KGYSc-3/250 High-frequency
Induction Furnace Insturction book
1.Profile
2.Working principle
3.Operational Process
8.Attached map
9.Packing list
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
1.Profile
KGYSC-250/3High frenqucy induciton furnace,The development of
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
2.Working principle
KGYSC-250/3High-frequency induction furnace,use AC circuit
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
3.Equipments installment:
3-1 Installment:
Foundation engineering:
1. Please according to manufactures foundation drawing to work.
2. The quipment grounding area refer to the drawing.Prepare
before installment.
3. Mainboard need brass cable 185 ㎜ 2 available.
4.Position:According to the instructurer
5.Wiring project:Stainless steel or PVC plastic tube.If in winter
the weather is cold,it is better to use zinc plated,stell tube instead
of pvc tube.Furnace body and main circuit board wiring need
technical engineer to install.the supplier to provide assistance.
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
4.Operational process:
4-1.setup furnace:(daily process)
1. Check the furace body if any cracks or leaking;
2. Turn on the wating switch;
3. Check the water circle water level,repalce or add water;
4. Setup main circuit circle water and furnace water pump;
5. Check inside,outside water if any leaking;
6. Check inside,outside water pressure ,inside 2.5kg/cm2
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
Ourside 2-3kg/cm2
7. Turn on the furnace bottom to working position,close the cabinet
door;
8.Close the air circuit breaker signal of power supply green and red
fault light on;
9.Turn off the red fault light;
10.Press“high frequency close,rectifier start”Bottom,Yellow
main power supply light on;
11.Ensure the power bottom in zero position,press red start bottom
10-15 seconds,start well(full the material first then start)
12.Full the steel material,notice the material no oil,water,to avoid any
empty place like bridge situation;
13.When the voltage limited and TOT limited lihgt on,turn low the
power,Notice:the first batch of melting,it is not allowed to increase
the tempreturer sharply,in case any furnace body or crucible damage.
4-2.Standard operation:
During melting the steel,seldom need opeartor adjusted,except
the power knob.
The best contdition is :from the beginning to end, to keep the
power limited in high power output to reach the pouring
tempreture.The operator need to monitor the process,familiar with
the meter,any light turn to red,it stand of not normal.
Operator need to record the
power ,voltage,frequency,pressure,any issue or operation not
well,Please feel free to contact us.
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
4-3Stop working:
1.Coreless furnace feature could be work intermittent,when the
furnace stop working,it need to do following step to protect the
furnace.
2.Melting the steel liquid ,it can not pouring all material,try to make
the furnace in inclined angle position
3.Firstly,turn the power knob to zero position.
4.Press the hight frequency close bottom;
5.if dont open the furnace shortly,pull down the air circuit breaker
QF within 3minutes.
6.After stop working,outside water cooling system still nee to open,in
case the heat shaking ,and protect the furnace.induction coil cooling
water pressure maintain 1.5kg, after 60-90minites,turn off the
cooling water(outside water);
5-2Opearator notice:
All induction heating and melting equipments are high pressure
power equipment.Every operator need to following the instruction
for protection:
1. Lock all power supply door,relative people have the key;
2. Keep the cover and device on original equipment,open any of
them may cuase dangerous;
3. Open any circuit board,ensure the power in OFF position,Place
warning mark to avoid anyone imput the power;
4. Full dry material without any firing or liquid,incase the
explosion;
5. Be careful to add low tempreture material into high tempreture
furnace.Avoid any gasify ,boilling or explosion;
6. Full understand the melting material chemial composition and
chemical reaction if may damage the equipment;
7. Full material should notice the precedenc order.;
8. Avoid any possible container may contain water or liquid mixed
into the material.The liquid and combustible material may cause
the gasify and metal liquid spray out;
9. Start or end the furnace need to check the furnace body if leak
or induction coil reach water,need to be repare on time;
10. To avoid bridge performance in melting the material,it will hurt
the furnace body,pouring the furnace body to bridge area and
keep the 3/4 power;
11. Operator follow the instruction and in good condition.
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
9. Please notice the builing line will be leak when the output water
tempreture higher or combine with slaggy;
10. When leacking the melting liquid,turn off the power supplier
and pouring all the liquid on time;
11. Before smelting,prepare dry sand pit to contain all quid,to avoid
and hurt;
12. If the coil damage and high tempreture steel liquid with cooling
water,turn off the water pump ,leave the scene for further
process.
6-2Main circuit maintenance
1. Open the circuit board (no power),spray the air dust by gun
blasting,brush the dust with brusher,no damage control circuit
board or components;
2. Remove all attachement on the conductive copper board;
3. Oiled the switch of shift furnace body,using electrical
properties of lubricating oil;
4. Chek all screws,cables,buscar,components if too hot or change
colour;
5. Check the water tube around,if leak or not;
6. Check control liner,electric relay is loose or not;
7. Check all screes and components locking well and Make sure all
tools took out.
6-3Routine maintenance sheet:
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
7- 1 FLOW CHART:
1) Setup the imput and output valves,start the furnace body and water circle
motor
2)Open the board,check the inside water cycle if any leak
performance,components change colour or out of shaping or smelty.
3)using the meter to check SCR ,diode,RC and MOV if troubleshooting-----If
yes,change the components
4)Check the DC capacitor and AC capacitor if troubleshooting-----If yes,change
the components
5)check the switch of furnace body,buscar ,connect copper plate if touch not
well or over tempreture---relock and clean
6)Check the transformor if put110VAC---YES-380V-110 transformor trouble.
7)Signal of board light on or red-- 1NO-10 V QC/24VKC power supplier trouble
8)Press check the switch red light if all down----NO.-- 5A blown fuse.
