be adjusted with putty.

The second side is dyed and delivered to the consultant. The consultant has the right to request a third side if the dyeing work is not done

Decent and not at the required level.

• The owner chooses light colors, beige and its shades.

A) Interior dyeing is done with Jotun Fenomasticsilk dyes at a price of 18.1 riyals/m

B) External painting is done with Jotun sand paints Jotashield at a price of 22.1 riyals/m

7-Electrical works:

• The contractor must carry out all the works mentioned in the drawings in accordance with the specifications and regulations of the State of Qatar issued by the Ministry of Electricity.

And water. He must deliver all the work and deliver the electricity card to the owner. The owner is responsible for paying connection fees.

the service

• The main distribution board and sub-boards, MSB and DBS, MEM brand, English - Romanian made.

• The contractor must supply and install the main and secondary electrical breakers according to the drawings (Breaker Circuit or Isolator)

Eaton brand, English-Romanian made.


Cables shall be installed with English specifications, Omani manufacture, or similar, and passed through a plastic duct (PVC) inside the

millimeter building. The diameters of these plastic ducts shall not be less than 51
Machine Translated by Google

• Single Core Cables : The contractor must supply and install individual cables with English specifications, Omani industry, or similar, for

each of the interior lighting, light switches, and sockets, according to the attached drawings and tables at least

The cross-sectional area of any individual cable is less than 2.5 mm2 according to the approved maps.

• Sockets & Switches (The contractor must supply and install all lighting switches and switches

The interior drawings are branded (MK), English made in plastic, after the sample is approved by the owner.

• The contractor must supply and install all lighting switches and external sockets of the insulated and weather-resistant type.

According to the approved maps Y MK brand (must be equipped with protection switches against ground leakage).

• Lighting points (Unit Lights): Lighting bases (Holders) are supplied and installed for the points shown in the drawings for testing and

delivery. The owner must supply the lighting units, and the contractor is responsible for the installation, and the supplying companies are

Chandeliers is responsible for assembly and installation.


Float switches (SWITCH AUTOMATIC) are supplied and installed on all tanks to control the water level.

• Before using electrical work, it must be tested in the presence of the consulting engineer. The engineer may request that the buildings be illuminated for a period of time.

condition of Two consecutive days to ensure the safety of the electrical units. He may ask the contractor to come at night to ensure the working

the lighting and repair the damaged ones.

• Air conditioners:

1- Air conditioning units are supplied and installed by the owner.

2- The contractor must do the following:

- Making rooftop air conditioner bases and their electrical connections.

- Extending empty pipes for cooling pipes and electrical cables and connecting them to air conditioning units.

- Connecting electricity service to air conditioners (switches, etc.), up to a sub-junction, provided that it is of the resistant metal type.

We supply these breakers to weather conditions.

- Extending the air conditioner water drainage pipes until they are connected to the nearest place for drainage. These pipes are buried and not

phenomenon.

• Heaters: A separate heater system is supplied and installed for each bathroom and kitchen. The heater price is not less than 411 riyals.

• Suction fans: Japanese suction fans for bathrooms, size 8", Sinar brand or equivalent , are supplied and installed.

Iron suction cup for kitchen, size 12", price is 251 riyals

-8 Sanitation works:

The contractor supplies and installs underground sanitation works outside the building using diagonal PVC pipes and specifications, and the works are
! !

To national specifications. According to the attached drawings carried out in accordance with
English or equivalent
Machine Translated by Google

• The contractor must supply and install all internal and external sanitation pipes from 6-4-3-2 Angle (CVP) for kitchens
!

for surface. with And bathrooms too


rainwater drainage pipes

• Horizontal drainage pipes between manholes with a diameter of 6” shall be underground according to the proportions shown in the drawings.

According to the table in the attached drawings.


The connections between the pipes are made of Qatari-made PVC.

• MANHOLES All inspection rooms shown in the drawings shall be implemented in the same numbers and manner

And sizes.


Manhole covers are supplied and installed according to British specifications, of the Duty Light type and Heavy covers are supplied

Duty cars.

• Bathroom drainage manhole, made of plastic, size 21*21



The contractor must test all sanitary works in the presence of the consulting engineer by passing water through all the tools.

Sanitary connections, observations of water flow in pipes, as well as testing the method of installing pipes and sanitary tools. The

contractor must repair any work that the consulting engineer deems below the required level.

9- Water supply works:



All water pipes are supplied and installed according to the diameters and dimensions shown in the drawings, made of German-made PPR

plastic, Banninger brand, or similar, for the internal and external network, with insulating work for the external network.

