You are on page 1of 2

Weekly Safety Summary Report

COMPANY :DECOVISION
PROJECT: FlIGHT SIMULATOR HUB DATE: 02.07.2023
REPORTING PERIOD: FROM: 25.06.2023
TO: 01.07.2023

(1) MAN HOURS* WORKED

Total Manpower Last Period Total Manpower This Period Total To Date

0 8 8

Total Manhours Last Period Total Manhours This Period Total To Date

0 64 64

* Man hours : the total number of man-hours the site has worked within a specific period (inclusive of subcontractors)

(2) ACCIDENTS

To date
S/N Type of accident This Period
(cumulative)

1 Lost Time Injuries (LTIs) 0 0

2 Restricted Work Cases (RWC) 0 0

3 Occupational Illnesses 0 0

4 Occupational Fatalities 0 0

5 Medical Treatement Cases (MTC) 0 0

6 First Aid Cases (FAC) 0 0

7 Near Misses 0 0

8 Non-Occupational Fatality 0 0

(3) OTHER ACTIVITIES

To date
S/N Types Last Period This Period
(cumulative)
1 Observation Card / Report 0 0 0
2 Safety Awards 0 0 0
3 Safety Violations 0 0 0
4 Trainings a) Safety Induction 0 4 4
In groups b) Tool Box Talk 0 1 1
In groups c) Pretask Brefing 0 0 0

Prepared by: ASHIF M YUSOOF Approved By Wadi Foqaha

Signature : Signature :
Date:
HSE Department
DV-HSE-FM-49 REV O DATE ISSUED: 01.01.2023

Page 1 of 2
16.08.13 27988 720 28708
23.08.13 5702 60 5762
30.08.13 5724 286 6010
06.09.13 5876 75 5951
13.09.13 5712 1451 7163
20.09.13 4930 130 5060
27.09.13 4992 4992
04.10.13 4927 4927
11.10.13 5060 624 5684
18.10.13 3063 312 3375
25.10.13 5555 747 6302
01.11.13 6075 800 6875
08.11.13 5090 1616 6706
15.11.13 5540 1818 7358
22.11.13 5722 1728 7450
29.11.13 5680 1680 7360
06.12.13 9769 4070 13839
13.12.13 7563 8446 16009
20.12.13 8470 8190 16660
166191