You are on page 1of 16

http://paxenergy-kpinter.

com

English ver. 1.0


@copyright 2023

1
Email : info@paxenergy-kpinter.com
Our Profile : Our Motto :
PT. Pax Energy Indonesia - PT. Kami Plant Internasional,
Joint Operation (JO/ KSO) Project is a combination of “We Think Fastest And Are Determined Together To
two companies that are committed to working on a Move and Develop Technology Not Just Ordinary Solar
project that has been mutually agreed with the Power Plants”
division of tasks for each, namely the project: EPC of a
Solar Power Plant with a capacity of 5 Megawatts and “Kami Berpikir Sangat Cepat Dan Bertekad Bersama
supported by Batteries (ESS) with 5 Megawatt capacity Untuk Memindahkan Dan Mengembangkan Teknologi
in the Jorong Industrial Area, Tanah Laut Regency, Bukan Sekedar Pembangkit Listrik Tenaga Surya Biasa”
South Kalimantan Province, Indonesia.

PT. PAX Energy Indonesia Vision


PT. Pax Energy Indonesia is a company engaged in • Building a strong and reliable work team that is
the power generation business as a private EPC and highly committed to carrying out EPC work for Solar
IPP contractor, originating from South Korea and is an Power Plants
FDI company in Indonesia with the original company • Providing comfort for Employers and Investors in
being PAX Co. Ltd and has experience in this field investing.
since 2016. • Prosperity of all stake holders involved in the work.

PT. Kami Plant Indonesia Mision


PT. Kami Plant Internasional, are a company engaged "We focus on developing a business that will make
in the Power Plant construction business and in this everyone enjoy our rich results, For realizing clean and
operational cooperation agreement are EPC environmentally friendly energy and we will be a
contractor partners originating from local Indonesian. company that leads wherever we make it happen"

http://paxenergy-kpinter.com
PROJECT
DIRECTOR
KIM SUNG DAE
CEO / CHAIRMAN
PT. PAX ENERGY
INDONESIA PAX Co. Ltd
Brief Of Company PT. PAX Energy Indonesia
Mr. Kim Sung Dae, He is was born in
PAX CO. LTD is a company that is consistently engaged in the
Seoul, Republic of Korea, in the year
energy business, especially in solar power plants and mini
hydropower plants . 1969 – 24 March is a hard worker
who continues to study in the field of
Pax Co.Ltd through its FDI company, namely PT. Pax Energy law continues his education until
Indonesia, which has experience, will be the lead company in this now.
project in accordance with the cooperation agreement with PT.
We are Plant International, armed with sufficient working capital Armed with long experience since
and mastery in the field of solar power generation technology. It is building its business starting from
hoped that PT. Pax Energy Indonesia can carry out the EPC plant 2016, the PAX company continues to
work and successfully carry out technology transfer. expand its business abroad and is
Company Establish now present in Indonesia to continue
to build businesses and partnerships
Notary Register : -08-, Tanggal 19 – 09 - 2023 in the energy business and various
Notary Public : Nevi Sri Enjili, Sh. Mkn other business opportunities under
Business Reg. Number : 2009230030949 the company name PT. PAX Energy
Tax Registration Number : 50.422.048.4-013.00 Indonesia which is a foreign investor
company from the origin of PAX Co.
Business Lines : PLTS – EPC By Contract
Ltd of the Republic Of Korea.
Acoount Number : (IDR) 039301001804309
Swift Code : BRINIDJA
Bank And Branch : Bank Rakyat Indonesia (BRI)/ Bintaro

http://pax-energy-Indonesia.com
Email : info@paxenergy-kpinter.com
OPERATION
MANAGER

