INTRODUCTION
INTRODUCTION
SNP Post tension Co., Ltd. We serve all scope of post-tensioned slab work for example preliminary
design , provide shop drawing , install post-tensioned slab equipment , stressing tendon and grouting by
high experience engineering team to make high quality and high standard
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM CONTENT
CONTENT
General Information Page
- Materials 1-3
- Equipment 4-5
- Elongation and Anchorage loss 7-11
Working procedures
- Storage and handling 12
- Protection from environmental 13
- Installation of post-tensioned materials 13-15
- Maintenance of hydraulic jack 14
- Stressing 14-15
- Grouting 16-18
- Documentation 18
Appendix
- Appendix 1 Precaution in post-tensioned slab work 19-20
- Appendix 2 Material, tool, equipment and testing 21-73
- Appendix 3 Computer software and Shop drawing 74-78
- Appendix 4 Stressing concept and Elongation measurement 79-86
- Appendix 5 Stressing form and grouting form 87-89
- Appendix 6 Engineering team 90-91
- Appendix 7 Shop drawing process and site checking 92-93
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
GENERAL INFORMATIONS
1. General Informations
1.1 Materials
PC Strand 7 wire strand low relaxation according to TIS 420-2540 or ISO 6934-4:1991 or ASTM A416
Diameter 12.7 mm
Sectional area 98.71 mm2
Minimum breaking load 18.73 Tons
Maximum Relaxation at 70% initial load 2.8 %
Anchorages
Anchorages for post-tensioned slab use ANCHORA 1SNP13, 2SNP13, 3SNP13, 4SNP13 and
5SNP13 from US ANCHORA Post tensioning system for stressing end and Onion dead end for dead
end. All SNP anchorage can transfer compressive force to concrete according to ACI code and PTI.
1
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Grouting
Cement type 1 (50kg/package)
Water
Admixture Pozzolith 100R and Aluminum powder for increase flowability and expand in duct.
Grout quality
Fludity > 11 second
Bleeding 2-4%
Initial setting time 6 hour
Final setting time 8 hour
Water temperature < 40 degree celcius
Compressive strength of 5x5x5cm 175 ksc in 7 day
and 280 ksc in 28 day
Supporting chair
For supporting tendon as vertical distance from shop drawing
Depth not exceed 60cm use pc wire supporting chair
Depth more than 60cm use mild steel or pc wire
2
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Other materials
Concrete
Cylindrical compressive strength 15cm diameter and 30cm high moist curing
320 ksc minimum at 28 days
240 ksc minimum at stressing
Mild steel
Round bar diameter 6mm-9mm SR24 TIS20-2543
Deform bar diameter 12mm-28mm SD40 TIS24-2548
3
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
GENERAL INFORMATIONS
1.2 Equipment
- Stressing Jack was designed for our anchorage and will be calibrated every 6 month by reliable
institute.
- Cement mixture and pump for grouting work
Elongation =
4
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
GENERAL INFORMATIONS
Tendon Tendon
Description Item Unit
2 12.7 4 12.7
- Nominal Cross-Sectional Area,Aps mm2 197.4 394.8
- Minimum Breaking Strength ton 37.5 74.9
- Minimum Yield Strength ton 31.8 63.7
- Jacking Force ton 14.2/strand 14.2/strand
- Modulus of Elasiticity, Es Ksc 1.98 E+06 1.98 E+06
- Frictional Coefficient, /rad 0.20 0.20
- Wobble Coefficient,k /m. 0.003 0.003
- Anchorage Type type 2SNP13 4SNP13
- Anchorage Slip mm. 6 (max.) 6 (max.)
- Anchorage Friction Loss % 0 0
- Stressing Jack type M20A M20A
- Stroke mm. 300 300
- Jack Friction Loss % 0 0
5
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
GENERAL INFORMATIONS
Anchorage Slip ( )
= (1/EsAps)
= Area under graph between tension in tendon before and after anchorage slip. When known
anchorage slip then we can calculate Ld and Pd respectively.
6
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Remark
Grouting work will start when scaffolding or prop to be cleared
MC = MAIN CONTRACTOR
7
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
8
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
9
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
9. Stressing
10. Cutting tail of strand
11. Fill end recess with mortar
12. Remove formwork and shoring and then install scaffolding on next
floor
10
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Remark : Construction joint of slab should be on L/4 – L/3 of span and approve by inspector.
