Case Study For MSBP
Case Study For MSBP
Tracer studies are a useful instrument for quality management and allow higher education institutions
to peak into the black box of the whereabouts of their graduates. It can also provide the information,
which indicates the outcome of its education and shows its strengths and weaknesses. Tracer studies
can, therefore, be used for evaluation purposes and as guidance for future planning. To implement an
own tracer study, it is recommended to have a team, which is experienced in questionnaire design,
masters empirical research methods and is knowledgeable in statistical analysis. In addition, you
might also need several (student) assistants for questionnaire dissemination and digitalization.
Besides preparing and launching the survey in the field, it is important to think through the follow-up
phase after the survey results are available: what is being reported and how? How are the results
spread into the faculties and departments? How to encourage actions which are taken from the
results? Our following exemplary PAP concentrates only on the conception of the survey leaving the
other phases of a tracer study out.
Task A: Conception of a survey for Tracer Study
After assessing the requirements for the plan you determine four major deliverables:
• Conception
• Design the survey inclusing layout and contents
• Test the survey
• Prepare for dispatch
1. For each deliverable, you divide the work into separate work packages. Each work package
has its own owner, duration, and details. The work package associated with your deliverables
include:
• Conception: define the objectives and themes of the survey, set the survey methods (online
survey or paper based survey), define the target graduates.
• Survey design: analyse relevant literature and research, clarify software and hardware
requirements, design the survey, discuss draft with relevant stakeholders.
• Survey testing: Review the survey, test the survey
• Dispatch: check and clarify private data protection rules, acquire the addresses (email address),
check the update the addresses, prepare invitaion letter, prepare for sending out.
2. To finish these work packages, there are some resources are required. The resouces involved
in each work package include
• define the objectives and themes of the survey (project team, stakeholders)
• set the survey methods (project team, material)
• define the target graduates (project team, stakeholders)
• analyse relevant literature and research (project team, material)
• clarify software and hardware requirements (project team, technical support for software and
hardware)
• design the survey (project team, tools, material).
• discuss draft with relevant stakeholders.(project team, stakeholders)
• Review the survey (project team)
• Test the survey (include pre test) (project team, material, groups of students who are invited for
the pre test)
• check and clarify private data protection rules (project team)
• acquire the addresses (project team)
• check the update the addresses, prepare invitaion letter, prepare for sending out (project team,
student assistants).
Deliverables/Workage Resources Description of strengths
Define the objectives and (project team, stakeholders)
themes of the survey
Set the survey methods (project team, material)
5. Communication management
Most if not all of the communications on quality issues will take place over e-mail, call
conferences and telephone.
The project team will maintain a schedule of monthly meetings to update the project status and
discuss potential issues. All workgroup members, subgroup members, project owners and other
who have expressed interest are included in the CC list for meeting agendas and meeting notes.
If a particular meeting is not needed, it will be cancelled. The workgroup maintains a Basecamp
web site for collaborative work. This site is accessible only to authorized users. Additional or
alternate workgroup collaborative work sites will be considered if the need arises.
6. Quality management
Project manager has to guarantee the quality of the works to be done along the project as well as
focused on managing the quality of the project’s deliverables and the overal project result.
No Deliverables Quality Planning
Literature review What?
Research Lquan đến topic
Các pp, Theory
Điểm yếu/mạnh/kết quả của previous
researches
Tính cấp thiết trong bài project of bạn
How?
Choose appropriate Keywords
Read the research
Summarize, analyze the research
Delivarables
CSR