You are on page 1of 2

International University – VNUHCM Deterministic Models in Operation Research

School of Industrial Engineering and Management Year: 2022-2023

HOMEWORK 2 - SOLVING LPP USING SIMPLEX


(due date: 1 week)
Instruction: Please finish all questions IN WRITING and scan to pdf to submit before the due hour.
This is individual work, to be submitted on Blackboard.

Question 1. Consider the following problem:


Maximize 𝑍 = 2𝑥1 + 𝑥2 ,
Subject to 𝑥1 + 𝑥2 ≤ 40
4𝑥1 + 𝑥2 ≤ 100
x1 and x2 are non-negative
a) Solve this problem graphically. Also identify all the Corner Point Feasible (CPF) solutions.
b) Now, solve this problem by the simplex method.

Question 2. Consider the following problem:


Minimize 𝑍 = 2𝑥1 + 3𝑥2 + 𝑥3 ,
Subject to 𝑥1 + 4𝑥2 + 2𝑥3 ≥ 8
3𝑥1 + 2𝑥2 ≥ 6
x1 and x2 are non-negative
Solve this problem by the simplex method step by step.

Question 3. Consider the following problem:


Maximize 𝑍 = 2𝑥1 + 5𝑥2 + 3𝑥3 ,
Subject to 𝑥1 − 2𝑥2 + 𝑥3 ≥ 20
2𝑥1 + 4𝑥2 + 𝑥3 = 50
x1 and x2 are non-negative
Solve the problem using the Big M method step by step.

Question 4. Consider the following problem:


Minimize 𝑍 = 3𝑥1 + 2𝑥2 + 4𝑥3 ,
International University – VNUHCM Deterministic Models in Operation Research
School of Industrial Engineering and Management Year: 2022-2023

subject to 2𝑥1 + 𝑥2 + 3𝑥3 = 60


3𝑥1 + 3𝑥2 + 5𝑥3 ≥ 120
x1 , x2 , x3 are non-negative
(a) Solve the problem using the Big M method step by step.
(b) Solve the problem using the two-phase method step by step.

Question 5. Consider the following problem:


Minimize 𝑍 = 2𝑥1 − 2𝑥2 + 3𝑥3 ,
subject to −𝑥1 + 𝑥2 + 𝑥3 ≤ 4 (𝑟𝑒𝑠𝑜𝑢𝑟𝑐𝑒 1)
2𝑥1 − 𝑥2 + 𝑥3 ≤ 2 (𝑟𝑒𝑠𝑜𝑢𝑟𝑐𝑒 2)
𝑥1 + 𝑥2 + 3𝑥3 ≤ 12 (𝑟𝑒𝑠𝑜𝑢𝑟𝑐𝑒 3)
x1 , x2 , x3 are non-negative
(a) Work through the simplex method step by step to solve the problem.
(b) Identify the shadow prices for the three resources and describe their significance.

(Reference: Chapter 4 - Introduction to Operations Research by Hillier and Lieberman, 9th ed.)

You might also like