11
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
WORKING PROCEDURES
3. Working procedure
1.1 Storage and handling Strand
- Stand will be cut by length in shop drawing with onion ring on dead end (100ksg/roll).
- Transport to site before using 1-2 day
Roll of strands
Sheath
- Corrugated sheath for flat slab with anchorage 1SNP13,2SNP13,3SNP13,4SNP13 and 5SNP13
- Length 20m each or roll up by diameter 1.5m
- Transport to site before using 1-2 day
12
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
WORKING PROCEDURES
Material and equipment
Transport carefully and store in ventilated room.
1.2 Environmental protection
All materials should keep on supporting over the ground
Store
Closed room ,good ventilation and no water
Outdoor keeping
Strand and equipment should keep on platform or table over the ground and close with rain
protection
Anchorage and grout vent installation
Install anchorage at edge of slab and insert grout vent as the following picture.
(Grout vent is HDPE diameter 16mm)
13
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
WORKING PROCEDURES
Tendon placing
Placing tendon will be start after finish scaffolding, side formwork, bottom reinforcement
and shear stirrup. This stage start by the following steps.
Locate supporting chair for tendon as specified in shop drawing
Check sheath and take off from roll
Insert strand to sheath and install anchorage for live end
Install spacer plate for onion end
Use tape to close connection between coupler or anchorage with sheath
Fix sheath to supporting chair and then fix supporting chair to bottom reinforcement
Clean sheath and sheath connection
Check completeness of tendon, anchorage and grout vent
14
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Stressing steps
Put jack on strand and set temporary wedge for holding strand
Open pump until reach required pressure
15
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
WORKING PROCEDURES
Remark
Elongation measurement method is in appendix with stressing report
Stressing sequence and calculated elongation provide by SNP and send to inspector 3-7 days before
working
Stressing results of all strands record in report in appendix 5
After finish stressing the report shall be sent to inspector for approval before cut the strand tail
Cut strand tail before remove scaffolding or platform
Preparation before stressing
Anchorage block preparation
Anchorage block shall be coated for corrosion protection and shall be inserted before stressing
Check length of strand before insert anchorage block
Clean tail of strand and anchorage guide before insert anchorage block
Method to insert wedge
Insert anchorage block to anchorage guide
Insert wedge to anchorage block
Use hammer to tighten wedge
Check tail of strand before stressing
Stressing method
See appendix 4
Grouting
Grouting work will increase durability of slab. Grouting will start when scaffolding or platform are
removed clearly.
Site preparation
Cut tail of strand after get approval from inspector
Plug mortar in end recess (Mix sand-cement type 1 ratio by 2:1)
Set up grouting machine on site near working area
Provide quantity of cement type 1, water and admixture for grouting area
Grouting can inject not exceed 40m height
Check mixture, pump, guage and valve
Inject water to sheath for clearing each ducts
16
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
WORKING PROCEDURES
Mortar and admixture
Mortar consist of cement, water and admixture
Cement should be type 1 with 7-30 day age and check weight in package ±2% if exceed we should
adjust proportion
Admixture consist of Pozzolith110R and aluminum powder by following proportion
Pozzolith 110R volume 200cc/cement 100 kg
Aluminum powder 7g/ cement 100 kg
Water
Clean water not exceed 45% of cement weight no disguise, no organic substance and chlorine not
exceed 500mg/liter
17
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
WORKING PROCEDURES
Grouting procedure
After grouting mortar is pass for all test, we can start grouting while the temperature not exceed 30
degree celcius.
Grouting method
Inject mortar to sheath at grout vent
Control pump pressure by pressure guage
When mortar run out of grout vent at other side let it flow out for clear bubble and disguise
Fold grout vent and tighten remain pressure 7 bar for beam and 3 bar for slab until pressure value is
constant.
Fold grout vent at inject side and tighten
Move to next tendon
Grouting record
Number of tendon
Working time
Test results
Important incident
Documentations
Request for working
Inspection form
Stressing report
Grouting report
Example of all documents are in appendix
18
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 1
PRECAUTION IN POST-TENSIONED SLAB WORKING
19
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
1. Before coring slab, post-tensioned slab designer should check and confirm.
2. All strands should be protected from welding work.
3. Provide platform 0.80m away from edge of slab.
4. Shafts and sleeves should be away from column.
5. In case of column was poured exceed bottom slab level. The excessive part should
be cut.
