Professional Documents
Culture Documents
t--
02
->
j,__
"<t
:::s
C
G)
>
C
Group No. 10 to 18 & 30, 31
CR-17
03 G)
bl) -
N G) Group No. 19 to 27 & 32
s' 0 > TUT-5 All
r/J ~ ~
I--- "Ei)
04
...i ·;;;:
G)
Q ~ Group No. 37 to 45 & 33 Respective
CR-21 Guides
- ~
V"\
·=ci::
e-
Q.,
0
0 Group No. 46 to 54 & 34
OS 0
-06 -
0
Group No. 55 to till remaining & 35, 36
Seminar Hall
TUT-8
I) Project Stage II, Review IV is mandatory for all project groups and will be conducted as per above schedule.
2) Project groups will be eligible for the Review IV if the following points are completed.
A. Hardcopy of rough draft of final project report printed on both side pages.
B. Plagiarism certificate of project report (similarity index should be less than 25%)
C. Sponsorship letter (if applicable)
D. Physical model of the project.
E. Student project diary.
Index of Report (report should be prepared considering all the following points)
I . Title Sheet
2. Certificate (Institution)
3. Certificate (Company, if sponsored by company)
4. Acknowledgement
5. Abstract of the Project
6. List of Figures
7. List of Photographs / Plates
8. List ofTables
9. Table of Contents
I0. Introduction
11. Literature Survey / Theory
I~. Design/ Experimentation/ Fabrication/ Production/ Actual work carried out for the same
13. Observation Results
14. Discussion on Result and Conclusion /
I~- Student and Guide de 'Is. (Ac m on <otograph with project)