You are on page 1of 4
déuilgall gfinuw SPIMACO ADDWAEIH WORK INSPECTION REQUEST aa aaa TE be + aia mm 7 = [submittal & [Approved Drawing Ref. [Specification nef § Location: jo1 & Bz lZone / Grid: é Electrical | Mechanical | Structural Civil n = Architect Engineer | Engineer | engineer | Engineer QC Engineer Construction Manager E sien: sign: Sign: sign: sign: sign: Sign: re saa pe oe vada nr neato TD ea ee Projects Dept, Date: TS pavine gue Hee pen PE i padieg & CE Ty = Lomcse] fark wae fPIC rat LED PaO pote pte fafor Zz fO#- fen yop pop ea fyoe = eke Et™ ata ae Eg eliteg Otopront by ont [signature: = Date: AB. ves INSPECTION ENDORSED BY Civil engineer | structural Engineer | Mechanical Engineer | electrical Engineer Architect sen: sien: Sie Sen Sign bate: Date: bate: Date: pate: —— Inspection Results —_ HPrcsed ith wo [Cl incrpoate the above merino cammorts an proceed wth the work (Cl ribor complete the wer an rit Wa Project Manager: ook procsed with work signeture: WORK INSPECTION REQUEST duilgall gflonm SPIMACO ADDWAEIH Description of work Meterage verfeation for basement i Riser Jang landing Valves , additional work in basement B1, ees lie /Adltional Workin basement 81 Date G03} a ans 2224 3 Submittal [paproved raving ne. Specification Ref. 8 |Location: [Basement 81, HZome Grid neem : stectriat | mechanics | strctrat | ci neneer ln manager z Lee Engineer | Engineer | Engineer | Engineer orem aetuctca ene 5 an Sign: ign: Sian: sign: sis = [se a se i c en We hereby submit resubmit orispection the above referenced work and cori that ths work fas Ben Completed a acordone| withthe Contact naire fron inspection by the Constants Project Manager (Contractor: Lad = = — [Detais And Comments Pipe size | easement 81 8" ° _ a o uy a a 34 e ¥ 3 ae | 0 z ° frase (sewn | 1.25" 116 — e [4 signature: Date: INSPECTION ENDORSED BY uitengineer | structuratngineer | Mechanical Engineer | electrical Engineer rchiect San ian Si a Sane Sie pate: Date Date pate pate 3-823 Inspection Results Project Manager: Di renees wth wor (Cremer ample tne work nd rest VAR Cor proceed wah work (Ctncapiat tne aoe eto comments and proceed wt the Wak auilgall glow SPIMACO ADDWAEIH ‘WORK INSPECTION REQUEST Aecbretputen site 22 Description of work: Sprinkler Qunatity Verification wir No. a Zone Control Valve Quantity Verification Date 132023] Tams 12.00 AM ~ Landing Valves Quanity Veriton Submit Approved Drawing Ret Speciation Re. Location _ Bt to Lower Root Foor foome a ttecical | mechani | structural | cw see Engineer | Engineer | Engineer | Engineer oer oan sign: sien: [Sign sien: sign: Sian “Tens ame Wn hereby brit /reub fornpecton the above referenced work and confirm tts war has ben compleedia accordance wih he Contract nds red for en spect bythe Consus Project Manager |Contractor: - - om - Tanai | sorter] Upright . 5 Floor | pandant | sprinter | 2¥*" | Zove" | Vales 3rd 101 “| 17 ze — — an | 977 12 a 5th. 96K a7 2 Tower 7 tower Tg ° a ae ; a | 7] [eo ae 2 |7- | a |= 17 “Ground zd 4 4 G ast 2 2nd 27 x0 | 40 2 2 ry : y= : Date: INSPECTION ENDORSED BY ttngneer | structural Engineer | Mechanica Engineer | eect Engineer nehitet Se se Be A Sen Ser bate pate: pate: bat: bate: 13 8-23 Inspection Results reset wth won| Citecrprat te stove mares comments nd roca with Weck rework compe the wrk ane esi WR, Project Manager: (Coon proceed wth wre sionature: J auilgall gfloum SPIMACO ADDWAEIH WORK INSPECTION REQUEST [Description of work: Metarage Verincation of Additional Work in lbasement 82 [Submittal [Approved Drawing Ref Specification Ref Location . lpasement 82 |zone / Grid. electrical | Mechanical | Structural | civil ‘Architect | engineer | Engineer | Engineer | Engineer | °°sneet Constrection taoncer Sin: sien: Sign: sign: sign: Sign ‘Tobe Filled by the Contractor We hereby submit / laccordance with th Project Manager Contract ‘ABOVE feferenced work and confirm that this work has been completed in Pai agai ery ncn fety” Projects [eta And Comments Pipe size] ai-tioor -}> 3 D— =a cua aE cman meat : 5 = [| Alban k work vapid ooh i [os ose nated - : coaes TE caw IEF INSPECTION ENDORSED BY camera | coeeeemeeseety tesmsnete | etarmenreens — oy oy San Bien sa pate pate: pate ate: ate (3-29 z Inspection Results ke Crests = i inearporte the abovementioned conmerts and proceed wth the work Cl Rework complete the work an resubmit WIR project Manager: (Ce srcses wth wer stereture: Bete ann

You might also like