MAINTENANCE SAND STORAGE

ROOM WAREHOUSE
Luas Area 52 m ² Luas Area 61 m ²

PEST CONTROL

APAR

INCOMING
AREA

CT

APAR

LASER QC AND
MARKING
INDUSTRY WASTE STORAGE
COMPRESSOR
BBT

BBT
BBT

BBT
Luas Area 14 m ²

PLASMA
FINISHGOODS ROOM
SEMI FINISHGOODS

Luas Area 28 m ²
MACHINING CT
CUTTING
TRANSIT
AREA
WORKING REJECT
ROOM PEST CONTROL SAND STORAGE
BENCH
AREA AREA Luas Area 28 m ²
Luas Area 28 m ²
WAREHOUSE

GRINDER
Luas Area 43 m ² WAREHOUSE
Luas Area 57 m ²
IMPLANT

Luas Area 28 m ² COMPRESSOR


MUSHOLLA MIL
L
MIL
L PEST CONTROL
PEST CONTROL
4830
Luas Area 24 m ² FINISHGOODS
AREA

TOILET AC AC AC
DEHUMIDIFIER DEHUMIDIFIER DEHUMIDIFIER PEST CONTROL

BENCH BENCH
U-5 U-5.1
BAR FEEDER

MIRROR BENCH GRINDER DRILL


POLISHING GRINDER
ARGON
WELDING
12220 SAND
DUST
COLLECTOR
SLURRY SAND FLOATING SLURRY
APAR SHOWERING
D.3
C.3 D.2
7850
DRYING ROOM C.2
Luas Area 96 m ²
DIPPING ROOM
GUNBLAST

APAR
J.1
OPEN SAND C.1
Luas Area 93 m ²
SWISSTYPE

SHOWERING
DUST
COLLECTOR SLURRY
HYDRAULIC

DRYING
PRESS

WAREHOUSE D.1
BELT SANDER

Luas Area 53 m ²
HYDRAULIC

L.2

FINISHING
PRESS

M.1
EVAPORATOR

Luas Area 226 m ²


PEST CONTROL

TOOL MAKING
WHEEL
FLYING

H.1
PRESS

L.1 N.1 H.2


Luas Area 129 m ² PANEL FURNACE PANEL FURNACE
B.3 B.2 B.1
250 225

H.1.1 H.1.2 H.2.1 H.2.1 APAR FIXING AND


SINTER
MINI

ASSEMBLING 6050
TURN TABLE
BLASTING

AC
Luas Area 72 m ²
FURNACE FURNACE FURNACE FURNACE
300 KG 300 KG 50 KG 30 KG
I.2
BROTHER
LOSTWAX PEST CONTROL
PEST CONTROL

PEST CONTROL

F.1
COLLECTOR

MELTING AND Luas Area 98 m ²


BROTHER POURING C.1 PEST CONTROL
DUST

ELECTROSTATIC

APAR A.1.2 A.2.2


Luas Area 154 m ²
WAX INJECTION

WAX INJECTION

C.2
BUCKET
BLASTING
HANGER

I.1 C.3
7750
GAS Luas Area 11 m ² WAX A.1.1 A.2.1
TRANSFER
KNOCKOUT ROASTING ELECTRIC C.4
HAAS K.1 FURNACE ROASTING
FURNACE
SPECTRO
METER WAX INJECTION
G.2 G.1
F.2
ROOM
PEST CONTROL
AC Luas Area 92 m ²

11850
PEST CONTROL

CHILLER

COOLING COOLING
TOWER TOWER

APAR

SECURITY
POST TRAFO ROOM
Luas Area 129 m ²

GENSET CUBICLE
PANEL
TRAFO
MDP

Dwg. No. SHEET Rev. Scale :


DWG-PTI-LAYOUT-01 1 15 1:300

PT. PELOPOR TEKNOLOGI IMPLANTINDO


Drawn Date Check Date Appr'd Date
03 23 03 23 03 23
RESEARCH AND DEVELOPMENT
Department.
................
05 THP .....................
ANG ..................... ................
ANG ................ ................ 05 05

CUSTOMER Title
Factory Layout