Professional Documents
Culture Documents
Sheet Metal
Sheet Metal
Nội dung không phù hợp/ Trouble Description Minh họa/ Figure
1. Information: • Picture detail :
- Issue name: Oil and dirt stick on surface part
- Failure Rate: 32% (36/100 pcs)
2. Description:
2.1) On 28.Jun.2018 , DAV detected part no. 2P381655-1 NG : oil and dirt stick on
surface part ( This NG problem happend again )
2.2) Part No. 2P381655-1 with detail history as following: Oil and dirt stick
- 12.Apr : Inform NG information to DTLT supplier
• Carton box label:
- 12.Apr : DTLT feedback DAV by email and request DAV inform the cost for sorting
- 27.Apr : 1st - DAV send sorting result for DTLT
- 02.May: 2nd - DAV send sorting result for DTLT
- 06.Jun : DTLR feedback DAV corrective action report
- 28.Jun : NG problem happend again
3. SQG Request
3.1) Request supplier to check and do sorting in DAV & their warehouse and update result.
3.2) Analysis root-cause investigation & preventive action for next lots, why this problem
happen again ?
3.3) How to identify and control part which are already sorted by DTLT? (From which
shipment? How is the label…)
Số lượng Tình trạng/ Status Biện pháp xử lý/ Ảnh hưởng tới kế hoạch xuất hàng cho DAV
Tình trạng hàng Stock quantity Treatment for stock How influence for shipment goods to DAV
tồn kho OK NG
Status of stocks
Có/ Yes Không/ No
Biện pháp khắc phục tạm thời/ Temporary countermeasure Minh họa/ Figure
Lô hàng bắt đầu thực hiện đối Xác nhận/ Confirmed Thực hiện/ Prepared
sách khắc phục
Improve from Lot