You are on page 1of 163

GENERAL DRAWING SUPERSTRUCTURE

C- 1 -001 LIST OF DRAWINGS 1 PYLON


C- 1 -002 LIST OF DRAWINGS 2 C-3a-001 GEOMETRY CONTROL OF PYLON 1
C- 1 -003 GENERAL NOTES 1 C-3a-002 GEOMETRY CONTROL OF PYLON 2
C- 1 -004 GENERAL NOTES 2 C-3a-003 GEOMETRY CONTROL OF PYLON 3
C- 1 -005 MAIN BRIDGE GENERAL DRAWING 1 C-3a-004 DRAINAGE FOR PYLON
C- 1 -006 MAIN BRIDGE GENERAL DRAWING 2 C-3a-005 CROSSBEAM DETAILS
C- 1 -007 MAIN BRIDGE GENERAL DRAWING 3 C-3a-006 REINFORCEMENT OF PYLON COLUMN 1
C-3a-007 REINFORCEMENT OF PYLON COLUMN 2
SUBSTRUCTURE C-3a-008 REINFORCEMENT OF PYLON COLUMN 3
FOUNDATION C-3a-009 PYLON CROSSBEAM PRESTRESSING 1
C-2a-001 GENERAL VIEW OF PYLON P12 C-3a-010 PYLON CROSSBEAM PRESTRESSING 2
C-2a-002 GENERAL VIEW OF PYLON P13 C-3a-011 REINFORCEMENT OF PYLON CROSSBEAM 1
C-2a-003 GENERAL VIEW OF PYLON P14 C-3a-012 REINFORCEMENT OF PYLON CROSSBEAM 2
C-2a-004 GENERAL VIEW OF PYLON P15 C-3a-013 REINFORCEMENT OF PYLON CROSSBEAM 3
C-2a-005 GENERAL VIEW OF PYLON P16 C-3a-014 REINFORCEMENT OF TOP STRUT AND TOP OF PYLON
C-2a-006 LAYOUT OF STEEL PIPE SHEET PILE (P12) C-3a-015 GENERAL VIEW OF ANCHOR BOX 1
C-2a-007 ARRANGEMENT OF STEEL PIPE SHEET PILES (P12) C-3a-016 GENERAL VIEW OF ANCHOR BOX 2
C-2a-008 LAYOUT OF STEEL PIPE SHEET PILE (P13) C-3a-017 CROSS SECTIONS OF ANCHOR BOX 1
C-2a-009 ARRANGEMENT OF STEEL PIPE SHEET PILES (P13) C-3a-018 CROSS SECTIONS OF ANCHOR BOX 2
C-2a-010 LAYOUT OF STEEL PIPE SHEET PILE (P14) C-3a-019 ANCHOR BOX DETAILS 1
C-2a-011 ARRANGEMENT OF STEEL PIPE SHEET PILES (P14) C-3a-020 ANCHOR BOX DETAILS 2
C-2a-012 LAYOUT OF STEEL PIPE SHEET PILE (P15) C-3a-021 STUD ARRANGEMENT OF ANCHOR BOX
C-2a-013 ARRANGEMENT OF STEEL PIPE SHEET PILES (P15) C-3a-022 BASE OF ANCHOR BOX
C-2a-014 LAYOUT OF STEEL PIPE SHEET PILE (P16) C-3a-023 STAY CABLE BOOT AT PYLON EXIT
C-2a-015 ARRANGEMENT OF STEEL PIPE SHEET PILES (P16) C-3a-024 CROSS BEAM FOR ANCHOR BOX
C-2a-016 DETAIL OF STEEL PIPE SHEET PILE
C-2a-017 PILE HEAD DETAIL DECK AND GIRDER
C-2a-018 CONSTRUCTION SEQUENCE OF STEEL PIPE SHEET PILE FOUNDATION (P12) C-3b-001 GENERAL LAYOUT 1
C-2a-019 CONSTRUCTION SEQUENCE OF STEEL PIPE SHEET PILE FOUNDATION (P13) C-3b-002 GENERAL LAYOUT 2
C-2a-020 CONSTRUCTION SEQUENCE OF STEEL PIPE SHEET PILE FOUNDATION (P14) C-3b-003 GENERAL LAYOUT 3
C-2a-021 CONSTRUCTION SEQUENCE OF STEEL PIPE SHEET PILE FOUNDATION (P15) C-3b-004 LAYOUT OF BEARINGS
C-2a-022 CONSTRUCTION SEQUENCE OF STEEL PIPE SHEET PILE FOUNDATION (P16) C-3b-005 LAYOUT OF PRECAST DECK PANEL 1
C-2a-023 REINFORCEMENT OF TOP SLAB (P12) C-3b-006 LAYOUT OF PRECAST DECK PANEL 2
C-2a-024 REINFORCEMENT OF TOP SLAB (P13) C-3b-007 LAYOUT OF PRECAST DECK PANEL 3
C-2a-025 REINFORCEMENT OF TOP SLAB (P14) C-3b-008 LAYOUT OF PRECAST DECK PANEL 4
C-2a-026 REINFORCEMENT OF TOP SLAB (P15) C-3b-009 LAYOUT OF PRECAST DECK PANEL 5
C-2a-027 REINFORCEMENT OF TOP SLAB (P16) C-3b-010 LAYOUT OF PRESTRESSING TENDON 1
C-2a-028 CONNECTION BETWEEN TOP SLAB AND SHEET PILES (P12) C-3b-011 LAYOUT OF PRESTRESSING TENDON 2
C-2a-029 CONNECTION BETWEEN TOP SLAB AND SHEET PILES (P13) C-3b-012 LAYOUT OF PRESTRESSING TENDON 3
C-2a-030 CONNECTION BETWEEN TOP SLAB AND SHEET PILES (P14) C-3b-013 LAYOUT OF PRESTRESSING TENDON 4
C-2a-031 CONNECTION BETWEEN TOP SLAB AND SHEET PILES (P15) C-3b-014 LAYOUT OF PRESTRESSING TENDON 5
C-2a-032 CONNECTION BETWEEN TOP SLAB AND SHEET PILES (P16) C-3b-015 LAYOUT OF PRESTRESSING TENDON 6
C-3b-016 REINFORCEMENT OF PRECAST DECK PANEL 1
END PIER C-3b-017 REINFORCEMENT OF PRECAST DECK PANEL 2
C-2b-001 END PIER P11 1 C-3b-018 REINFORCEMENT OF PRESTRESSING CABLE ANCHORAGE
C-2b-002 END PIER P11 2 C-3b-019 REINFORCEMENT OF CIP CONCRETE SLAB 1
C-2b-003 END PIER P17 C-3b-020 REINFORCEMENT OF CIP CONCRETE SLAB 2
C-2b-004 REINFORCEMENT OF END PIER P11 C-3b-021 REINFORCEMENT OF CIP CONCRETE SLAB 3
C-2b-005 REINFORCEMENT OF END PIER P17 C-3b-022 REINFORCEMENT OF CIP CONCRETE SLAB 4
C-2b-006 CIP PILE REINFORCEMENT P11 C-3b-023 REINFORCEMENT OF SIDEWALK AND MEDIAN 1
C-2b-007 CIP PILE REINFORCEMENT P17 C-3b-024 REINFORCEMENT OF SIDEWALK AND MEDIAN 2

