You are on page 1of 97

PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

INTRODUCTION

INTRODUCTION

Scope of post-tensioned slab work


- Provide shop drawing and install equipment at site
- Stressing according to sequence and elongation check for all strands
- Grout mortar to all galvanized ducts

Advantages of post-tensioned slab


- Increase column span to reduce quantity of column
- Free to set the line of partitions or masonry walls
- Reduce slab thickness for increasing number of stories
- Reduce construction time
- All materials cost are saver than conventional slab-beam around 10-15% for span greater than 6
meter

SNP Post tension Co., Ltd. We serve all scope of post-tensioned slab work for example preliminary
design , provide shop drawing , install post-tensioned slab equipment , stressing tendon and grouting by
high experience engineering team to make high quality and high standard
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM CONTENT

CONTENT
General Information Page
- Materials 1-3
- Equipment 4-5
- Elongation and Anchorage loss 7-11

Construction method and sequence

Working procedures
- Storage and handling 12
- Protection from environmental 13
- Installation of post-tensioned materials 13-15
- Maintenance of hydraulic jack 14
- Stressing 14-15
- Grouting 16-18
- Documentation 18

Appendix
- Appendix 1 Precaution in post-tensioned slab work 19-20
- Appendix 2 Material, tool, equipment and testing 21-73
- Appendix 3 Computer software and Shop drawing 74-78
- Appendix 4 Stressing concept and Elongation measurement 79-86
- Appendix 5 Stressing form and grouting form 87-89
- Appendix 6 Engineering team 90-91
- Appendix 7 Shop drawing process and site checking 92-93
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

GENERAL INFORMATIONS
1. General Informations

1.1 Materials
PC Strand 7 wire strand low relaxation according to TIS 420-2540 or ISO 6934-4:1991 or ASTM A416
Diameter 12.7 mm
Sectional area 98.71 mm2
Minimum breaking load 18.73 Tons
Maximum Relaxation at 70% initial load 2.8 %

Anchorages
Anchorages for post-tensioned slab use ANCHORA 1SNP13, 2SNP13, 3SNP13, 4SNP13 and
5SNP13 from US ANCHORA Post tensioning system for stressing end and Onion dead end for dead
end. All SNP anchorage can transfer compressive force to concrete according to ACI code and PTI.

Corrugated sheath or Galvanized duct


Oval corrugated sheath internal size 21x47mm for 2 and 3 strand tendon, 20x62mm for 4 strand
tendon and 20x75mm for 5 strand tendon. Total length 20m or 6m each with coupler. This sheath
made from galvanized steel strip which can protect strand no corrosion and can bend as shop
drawing.

1
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Material for pluging end recess


Cement type 1
Sand
Water

Grouting
Cement type 1 (50kg/package)
Water
Admixture Pozzolith 100R and Aluminum powder for increase flowability and expand in duct.
Grout quality
Fludity > 11 second
Bleeding 2-4%
Initial setting time 6 hour
Final setting time 8 hour
Water temperature < 40 degree celcius
Compressive strength of 5x5x5cm 175 ksc in 7 day
and 280 ksc in 28 day

Supporting chair
For supporting tendon as vertical distance from shop drawing
Depth not exceed 60cm use pc wire supporting chair
Depth more than 60cm use mild steel or pc wire

2
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Other materials
Concrete
Cylindrical compressive strength 15cm diameter and 30cm high moist curing
320 ksc minimum at 28 days
240 ksc minimum at stressing

Mild steel
Round bar diameter 6mm-9mm SR24 TIS20-2543
Deform bar diameter 12mm-28mm SD40 TIS24-2548

3
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

GENERAL INFORMATIONS
1.2 Equipment
- Stressing Jack was designed for our anchorage and will be calibrated every 6 month by reliable
institute.
- Cement mixture and pump for grouting work

1.3 Elongation and Anchorage loss


Elongation equation

Elongation =

Where P at any position from T.Y.Lin equation P2 = P1 . e-(θ-KL)


 = Friction coefficient
θ = change of angular
K = Wobble coefficient
P = Tendon force
Es = Modulus of elasticity of strand
Aps = Sectional area of strand

4
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

GENERAL INFORMATIONS
Tendon Tendon
Description Item Unit
2  12.7 4  12.7
- Nominal Cross-Sectional Area,Aps mm2 197.4 394.8
- Minimum Breaking Strength ton 37.5 74.9
- Minimum Yield Strength ton 31.8 63.7
- Jacking Force ton 14.2/strand 14.2/strand
- Modulus of Elasiticity, Es Ksc 1.98 E+06 1.98 E+06
- Frictional Coefficient, /rad 0.20 0.20
- Wobble Coefficient,k /m. 0.003 0.003
- Anchorage Type type 2SNP13 4SNP13
- Anchorage Slip mm. 6 (max.) 6 (max.)
- Anchorage Friction Loss % 0 0
- Stressing Jack type M20A M20A
- Stroke mm. 300 300
- Jack Friction Loss % 0 0

