HORIZONTAL & VERTICAL CURVE

LEGEND:
-

PVI - POINT OF VERTICAL INTERSECTION


PVC - POINT OF VERTICAL CURVATURE

MO PVT - POINT OF VERTICAL TANGENCY FORMULA:


LVC, LVC1, LVC2 -LENGTH OF VERTICAL CURVES T=R(TAN 1/2)
g- GRADE IN PERCENT Lc=TT
PI PI
MO- MIDDLE ORDINATE T T
D=1145.916
R PI
Y X, X1, X2 - DISTANCE FROM PCV OR PVT TO
E=T(TAN 1/4)
ANY POINT IN CURVE
Y, Y1, Y2 - VERTICAL OFFSET
LEGEND:
A- ALGEBRAIC DIFFERENCE OF GRADES IN %
PI - POINT OF HORIZONTAL INTERSECTION
I - EXTERNAL ANGLE
NOTE:
T - LENGTH OF TANGENT
NO VERTICAL CURVES IS REQUIRED WHEN THE ALGEBRAIC
R - HORIZONTAL RADIUS
DIFFERENCE IN GRADE IS LESS THAN 0.50%
Lc - LENGTH OF CURVATURE
D - DEGREE OF CURVE (ARC DEFINITION)
IN ANY SYMMETRICAL VERTICAL PARABOLIC CURVE
LVC/2 LVC2 PC - POINT OF TANGENCY
MO = ALVC
800 PI
E - EXTERNAL DISTANCE
LVC

X² (MO)
HORIZONTAL CURVE (CIRCULAR)
Y = (LVC/2)² NOT TO SCALE

SYMMETRICAL VERTICAL PARABOLIC CURVE FORMULA:


NOT TO SCALE LVC = KA

LEGEND:
A - ALGEBRAIC DIFFERENCE GRADIENT (%)
K - RATE OF VERTICAL CURVATURE (m)
X1 X2
IN ANY UNSYMMETRICAL VERTICAL PARABOLIC CURVE

MO = (LVC1)(LVC2)(A)
200LVC

Y1
Y1= MO(X1)²
(LVC1)²
Y2
Y2 = MO(X2)²
(LVC2)²

LVC1 LVC2
FORMULA:
LVC = KA

LVC LEGEND:
A - ALGEBRAIC DIFFERENCE OF GRADIENT (%)
K - RATE OF VERTICAL CURVATURE (m)
UNSYMMETRICAL VERTICAL PARABOLIC CURVE
NOT TO SCALE

PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: SUBMITTED: RECOMMENDED: APPROVED: SHEET NO.
C.Y. 2021 PROJECT
FIRST GRANDUER BUILDERS "AS-STAKE" PLAN FOR
GEN. ENGINEERING & BUILDING CONTRACTOR 21HG0143 - LOCAL PROGRAM, LOCAL INFRASTRUCTURE
Pakigne, Minglanilla, Cebu
Tel. No. (032) 516-5962, Telfax. No. (032)490-4323 PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REPUBLIC OF THE PHILIPPINES 07
Cell. No. 09209087470 & 09325836555
firstgrandeurbuilders@yahoo.com GAVINO T. UMALI CONCRETING OF BARANGAY ROAD, BARANGAY BASAK TO DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RALPH JOCYPH S. ALEGADO MARLON D. MAROLLANO CONNIE L. CABALLO RENULT G. RICARDO NOEL L. PINEDA, CESE 22
JUMANGPAS, SAMBOAN, CEBU REGIONAL OFFICE NO. VII
PROJECT MANAGER 000 + 000.00 - STA. 000 + 776.00 CEBU 4TH DISTRICT ENG'G OFFICE PROJECT ENGINEER CHIEF, PLANNING AND DESIGN SECTION CHIEF, CONSTRUCTION SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE : NET LENGTH = 776.00 M. POBLACION DALAGUETE, CEBU DATE : DATE : DATE : DATE : DATE :