You are on page 1of 1

WEEKLY HSE PERFORMANCE REPORT

Project Name: Year:2022

Week
Project Consultant: 12 FEB -17 FEB 2023
Period:
Main Contractor:
CUMULATIVE
STATISTICS WEEK REMARKS
(From Job Inception)
Average Daily Manpower for the Week (day night) 303 NA
Average Manpower (Main Contractors) 218 358870 HRS
Average Manpower (sub-Contractors) 85 100409 HRS
Total Man Hours worked 17876 459279
No. of Sub-Contractors 1 1
Lost Time Injuries (LTI) 0 0
Total Man Hours worked since last LTI 17876 459279
Lost Time Injury Frequency Rate (LTIFR) 0 0
First Aid Cases (FAC) 1 11
No. of Medical Treatment Cases (MTC) 0 0
No. of Near Misses 1 17
No. of Environmental Incidents 0 0
No. of Property/ Equipment Damage 0 0
No. of Dangerous Occurrence 0 0
No. of Safety Staff 1 1
No. of staffs attended Safety Induction 0 188
No. of Training Conducted 1 35
No. of Pre-task Briefings & Tool Box Talks (session) 4 155
No. of Safety Observation Reports received (NCR) 0 40
No. of Safety Enforcement Notices received 0 0
No. of DDA Safety Observation Notices 0 5

Item Comment
Short Description of Accident/ Incident occurred this
Nil
week:
 Site Mobilization
 Block work
 Re bar and shutter for neck columns
High Risk Activities In-progress:
 Back filling
 Painting
 Tile fixing

Prepared by ( HSE ENGINEER) Approved by (PROJECT MANAGER)


Name: Engr. SHANWAS Engr. WAEL
Date: 19 -02-2023 19 -02-2023
Sign & Stamp

Page 1 of 1