- Jacking direction effect


One end stressing
Both end stressing
- Anchorage Loss
Immediate loss due to wedge slip.
Loss = δPd
Loss distance from slab edge = Ld

5
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

GENERAL INFORMATIONS

Anchor Slip Loss

Anchorage Slip ( )
 = (1/EsAps)

= Area under graph between tension in tendon before and after anchorage slip. When known
anchorage slip then we can calculate Ld and  Pd respectively.

6
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

CONSTRUCTION METHOD & SEQUENCE


2. Construction method and sequence

WORK MC. SNP


1. Install scaffolding or formwork
2. Place Bottom and Shear reinforcement and Progressive Rebar
3. Install Recess Former and fix anchorage
4. Place tendon and grout vent
5. Place top reinforcement
6. Pour concrete
7. Curing and remove side formwork
8. Remove recess former
9. Stressing strand when concrete strength greater than 240 ksc.(Cylinder)
10. Cut tail of strand
11. Fill ending recess with mortar
12. Remove scaffolding and shoring
13. Grouting

Remark
 Grouting work will start when scaffolding or prop to be cleared
 MC = MAIN CONTRACTOR

7
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

CONSTRUCTION METHOD & SEQUENCE

1. Set scaffolding and formwork


2. Place bottom, shear reinforcement and progressive reinforcement

3. Install former recess, anchorage and grout vent


4. Fixing strand

8
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

CONSTRUCTION METHOD & SEQUENCE

5. Place top reinforcement


6. Pouring concrete

7. Curing concrete and remove formwork


8. Remove formwork and end recess

9
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

CONSTRUCTION METHOD & SEQUENCE

9. Stressing
10. Cutting tail of strand
11. Fill end recess with mortar

12. Remove formwork and shoring and then install scaffolding on next
floor

10
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

CONSTRUCTION METHOD & SEQUENCE


1. SNP provide shop drawing to present tendon layout after we got framing plan that combine
structural plan and MEP opening from main contractor.
2. Column will be casted at soffit of post tension slab
3. Concrete covering for slab are 2cm
4. Quantity and size of scaffolding will be calculated from actual load
5. Bottom reinforcement place 40-50cm space or wire mesh diameter 8mm and 30cm space.
6. Place tendon and install anchorage with pocket former on bar chair
7. Place top reinforcement or rebar around opening and anti-bursting reinforcement
8. Pour concrete and inspect especially in anchorage zone.
9. Curing and take side formwork off.
10. Stressing after concrete strength reach 240 ksc and measure each strand elongation that check
with calculation.
11. Remove scaffolding and shoring
12. Plug mortar at end recess
13. Grouting for protecting strand

Remark : Construction joint of slab should be on L/4 – L/3 of span and approve by inspector.

Animation : Construction Method & Sequence

11
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

WORKING PROCEDURES
3. Working procedure
1.1 Storage and handling Strand
- Stand will be cut by length in shop drawing with onion ring on dead end (100ksg/roll).
- Transport to site before using 1-2 day

Roll of strands

Steel or timber support

Sheath
- Corrugated sheath for flat slab with anchorage 1SNP13,2SNP13,3SNP13,4SNP13 and 5SNP13
- Length 20m each or roll up by diameter 1.5m
- Transport to site before using 1-2 day

Corrugated sheaths or Galvanized ducts

Steel or timber support

12
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

WORKING PROCEDURES
Material and equipment
Transport carefully and store in ventilated room.
1.2 Environmental protection
All materials should keep on supporting over the ground
Store
Closed room ,good ventilation and no water
Outdoor keeping
Strand and equipment should keep on platform or table over the ground and close with rain
protection
Anchorage and grout vent installation
Install anchorage at edge of slab and insert grout vent as the following picture.
(Grout vent is HDPE diameter 16mm)

13
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

WORKING PROCEDURES
Tendon placing
Placing tendon will be start after finish scaffolding, side formwork, bottom reinforcement
and shear stirrup. This stage start by the following steps.
 Locate supporting chair for tendon as specified in shop drawing
 Check sheath and take off from roll
 Insert strand to sheath and install anchorage for live end
 Install spacer plate for onion end
 Use tape to close connection between coupler or anchorage with sheath
 Fix sheath to supporting chair and then fix supporting chair to bottom reinforcement
 Clean sheath and sheath connection
 Check completeness of tendon, anchorage and grout vent