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

LIST OF DRAWINGS 1
in association with
TRANSPORT ENGINEERING DESIGN INCORPORATED SCALE: --- DRAWING No. : C - 1 - 001
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
C-3b-025 REINFORCEMENT OF LIGHTING POLE BASE C- 4 -018 DRAINAGE DETAIL 1
C-3b-026 REINFORCEMENT OF STAY CABLE BOOT SUPPORT BASE C- 4 -019 DRAINAGE DETAIL 2
C-3b-027 EDGE GIRDER SHEDULE 1 C- 4 -020 WIND FAIRING
C-3b-028 EDGE GIRDER SHEDULE 2 C- 4 -021 LONGITUDINAL LOCATION OF INSPECTION WAY
C-3b-029 CABLE ANCHORAGE DETAILS C- 4 -022 TRANSVERSE LOCATION OF INSPECTION WAY
C-3b-030 FIELD CONNECTION OF EDGE GIRDERS C- 4 -023 HANDRAIL FOR PYLON CROSSBEAM
C-3b-031 EDGE GIRDER 1 C- 4 -024 TRANSVERSE INSPECTION WAY
C-3b-032 EDGE GIRDER 2 C- 4 -025 INSPECTION WAY DETAIL 1
C-3b-033 EDGE GIRDER 3 C- 4 -026 INSPECTION WAY DETAIL 2
C-3b-034 EDGE GIRDER 4 C- 4 -027 STAIRS AND LADDERS FOR PYLON
C-3b-035 EDGE GIRDER 5 C- 4 -028 STAIRS AND LADDER DETAIL 1
C-3b-036 EDGE GIRDER DETAILS C- 4 -029 STAIRS AND LADDER DETAIL 2
C-3b-037 INTERMEDIATE FLOORBEAM 1 C- 4 -030 STAIRS AND LADDER DETAIL 3
C-3b-038 INTERMEDIATE FLOORBEAM 2 C- 4 -031 STAIRS AND LADDER DETAIL 4
C-3b-039 INTERMEDIATE FLOORBEAM 3 C- 4 -032 STAIRS AND LADDER DETAIL 5
C-3b-040 PYLON FLOORBEAM 1 C- 4 -033 MAINTENANCE FACILITIES AT PYLON TOP AND ACCESS DOOR FOR PYLON
C-3b-041 PYLON FLOORBEAM 2 C- 4 -034 PLATFORM OF ELECTRIC SUBSTATION
C-3b-042 PYLON FLOORBEAM 3 C- 4 -035 LAYOUT OF SUBSTATIONS ON ELECTRIC PLATFORM
C-3b-043 END FLOORBEAM 1 C- 4 -036 NAVIGATION LIGHTS ARRANGEMENT
C-3b-044 END FLOORBEAM 2
C-3b-045 END FLOORBEAM 3 ERECTION SEQUENCE AND TEMPORARY STRUCTURES
C-3b-046 UPPER BRACKET OF TIE-DOWN CABLE C- 5 -001 ERECTION SEQUENCE
C-3b-047 LOWER BRACKET OF TIE-DOWN CABLE C- 5 -002 ERECTION METHOD

STAY CABLE
C-3c-001 STAY CABLE LAYOUT 1
C-3c-002 STAY CABLE LAYOUT 2
C-3c-003 STAY CABLE LAYOUT 3
C-3c-004 STAY CABLE LAYOUT 4
C-3c-005 CROSS SECTION OF STAY CABLE
C-3c-006 STAY CABLE SOCKET
C-3c-007 SHIM PLATE AND BEARING PLATE
C-3c-008 STAY CABLE BOOT AT GIRDER EXIT

ACCESSORIES
C- 4 -001 ELASTOMERIC BEARING AT P12 AND P16 1
C- 4 -002 ELASTOMERIC BEARING AT P12 AND P16 2
C- 4 -003 ELASTOMERIC BEARING AT P13, P14 AND P15 1
C- 4 -004 ELASTOMERIC BEARING AT P13, P14 AND P15 2
C- 4 -005 POT BEARING AT P11 AND P17
C- 4 -006 EXPANSION JOINT P11 1
C- 4 -007 EXPANSION JOINT P11 2
C- 4 -008 EXPANSION JOINT P11 3
C- 4 -009 EXPANSION JOINT P11 4
C- 4 -010 EXPANSION JOINT P17 1
C- 4 -011 EXPANSION JOINT P17 2
C- 4 -012 EXPANSION JOINT P17 3
C- 4 -013 EXPANSION JOINT P17 4
C- 4 -014 METAL BRIDGE RAILING AT SHOULDER TYPE 1
C- 4 -015 METAL BRIDGE RAILING AT MEDIAN
C- 4 -016 DRAINAGE ARRANGEMENT 1
C- 4 -017 DRAINAGE ARRANGEMENT 2

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

LIST OF DRAWINGS 2
in association with
TRANSPORT ENGINEERING DESIGN INCORPORATED SCALE: --- DRAWING No. : C - 1 - 002
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
5.3 DYNAMIC LOAD ALLOWANCE, IM
1 GENERAL - DYNAMIC LOAD ALLOWANCE IS APPLIED IN ACCORDANCE WITH SECTION 3.6.2 OF 22TCN-272-05.
- ALL STATIONS, COORDINATES AND ELEVATIONS ARE IN METERS.
- DYNAMIC LOAD ALLOWANCE IS APPLIED TO STAY CABLES AND ANCHORS.
- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED.
- DYNAMIC LOAD ALLOWANCE IS NOT APPLIED TO PYLON FOUNDATIONS THAT ARE ENTIRELY BELOW GROUND.
- DYNAMIC LOAD ALLOWANCE IS NOT APPLIED TO LANE LOAD AND PEDESTRIAN LOAD.
2 DESIGN STANDARDS
2.1 SPECIFICATIONS FOR DESIGN WORKS 5.4 PEDESTRIAN LOAD
DESCRIPTION NAME OF SPECIFICATIONS CODE PEDESTRIAN LOAD IS APPLIED WITH AN INTENSITY OF 3 X 10-3 MPA.

