déuilgall gfinuw
SPIMACO ADDWAEIH
WORK INSPECTION REQUEST
aa aaa TE
be + aia mm
7 = [submittal
& [Approved Drawing Ref. [Specification nef
§ Location: jo1 & Bz lZone / Grid:
é Electrical | Mechanical | Structural Civil n
= Architect Engineer | Engineer | engineer | Engineer QC Engineer Construction Manager
E sien: sign: Sign: sign: sign: sign: Sign:
re saa pe oe vada nr neato TD
ea ee
Projects Dept, Date:
TS pavine gue Hee pen PE i
padieg & CE Ty =
Lomcse] fark wae fPIC rat LED PaO
pote pte fafor Zz fO#- fen yop
pop ea fyoe =
eke Et™ ata ae Eg
eliteg Otopront by ont
[signature: = Date: AB. ves
INSPECTION ENDORSED BY
Civil engineer | structural Engineer | Mechanical Engineer | electrical Engineer Architect
sen: sien: Sie Sen Sign
bate: Date: bate: Date: pate:
——
Inspection Results
—_ HPrcsed ith wo
[Cl incrpoate the above merino cammorts an proceed wth the work
(Cl ribor complete the wer an rit Wa
Project Manager: ook procsed with work
signeture:WORK INSPECTION REQUEST
duilgall gflonm
SPIMACO ADDWAEIH
Description of work Meterage verfeation for basement i Riser
Jang landing Valves , additional work in basement B1, ees lie
/Adltional Workin basement 81 Date G03} a ans 2224
3 Submittal
[paproved raving ne. Specification Ref.
8 |Location: [Basement 81, HZome Grid neem
: stectriat | mechanics | strctrat | ci neneer ln manager
z Lee Engineer | Engineer | Engineer | Engineer orem aetuctca ene
5 an Sign: ign: Sian: sign: sis
= [se a se i c en
We hereby submit resubmit orispection the above referenced work and cori that ths work fas Ben Completed a acordone|
withthe Contact naire fron inspection by the Constants
Project Manager
(Contractor: Lad = =
—
[Detais And Comments
Pipe size | easement 81
8" ° _ a
o uy a
a 34 e
¥ 3
ae | 0
z °
frase (sewn |
1.25" 116 —
e [4
signature: Date:
INSPECTION ENDORSED BY
uitengineer | structuratngineer | Mechanical Engineer | electrical Engineer rchiect
San ian Si a Sane Sie
pate: Date Date pate pate
3-823
Inspection Results
Project Manager:
Di renees wth wor
(Cremer ample tne work nd rest VAR
Cor proceed wah work
(Ctncapiat tne aoe eto comments and proceed wt the Wakauilgall glow
SPIMACO ADDWAEIH
‘WORK INSPECTION REQUEST
Aecbretputen site 22
Description of work: Sprinkler Qunatity Verification wir No. a
Zone Control Valve Quantity Verification Date 132023] Tams 12.00 AM
~ Landing Valves Quanity Veriton Submit
Approved Drawing Ret Speciation Re.
Location _ Bt to Lower Root Foor foome a
ttecical | mechani | structural | cw
see Engineer | Engineer | Engineer | Engineer oer oan
sign: sien: [Sign sien: sign: Sian “Tens ame
Wn hereby brit /reub fornpecton the above referenced work and confirm tts war has ben compleedia
accordance wih he Contract nds red for en spect bythe Consus
Project Manager
|Contractor: - - om -
Tanai
| sorter] Upright . 5
Floor | pandant | sprinter | 2¥*" | Zove" | Vales
3rd 101 “| 17 ze — —
an | 977 12 a
5th. 96K a7 2
Tower 7
tower Tg ° a ae ;
a | 7] [eo ae
2 |7- | a |= 17
“Ground zd 4 4 G
ast 2
2nd 27
x0 | 40 2 2 ry
: y= : Date:
INSPECTION ENDORSED BY
ttngneer | structural Engineer | Mechanica Engineer | eect Engineer nehitet
Se se Be A Sen Ser
bate pate: pate: bat: bate:
13 8-23
Inspection Results
reset wth won|
Citecrprat te stove mares comments nd roca with Weck
rework compe the wrk ane esi WR,
Project Manager: (Coon proceed wth wre
sionature:
Jauilgall gfloum
SPIMACO ADDWAEIH
WORK INSPECTION REQUEST
[Description of work: Metarage Verincation of Additional Work in
lbasement 82
[Submittal
[Approved Drawing Ref Specification Ref
Location . lpasement 82 |zone / Grid.
electrical | Mechanical | Structural | civil
‘Architect | engineer | Engineer | Engineer | Engineer | °°sneet Constrection taoncer
Sin: sien: Sign: sign: sign: Sign
‘Tobe Filled by the Contractor
We hereby submit /
laccordance with th
Project Manager
Contract
‘ABOVE feferenced work and confirm that this work has been completed in
Pai agai ery ncn
fety” Projects
[eta And Comments
Pipe size] ai-tioor -}> 3 D—
=a
cua
aE
cman
meat : 5
= [| Alban k work vapid ooh
i [os
ose nated - :
coaes TE caw IEF
INSPECTION ENDORSED BY
camera | coeeeemeeseety tesmsnete | etarmenreens —
oy oy San Bien sa
pate pate: pate ate: ate
(3-29
z Inspection Results
ke Crests
=
i
inearporte the abovementioned conmerts and proceed wth the work
Cl Rework complete the work an resubmit WIR
project Manager: (Ce srcses wth wer
stereture: Bete ann