Hydraulic jack Maintenance


 Calibrate every 6 months
 Clean hydraulic pipe before connected
 Tighten jack and pump connection before using
 Temporary wedge for holding strand coated by graphite powder and lubricant every 100 times usage
 Keeping tidy in storage

14
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Stressing steps
 Put jack on strand and set temporary wedge for holding strand
 Open pump until reach required pressure

 Measure and record elongation


 Increase pressure and record to stressing report
 Insert wedge to anchorage block
 Decrease pressure for releasing strand from jack
 Take off jack and check wedge
 Compare measured elongation with calculated elongation with ±5%

15
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

WORKING PROCEDURES
Remark
 Elongation measurement method is in appendix with stressing report
 Stressing sequence and calculated elongation provide by SNP and send to inspector 3-7 days before
working
 Stressing results of all strands record in report in appendix 5
 After finish stressing the report shall be sent to inspector for approval before cut the strand tail
 Cut strand tail before remove scaffolding or platform
Preparation before stressing
Anchorage block preparation
 Anchorage block shall be coated for corrosion protection and shall be inserted before stressing
 Check length of strand before insert anchorage block
 Clean tail of strand and anchorage guide before insert anchorage block
Method to insert wedge
 Insert anchorage block to anchorage guide
 Insert wedge to anchorage block
 Use hammer to tighten wedge
 Check tail of strand before stressing
Stressing method
See appendix 4
Grouting
Grouting work will increase durability of slab. Grouting will start when scaffolding or platform are
removed clearly.
Site preparation
 Cut tail of strand after get approval from inspector
 Plug mortar in end recess (Mix sand-cement type 1 ratio by 2:1)
 Set up grouting machine on site near working area
 Provide quantity of cement type 1, water and admixture for grouting area
 Grouting can inject not exceed 40m height
 Check mixture, pump, guage and valve
 Inject water to sheath for clearing each ducts

16
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

WORKING PROCEDURES
Mortar and admixture
 Mortar consist of cement, water and admixture
 Cement should be type 1 with 7-30 day age and check weight in package ±2% if exceed we should
adjust proportion
 Admixture consist of Pozzolith110R and aluminum powder by following proportion
Pozzolith 110R volume 200cc/cement 100 kg
Aluminum powder 7g/ cement 100 kg
 Water
Clean water not exceed 45% of cement weight no disguise, no organic substance and chlorine not
exceed 500mg/liter

Grouting mortar test before using


Grouting mortar should be test before using at site. The test method are following
1. Fluidity test
2. Expansion or bleeding
3. Compressive test with 5x5x5cm samples by 3 samples at 7 days and 3 samples at 28 days
For item 1 and 2 can be adjust proportion until test results are pass. For compressive test
will be test by age of mortar.

Grouting mortar test while using


While grouting on site, we should test by this following
 Check fluidity every 3 hour
 Check expansion or bleeding 2 times/day

17
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

WORKING PROCEDURES
Grouting procedure
After grouting mortar is pass for all test, we can start grouting while the temperature not exceed 30
degree celcius.
Grouting method
 Inject mortar to sheath at grout vent
 Control pump pressure by pressure guage
 When mortar run out of grout vent at other side let it flow out for clear bubble and disguise
 Fold grout vent and tighten remain pressure 7 bar for beam and 3 bar for slab until pressure value is
constant.
 Fold grout vent at inject side and tighten
 Move to next tendon

Grouting record
 Number of tendon
 Working time
 Test results
 Important incident

Difficulty in grouting work


 Grouting should work continuously and do not stop long time more than 30 minute. If process not finish
in 30 minute all grouting equipment should clean by blow mortar out by fresh water.
 Every 4-5 working hour and when finish grouting, all grouting equipment should clean before keeping.

Documentations
 Request for working
 Inspection form
 Stressing report
 Grouting report
Example of all documents are in appendix

18
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 1
PRECAUTION IN POST-TENSIONED SLAB WORKING

19
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

PRECAUTION IN POST-TENSIONED SLAB WORKING

1. Before coring slab, post-tensioned slab designer should check and confirm.
2. All strands should be protected from welding work.
3. Provide platform 0.80m away from edge of slab.
4. Shafts and sleeves should be away from column.
5. In case of column was poured exceed bottom slab level. The excessive part should
be cut.

20
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 2
MARERIALS, TOOLS, EQUIPMENT AND TESTING

21
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

MATERIALS, TOOLS, EQUIPMENT AND TESTING


Strand
STRAND PROPERTIES
7-wire low relaxation strand

Nominal Nominal Relaxatio


Nominal Nominal Minimum
tensile Weight n
Standard Diameter Area Breaking
strength Kg/1000m 1,000 hrs.
mm. sq.mm strength kN.
N/sq.mm . %
TIS 420-2540 1860 12.7 98.7 774 184 2.5 *
& ISO 6934- 15.2 139 1,101 259
4:1991
ASTM A 416-96 Grade 270 12.7 98.7 775 183.7 2.5 *
(1860) 15.2 140 1,102 260.7

Note
* Initial force of 70 % of minimum breaking strength
Modulus of elasticity = 1,980,000-2,000,000 kgf/sq.cm

22
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

STRAND

23
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

24
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 1SNP13

25
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 2SNP13
BLOCK 2SNP13

26
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 2SNP13
GUIDE 2SNP13

27
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 3SNP13
BLOCK 3SNP13

28
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 3SNP13
GUIDE 3SNP13

29
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 4SNP13
BLOCK 4SNP13

30
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 4SNP13
GUIDE 4SNP13

31
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 5SNP13
BLOCK 5SNP13

32
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ANCHORAGE

ANCHORAGE 5SNP13
GUIDE 5SNP13

33
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ONION DEAD END ANCHORAGE

34
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

STATIC LOAD TEST


OF POST – TENSION ANCHORAGES
TYPE 1SNP13 ,2SNP13 ,3SNP13
,4SNP13 and 5SNP13

35
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

SPECIFICATION OF TESTED SPECIMENS


MATERIAL PROPERTIES

1. CONCRETE
1.1 Compressive Strength at 28 day 320 ksc. (Cylinder)
1.2 Compressive Strength at Transfer 240 ksc. (Cylinder)

2. MILD STEEL
2.1 Round Bar DIA. 6-9 mm. Conforming to TIS.20-2543 Type SR-24
2.2 Deform Bar DIA. 12-28 mm. Conforming to TIS. 24-2548 Type SD-40

3. STRANDS
Seven-Wire Strand DIA 12.7 mm. (Low-Relaxation) Grade 270 K.Conforming to TIS.420-2534 and
ASTM A416-94
Diameter 12.7 mm.
Cross Section Area 98.71 sq.mm.
Weight 0.775 kg./m.
Min.Breaking Strength 18.73 ton.

4. ANCHORAGE
Post-Tension Anchorage Type 1SNP13, 2SNP13, 3SNP13, 4SNP13, 5SNP13 and Onion Dead End
Conforming to US. ANCHORA Post-Tensioning System

5. CORRUGATED SHEATH
Corrugated Sheath made form Galvanized Steel Strip 0.23 mm. in thickness.
Curvature Friction Coefficient (µ) 0.17 /Rad.
Wobble Friction Coefficient (k) 0.0016 /m.

6. WEDGE
2-PC Standard Wedge manufactured by Post-Tension Product Mfg.Inc.Texas U.S.A.

36
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

37
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

38
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

39
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

40
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

41
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

42
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

43
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

44
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

45
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

46
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

47
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

48
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

49
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

50
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

SUPPORTING CHAIR

Height of bar chair Color


Height ?1cm (11,21,31,…) Red
Height ?2cm (12,22,32,…) Black
Height ?3cm (13,23,33,…) Blue
Height ?4cm (4,14,24,34,…) Pink
Height ?5cm (5,15,25,35,…) Dark Green
Height ?6cm (6,16,26,36,…) Orange
Height ?7cm (7,17,27,37,…) Yellow
Height ?8cm (8,18,28,38,…) White
Height ?9cm (9,19,29,39,…) Light Green
Height ?0cm (10,20,30,…) None

Color of barchair

Height of barchair

51
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

STRESSING JACK

52
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Electric / Hydraulic Pumps

53
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

54
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

55
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

56
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

57
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

58
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

59
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

60
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

61
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

62
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

63
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

64
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

65
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

66
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

67
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

68
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

69
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

70
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

71
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

72
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

GROUTING EQUIPMENT

MIX-1 GROUTING EQUIPMENT

- Tank capacity 100 liters


- Flow rate 40 l/min.(at 0 bar)
25 l/min.(at 9 bar)
- Required electric power 6 kw.(380V.3-phase)
Beware
1.) Grouting process should be operated continuously if it stop more than 30 minutes, the
operator need to clean mixer, pump, valve and any components that involve with
water.
2.) After operating continous of grouting machine for 4-5 hours, it should be stop for
cleaning with water
3.) Grout machine should be cleaned atter operating is finish.

Animation : Grouting Sequence

73
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 3
COMPUTER SOFTWARES AND SHOP DRAWING

74
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

COMPUTER SOFTWARES AND SHOP DRAWING


ADAPT-PT for typical equivalent frame analysis and typical span design

ADAPT-FLOOR for irregular shape with finite element method and design

75
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Post – Tensioning Shop Drawing Software (AUTOPOST)


Computer program module that developed with SNP team for working with AutoCAD Software.
This module can draft shop drawing quickly, estimate, provide stressing sequence and elongation
calculation.

Example of Shop Drawing

76
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

77
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

78
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 4
STRESSING CONCEPT AND ELONGATION MEASUREMENT

79
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

STRESSING CONCEPT AND ELONGATION MEASUREMENT

80
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

STRESSING CONCEPT
 Stressing Sequence
 Elongation measurement and Anchorage Slip

Stressing Sequence
 Step 1 Stressing strand 50% of group of tendon in band direction except extra tendon, extra
tendon around opening or lift core (Stressing in step 3)
 Step 2 Stressing all strand in uniform direction by start with tendon near column to mid span
tendon.
 STEP 3 Stressing remained strand in band direction Band and extra tendon, extra tendon
around opening or lift core.

REMARK
In case of irregular plan stressing sequence will be change by structural engineer.

Animation : Stressing Sequence

81
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Elongation measurement and Anchorage Slip


1. Start hydraulic pump for stressing strand until pressure reach 37.9% of fpu and stop to set
zero elongation point.
2. Start hydraulic pump again for stressing strand until pressure reach 75.8% of fpu and stop to
measure elongation (OA). The total elongation are two time of OA
3. Compare total elongation with theoretical elongation
3.1 If total elongation within ±5% of theoretical elongation then go to next step
3.2 If total elongation greater than theoretical elongation over 5% find out the cause of error
and report to inspector
3.3 If total elongation less than theoretical elongation over 5% then start hydraulic pump for
stressing again until pressure reach 80% of fpu measure the total elongation(OB). The final
total elongation equal to OA+OB and compare with theoretical elongation. If final
elongation still less than theoretical over 5% then report to engineer for re-calculate force
of this strand.
4. Push wedge to anchorage by hydraulic jack and calculate anchorage slip
Anchorage slip = X-Y-3mm.(not exceed 3mm in each side)
X= The final elongation
Y= The final elongation after pushing wedge
3mm = The elongation of strand measure from face of anchorage to jack wedge in
hydraulic jack

82
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Jacking Force – Tendon Extension Curve

Elongation at 37.9%
Elongation at 75.8%

Note
1. OA=OA’
2. Sag is the displacement between strand sag to tight exactly.
3. Elongation measurement compare with theoretical elongation for confirmation that
strand force equal to calculation and for checking something wrong in each strand

83
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Step 1

Step 2

84
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Step 3

Step 4

85
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

Step 5

86
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 5
STRESSING REPORT

87
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

STRESSING REPORT

88
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

89
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 6
ENGINEERING TEAM

90
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

ENGINEERING TEAM
SNP Post tension consist of structural engineering design team and operation team with chief of
each team are structural engineer who are more than 10 year experience.

1. Mr. Suthi Phungklun (Senior professional of operation team )


2. Mr. Puttiphon Siriwattanasereekul (Chief of marketing team)
3. Mr. Tanon Triyodsakon (Chief of engineering design team)
4. Mr. Pakorn Sanruayngern (Chief of engineering team)
5. Mr. Sarayut Kongsong (Chief of operation team)
6. Mr. Parkpoome Vanitkamonnunt (Senior Professional Engineer 1924)

We are international member of Post-Tensioning Institute (PTI) for follow up new knowledge,
research, application and code development for better quality in every projects.

91
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

APPENDIX 7
SHOP-DRAWING AND SITE CHECKING

92
PROPOSAL STATEMENT POST-TENSION BONDED SYSTEM SNP-PT INTERNATIONAL CO., LTD.

SHOP-DRAWING AND SITE CHECKING


1. SNP will finish construction drawing in 5 days after get framing plan.( may be 1-2 days for
special case)
2. Construction drawing will be checked by engineers who get 10 years experience.
3. Tendon layout will be checked by foreman.
4. Foreman and worker will stand by while pouring concrete.
5. Stressing strand will be checked by foreman.
6. Grouting tendon will be checked by foreman.

93