20
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 2
MARERIALS, TOOLS, EQUIPMENT AND TESTING
21
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Note
* Initial force of 70 % of minimum breaking strength
Modulus of elasticity = 1,980,000-2,000,000 kgf/sq.cm
22
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
STRAND
23
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
24
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 1SNP13
25
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 2SNP13
BLOCK 2SNP13
26
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 2SNP13
GUIDE 2SNP13
27
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 3SNP13
BLOCK 3SNP13
28
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 3SNP13
GUIDE 3SNP13
29
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 4SNP13
BLOCK 4SNP13
30
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 4SNP13
GUIDE 4SNP13
31
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 5SNP13
BLOCK 5SNP13
32
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ANCHORAGE
ANCHORAGE 5SNP13
GUIDE 5SNP13
33
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
34
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
35
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
1. CONCRETE
1.1 Compressive Strength at 28 day 320 ksc. (Cylinder)
1.2 Compressive Strength at Transfer 240 ksc. (Cylinder)
2. MILD STEEL
2.1 Round Bar DIA. 6-9 mm. Conforming to TIS.20-2543 Type SR-24
2.2 Deform Bar DIA. 12-28 mm. Conforming to TIS. 24-2548 Type SD-40
3. STRANDS
Seven-Wire Strand DIA 12.7 mm. (Low-Relaxation) Grade 270 K.Conforming to TIS.420-2534 and
ASTM A416-94
Diameter 12.7 mm.
Cross Section Area 98.71 sq.mm.
Weight 0.775 kg./m.
Min.Breaking Strength 18.73 ton.
4. ANCHORAGE
Post-Tension Anchorage Type 1SNP13, 2SNP13, 3SNP13, 4SNP13, 5SNP13 and Onion Dead End
Conforming to US. ANCHORA Post-Tensioning System
5. CORRUGATED SHEATH
Corrugated Sheath made form Galvanized Steel Strip 0.23 mm. in thickness.
Curvature Friction Coefficient (µ) 0.17 /Rad.
Wobble Friction Coefficient (k) 0.0016 /m.
6. WEDGE
2-PC Standard Wedge manufactured by Post-Tension Product Mfg.Inc.Texas U.S.A.
36
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
37
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
38
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
39
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
40
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
41
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
42
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
43
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
44
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
45
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
46
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
47
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
48
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
49
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
50
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
SUPPORTING CHAIR
Color of barchair
Height of barchair
51
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
STRESSING JACK
52
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
53
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
54
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
55
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
56
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
57
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
58
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
59
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
60
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
61
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
62
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
63
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
64
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
65
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
66
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
67
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
68
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
69
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
70
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
71
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
72
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
GROUTING EQUIPMENT
73
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 3
COMPUTER SOFTWARES AND SHOP DRAWING
74
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ADAPT-FLOOR for irregular shape with finite element method and design
75
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
76
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
77
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
78
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 4
STRESSING CONCEPT AND ELONGATION MEASUREMENT
79
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
80
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
STRESSING CONCEPT
Stressing Sequence
Elongation measurement and Anchorage Slip
Stressing Sequence
Step 1 Stressing strand 50% of group of tendon in band direction except extra tendon, extra
tendon around opening or lift core (Stressing in step 3)
Step 2 Stressing all strand in uniform direction by start with tendon near column to mid span
tendon.
STEP 3 Stressing remained strand in band direction Band and extra tendon, extra tendon
around opening or lift core.
REMARK
In case of irregular plan stressing sequence will be change by structural engineer.
81
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
82
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Elongation at 37.9%
Elongation at 75.8%
Note
1. OA=OA’
2. Sag is the displacement between strand sag to tight exactly.
3. Elongation measurement compare with theoretical elongation for confirmation that
strand force equal to calculation and for checking something wrong in each strand
83
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Step 1
Step 2
84
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Step 3
Step 4
85
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
Step 5
86
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 5
STRESSING REPORT
87
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
STRESSING REPORT
88
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
89
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 6
ENGINEERING TEAM
90
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
ENGINEERING TEAM
SNP Post tension consist of structural engineering design team and operation team with chief of
each team are structural engineer who are more than 10 year experience.
We are international member of Post-Tensioning Institute (PTI) for follow up new knowledge,
research, application and code development for better quality in every projects.
91
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
APPENDIX 7
SHOP-DRAWING AND SITE CHECKING
92
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.
93