1 LOAD AND ANALYSIS METHOD FOR DESIGN ALL SPECIFICATION FOR BRIDGE DESIGN 22TCN 272-05 5.5 BREAKING FORCE
COMPONENTS OF BRIDGE EXCEPT BELOWS
- BREAKING FORCE IS APPLIED IN ACCORDANCE WITH SECTION 3.6.4 OF AASHTO-LRFD 2004.
2 DESIGN ALL COMPONENTS OF BRIDGE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SI UNITS, 4TH, AASHTO AASHTO LRFD 4TH - THE BREAKING FORCE IS TAKEN AS GREATER OF A) 25% OF THE AXLE WEIGHTS OF THE DESIGN TRUCK OR DESIGN TANDEM
EXCEPT BELOWS 2007
OR, B) 5% OF THE DESIGN TRUCK PLUS LANE LOAD OR 5% OF THE DESIGN TANDEM PLUS LANE LOAD.
3 STEEL PIPE SHEET PILE DESIGN SPECIFICATIONS FOR HIGHWAY BRIDGES, IV. SUBSTRUCTURE SECTION JRA - 2002
GUIDELINE FOR DESIGN AND CONSTRUCTION OF STEEL PIPE 5.6 UNIFORM TEMPERATURE ( REFERENCE TEMPARATURE IS +24°C )
4 STEEL PIPE SHEET PILE DESIGN SHEET PILE FOUNDATIONS, JAPAN ROAD ASSOCIATION JRA - 1997
CONCRETE STRUCTURE +5°C TO +47°C
RECOMMENDATION FOR STAY CABLE DESIGN, TESTING AND CONCRETE DECK ON STEEL GIRDER +1°C TO +55°C
5 STAY CABLES INSTALLATION - 2000, POST TENSIONING INSTITUTE PTI - 2007
STEEL CABLE -3°C TO +63°C
6 PRELIMINARY AERODYNAMIC EXAMINATION DESIGN MANUAL FOR BRIDGE AERODYNAMIC, JAPAN ROAD ASSOCIATION JRA - 1991
5.7 THERMAL GRADIENT
7 AERODYNAMIC ANALYSIS WIND PROOF DESIGN STANDARD FOR HONSHU-SHIKOKU HBS-2001
BRIDGES, HONSHU-SHIKOKU BRIDGE AUTHORITY FOR THERMAL GRADIENT, SECTION 3.12 OF 22TCN-272-05 SHALL BE APPLIED.

WIND PROOF DESIGN STANDARD FOR HONSHU-SHIKOKU 5.8 WIND LOAD


8 WIND TUNNEL TEST BRIDGES, HONSHU-SHIKOKU BRIDGE AUTHORITY HBS-2001
- DESIGN WIND VELOCITY IS APPLIED IN ACCORDANCE WITH SECTION 3.8.1.1 OF 22TCN-272-05.
9 MODEL FOR CREEP AND SHRINKAGE CEB-FIP MODEL CODE 1990 CEB-FIP MC90 - THE 10 MINUTES AVERAGE WIND VELOCITY IS 34 M/SEC AT 10-M ELEVATION.
SPECIFICATIONS FOR HIGHWAY BRIDGES - PART V SEISMIC - GUST RESPONSE FACTOR FOR THE STATIC WIND ANALYSIS IS 1.9.
10 SEISMIC DESIGN - LIQUEFACTION OF SOIL DESIGN, JAPAN ROAD ASSOCIATION JRA - 2002
- DRAG COEFFICIENT FOR THE DECK IS 1.70.
11 BEARING MANUAL FOR HIGHWAY BRIDGE BEARING JRA - 2004 - DRAG COEFFICIENT FOR STAY CABLES IS 0.8. DRAG COEFFICIENT FOR PYLON IS 1.6 FOR WINDWARD SECTION AND 0.8
12 BRIDGE WELDING SPECIFICATIONS FOR BRIDGE WELDING CODE AASHTO/AWS D1.5 FOR LEEWARD SECTION.
13 STRUCTURAL WELDING SPECIFICATIONS FOR STRUCTURAL WELDING CODE - STEEL AWS D1.1 - DESIGN WIND VELOCITY DURING CONSTRUCTION AT 10M ELEVATION IS 24 M/SEC.

