You are on page 1of 18

As Plan Drawing (APD) Guideline

Department name: Delivery Management Department


Author’s name: Dhimas Adi Nur Fauzi (84324680)
Date: 27 Nov 2023

Security Level: Internal Only


Tools for Making APD

1. AutoCAD

2. Google Earth
Basemap Checking

Good Basemap, Ready to Go Need to Retouch the Basemap

wrong formatting

House Number formatting: NN?-X and Ruko?-X


Remove the Unnecessary Home Pass

Remove or ignore the unnecessary home pass that might be uncovered.


Separate the uncovered home pass to another layer.
Add Street Name

Check the street name based on the cluster from Google Earth or Google Maps, then add it to the drawing.
Used Layers

1. Basic Map
2. Bizz Pass
3. Distance
4. Drop Wire
5. End Box
6. FAT ID
7. Home Pass
8. Hub Box
9. Precon (5m, 50m, 80m, 100m, 150m, 200m,
250, 300m)
10. Pole ID
11. Sling Wire
12. Sub Box
13. Uncovered Home pass
Add the Drop Wires for Each Home Pass

Prioritize to cover 8 home pass first for every FAT (Sub box/End box). If Put the drop wire on the middle
not possible, you can cover below 8 home pass. node of the house number

4
`
5
3 4
2 4 1 2 3 2
1 3

1
`

8 7 6 8 7 6 5
5 8 7 6
Put the drop wires in the center of the pole
Drop Wires Concern

1. FAT can cover home pass up to 120m as long 2. Last pole can only cover home pass up to 35m
as there are poles in between

More than 35m

Total 74m Uncovered

Can be covered
Drop Wires Concern
3. Add sling wire to the extension pole if there is no precon cable in between to
extend the coverage

Add sling wire to the extension pole


Drop Wires Concern
4. One Pole can be installed with 2 equipment (Hub box + Sub box or 2 Sub box)

2 FAT on the same pole

FAT and FDT on the same


pole
Count the FAT and Deterime the FDT’s Coverage

Maximizing each line with 4 FAT Count the FAT and determine the FDT’s coverage

2
1
16 FAT
2 (4 line)
1
Even number
of hub box
3 output
4

1. Maximize each line with 4 FAT (3 Sub box + 1 End box)


2. Make sure the FDT’s coverage is above 50 home pass
3. Make the Hub box output with even number of lines if possible
Add the FATs and FAT ID

FAT ID format: FXXXXXD0XS0XA0X


D0X → Urutan FDT (Hub box)
S0X → Nomor Splitter
S01: Line A-B
S02: Line C-D
S03: Line E-F
S04: Line G-H
Example:
FXXXXXD02S01A04
FXXXXXD01S02D01
Determine the FDT’s Position and Add the Precon Cables

Precon Cable Lists:


- Precon 5m
- Precon 50m
- Precon 80m
- Precon 100m
- Precon 150m
- Precon 200m
- Precon 250m
FDT position - Precon 300m
Add 10m tolerance when adding the
precon cable.
Example: 41m FAT distance use precon
Use Precon 80m 80m

FDT ID formatting: FXXXXXD0X


Example: FXXXXXD02 Urutan FDT (Hub box)
Fill the Link Budget Template

You can fill the link budget template parallel while adding the precon cable on your
design

You can also add the


Home pass covered
closure if the distance is
more than 300m
Closure Fill the total distance between FAT

After you add the cable span, draw the precon cable on your design
Add the Pole ID and FDT’s Coordinate

Add the Pole ID FDT’s Coordinate must in decimal format

Add the Pole ID based on FAT’s sequences Add the coordinate using Google Maps
Pole ID format: XA
Add the Legend to the Drawing

Use MVIEW based


on FDT’s coverage

Copy Paste from Link


Budget Template
Fulfill the Legend

Fill the XL ID based on


permit approve

Cluster name Add all the available XL IDs

Subbox/Endbox

Total Pole Total kabel masing-


masing line
Koordinat FDT

Homepass

Ruko, Sekolah, Kantor, dll.

Homepass + Bizzpass
Thank you. Bring digital to every person, home and
organization for a fully connected,
intelligent world.

Copyright©2018 Huawei Technologies Co., Ltd.


All Rights Reserved.

The information in this document may contain predictive


statements including, without limitation, statements regarding
the future financial and operating results, future product
portfolio, new technology, etc. There are a number of factors that
could cause actual results and developments to differ materially
from those expressed or implied in the predictive statements.
Therefore, such information is provided for reference purpose
only and constitutes neither an offer nor an acceptance. Huawei
may change the information at any time without notice.

You might also like