• All elbows and connections are made of the same type of pipes and have points in the yard.

The numbers and capacity shown in the drawings, provided that they are placed on a concrete base (the company • Water tanks are according to

the tanks supplied according to the owner’s choice)

The numbers shown in the drawings are industrial• PUMP WATER: European water pumps are supplied and installed according

to the owner’s choice.

• The contractor must provide samples of all internal and external pipes for approval by the consultant before installation.


A water pressure test for the pipes is conducted at an equivalent of 11 bar per hour for 48 hours and is handed over to the supervising engineer.

-11 Health works:



All sanitary works, including water supply and sewage, are carried out according to the instructions, specifications and regulations issued.

From both the Ministry of Electricity and Water and the Ministry of Works (Sewage Department)


The contractor submits detailed drawings of all sanitary installation works for approval from the consulting engineer before

Start working.
Machine Translated by Google


Full coordination with the building’s structural, architectural and electrical needs must be taken into account and explained

With detailed drawings.

• The contractor must submit models of any materials that will be used in the project for approval before supply.

• The value of bathroom sets with accessories is 3111.1 riyals per bathroom.

• The value of the kitchen sinks with marble for the sink is not less than 1,111 riyals

-11 Tiling works:



Supplying porcelain flooring for rooms, corridors, and hall at a price of 61 riyals per square meter, including slippers of the same type of porcelain.

The owner chooses the sample from one or more suppliers, and the supplier or contractor undertakes to deliver the materials to the site and

deliver them to the supervising engineer.


Supplying floors and walls for bathrooms and kitchens at a price of 51 riyals per square meter.


Supplying courtyard flooring at a price of 41 riyals per square meter. 21 Newton concrete slabs are made, reinforced with 6 mm iron

mesh and only 11 cm thick, in the parking lots with an area of 21 square meters.

• The price includes installation of ceilings and internal walls with a maximum size of 61*121 in the event of supplying larger sizes.

An additional installation fee will be charged according to the measurement.


Floors are installed using a mortar resulting from mixing washed sand and Portland cement, manufactured by Qatar Company.

The walls are installed using local tile adhesive, and grout is made for the floors and walls as well, a local industry.

• Plastic corners are also used for the corners and edges, and they are the same color as the tiles.


Yes. The amount of plastering for walls with a maximum height

of 3.5 m is calculated - 12 Marble, granite, tile and natural stone works:



Supplying granite for the staircase of the main entrance and the external lounge of the villa, with a skirting board of the same type of granite, at a price

of 151 riyals per square metre. Installation is by the contractor.


Supplying marble for the internal staircase with slippers and rests. Supply at a price of 151 riyals per linear meter (ready-made staircase).

Installation by the contractor.

• The price of slippers is calculated from the total linear meters of the stairs.

-11 Carpentry works:

• The contractor must supply and install all interior doors, such as solid and frame, and the price of one door is 1,811 riyals, including

decoration, paints, and locks.


Machine Translated by Google

! !

From cracks and deformations Of the knots completely dry and free Types of wood to be free The finest and fractions

should be used.

• The contractor must deliver the door carpentry work to the consultant without any deficiency, such as sanding, dyeing, putty, etc., and he has the right to

The consultant may reject any work below the required level.

-14 uPVC works:



Supply and installation of uPVC window works, section width 7 cm, with 6 mm reflective glass (Double) according to the owner’s choice, at

a price of 471 riyals per square meter.

• Window and glass samples and sections are approved by the consultant and the owner

• Window and lock accessories, German manufacture.


Supply and installation of external kitchen doors, rooftop door, and back villa door. Installation of uPVC at a price of 1,211 riyals per door.

-15 Decoration works:

The ceilings of the halls and the master room, a false ceiling, 2 levels, at a price of no less than 111 riyals + - Making all cm

at a price not less than 15 riyals per linear meterCornice

15 - Making false ceilings for bathrooms and kitchens, 1 level, of the Solitex type, at a price of no

less than 81 riyals / m2


Not less than 81 riyals - Making a false ceiling for all the remaining ceilings in the project, 1 level, at a price + a

cornice at a price of no less than 15 riyals / linear meter. The owner chooses light colors, beige and its shades.

-16 Iron works:


Supply and installation of fence doors for individuals according to the owner’s choice, with a total price of 711 riyals/m2 •

Supply and installation of the car entrance door at a price of 711 riyals/m2. •

Supply and installation of the villa entrance door at a price of 711 riyals/m2 •


Supply and installation of internal staircase handrails at a price of 711 riyals per linear meter

You might also like