2.2 SPECIFICATIONS FOR MATERIALS 5.9 STREAM FLOW


NAME OF SPECIFICATIONS CODE - FORCES DUE TO STREAM FLOW UNDER DESIGN FLOOD IS APPLIED TO EACH SUBSTRUCTURE.
1 STANDARD SPECIFICATION FOR PORTLAND CEMENT TCVN 2682:1999 - THE DESIGN WATER VELOCITY IS 2.3 M/SEC FOR DESIGN 100-YEAR AND 500-YEAR FLOODS.
2 STANDARD SPECIFICATION FOR PORTLAND CEMENT COMPOSITE TCVN 6260:1997 - THE DESIGN WATER VELOCITY IN EXTREME LIMIT STATES, 0.9 M/SEC IS USED AS AN ANNUAL DISCHARGE VELOCITY.
3 STANDARD SPECIFICATION FOR FINE AGGREGATE FOR PORTLAND CEMENT CONCRETE AASHTO M6-03
5.10 DESIGN VESSEL
4 STANDARD SPECIFICATION FOR COARSE AGGREGATE FOR PORTLAND CEMENT CONCRETE AASHTO M80-87 (2003)
SELF-PROPELLED SHIP TOWED BARGE
5 STANDARD SPECIFICATION FOR READY-MIXED CONCRETE AASHTO M157-06
MAXIMUM TONNAGE 2,000 DWT 500 DWT
6 WATER FOR CONCRETE AND MORTAR - TECHNICAL REQUIREMENT TCVN 4506-87
MAXIMUM DIMENSION LENGTH=90 M, WIDTH=12 M, LENGTH=40 M, WIDTH=10 M,
7 STANDARD SPECIFICATION FOR CHEMICAL ADMIXTURES FOR CONCRETE AASHTO M 194M
LADEN DRAUGHT=3.5 M LADEN DRAUGHT=1.7 M
8 STANDARD SPECIFICATION FOR STEEL BARS FOR CONCRETE REINFORCEMENT JIS G3112
COLLISION SPEED (M/S) 3.3 + VS 1.6 + VS
9 STANDARD
CONCRETE
SPECIFICATION FOR UNCOATED STRESS-RELIEVED STEEL WIRE AND STRANDS FOR PRESTRESSED JIS G3536 FLOW SPEED VS (M/S) 0.9 0.9
10 STANDARD SPECIFICATION FOR STEEL BARS FOR PRESTRESSED CONCRETE JIS G3109 5.11 SCOUR
11 STANDARD SPECIFICATION FOR ROLLED STEELS FOR GENERAL STRUCTURE JIS G3101 SCOUR DUE TO DESIGN FLOOD IS CONSIDERED AT STRENGTH AND SERVICE LIMIT STATES.
12 STANDARD SPECIFICATION FOR ROLLED STEELS FOR WELDED STRUCTURE JIS G3106 SCOUR DUE TO ANNUAL DISCHARGE IS CONSIDERED AT EXTREME EVENT LIMIT STATE.
13 STANDARD SPECIFICATION FOR STEEL PIPE SHEET PILE JIS A5530 PIER NO. SCOUR DEPTHS DUE TO DESIGN FLOOD (M) SCOUR DEPTHS DUE TO ANNUAL DISCHARGE (M)
P11 (SOUTH END PIER) 5.0 0.0
3 CLEARANCE P12, P13, P15 15.0 7.0
3.1 HIGH WATER LEVEL P14 (@ SANDBAR) 15.0 0.0
HIGH WATER LEVEL (MNTK) : +13.67 M. P16 15.0 0.0
LOW WATER LEVEL (MNNN) : +2.33 M. P17 (NORTH END PIER) 3.0 0.0
3.2 REQUIRED NAVIGATIONAL CLEARANCE 5.12 SEISMIC DESIGN
HORIZONTAL NAVIGATION WIDTH FOR BOTH EASTWARD AND WESTWARD DIRECTIONS SHALL BE 80.0 M. MINIMUM VERTICAL CLEARANCE
OVER THE NAVIGATION CHANNELS SHALL BE 10.0 M MEASURED FROM WATER LEVEL 5% PROBABILITY OF +13.41M, DESIGNATED AS MNTT. - THE NHAT TAN BRIDGE PROJECT AREA IS DESIGNATED AS MSK CLASS 8 IN SECTION 3.10.2 OF 22TCN-272-05.
- THE ACCELERATION COEFFICIENT (A) OF GROUND MOTION FOR THE BRIDGE IS 0.12, FOR THE RETURN PERIOD TO 2,500 YEARS.
- SITE EFFECT, S SHALL BE 1.2 IN ACCORDANCE WITH SECTION 3.10.5.2 OF 22TCN-272-05.
4 DATUM - RESPONSE MODIFICATION FACTOR IS DETERMINED WITH CONSIDERING IMPORTANCE OF THE PYLONS.
ELEVATIONS ARE BASED ON THE NATIONAL VERTICAL DATUM.
COMPONENTS R
SUPERSTRUCTURE, PYLON 1.0
5 DESIGN LOADS CAST-IN-PLACE PILE FOUNDATION 1.0
5.1 DEAD LOAD
STEEL PIPE SHEET PILE FOUNDATION 1.0
DENSITY KG/M3 UNIT DEAD LOAD KN/M3
PLAIN CONCRETE 2400 23.5 5.13 PYLON PLUMBNESS
REINFORCED CONCRETE 2500 24.5 THE PLUMBNESS OF PYLON DUE TO ERECTION ERROR SHALL BE H/1,000 FOR BOTH LONGITUDINALLY AND TRANSVERSELY,
STEEL 7850 77.0 WHERE H IS A DISTANCE BETWEEN TOP AND BOTTOM OF PYLON.
STAY CABLE 7850 77.0
ASPHALT PAVEMENT 2250 22.0 6 MATERIALS
COMPACTED SOIL 1950 19.0 6.1 CONCRETE
WATER 1000 10.0 COMPRESSIVE STRENGTH OF CONCRETE SHALL BE BASED ON A 28-DAY STRENGTH OF A 150MM DIAMETER CYLINDER.
UNIT DEAD LOAD KN/M/BR. (MPA)
WIND FAIRING 4.0 PYLON
40
INSPECTION WAYS, HANDRAIL AND ETC. 3.6 PRECAST AND CAST-IN-PLACE CONCRETE DECK
RAILINGS 1.6 END PIER OF CABLE-STAYED BRIDGE
30
COMMUNICATION CABLE AND ELECTRIC POWER LINE 1.6 CAST-IN-PLACE PILE OF CABLE-STAYED BRIDGE
TOP SLAB, AND BULKHEAD AND INNER PILE FILLING CONCRETE OF
5.2 LIVE LOAD
STEEL PIPE SHEET PILE FOUNDATION 25
IN ACCORDANCE WITH ARTICLE 3.6 OF 22TCN-272-05, THE FOLLOWING LIVE LOADS ARE APPLIED IN THE DESIGN.
SIDE WALK, PRECAST CURB AND MEDIAN
VEHICULAR LIVE LOAD SHALL CONSIST OF A COMBINATION OF :
BOTTOM SLAB OF SPSP FOUNDATION
- DESIGN TRUCK OR DESIGN TANDEM , AND
EXTERIOR PILE FILLING CONCRETE OF SPSP FOUNDATION 20
- DESIGN LANE LOAD.
COUNTER WEIGHT IN END FLOORBEAM
TRUCK LOAD 325 KN TRUCK
MORTAR FILLING TO STEEL PIPE JOINT 21
TANDEM LOAD A PAIR OF 110 KN LOADS
BLINDING CONCRETE 10
LANE LOAD 9.3 KN/M LOAD
- UNLESS FORMS ARE NOT USED, PILE CAP CONCRETE SHALL BE PLACED ON 100MM MINIMUM THICKNESS OF BLINDING CONCRETE.
PEDESTRIAN LOAD 0.003 MPA
- BLINDING STONE SHOWN ON THE DRAWINGS IS INDICATIVE ONLY. THE CONTRACTOR SHALL PROVIDE BLINDING STONE WHEN APPROVED OR
NUMBER OF DESIGN LANE 4 LANES LOADING/DIRECTION
INSTRUCTED BY THE ENGINEER.
FATIGUE LOADING SHALL BE SINGLE DESIGN TRUCK WITH 9.0M SPACING BETWEEN REAR AXLES, THE DESIGN LIFE SHALL BE 100 YEARS.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No. 1