GUNAWAN

PT. KAMI PLANT


Brief Of Company INTERNASIONAL
PT. KAMI PLANT INTERNASIONAL are a company that operates in the Mr. Gunawan, He is was born in
energy and construction sector, especially in the construction of Bandung Of West java, Republic of
solar power plants which focuses on infrastructure development Indonesia, in the year 1973 – 04 February
work and construction of the structures needed for the is a hard worker who Results oriented,
construction of a plant. . Financial Professional and relationship
for the consumer loan with 17 years
PT. Kami Plant internasional, will committed to carrying out the experience in financial analysis,
work of PT. Pax Energy Indonesia, especially in the field of basic analytical capability, personnel
infrastructure preparation and construction work on the development, business judgment and
construction of a solar power plant with a capacity of 5 hard working with strong leadership
megawatts with the 5 megawatt ESS which will be carried out skills.
together for a period of 1 full year in accordance with the work
contract obtained by PT. Pax Energy Indonesia or PAX Co. Ltd. CONSTRUCTION
Company Establish MANAGER
Notary Register : -04-, Tanggal 29-08-2023 KRISANTO
Notary Public : Nurul Larasati, S.H.
PT. KAMI PLANT
Business Reg. Number : 1309220003917
INTERNASIONAL
Tax Registration Number : 60.910.699.2-015.000
Mr. Krisanto, He is was born in Lampung,
Business Area : Local Partner For Construction PLTS Republic of Indonesia, in the year 1986 –
Acoount Number : (IDR) 039301001813308 01 Nopember is a hard worker who
Swift Code : BRINIDJA continues to study in the field of
engineering design and civil structure. I
Bank And Branch : Bank Rakyat Indonesia (BRI)/ Bintaro Have 7 year experience in consultant
engineering.

http://kpinter.co.id
Email : info@kpinter.co.id
SUMMARY JOIN OPERATION PROJECT

Project Model : EPC And Transfer Technology (Investment Project)


Project Name : EPC Solar PV Power Plant 5 MW + ESS 5 MW
(Gloowing Energy Project)
No. Project : 30005-MIP-KIJ-10-2023-1
Project Owner : PT. Mustika Inti Property
Power Plant Status : Power Consumption By Own In Land Authority Distribution

Contarctor : PAX Co. Ltd


Field Contractor : PT. PAX Energy Indonesia – PT. Kami Plant Internasional, JO Project
Project Location : Industrial Estate Of Jorong, Tanah Laut Regency
South Of Kalimantan Province, Republic Of Indonesia
Project Schedule : 1 October 2023 – 30 September 2024 (365 Day/ 12 Month/ Year)
Pre Setup : 1 Agustus 2023 – 30 September 2023 (60 Day/ 2 Month)
Project Value : Rp. 168.000.000.000,- (Seratus Enam Puluh Delapan Milyar Rupiah)
Equivalent USD 11.200.000,

Notary JO Company Register : -04-, Tanggal 27 September 2023


Public Notary In Charge : Nevi Sri Enjli, SH, Mkn
Tax Number JO Project : 50.503.832.3-013.000
Bank Account JO Project : BRI (Bank Rakyat Indonesia)
Number Account : 039301001822307 (IDR)
Branch : Bintaro-Tangerang Selatan
Swift Code : BRINIDJA

Email : info@paxenergy-kpinter.com
PT. PAX ENERGY
INDONESIA
Leading Company Job Sheet Local Partner Job Sheet
Job Sheet Technology And Special Equipment Handler : Job Sheet Partner Local And EPC Handling Desk :

• Working Capital Support (Legal, Operation And Purchase) • Operation Site Management Office And Drection Keet
• Advisor For Leading Company Person In Charge On Project • Operation Jakarta Office
• Technical Specification By Engineering Assist • Site Acuisition (Land Rent And Legal / Administration Of Land)
• Basic Drawing Consolidation And Parameter • Legal & Permit Handling- Administration
• Detail Engineering Desain Consolidation And Parameter • Material Local And Equipment Local Handling
• Survey, Monitoring And Control Progress And Deviation Work • Office, Warehouse, Site Office, Mess And Other Property Service And
• QS And QC Product/ Equipment/ Material Sheet And Declairation Special Handler
• Sales And Purchase Special Material Product Import And Equipment • Manual And Web Report Program Design And Application Handling
Product Import • Execution Tax Payment And Report (PPN And PPH)
• Maker Manual Book Application For Operation And Maintenace Service ( • Warehaouse Logistic Handling
Text And Drawing) Indonesia English Version • Worker Handling (Procuerment/ HRD And Site Permit Handling)
• Hardware And Software For System Monitoring And Control • Engineering Handling (Making Surveyor/ Basic/ DED/ Drawing And BoQ)
• Trainer For Controling, Operation And Maintenance- Technical Supervisor • Procuerment Local Handling (Jakarta And Jorong Office)
For Instalatir Work And Equipment Procedure • Planning And Scheduling Handling & Assist (All Project Activity)
• Backup Data Sheet For All Activity Sertification Engineering Design, • Construction Handling (All Construction Work)
Function And Technology • Supervision Handling (Consolidation And Reporting With Term And
• Product Guarantee And Warranty Condition)
• Reporting Handling And Assist Progress (Daily Report/ Weekly Report/
Monthly Report)
• Bank Facility And Credit Line For LC Purchase Assist (If Needed)
• IT Web Base And Server Cloud Facilities Monitoring And Report Handling
Service (Special Job Handling ERP Program)
• Partnership For Project Supporting Handler (Insurance Broker
• Banker - Consultant - Law Firm - Auditor - Accountant)

