100% found this document useful (2 votes)
2K views29 pages

4.0 Best Practice - Risk Based Inspection

Uploaded by

ramu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views29 pages

4.0 Best Practice - Risk Based Inspection

Uploaded by

ramu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Integrated Refinery Business Improvement Program: Introduces the overall business improvement program structure at the refinery, including key initiatives and management systems.
  • Methodologies and Risk Management: Discusses methodologies, principles, and risk management strategies used for business improvement in the refinery setting.
  • Global Application of RRM and S-RBI: Explains the global application of Risk and Reliability Management (RRM) and Shell's Risk-Based Inspection (S-RBI) processes.
  • Team Competency and Integration: Covers the competencies required for the multidisciplinary teams and the integration of various roles within S-RBI processes.
  • Risk Prevention and Mitigation: Details the strategies for risk assessment, prevention, and mitigation including the use of risk matrices.
  • S-RBI Process and Failure Modes: Outlines the process steps in S-RBI and characteristics of typical failure modes affecting refinery operations.
  • Corrosion Loop Concepts: Explores the concept of corrosion loops, their boundaries, and related examples within a unit.
  • Inspection and Integrity Management: Addresses inspection strategies and integrity management focused on maintaining spacecraft structural integrity.
  • Critical Success Factors and Limitations: Identifies critical success factors for implementing S-RBI and outlines potential limitations of the process.
  • Software Walkthrough: Provides a brief walkthrough of the software tools used in risk-based inspection and process analysis.
  • CUI and Sustainability Strategies: Discusses strategies for inspection and maintenance, specifically tailored for corrosion under insulation and sustainability initiatives.

INTEGRATED REFINERY

BUSINESS IMPROVEMENT PROGRAM

HPCL Mumbai–
Best Practice:-
Shell Risk Based Inspection

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 1

Operational Reliability Management System (ORMS)


PUBLICISE,
RELIABILITY STEERING COMMITTEE COMMUNICATE
CHAMPION EM OM TM

ACTION PLANS

OPTIMUM
RECOMMEND
MAINTENANCE
PROGRAMME
FEEDBACK

IMPLEMENT
Area Focal
S-RCM
Point(s)
S-RBI RRM Defect
SIFpro Elimination

Multidiscipline
Team(s)
PROACTIVE REACTIVE MONITOR,
KPIs

15

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 2


© Shell Global Solutions 2
P-B-v1.1 CvdS 20070920

1
METHODOLOGIES, PRINCIPLES, SCOPES,
DELIVERABLES, BENEFITS
Risk & Reliability Management (RRM)

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 3

PART OF RISK & RELIABILITY MANAGEMENT

Methodology
&
Software

S-RBI S-RCM SIFpro Tank RRM

roof

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 4

2
SCOPE

Methodology Scope
S-RBI integrity, envelope, pressure containment,

Verify  Test  Rectify  Modify


avoiding leaks
Tank RRM containment in storage tanks
SRV-RBI safety relief valves
SIFpro automatic systems to avoid hazards
Civil RCM civil infrastructures
S-RCM rotating equipment, static equipment (internals,
fouling), instrumentation, electrical equipment
Defect Elimination incidents

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 5

DELIVERABLES

Methodology Deliverables
S-RBI optimised inspection tasks and agreed integrity
Verify  Test  Rectify  Modify

operating windows
Tank RRM optimised inspection and maintenance tasks
SRV-RBI optimised test frequencies and overhauls
SIFpro optimised levels of safeguarding
Civil RCM optimised inspection and maintenance tasks
S-RCM cost effective maintenance plan to ensure facility
produces as intended
Defect Elimination optimal solutions to eliminate root causes

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 6

3
RRM & S-RBI IN THE WORLD

S-RBI up to 1999
2002 onwards
Fredericia
Gothenburg Harburg
Cominco NAM Godorf
Paper & pulp BP Grangemouth 2 x
Carrington Orlen SEIC
Pernis CRC Omsk Cosmo Sakaide 2 x
Berre BayernOil Kawasaki Ref.
Yokkaichi
API 580 Saras KNPC
Cosmo Yokkaichi 2 x
Abu Dhabi 3 x
API 581 Saudi Arabia
Oman LNG
PDO Hazira Port Dickson 2 x
Petronas Gas Petronas Melakka 5 x
Nigeria LNG
Bintulu-MLNG Brunei LNG
Mombassa Sarawak EP