K. Itabashi GENERAL NOTES 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: --- DRAWING No. : C - 1 - 003
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
6.2 REINFORCING STEEL 6.9 BEARING
FY FU BEARINGS AT P11 AND P17 ARE POT BEARING AND BEARINGS AT PYLONS ARE HIGH DAMPING ELASTOMERIC BEARING.
TYPE STRUCTURAL COMPONENT
(MPA) (MPA) "HDR-S" ( HIGH DAMPING RUBBER - SUPER ) IS USED FOR ELASTOMERIC BEARING.
JIS G 3112: REBAR FOR PYLON, DECK, END PIER, SHEAR MODULUS OF ELASTICITY 1.0 MPA
SD390 390 560
TOP SLAB OF STEEL PIPE SHEET PILE FOUNDATION FRACTURE STRAIN 600 %
SR235 235 380 JIS G 3112: REBAR FOR DRAIN PIPE COMPRESSIVE STRESS MAXIMUM S1 < 8 8.0 MPA
8 <= S1 < 12 S1
6.3 PRESTRESSING TENDONS
12 <= S1 12.0 MPA
LOW RELAXATION STEEL SHALL BE USED FOR PRESTRESSING TENDONS.
MINIMUM 1.5 MPA
PY PU MODULUS OF ELASTICITY STRUCTURAL
TYPE STRESS RANGE S1 <= 8.0 5.0 MPA
(KN) (KN) (GPA) COMPONENT
S1 > 8.0 5.0 + 0.375 (S1 - 8.0)
SWPR7BL 15.2MM 222 261 200 JIS G 3536 :
SHEAR STRAIN CAPACITY SERVICE 70 %
SWPR19L 28.6MM 807 949 200 PRESTRESSING STEEL
EXTREME EVENT 150 %
6.4 STEEL FOR STAY CABLES / TIE-DOWN CABLES
MINIMUM TENSILE STRENGTH 1,770 MPA 7 CONCRETE DESIGN
MINIMUM PROOF STRENGTH AT 0.8% STRAIN 1,370 MPA 7.1 CONCRETE COVER
DESIGN ELASTIC MODULUS 195 GPA MINIMUM CONCRETE COVER ELEMENTS
ELONGATION IN A 250MM GAGE LENGTH 4 .0 % - CAST-IN-PLACE PILE AND PILE CAP
MINIMUM FATIGUE ENDURANCE LIMIT OF STRAND 245 MPA - TOP CAST-IN-PLACE SLAB OF STEEL PIPE SHEET PILE FOUNDATION
75 mm
HIGH DENSITY POLYETHYLENE COVER ( HDPE ) - EXTERIOR SURFACE OF PYLON BELOW WATER OR BELOW GROUND
- EXTERIOR SURFACE OF END PIER BELOW WATER OR BELOW GROUND
6.5 STRUCTURAL STEEL FOR SUPERSTRUCTURE
- EXTERIOR SURFACE OF PYLON ABOVE WATER OR ABOVE GROUND
TYPE JIS DESIGNATION AND STRUCTURAL COMPONENTS
50 mm - EXTERIOR SURFACE OF END PIER ABOVE WATER OR ABOVE GROUND
JIS G 3106
SM570 - INTERIOR SURFACE OF PYLON (IF NECESSARY)
- EDGE GIRDER AND CABLE ANCHORAGE
- INTERIOR SURFACE OF PYLON
SM490Y JIS G 3106
40 mm - INTERIOR SURFACE OF END PIER
SM520 - EDGE GIRDER, FLOORBEAM, CABLE ANCHOR BOX, TOP STRUT
- TOP EXTERIOR SURFACE OF PRECAST AND CAST-IN-PLACE SLAB
JIS G 3106
SM490 35 mm - BOTTOM EXTERIOR SURFACE OF PRECAST AND CAST-IN-PLACE DECK SLAB
- BEARING, SOLE PLATE
SS400 JIS G 3101, JIS G 3106 7.2 CRACK
- CONTROL
SM400 - SUPPORT STRUT CRACK WIDTH PARAMETER IS 30,000 N/MM ( MODERATE EXPOSURE CONDITION ) EXCEPT ENDPIER PILECAP ( =17500 N/MM).

SS400 SM400 7.3 REINFORCEMENT


THICKNESS OF PLATE (MM) UP TO 40 OVER 40 UP TO 100 - MINIMUM SPLICE LENGTH SHALL BE IN ACCORDANCE WITH 22TCN-272-05.
MINIMUM YIELD POINT OR MINIMUM YIELD - STANDARD HOOKS AND MINIMUM BEND DIAMETER SHALL BE IN ACCORDANCE WITH 22TCN-272-05.
235 215
STRENGTH FY (MPA) - A REINFORCING BAR INDICATED AS VARIED LENGTH SHALL BE LAP SPLICED AS NECESSARY SUBJECT TO THE FOLLOWING CONDITIONS :
MINIMUM TENSILE STRENGTH FU (MPA) 410 ~ 510 A) LAP SPLICES IN ADJACENT BARS SHALL BE STAGGERED.
B) MINIMUM LAP LENGTHS SHALL BE IN ACCORDANCE WITH 22TCN 272-05. LAP LENGTHS FOR CIP PILES SHALL NOT BE LESS THAN 40
SM490Y SM520
TIMES BAR DIAMETER.
THICKNESS OF PLATE (MM) UP TO 40 OVER 40 UP TO 75 OVER 75 UP TO 100
MINIMUM YIELD POINT OR MINIMUM YIELD 7.4 ANCHORAGES AND DUCTS
355 335 325
STRENGTH FY (MPA) - DUCTS FOR INTERNAL TENDONS SHALL BE FULLY COMPATIBLE WITH THE PROPOSED PRESTRESSSING SYSTEM.
MINIMUM TENSILE STRENGTH FU (MPA) 490 ~ 610 FOR SM490Y AND 520 ~ 640 FOR SM520 THE DUCTS SHALL FORM AN AIRTIGHT AND WATERTIGHT BARRIER TO THE TENDONS AND SHALL BE FABRICATED FROM CORRUGATED
GALVANIZED SHEET STEEL OR SEMI-RIGID CONDUIT.
SM570
- GROUTING MATERIAL SHALL BE NON-BREEDING TYPE AS SPECIFIED IN THE TECHNICAL SPECIFICATION.
THICKNESS OF PLATE (MM) UP TO 40 OVER 40 UP TO 75 OVER 75 UP TO 100
MINIMUM YIELD POINT OR MINIMUM YIELD
STRENGTH FY (MPA)
450 430 420 8 STEEL DESIGN
8.1 WELD
MINIMUM TENSILE STRENGTH FU (MPA) 570 ~ 720
MINIMUM FILLET WELD SIZE IS IN ACCORDANCE WITH TABLE 2.1 OF 2002-AWS D1.5 AS SPECIFIED BELOW :
6.6 STRUCTURAL STEEL FOR STEEL PIPE SHEET PILE FOUNDATION - 6MM FOR BASE MATERIAL THICKNESS OF THICKER PART JOINTED IS 20MM OR LESS
FY FU - LARGER OF 8MM, T1 , OR (2T2 ) FOR 20MM OR LARGER
TYPE STRUCTURAL COMPONENT
(MPA) (MPA) WHERE, T2 IS THE THICKNESS OF THICKER PLATE OF JOINING PLATES
SKY400 235 400 JIS A 5530
SKY490 315 490 STEEL PIPE SHEET PILE FOR SHEET PILE FOUNDATION 9 STAY CABLE DESIGN
JIS A 5525 - REPLACEMET OF STAY CABLE IS CONSIDERED WITH SHIFTING AWAY OF LIVE LOAD AT LEAST TWO LANES FROM THE CABLE UNDER REPLACEMENT.
SKK400 235 400
STEEL PIPE FOR INTERNAL INDEPENDENT PILES
STK400 235 400 JIS G 3444 JOINT PIPE TYPE P-P FOR STEEL PIPE SHEET PILES 10 CONSTRUCTION
SM490A-SD 345 490 PROPERTY COMFORMS TO "SD345" OF JIS G 3112 10.1 CONSTRUCTION WATER LEVEL
STUD REBAR CONNECTION CONSTRUCTION WATER LEVEL FOR STEEL PIPE SHEET PILE FOUNDATION IS ASSUMED +9.5M.

