You are on page 1of 4

FIELD DENSITY TEST (SAND

Date 31/01/2019 Doc. No. P-KrwPM14-NRC-QC

Project Title PD.3 Power Plant


Job No P-KrwPM14
Client Pindo Deli
Contractor PT.Nusa Raya Cipta
Location :

Area testing :
Layer :
Coordinate X=
Y=
Elevation Z=
Result of Laboratory Test for Filling Material :

ITEM TEST RESULT

Standard Proctor Optimum Moisture Content


Maximum Dry Density

NO. DESCRIPTION UNIT

“A” WEIGHT OF SAND


1. Weight of sand before pouring gr
2. Weight of sand after pouring gr
3. Weight of sand used gr
“B” WEIGHT OF SAND TAKEN FROM MOLD
4. Mass of sand in cone + plate gr
5. Mass of sand in hole gr
6. Unit Weight of sand gr/cm3
7. Volume of hole cm3
“C” VOLUME OF MOLD
8. Weight of soil and tare gr
9. Weight of tare gr
10. Weight of wet soil gr
11. Wet density gr/cm3
“D” MOISTURE CONTENT / SPEEDY
12. Moisture content %
13. Dry density gr/cm3
14. Optimum Moisture Content (Lab) %
15. Max. Dry Density (Lab) gr/cm3
“E” DENSITY COMPUTATION
16. Percent of Compaction %
17. Required percent of compaction %

Prepared by,
Involvement Party PT. Nusa Raya Cipta
Construction QA/QC

Signature

Name
Sign Date
Job Title
EST (SAND CONE METHOD)

P-KrwPM14-NRC-QC-FO-0008 Rev. 2 Page 22 of 25

No. : P-KrwPM14/RFI/NRC/CVL/STR/……

Date :

Page :

ACTUAL MEASURE
RESULT
Sample No. Sample No. Sample No. Sample No.

FORMULA Sample No. Sample No. Sample No. Sample No.

=(1) - (2) 0
=(3) - (4) 0

=(5)/(6) #DIV/0!

=(8) - (9) 0

=(10)/(7) #DIV/0!

A
=[(11)/(1 +A/100)] #DIV/0!

0
0

=(13/15)x100) #DIV/0!

Checked and Approved by, Tested by,


PINDO DELI Third Party (if any)
Construction QA/QC (…..)

You might also like