You are on page 1of 1

PROJECT NAME:

National Engineering Services Pakistan


Date of Testing:- (Pvt) Limited
Nespak House, 1-C, Block
,Model Town Extension, Lahore
FIELD DENSITY TEST
AASHTO T-191
(A) GENERAL
1 F.D.T Test No.
2 Chainage
3 Test Location
4 Depth of Hole (Cm)
5 Layer No.
(B) MOISTURE CONTENT
1 Cone No.
2 Wt.of Cone
3 Wt of Cone + Wet Soil
4 Wt of Cone + Dry Soil
5 Wt of Water
6 Wt of Dry Soil
7 Water Content
8 By Speedy Moisture Tester
( C ) FDT
1 Wt.of Material Excavated from Hole (gm)
2 Wt.of Sand Before Pouring (gm)
3 Wt.of Sand After Pouring (gm)
4 Wt.of Sand in Hole & Cone (gm)
5 Wt.of Sand to Fill Cone (gm)
6 Wt. of Sand to fill Hole (gm)
7 Unit Wt . Of Sand (gm/cc)
8 Gross Vol of Hole (cc)
9 Wt.Ret.3/4 frome Hole (gm)
10 % age of Ret.3/4 from Hole ( %)
11 Wet Density of Soil (gm/cc)
12 Dry Density of Soil (gm/cc)
13 Max.Dry Density ( gm/cc)
14 Opt.M.C (%)
15 Adjusted Proctor (gm/cc)
16 Compaction Obtained ( %)
17 Requird Compaction (%)

Remarks:

CONSULTANT:
Lab. Technician : ____________________
Material Engineer:___________________

You might also like