6.7 MISCELLANEOUS STEEL 10.2 SETTING POSITION


MINIMUM YIELD POINT OR THE BRIDGE GEOMETRY AND DIMENSIONS SHOWN IN THE DRAWINGS ARE AT A REFERENCE TEMPERATURE OF 24°C AND 10-YEAR CREEP AND SHRINKAGE
COMPONENT DESIGNATION MINIMUM YIELD STRENGTH JIS AFTER THE BRIDGE COMPLETION. THE CONTRACTOR SHALL CALCULATE DISPLACEMENTS INCLUDING ELASTIC, CREEP/SHRINKAGE FOR EACH ERECTION
FY (MPA) STAGE ACCORDING TO HIS CONSTRUCTION METHOD AND ERECTION SEQUENCES.
ANCHOR BOLT, S35CN 305 JIS G 4051
10.3 PYLON
BEARING PLATE OF CABLE ANCHORAGE S45CN 345
PYLON CROSSBEAM SHALL BE PRESTRESSED BEFORE CASTING CONCRETE OF STEM ABOVE CROSSBEAM.
STEEL COMPONENTS OF BEARING SCW480N 275 JIS G 5102
PIPE CABLE ANCHORAGE SCW490-CF 315 JIS G 5201 10.4 LONGITUDINAL PRESTRESSING FOR PRECAST DECK PANELS
PIPE CABLE ANCHORAGE SEE CONTRACT DRAWINGS FOR TIMING OF LONGITUDINAL PRESTRESSING FOR PRECAST DECK PANELS.
SCW550 355 JIS G 5102
TAPERED EXTENSION
CABLE SOCKET SCM440H 835 JIS G 4105 11 REFERENCE OF REBAR
CABLE COVER, ETC. STK400 235 JIS G 3444 REBAR PROPERTIY WHICH IS REFERRED IN THE DRAWINGS IS EXPLAINED AS FOLLOWS.
STUD DOWEL 235 JIS B 1198
EXAMPLE: 20 NX02-D16-150-NF
6.8 HIGH STRENGTH BOLTS LOCATION AS FOLLOWS (IF INDICATED)
Designation F10T, S10T NF : NEAR FACE, FF : FAR FACE, T : TOP, B : BOTTOM, ETC.
(Nominal Bolt Diameter) Slip Resistance (kN) Design Bolt Tension (kN) SPACING (MM) (IF INDICATED)
M24 56 238 NOMINAL BAR DIAMETER (MM)
DESIGNATION OF BAR
2 DIGITS NUMBER AFTER "N", OR "N"+1 CHARACTER+2 NUMBERS
THIS NUMBER REPRESENTS A GROUP OF BARS.
NUMBER OF BARS ( IF INDICATED )

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

GENERAL NOTES 2
in association with
TRANSPORT ENGINEERING DESIGN INCORPORATED SCALE: --- DRAWING No. : C - 1 - 004
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
GIRDER CROSS SECTION S = 1 / 300 TRANSVERSE ELEVATON (P12) S = 1 / 1000

35600

1200 1200

750 3300 150 3 x 3750=11250 500500 3 x 3750=11250 150 3300 750

7200 2800
400 500 400

20000
10000
4500

2700 260
1100

1000
250 750

2500
2500

150

11000
1250

2000

3000
R=364013

800 800

PYLON CROSS SECTION S = 1 / 300


5-5 3-3
5700
3536
1200 4500 4 500
479 3057
1 200
1529 Cable Anchor Box ( Steel )

750
8000
1529

4000
8200
6500
1596

1 2 00

8000

8200
3191

10455
4167 750
1596

4000

LC R
-P 12
+1 12L -P
LC .60
750

.16
+1

15455
629 629
1800
1328 4980 AT:+1.33

6308

4-4 2-2 1200


8438
4391 1200 5941 1297
764 3628 2971 2971

37500
750

1814
1732

1814
751
4100
6700
2546

4736

8200

-34.40 (P12)
5092

6900 757 Estimated Bearing Stratum


2546

4100

-40.5
1732
750

3641 750

1' - 1' 1-1


11992 11400 10135 11582 10135 8446
1226 7767 2998 1200 7500 2700
3833 3934 3750 3750
3606
3817
4100

4100
8200

8200
566

987

All dimensions are in mm, unless otherwise shown.


4100

4100
3817

3606

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi MAIN BRIDGE GENERAL DRAWING 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE:
SHOWN IN
DRAWING DRAWING No. : C - 1 - 006
SHEET No. :
Sheet of PACKAGE:
TRANSVERSE ELEVATON (P11) S = 1 / 300 TRANSVERSE ELEVATON (P17) S = 1 / 300

PYLON 16 PIER 18
CL
PIER 10 PYLON 12 4150
36800
450 725 700
14900 - West 3500 4900 1350 1375
500 1800 5395 6000 1705 500 1050 1400 1100 1350 450 500 2500 15900
825 1100 150
6@2200=13200

R32101 50 50
805 1145 540 2160
1.0 % 1.0 %

478
1.0 %

451

11
571
Tie-down cable

50 57

2000
Tie-down cable

25
+27.20 1.0 %

525

1682
1999
1000 1500 CL

1000 1500
150 1800 500 +27.2

1682
2500

2500

42
1000 1500
2968

1000 1500
2387

2500
1729

1797

2968
R179105
800 3000 8300 3000 800 1400 1025
15900 3000 950 3000 950

800 3000 8000 3000 4100


575 3000 575
11000 5600

17500
20200

15771
11300 5300

15088
2600 3000 8000 3000 4100 4500 3000 4500

2600 3000 8300 3000 3800 4500 3000 4500 +9.7

200 3000

3000
+7.00
1500

150

150
+6.7
3000

100
150

150
+4.00 CIP PILE Ø1500
100

-34.3
200

CIP PILE Ø1500


-30.00 1500 8@4800=38400 1500 2@4500=9000 1500

1500 8@4800=38400 1500 2@4500=9000 1500 100 41400 100 12000 100
100 41400 100 12000 100

PLAN S=1/300 PLAN S=1/300

1500
Ø Ø
15 15
6000

PYLON 12

00 00

PIER 18
2@4500=9000
12000

PYLON 16
PIER 10
6000

1500

1500 8@4800=38400 1500 8@4800=38400


41400 41400

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N. H. Nghia DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda MAIN BRIDGE GENERAL DRAWING 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 1 - 007
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/1000 CROSS SECTION S = 1 / 300

A-A B-B
C-C B D-D
C D A 6-6 3-3
Obstacle Light Obstacle Light
8000 3000 5700
45 0 3 Lighting Arrester Lighting Arrester 3536
0 00 2850
1200 4500
479 3057

