the overall project management and the rules HMIs were served via a data concentrator
for logical devices, logical nodes, controls, and did not communicate via the IEC 61850
and data mapping as well as the HMI and protocols.
gateway database. ZIV integrated the HMI
All protection devices were required to be in
and provided IEDs for bay control and
the LAPEM 5L (list of approved IEDs for
communications. CFE defined the database
use in the CFE network), and all protection
to SCADA master and provided the appro-
schemes were required to meet CFE
priate technical support. SEL provided the
protection specifications for substation
protection and control IEDs, built the panels,
protection functions. Each switch is
staged the system, trained the CFE staff, and
associated with a specific bay scheme, as
provided on-site support for commissioning
shown in Figure 3.
the substation. The other vendors also
provided equipment and support as needed. “In addition to using the new IEC 61850
standard, the substation’s integrated com-
The La Venta II substation design specified
munications system incorporated some
that the devices will directly connect to the
products that CFE had not used before,”
Ethernet LAN and allowed no data concen-
Alzate says. “All of the protective relays had
tration for data exchange among the IEDs,
to be independently approved for use by
local HMIs, and protocol gateways. Vendors
CFE on their system, regardless of their
submitted product designs that performed
support of IEC 61850 protocols.”
direct transmission and receipt of IEC 61850
protocols. Data concentration was initially The final design relied heavily on several
allowed only for the SCADA gateway func- SEL relays, previously approved by CFE,
tion that converted IEC 61850 protocols into that now also support IEC 61850.
DNP3 and Conitel 2020. In the end, the
The accuracy of SNTP is at best within Overall, the factory acceptance tests took six
several milliseconds and varies as the weeks. SEL, IBERINCO, and ZIV were
network traffic varies. Alzate says that CFE involved the entire time. Siemens and GE
agreed to implement time synchronization participated in the configuration and testing
via SNTP or IRIG-B to accommodate the of their devices.
different implementations among all the
vendors. The process started with the initial network
setup, switch configuration, and initial
CFE requested vendors to provide useful communications tests. This part of the
descriptive naming of the IEC 61850 data process went quickly but also surfaced some
and groups, such as logical node names, and issues.
avoid generic names. Although many
vendors used generic names because they Some vendors were not able to meet some of
conform to the standard, they are not very the IEC 61850 requirements for the project,
useful to the end user because the context of and certain adjustments had to be made. For
the data is lost. example, as mentioned earlier, physical
device names were limited to 8 characters in
By using generic naming, the vendors some IEDs, although the physical name
eliminate the ability to perform automatic required 12 characters for the project. This
configuration and require the integrator to required IBERINCO to redefine the
refer to documentation to interpret generic database naming conventions, which meant
IEC 61850 values for phase voltage or database reconfiguration for all the clients.
breaker position. Most of the limitations found were due to
IED limitations and were not resolvable
CFE had planned to continue using the within some of the IEDs. The design team
naming convention developed within their changed databases and naming conventions
organization, whereby all of the databases to accommodate those devices with limita-
that receive substation data—protocol gate- tions.
way, engineering, SCADA, HMI, and