Regent Garment - IED-SOP 002 New Style Startup Training
Regent Garment - IED-SOP 002 New Style Startup Training
Revision Record
Revision Date Revision Details Effective Date
DD/MM/YY No. DD/MM/YY
6.2.1
10/01/08 001 6.2.2 11/01/08
6.2.3
8.0
Signature
Name
Huyen Vu Thi Thanh Dao Tien Zainuddin Yasin
Title
Assistant Officer Assistant Manager Senior Manager
Date
1. Purpose:
The purposes of this procedure are:
1.1 - To control the production preparation process in IED to ensure fast new loading in the line
1.2 - Ensure correct method for Supervisor/ Line Leader/ Utility Operator before start sewing new
style.
1.3 - Highlight all the technical issue to related department.
2. Scope:
Apply for IED, PPC, MCD, MTN, CUT, CMD –Sample room and production
3. Reference
Manufacture Order
Master plan
4. Abbreviation and Definition:
MO: Manufacture Order
CUT: Cutting
CMD: Computer Maker Department
IED: Industrial Engineering Department
PPC: Production Planning and Control
MCD: Material Control Department
MTN: Maintenance
QA: Quality Assurance
LLD: Line Leader
SAM: Standard Allowed Minutes
WHS: Warehouse
SEW: Sewing
5. Responsibility
Refer to the content of procedure
Standard Operation Procedure
Title: New style start up training
Reference No.: IED–SOP 002
Effective Date:01/11/07 Revision No: new Page 3 of 7
6. Content:
6.1 - Flow chart:
6.2 - Procedure:
No Procedure and Requirement Responsible
party
6.2.1 PPC issue the information to IED PPC
Receiving information about new style, such as original sample, MO, trim
card, SAM bulletin from PPC. IED will take note and start the duty.
In urgent loading plan, IE will base on the style to reduce the training
quantity of new style to suit with loading schedule. In case PPC has not
received approved sample, MO from customer IED will get agreement from
production to make new style training for Sewing Supervisor/LLD with any
information available in hand to catch up with the schedule.
6.2.2 Prepare standard method
IE Technician base on the paper maker of CMD to cut garment samples, IE
Standard Operation Procedure
Title: New style start up training
Reference No.: IED–SOP 002
Effective Date:01/11/07 Revision No: new Page 4 of 7
7. Record
Name of record Retention Responsible Party
Checklist for new style training (IED-F001) 6 months IED
New style training record (IED-F002) 6 months IED
8 Appendix:
Attachments