7200 2800
3000

3000

3000
10@2000=20000 2000
6

2000
1529

3000 2x400=8000 4x5000=20000

750
6 1529

10@2000=20000

20000

4000
6500
10000

1596
C

8000

8200
29800

29800
L

3191
4167 750

1596
11000

45000

4000
7800

7800

750
4800
629 629
5 1350
1800
5 1328 4980

78400

78400
6308
75500
23300

6x5000=30000
Obstacle Light
5-5 2-2
Obstacle Light

109310
8438

45600

45600
4 4391 1200 5941 1297 "A"
4 764 3628 2971 2971
Access Door

2950 2000 2x3500=7000

750
1814

1732
22300

33200
4 500 1814
751

4100
1 200 8000

6700
2546
5050 3600
4900

4736

8200
5092
3
2100

2100

2100
6900 757
8200
3200

Access Door
3

2546
30 3

4100
4500

4 5 00
1 2 00 3000
13355

1732
30 5

750
5x4000=20000
MNTK:+13.67

30910
LC R
28810

2 12
"A"

30910
-P
+ 12L -P
LC .60
2 1.16 +1 4-4 1-1
15455

13500
13000
MNNN:+2.33 AT:+1.33 11400
0.0
2910

2910
8200 1200 7500 2700

7000
1 5061

10000
-3.0
3750 3750
1' 1' "A"
35005500

-5.67 DE=2/3 by Liquefaction 987 4074


11000

Scour (ordinary) -8.67 2037 2037


1200
1
15000

1200
500

750

3606
4100
-18.00

3289
Scour (Flood) 750
37500

37500

5078

6578

8200
48743

988
26500

3528 750

3289

4100
3606
750
-34.40 (P12)
Estimated Bearing Stratum
-40.5 -40.5
"A"
B A
1200
1' - 1'
11992
1227 7767 2998
48743 16891
3833 3934 "A"
8446 10135 11582 10135 8446
PYLON 13

"A"
4346 8200 4346

3817
4100
A A
16891

8200
PIER 11

566
B B

100

4100
3817
7767 2998 12135 2998 7767
1227 1227

10 30
P12 118piles x Ø1200 / foundation 30

10
50
1+401.0 "A"
All dimensions are in mm, unless otherwise shown.

NOTE:LIFTS SHOWN IN THE DRAWING ARE FOR REFERENCE ONLY.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF PYLON P12


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 001
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/1000 CROSS SECTION S = 1 / 300

A-A B-B
C-C B D-D
C D Obstacle Light Obstacle Light
3000
A 6-6 3-3
8000 Lighting Arrester Lighting Arrester
45 0 3 5700
0 00 2850 3536
1200 4500

7200 2800
3000

3000

3000
479 3057
6

10@2000=20000 2000
2000

3000 2x400=8000 4x5000=20000


1529
6

750
1529

20000
10@2000=20000

4000
6500
10000
C

29800

29800

1596
L

8000

8200
3191
11000 4167 750

45000

1596

4000
7800

7800
4800

750
5 1350
629
1800
629
5 1328 4980

78400

78400
6308
75500
23300

6x5000=30000
Obstacle Light Obstacle Light 5-5 2-2

110810
45600

45600
8438
4 4391 1200 5941 1297
4 "A"
Access Door 764 3628 2971 2971

2950 2000 2x3500=7000

750
22300

33200 1814

1732
4 500
1814
1 200 751

4100
8000

6700
5050 3600

2546
4900

4736

8200
3
2100

2100

2100

5092
8200 6900 757
3200

Access Door
30 3 3
4500

2546
450

4100
1 2 00 0 3000
13355

30 5

1732
750
5x4000=20000

32410
MNTK:+13.67
2
30310

32410
LC R "A"
-P 13
+20 13L -P
.41 LC 0.43
4-4 1-1
16955

13500
12597 + 11688
MNNN:+2.33
0.0 4410 AT:+0.18 1200 7651 2836
8200
1 5061

7000
-3.0 3826 3826 "A"
1' 1' -5.58
35005500

-6.83 987 4074

4240
DE=2/3 by Liquefaction
11000

Scour (ordinary) 1200 2037 2037


1 -9.82
15000

1200
500

750

3788
4100
48743
-18.00
31500

31500

3289
Scour (Flood) 750

8200
624
20500

5078

6578
-28.09 (P13) 3528 750

4100
3289

3788
Estimated Bearing Stratum

750
-34.5 -34.5

1200
"A"
B A
1' - 1'
16891 12297
1227 7924 3146
48743
3910 4014 "A"
8446 10135 11582 10135 8446
10589 10589
PYLON 12 PYLON 14

"A"
3000
4346 8200 4346

4006
4100
A A
16891

8200
189
B
3000

100

4100
4006
7924 3146 10874 3146 7924
1227 1227

10 30
30

10
P13 124piles x Ø1200 / foundation

50
"A"
1+701.0
All dimensions are in mm, unless otherwise shown.

NOTE:LIFTS SHOWN IN THE DRAWING ARE FOR REFERENCE ONLY.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF PYLON P13


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 002
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/1000 CROSS SECTION S = 1 / 300

A-A B-B
C-C B D-D
C D
8000
Obstacle Light Obstacle Light
3000
A 6-6 3-3
45 0 3 Lighting Arrester Lighting Arrester
0 00 2850 5700
3536

7200 2800
3000

3000

3000
1200 4500
479 3057

10@2000=20000 2000
6

2000

3000 2x400=8000 4x5000=20000


6 1529

750
1529

10@2000=20000

20000

4000
10000

6500
C

29800

29800
L

1596

8000

8200
3191
11000

45000
4167 750

1596

4000
7800

7800
4800

750
5 1350
629 629
5 1800

78400

78400
1328 4980
75500

6308
23300

6x5000=30000
Obstacle Light Obstacle Light 5-5 2-2

111560
45600

45600
8438
4
4 4391 1200 5941 1297 "A"
Access Door 764 3628 2971 2971

2950 2000 2x3500=7000


22300

750
33200
4 500 1814

1732
1814
1 200 8000 751

4100
5050 3600

6700
2546
4900

4736

8200
2100

2100

2100

5092
8200
3200

Access Door 6900 757


30 3 3
4500

4 5 00

2546

4100
LC1 2 00 30 3000
13355

- R
+1 P14
5
14
-P 14

1732
1.0 L C
L 1 .

750
5x4000=20000
0
+1

1. 33160
2 MNTK:+13.67

33160
31060

AT:+11.14 "A"
2
1-1

1:
0

0
1.