Email : info@paxenergy-kpinter.com
Team Project Support By Owner
PT. PAX ENERGY
INDONESIA Mr. Lee Seong yeop
Team Project PAX Co. Ltd Served as Project Manager who will help PT.
Pax Energy Indonesia in carrying out its
Technical Team Support in Korea to handle some of the duties for EPC work for the construction of
work required (Maximum 2 Person): the 5 Megawatt Solar Power Plant and 5
• Prepare detailed technical specifications for the Megawatt ESS which will be built in the
generator related to the use of solar power generation Jorong Industrial Area, Tanah Laut Regency,
technology and the energy storage system that will be South Kalimantan Province, Indonesia.
used, including the manual book.
• Preparing software and hardware systems (BMS - EMS) This assignment is in order to facilitate
required for operating the power plant with English and communication between PAX Co. Ltd.
Indonesian language modules. Korea with local employers and
implementers who regularly collaborate in
Team Project PT PAX Energy Indonesia project implementation.
Mr Kim Sung Dae as CEO of the company will lead directly
assisted by his senior engineer, namely Mr. Kim and the Mr. Ahn Hong Rim
project owner also agreed that the project support team Served as Senior Engineering and QC
would be assigned personally to help PT. Pax Energy Manager who will assist the Project
Indonesia carries out the work, namely Mr. Lee Seong Manager and PT. Pax Energy Indonesia in
Yeop and Mr. Ahn Hong Rim, for the following assignments; carrying out its duties for EPC work for the
1. Mr. Kim Sung Dae as Project Director who directly leads construction of the 5 Megawatt Solar Power
the project. Plant and 5 Megawatt ESS which will be built
2. Mr. Lee Seong Yeop as Project Manager who will in the Jorong Industrial Area, Tanah Laut
manage the project. Regency, South Kalimantan Province,
3. Mr. Ahn Hong RIm as senior engineering and QC Indonesia.
Manager who will assist with the Project Manager's
duties. This assignment is in order to facilitate
4. Mr. Kim as Senior Engineering who will assist with communication between Foreign Work
engineering applications in carrying out work. Implementers (Korean) and Local Work
Implementers (Indonesian) who collaborate
in project implementation.

Email : info@paxenergy-kpinter.com
Team Project Support By Owner
Rosada Lukman
As a financial lines officer and manager
Team Operasional Project consultant who is ready to commit and
assist the company in controlling the
Technical Team Support in Korea to handle some of the project's financial strategy until it is
work required (Maximum 2 Person): declared complete.
• Prepare detailed technical specifications for the The person concerned is personally
generator related to the use of solar power generation assigned by the project owner to be able to
technology and the energy storage system that will be provide project financial direction and
used, including the manual book. control the project cash flow design until the
project is declared handover.
Team Engineering Project Hadi Siswantoro
Technical Team Support in Korea to handle some of the Served as QS & Project Contol Manager
work required (Maximum 2 Person): who will help PT. Pax Energy Indonesia in
• Prepare detailed technical specifications for the carrying out its duties for EPC work for the
generator related to the use of solar power generation construction of the 5 Megawatt Solar Power
technology and the energy storage system that will be Plant and 5 Megawatt ESS which will be built
used, including the manual book. in the Jorong Industrial Area, Tanah Laut
Regency, South Kalimantan Province,
Team General Support Project Indonesia.
Surawijaya
Technical Team Support in Korea to handle some of the
Served as Senior Engineering who will help
work required (Maximum 2 Person):
PT. Pax Energy Indonesia – PT. Kami Plant
• Prepare detailed technical specifications for the
Internasional, JO Project in carrying out its
generator related to the use of solar power generation
duties for EPC work for the construction of
technology and the energy storage system that will be
the 5 Megawatt Solar Power Plant and 5
used, including the manual book.
Megawatt ESS which will be built in the
Jorong Industrial Area, Tanah Laut Regency,
South Kalimantan Province, Indonesia.