Durban
Geelong
Buenos Aires Woodside

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 7

SHELL RISK BASED INSPECTION

Is a risk-based decision support process …


which is structured and multidisciplinary
to determine and document cost-effectively
the optimum inspection requirements
in terms of reliability and availability
of pressure containing equipment
in its operating context
and which safeguards integrity

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 8

4
S-RBI – Multidisciplinary Team

probability × exposure × consequence

inspector maintenance

corrosion engineer operation

process engineer

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 9


CvdS 20070920

S-RBI – COMPETENCES REQUIRED

time 2h 3d 2w 3m 3y

level 1 2 3 4 5
planner x
maintenance x
process engineer x x
operation x x
inspector x x x
corrosion engineer x x x
champion / guru / facilitator / reviewer x x x x
management / sponsor x

Shell Global Solutions x x x x x

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 10

5
Competency levels

Level   
Capability Experience Theory  
Practice Test

1 Awareness Hours Appreciate 75 : 25 Try Listen

2 Knowledge Days Understand 50 : 50 Participate Exam

3 Skill Weeks Explain 25 : 75 Implement Show

4 Mastery Months Teach 20 : 80 Optimise Prove

Develop
5 new
Years Innovate 10 : 90 Improve Justify

10

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 11


CvdS 20070920

Multiple “root causes” (simultaneously)


E.g. Technical Integrity Barriers

16

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 12


CvdS 20070920

6
Right balance legislation

verify S-RBI
test SIFpro
procedures
rectify S-RCM
Process improve RCA

software RRM
team

Tools People
equipment
training

competence
19

RRM = process : people : tools = 40 : 40 : 20


Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 13
CvdS 20070920

DETAILED DELIVERABLES S-RBI

Hard
 Integrity Operating Windows

 Tasks

 Recommendations (long term)

 Actions (short term)

Soft
 better understanding (of risk and influencing factors)

 better ownership (of information and assumptions)

 team building (to enable multidisciplinary work)

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 14

7
RISK, PREVENTION, MITIGATION
RISK ASSESSMENT MATRIX
Shell Risk Based Inspection

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 15

“Bow-tie” diagram

“prevention” cause effect


“mitigation”

27

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 16


CvdS 20070920

8
Risk Assessment Matrix (RAM)

Risk can be semi-quantified


allows assessment with factor 10 margin
a N × M matrix can still have (N+M-1) levels of risk

High Risk
Probability ?

Low Risk
Consequence ?

28

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 17


CvdS 20070920

Reducing risk by Prevention and Mitigation

Base Risk without maintenance, inspection, testing


Residual Risk after maintenance, inspection, testing

Mitigation

High Risk
Probability ?

Prevention

Low Risk
Consequence ?

29

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 18


CvdS 20070920

9
EXAMPLE RAM FOR RISK BASED INSPECTION

Any observations ?
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 19

METHODOLOGY
(IN A NUTSHELL)
Shell Risk Based Inspection

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 20

10
S-RBI PROCESS

Equipment
Data List
Analysis/Review
Design- and Feedback
Inspection Data

Asset Integrity
Task Execution
Database

Corrosion Loop Inspection/Monitoring


Definition Planning

Criticality Confidence
Assessment Assessment

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 21

FAILURE MODE CHARACTERISTIC

Corrosion Under Insulation


LT Embrittlement
Cooling Water Corrosion
Sulphuric acid corrosion
Caustic Cracking
Atmospheric Corrosion
Caustic Corrosion

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 22

11
S-RBI PROCESS
Asset
Integrity
Database

Corrosion Loop Investigative


1 definition Inspection

(Tag) criticality Feed back &


Criticality = N
assessment 2 Analyse

StF
Criticality Mitigate
H CR > 4*CRd L MH H E E
Risk
PROBABILITY CLASS

M CR = 1 - 4*CRd L M MH H E

No inspection L CR = 0,5 - 1 CRd N L M MH H Detailed


Analysis Execute
periodic review N CR < 0,5*CRd N N L M MH

no/slight damage minor damage local damage major damage extensive Inspection Plan
only ECONOMICS (US$)
CONSEQUENCE

(<10k) (10-100k) (0.1-1m) (1-10m) damage (> 10m)


CATEGORY

HEALTH & SAFETY no/slight injury minor injury major injury single fatality multiple fatalities

ENVIRONMENT no/slight effect minor effect local effect major effect massive effect

CONSEQUENCE CLASS NEGLIGIBLE LOW MEDIUM HIGH EXTREME


3
Remnant Life
Confidence Inspection &
(Age Related
Rating Monitoring Plan
only)

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd

MATERIAL AND ENVIRONMENT

degradation

What type of degradation


can occur and where ?
material
+
environment
Which (process) controls
Are needed ?

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 24

12
WHAT IS A CORROSION LOOP?
“A practical way to understand and describe Failure Modes in a Unit”

Part of a unit subjected to:


-similar process conditions Corrosion Loop
-similar materials selection
=> resulting in similar Failure Modes Loop
2

Loop 3

One “Operating Window”


- control of Failure Modes via
process control Loop 1

- values agreed by team


(boundary conditions for RBI)
- deviation should be reported • similar process conditions
• similar Failure Modes

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 25

CORROSION LOOP BOUNDARIES

Inert vapour
Some “rules”
4 Vapour
Change in Construction Material E-1
2 Liquid
Change in Process Conditions
“Battery Limit” V-1
Equipment in severest CL Susceptible
3
Feed material 1
Corrosive liquid
Merge very small CL’s Restistant
material
Split very large CL’s
Inert vapour 5

C-1
E-2

3
Inert liquid

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 26

13
CORROSION LOOP EXAMPLE

5Cr 0.5Mo

ss
1.25Cr 0.5Mo

CS

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 27

will not occur


Corrosion Loop
Will not
occur if
Tag 3

Tag 2
Will FM 2
occur AR
Tag 1
NAR

FM 1

% Management
% X of Change
% X

IOW X $
$
$
Monitor Task
IOW Task

43

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 28


CvdS 20070920

14
Age Related, Non-Age Related &
Strategy Based
Condition ?

Rejection Strategy Based

Age Related
Non-Age Related
e.g. SCC
Time ?

42

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 29


CvdS 20070920

INTEGRITY OPERATING WINDOW

Provides further operating limits to prevent pre-mature


integrity failures due to degradation of the material

The Operating Window

Design Window
Process & Economical Window
Integrity Operating Window

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 30

15
S-RBI Risk Assessment Matrix
premature failure

StF
Criticality
H CR > 4*CRd L MH H E E
PROBABILITY CLASS

M CR = 1 - 4*CRd L M MH H E

L CR = 0,5 - 1 CRd N L M MH H
within design

N CR < 0,5*CRd N N L M MH

no/slight damage minor damage local damage major damage extensive


ECONOMICS (US$)
CONSEQUENCE

(<10k) (10-100k) (0.1-1m) (1-10m) damage (>10m)


CATEGORY

HEALTH & SAFETY no/slight injury minor injury major injury single fatality multiple fatalities

ENVIRONMENT no/slight effect minor effect local effect major effect massive effect

CONSEQUENCE CLASS NEGLIGIBLE LOW MEDIUM HIGH EXTREME

N = Negligible L = Low M = Medium MH = Medium High H = High E = Extreme

44

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 31


CvdS 20070920

CONFIDENCE

? ?

? ?

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 32

16
Why Confidence Rating?
Statistical variations
influence short term Risk

There are many factors:

High confidence

Low confidence

now tx time 
27
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 33

MAXIMUM INSPECTION INTERVAL

inspections

t new remnant life


X X
maximum
X inspection interval

minimum allowable thickness


t (min)

Time →

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 34

17
INTERVAL FACTORS FOR AGE RELATED FAILURE MODES

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 35

PROCESS MONITORING REGIMES


FOR NON-AGE RELATED FAILURE MODES

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 36

18
LIMITATIONS,
CRITICAL SUCCESS FACTORS
Shell Risk Based Inspection

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 37

SPARC
Limitations of S-RBI

(too slow)
N
StF
Criticality
H CR > 4*CRd L MH H E E
PROBABILITY CLASS

M CR = 1 - 4*CRd L M MH H E

CR = CRd L CR = 0,5 - 1 CRd N L M MH H

N CR < 0,5*CRd N N L M MH

no/slight damage minor damage local damage major damage extensive


ECONOMICS (US$)
CONSEQUENCE

(<10k) (10-100k) (0.1-1m) (1-10m) damage (>10m)


CATEGORY

L HEALTH & SAFETY no/slight injury minor injury major injury single fatality multiple fatalities

ENVIRONMENT no/slight effect minor effect local effect major effect massive effect

CONSEQUENCE CLASS NEGLIGIBLE LOW MEDIUM HIGH EXTREME

Fit for Purpose Analysis min

(too fast)

Time 

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 38

19
Critical Success Factors for S-RBI
Asset Owner to establish design premises and review when necessary
Corrosion Engineer to structure knowledge, incl
map Failure Modes and associated Integrity Operating Windows onto the assets
use clear language and clarify the distinctions between the Corrosion Loops
Inspector to summarise raw inspection "data" into "information“, incl
select the most effective inspection technique
Process Engineer to participate and quantify operating conditions
Operations to implement Integrity Operating Windows and report excursions
Everyone to be trained to the appropriate competence level to contribute, incl
record assumptions so studies are repeatable and can be improved ( learning)
link to existing documents and avoid duplication
-------------------------------------------------------------------------------------------------------
Management to trust the process and to accept the outcomes, incl
provide resources and endorse policies to cater for extreme situations
Authorities to be engaged and work in partnership with the industry
Key Performance Indicators to demonstrate benefits and pro-activeness 55

Review
Copyright notSolutions
of Shell Global only(Malaysia)
after “effects” change, also before “causes” change
Sdn Bhd 10/14/2011 39
CvdS
CvdS20070920
20070808

SOFTWARE WALKTHROUGH

Shell Risk Based Inspection

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 40

20
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 41

C Confidence Rating
CoF Consequence of Failure
Cr Criticality
CRd Corrosion Rate (Design)
Ec Economics
Ev Environment
HS Health & Safety
IF Interval Factor
MII Maximum Inspection Interval
Qx Question x (for Confidence Rating)
RCA Remnant Corrosion Allowance
RL Remnant Life
SCR Selected Corrosion Rate
StF Susceptibility to Failure

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 42

21
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 43

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 44

22
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 45

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 46

23
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 47

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 48

24
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 49

Q1
Q2

Q3

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 50

25
C Confidence Rating
CoF Consequence of Failure
Cr Criticality
CRd Corrosion Rate (Design)
Ec Economics
Ev Environment
HS Health & Safety
IF Interval Factor
MII Maximum Inspection Interval
Qx Question x (for Confidence Rating)
RCA Remnant Corrosion Allowance
RL Remnant Life
SCR Selected Corrosion Rate
StF Susceptibility to Failure

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 51

SCC etc Monitoring plan

C Confidence Rating
CoF Consequence of Failure
Cr Criticality
CRd Corrosion Rate (Design)
Ec Economics
Ev Environment
HS Health & Safety
IF Interval Factor
MII Maximum Inspection Interval
Qx Question x (for Confidence Rating)
RCA Remnant Corrosion Allowance
RL Remnant Life
SCR Selected Corrosion Rate
StF Susceptibility to Failure

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 52

26
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 53

CUI INSPECTION/MAINTENANCE STRATEGIES


FOR CS/LOW ALLOY STEEL

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 54

27
CUI INSPECTION/MAINTENANCE STRATEGIES
FOR STAINLESS STEEL (CL-SCC)

Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 55

Sustainability

Commitment Quality
contribute ensure ownership
implement the results hand over roles

Efficiency Input & Communication


balance detail vs insight be structured and clear
leverage commonalities celebrate success

Ever greening Repeatability & Learning


refresh content & competences document assumptions
adopt (external) best practices have a logic audit trail

56

History ? Analysis ? Plan must always stay connected !!


Copyright of Shell Global Solutions (Malaysia) Sdn Bhd 10/14/2011 56
CvdS 20070920

28
29

1
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
INTEGRATED REFINERY 
BUSINESS IMPROVEMENT PROGRAM
HPCL Mumbai–
Best
2
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
Risk & Reliability Management (RRM)
METHODOLOGIES, PRINCIPLES, SCOPE
3
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
SCOPE
Methodology
Scope
S-RBI
integrity, envelope, pressure containm
4
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
RRM & S-RBI IN THE WORLD
7
10/14/2011
Buenos Aires
Port Dickson 2 x
5
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
9
CvdS 20070920
9
S-RBI – Multidisciplinary Team
inspector
corrosion
6
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CvdS 20070920
10
10
 




 
Competency levels
Level
Capabili
7
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CvdS 20070920
19
19
RRM 
Right balance
Tools
People
Process
training
8
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
Shell Risk Based Inspection
RISK, PREVENTION, MITIGATION
RISK ASSESS
9
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
28
CvdS 20070920
28
Risk Assessment Matrix (RAM)
Risk can be semi-qu
10
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
Any observations ?
EXAMPLE RAM FOR RISK BASED INSPECTION
19