---main circuit board trouble
----LED light trouble
9)Check high frequency open adn close buttom light ---No --check the
signal ,signal board trouble
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
10)Start the high frequecy light on or not---No. Main circuit board trouble.
12)Turn the power knob to the high frequency limit light ---No ,limited but the
light not on.adjusted the main ciruit board limit ligh,can not limited,replace or
adjusted the main circuit board.
13)Turn the power knob to zero wait the result.
According to the process open
14)Send the host no fuse switch---escape-- check whether the three-phase
power supply is in good condition.static checking of three-phase rectifier diode
SCR, MOV fault.
15)Press the "start" button to turn off ----No fuse switch immediately jump off --
--Static checking three phase rectifier ,static check discharge diode,static check
discharge diode,static check DC, VC capacitor.static check frequency conversion
SCR group.
16)The main power is not bright--check the start of the signal board and the end
of the wiring terminal is locked.check the "start" button contact. check the
indicator light.check the pulse rectifier transformer.
17)Press the "test switch" to extinguish all red fault indicator lights. --The red
fault indicator can not be cut off.---Check in accordance with indicator light.
18)Press the "high frequency start" button-No fuse switch immediately jump off-
-static checking frequency SCR, diode, MOV.static check DV/DT, RC protection
circuit.
19)High frequency running light does not light or frequency meter does not
read--check whether the main control board and its wiring terminal is
locked.check the indicator light and button connection is good.check the
monitor board relay.
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
20) Start the normal light is not bright--Check whether the rectifier start signal
board and its wiring terminal is locked.
21)Frequency meter reading but no high frequency output ---check frequency
pulse transformer.check the main control panel.Check the frequency conversion
SCR and whether the line is off.check the furnace body connection cable is
broken
22)SCR BAD LIGHT ---start frequency is too high, adjust the low-frequency
limiter VR.power knob is not zero. Inverter group fault.
23)Wait 15-20seconds,start light bright,Rotary power knob, KW table, KV table,
HZ table on the slow.--High frequency output signal of the abnormal
sound.check whether the power supply part of the phase. check rectifier
transformer. check whether the polar line between the rectifier SCR. check
whether the DC capacitor is low quality or part of the circuit breaker.
24)High frequency output signal instability --check the furnace body coil,
furnace body switch, the flow of the main circuit copper contact is loose and
jump fire.check the main engine, furnace cooling water pipe leakage or poor
insulation.Check the circuit board signal feedback system.check the main control
panel.check the host, DC, AC, isolation capacitance grounding wire is locked.
25)Adjust power knob output cannot be changed,heck the power knob of the
variable power group and wiring. check the main control panel.
26)Output power can not reach full load,Limiting the number of lights appears
to limit the output power.After the disappearance of the reasons to be excluded,
the power can be upgraded..
27)Automatic shutdown red fault signal display.Refer to red fault indicator.
28)Normal operation, dynamic check end.
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
上海朐燕实业有限公司
JAR HING PRODUCTS CORPORATION LIMITED
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
8.Attachment.
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919
-----------------------------------------------------------------------------------------------------------------------------------------------
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
JAR HING PRODUCTS CORPORATION LIMITED
上海朐燕实业有限公司
E-Mail:jennyhu@jh-products.com
Fax: ++86 / 512 / 53556919
电力表
电Power box
源
盒
电
Power box
源
盒
Frequ 频
ency 率
table
表
电力调整RT
Power Adjustment RT1
高频限制RT
High frequency limit RT2
低频限制RT
Low Frequency limit RT3
电力限制RT
Power Limit RT4
水泵
Water Voltage Limit RT5
pump 电压限制RT
Tot Limit RT6
炉体切换 内水压力 外水压力 内水温度 外水温度 TOT限制RT
SCR不良 测漏 贝相 ON/OFF
Website: www.jh-products.com
Tel: ++86 / 512 / 52873271
KA2 Furnace Body Switching 制图
KA3 Water Pressure
KA4 external pressure 审核 150KG高周波感应炉
KA5Water temperature
KA6 External temperature 图幅 比例 图号
KA7 SCR Bad
KA8 Side Leakage 材料 部件名 电器原理图
KS9 Bate
东营福浩精铸科技有限公司
-----------------------------------------------------------------------------------------------------------------------------------------------
Add:Rm805,Huaxu building,No.95 Renmin South Road,Taicang City,Jiangsu Province,China 215400
JAR HING PRODUCTS CORPORATION LIMITED
上海朐燕实业有限公司
E-Mail:jennyhu@jh-products.com
Fax: ++86 / 512 / 53556919
RED GREEN
红 绿 泵
PUMP
Main
主控柜 control
Cabinet
紧急用水进口(自来水或房顶备用水箱)
Emergency water inlet (tap water or roof standby
Description 说 明
1.正常工作,Q1、Q2打开,Q3关闭。
1: Normal work, Q1, Q2 Open, Q3 closed
2.备用水箱上水,Q1关闭,Q2、Q3打开。
3.水泵停电或故障,使用备用水,Q2关闭,
Website: www.jh-products.com
2: Standby tank water, Q1 closed, Q2, Q3 Open
N
Q1、Q3打开。
9.PACKING LIST
SPEC INDUCION FURNACE
Circuit board 1 unit
Instruction
1 unit
book
Circut diagram 1 unit
certificate
Packing list
components
date
-----------------------------------------------------------------------------------------------------------------------------------------------
Website: www.jh-products.com E-Mail:jennyhu@jh-products.com
Tel: ++86 / 512 / 52873271 Fax: ++86 / 512 / 53556919