Email : info@paxenergy-kpinter.com
Team Project (Construction And Operation)

Personal Key Team Join Operation Project

Kim Sung Dae


As Project Director Team Project Team Operation Team Local Support
Lee Seong Yeop
As Project Manager 1. Krisanto 1. Roy Suyadian 1. Helper (Lokal)
2. Dendy 2. Gunawan 2. Helper (Lokal)
Ahn Hong Rim 3. Kim 3. Hafizh Furqan 3. Security 1 (Lokal)
As Senior Engineering & QC Manager 4. Dedy 4. Aufa Akhmadi 4. Security 2 (Lokal)
5. Nana G 5. Hernitasari Indah 5. Security 3 (Lokal)
Rosada Lukman 6. Agus 6. Asto 6. Security 1 (Lokal)
As Finacial Lines & Consultant Manager 7. Dedy 7. Ginting 7. Security 2 (Lokal)
Surawijaya 8. Hasby 8. Annisa Puspa 8. Driver 1 (Lokal)
9. Ginting 9. Security Warehouse JKT 9. Dirver 2 (Lokal)
As Senior Electrical Engineering Manager 10.HSE (Lokal) 10.Office Boy (Lokal Jkt)
Hadi Siswantoro 11.Driver (Office JKT)
As Project Control Manager

Email : info@paxenergy-kpinter.com
Structure Organization Chart

Project Financial Lines &


Project Organization Director Consultant Advisor

Project
Manager Assisten PM Project Cost
& QC Control & QS Control
Operation Construction
Manager Manager
Humas Safety
Manager

Admin Project EPC Purchasing Engineering Supervisi PARTNERS

Civil ME & Plant Field Drawing &


Project Project Engineer Estimator

• Administration • Project • Plant management • Domestic • Design • Cert • External R&D partnership
• General Affair management • Construction management Purchasing • Manufacturing management • Outsourcing partners
• HR & Legal • Procuerment • Corporate CSR • Material • Build • Production
• Accounting management • Management Report Management • Insta/ Connection quality
• Security • Material Resourcing • Test & inspection
• Helper & OB Commisioning • After service
• Driver • Sertification

Outsourcing Partners

PV Structure Battery cell


Engineering Construction Solar PV PCS, Inverter &
&
Software Energy&Backup
Instalation
Time Line Project Of 12 Month

PT. PAX Energy Indonesia – PT. KPInter, JO Project

PROJECT PLTS MIP 5 MW + ESS 5 MW Jorong


General Job Sheet Scope EPC Project
Preparation Work Engineering Work Procuerment And Construction Work

1. Project Analisys 1. Schedule Work


2. Bisnis Matching 2. Survey
3. Project Setup 3. Boring And Sondir
4. Agreement Test
Setup 4. Basic Design
5. Schedule Setup 5. Detail Design
6. Working Capital 6. Technical
Setup Specification
7. Legal Company 7. Material
Setup Specification
8. Survey Project 8. Technology And IT
Location Software
9. Legal Project 9. Construction
Setup Aplication Term
10. Team Work 10. Technical Structure
Setup 11. Earth Work
12. BMS And EMS Setup
13. BoQ
14. Action Plan
15. Training And Manual
Book
16. Test And
Commisioning
Schedule

Email : info@paxenergy-kpinter.com
Tax Registration And Notary Register Doc

Email : info@paxenergy-kpinter.com
SERTIFICATION OF COMPANY

Email : info@paxenergy-kpinter.com
CONTACT US

Office Jakarta Office Site & Warehouse Jorong


Plaza Aminta Building Location Project Jorong Industrial Estate
7th Floor, Suite 701 Tanah Laut, South Kalimantan, Indonesia
TB. Simatupang Street
Telp. : +6285186867118
Kav. 10, Jakarta 12310
Email : admin@paxenergy-kpinter.com
Website : http://paxenergy-kpinter.com
Warehouse Jakarta
Rukan Taman Tekno BSD
Blok F, Tangerang Selatan
Bamten - Indonesia

Partner Broker’s
Insurance

Email : info@paxenergy-kpinter.com
Address :
Plaza Aminta Building, 7th Floor, Suite 701
TB. Simatupang Street, Kav. 10, Pondok Pinang Jakarta 12310,
Indonesia.
English ver. 1.0
Email : info@paxenergy-kpinter.com @copyright 2023

http://paxenergy-kpinter.com
16