Professional Documents
Culture Documents
1. AutoCAD
2. Google Earth
Basemap Checking
wrong formatting
Check the street name based on the cluster from Google Earth or Google Maps, then add it to the drawing.
Used Layers
1. Basic Map
2. Bizz Pass
3. Distance
4. Drop Wire
5. End Box
6. FAT ID
7. Home Pass
8. Hub Box
9. Precon (5m, 50m, 80m, 100m, 150m, 200m,
250, 300m)
10. Pole ID
11. Sling Wire
12. Sub Box
13. Uncovered Home pass
Add the Drop Wires for Each Home Pass
Prioritize to cover 8 home pass first for every FAT (Sub box/End box). If Put the drop wire on the middle
not possible, you can cover below 8 home pass. node of the house number
4
`
5
3 4
2 4 1 2 3 2
1 3
1
`
8 7 6 8 7 6 5
5 8 7 6
Put the drop wires in the center of the pole
Drop Wires Concern
1. FAT can cover home pass up to 120m as long 2. Last pole can only cover home pass up to 35m
as there are poles in between
Can be covered
Drop Wires Concern
3. Add sling wire to the extension pole if there is no precon cable in between to
extend the coverage
Maximizing each line with 4 FAT Count the FAT and determine the FDT’s coverage
2
1
16 FAT
2 (4 line)
1
Even number
of hub box
3 output
4
You can fill the link budget template parallel while adding the precon cable on your
design
After you add the cable span, draw the precon cable on your design
Add the Pole ID and FDT’s Coordinate
Add the Pole ID based on FAT’s sequences Add the coordinate using Google Maps
Pole ID format: XA
Add the Legend to the Drawing
Subbox/Endbox
Homepass
Homepass + Bizzpass
Thank you. Bring digital to every person, home and
organization for a fully connected,
intelligent world.