Engineer/ Contractor/

Nadzorni organ: Izvođač:

Modernization and Reconstruction of the Hungarian-Serbian railway line in the territory of the Republic of Serbia, section Novi Sad – Subotica
Modernizacija i rekonstrukcija mađarsko-srpske železničke pruge na teritoriji Republike Srbije, deonica Novi Sad – Subotica

MATERIAL APPROVAL REQUEST (MAR) No./Br.


(ZAHTEV ZA ODOBRENJE MATERIJALA) NSSU-S1-SUB-MAR-001

Contractor is submitting request for approval of following materials /


Izvođač dostavlja zahtev za odobrenje za sledeće materijale:

Material / Materijal:

Material Use / Korišćenje materijala:

The material complies with technical


conditions / Materijal je u skladu sa
tehničkim uslovima:

Enclosures / Prilozi:

Signed for Contractor / Overava za Izvođača: Position / Pozicija: Date / Datum:

The above materials are / Gore navedeni materijali su:

Approved / Approved with corrections / Returned for corrections /


A B C
Odobreni Odobreni uz korekcije Vraćeni na ispravku

Comments / Komentari:

Signed for Engineer / Overava za Nadzor: Position / Pozicija: Date / Datum: