Professional Documents
Culture Documents
Equipment
Site Name Type of Work
Number
Manufacturer Model Capacity
Year Date of First Date of
Manufactured Use Inspection
2 1
Rearview Mirror Operator’s Vision
3 Parking Brake
6 Tire Brake
Wheel Assembly Horn
4
7 Cylinder Leakage Head Light
Fog Light
5
Access Step
8
Safety Stand
11
Reverse Alarm
9
Frame Bolts
12
Tailgate Lock
4
Tail Light
10
Leaf Spring
(Keep the copy of Daily Pre-Start Equipment Checklist on Site for the Job Duration. Submit a copy to the Project HSE Department, if requested/required)
Note: Mark appropriate boxes with: Acceptable; Unacceptable; Need Further Check; NA Not Applicable