You are on page 1of 1

Contractor / Izvođač:

Contract No. / Ugovor br.: Project / Projekat:


Powerchina International Group Ltd. Ogranak Beograd
Subcontractor / Podizvođač
Construction of the New Bridge over the Sava River on the
location of the Old Sava Bridge in Belgrade /
119-01-00984/2/2019-07
Engineer / Inženjer: Projekat izgradnje Novog Mosta preko Save na mestu
starog savskog mosta u Beogradu

NOTICE OF COMMENCEMENT OF WORKS (NCW) No./Br.: PC(BB)/SC/NSB/NCW-001


OBAVEŠTENJE O POČETKU RADOVA

(I) By Contractor / Popunjava Izvođač


Fallowing works commence on / date / time /
__.__.2023. 8:00
Sledeći radovi započeti su: datum vreme
Works Item / Pozicija radova:

Location / Lokacija:

Type of works / Vrsta radova:

By issuing this notification we confirm that the fallowing documents associated with these works shall have been approved by the Engineer and foregoing
works inspected by the Engineer prior to commencing the subject works /
Ovom prijavom potvrđujemo da su sledeća dokumenta vezana za ove radove odobrena od strane Inženjera i da su prethodni radovi pregledani od strane
Inženjera pre početka navedenih radova
Document Reference / Date Approved /
Document / Dokument
Oznaka dokumenta Datum odobrenja

Quality Assurance Plan / Plan osiguranja kvaliteta

Method Statement / Metodologija radova

Construction Drawings / Crteži

Material Approval Request (MAR) / Zahtev za odobrenje materijala (ZOM)

Signed for Subcontractor: Position: Date:


Overava za Podizvođača: Pozicija: Datum:

Signed for Contractor: Position: Date:


Overava za Izvođača: Pozicija: Datum:

Received by Engineer: Position: Date:


Primio za Inženjera: Pozicija: Datum:

(II) By Engineer / Popunjava Inženjer


The above referenced commencement of works is:
Gore navedeni početak radova se:
Approved / Approved with Comments / Not approved /
A Odobrava
B Odobrava sa komentarima
C
Ne odobrava
Comments:
Komentari:

Signed for Engineer: Position: Date:


Overava za Inženjera: Pozicija: Datum: