Agllaull syliell shel ASpais
[rab Projects for Safety Co.Ltd
fuilgall gfloum
SPIMACO ADDWAEIH
MATERIAL SUBMITTAL fei\eA. | 5/6 (a1v503/06/2023
Row
‘Arab Projects for Sofety Company ‘SPIMACO Addwaeih
project Name: Upgradation fre Safety System-SPIMACO -AlMalaz _|Sbumittal No: 2
Description: Firefighting Pipes, Fitting & Valves ‘Submittal Details
(Original Copies | Dwes | CD Other
a |e, eye a
[specification Ref: [B00 ret Jorawing No:
Deseripation ‘Origin of Manufacture: ‘Supplier / Local Agent
SSP Pipes ERW ASTM AS3 GRA KSA Arab Projects for Safety Co,
[Thread Fitting from 1/2 to2 inch itachi/Talwan Arab Projects for Safety Co,
Mechanical Fitting from 2.5 to 8 inch National/india Arab Projects for Safety Co.
|zone Control valve (ZCv) Kopler/USA Precision Solutions Corporation | /+
[rest & Drain Valve Giacomini italy Precision Solutions Corporation |
Pressure Gauge AGF/USA Precision Solutions Corporation |/A
INFORMATION SUBMITTED / ATTACHED
"Technical Brochure Samples TT Others: (Please specify
D cerifcate T&M Manuals
Manufacture Data & Specs. | Spare Parts
Di _ shop Drawings OT Warannty
[contractor's Statement:
ote nek ULM,
let, Z
Tne soprova or genra onfornance with Sen cone
are contract documents. The contractor remains respons
for coodinatng the works of various trades for deals ang
accuracy, for conforming and corelating al quantities ang
Jeimonsons, fr selecting fabriating processes, for the
Biante provide cart Jtechnaues of assembly, and for performing his work in 2 sate
use ve /F 4 irene Inannee
UL/FM Centificake Shalt Be pee Cl A-Asprove ae suited
Tati le 98 Aproved 5 ees
1 c-Reve Rest
Reviewed By: eeyy Wea. Date: A(64 9423. |D 0-Rejected
Reviewed Endorsed By
«(fermen et ogee eg pea oer
Sign & Date Sign & Date Sign & Dated
Civil Engineer Structural Engineer |signatun...SSASm we
ark tare Sign & Date loste: iG /2m23- ae
°