1.
17705

+6.14 +6.14
4-4
1:

1:
0
12396

10500
MNNN:+2.33 11831
0.0 20500 20500
5160

5160 8200 1200 7727 2904


1 -3.0 5061
3864 3864
1' 1' "A"
35005500

987 4074
11000

2037 2037
15000

1200
1 1200
500

750
48743

3879
-18.00

31500
31500

3289
Scour (Flood) 750
20500

5078

6578

8200
442
-28.20 (P14) 3528 750

3289
Estimated Bearing Stratum

3879
750
-34.5 -34.5
1200
B A "A"
1' - 1'
16891 12449
1227 8002 3221
48743
3949 4053
8446 10135 11582 10135 8446 "A"
PYLON 15

"A"
4346 8200 4346

4100
A A
16891
PYLON 13

8200
B B

100

4100
8002 3221 10244 3221 8002
1227 1227

10 30
30

10
P14 124piles x Ø1200 / foundation

50
2+001.0 "A"
All dimensions are in mm, unless otherwise shown.

NOTE:LIFTS SHOWN IN THE DRAWING ARE FOR REFERENCE ONLY.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF PYLON P14


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 003
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/1000 CROSS SECTION S = 1 / 300

A-A B-B
C-C B D-D
C D Obstacle Light Obstacle Light
3000
A 6-6 3-3
8000 Lighting Arrester Lighting Arrester
45 0 3 5700
0 00 2850 3536
1200 4500

7200 2800
3000

3000

3000
479 3057
6

10@2000=20000 2000
2000

3000 2x400=8000 4x5000=20000


1529
6

750
1529

20000
10@2000=20000

4000
10000

6500
C

29800

29800

1596
L

8000

8200
3191
11000 4167 750

45000

1596

4000
7800

7800
4800

750
5 1350
629
1800
629
5 1328 4980

78400

78400
6308
75500
23300

6x5000=30000
Obstacle Light Obstacle Light 5-5 2-2

110810
45600

45600
8438
4 4391 1200 5941 1297
4 "A"
Access Door 764 3628 2971 2971

2950 2000 2x3500=7000

750
22300

33200 1814

1732
4 500
1814
1 200 751

4100
8000

6700
5050 3600

2546
4900

4736

8200
3
2100

2100

2100

5092
8200 6900 757
3200

Access Door
30 3 3
4500

2546
450

4100
1 2 00 0 3000
13355

30 5

1732
750
5x4000=20000

32410
MNTK:+13.67
2
30310

32410
"A"
LC R
2 -P15 15
-P
4-4 1-1
16955

-1. L LC .18

13500
23 12597 -1 MNNN:+2.33 11688
0.0 1200 7651 2836
4410

4410
8200 AT:-1.20
1 -3.0 5061
3826 3826 "A"

7000
1' 1'
35005500

987 4074

9530
DE=2/3 by Liquefaction
11000

-8.20 1200 2037 2037


1
15000

1200 Scour (ordinary) -10.73


500

750

3795
4100
48743
-18.00

3289
33000

33000
Scour (Flood) 750

8200
610
5078

6578
22000

3528 750

4100
3289

3795
-29.73 (P15)
Estimated Bearing Stratum

750
-36.0 -36.0

1200 B A "A"

1' - 1'
12297
16891
1227 7924 3146
48743 3910 4014 "A"
8446 10135 11582 10135 8446
PYLON 14 PYLON 16

"A"
4346 8200 4346

4006
4100
A A
16891

8200
189
B B

100

4100
4006
7924 3146 10874 3146 7924
1227 1227

10 30
30

10
50
P15 118piles x Ø1200 / foundation
"A"
2+301.0
All dimensions are in mm, unless otherwise shown.

NOTE:LIFTS SHOWN IN THE DRAWING ARE FOR REFERENCE ONLY.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF PYLON P15


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 004
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/1000 CROSS SECTION S = 1 / 300

A-A B-B
C-C B D-D
C D A 6-6 3-3
Obstacle Light Obstacle Light
8000 3000 5700
45 0 3 Lighting Arrester Lighting Arrester 3536
0 00 2850
1200 4500
479 3057

7200 2800
3000

3000

3000
10@2000=20000 2000
6

2000
1529

3000 2x400=8000 4x5000=20000

750
6 1529

10@2000=20000

20000

4000
6500
10000

1596
C

8000

8200
29800

29800
L

3191
4167 750

1596
11000

45000

4000
7800

7800

750
4800
629 629
5 1350
1800
5 1328 4980

78400

78400
6308
75500
23300

6x5000=30000
Obstacle Light
5-5 2-2
Obstacle Light

109310
8438

45600

45600
4 4391 1200 5941 1297 "A"
4 764 3628 2971 2971
Access Door

2950 2000 2x3500=7000

750
1814

1732
22300

33200
4 500 1814
751

4100
1 200 8000

6700
2546
5050 3600
4900

4736

8200
5092
3
2100

2100

2100
6900 757
8200
3200

Access Door
3

2546
30 3

4100
4500

L1C2 0 4 5 00 R
+1 -P01630 5 16 3000
13355

1732
-P
0.3 L LC 0.42

750
0
+1

5x4000=20000
MNTK:+13.67

30910
28810

2 "A"

30910
AT:+10.58
1:

1:
0

0
2 4-4 1-1
1.

1.
1.

1.
+5.58 +5.58
15455

1:

1:
0

13500
13000 MNNN:+2.33 11400
0.0
2910

2910
9500 9500 8200 9500 5061 1200 7500 2700
1 -3.0
3750 3750
1' 1' "A"
35005500

987 4074
11000

2037 2037
1
15000

1200
1200
500

750

3606
4100
48743 -18.00

3289
32000

32000
Scour (Flood) 750
21000

5078

6578

8200
988
-28.98 (P16) 3528 750

3289

4100
3606
Estimated Bearing Stratum

750
-35.0 -35.0

1200 B A
"A"

16891
1' - 1'
11992
48743 1227 7767 2998
8446 10135 11582 10135 8446 3833 3934 "A"
3000 3000 3000 3000
3000 3000 3000 3000
"A"
PYLON 15 PIER 17

3000
4346 8200 4346

3817
3000

4100
3500

A A
16891

3500

3000

8200
566
B
3000

100

4100
3817
7767 2998 12135 2998 7767
1227 1227

10 30
30

10
50
P16 148piles x Ø1200 / foundation
2+601.0 "A"
All dimensions are in mm, unless otherwise shown.

NOTE:LIFTS SHOWN IN THE DRAWING ARE FOR REFERENCE ONLY.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF PYLON P16


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 005
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200

48742.8
600 47542.8 600
7845.6 31851.6 8445.6

1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8

.8
47
14
7.
8 A A A A C A A A A A A D B

1426.5

226.5
24 B
F B
Bulkhead Steel Pipe Sheet Pile
5'1
8 "
B
°3
10 F B
F B
F B

F B

16891.2
8200

1226.5 7767 2998.1 6067.6 6067.6 2998.1 7767 1226.5

CROSS SECTION S=1/60

type-A type-B type-C type-D type-E type-F


Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe
Joint Pipe
Joint Pipe Joint Pipe Joint Pipe Joint Pipe Joint Pipe
( Mortar Filling )
( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling )
5°17'39"

5°17'39"
5°17'39"

5°17'39"
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 006
SHEET No. :
Sheet of PACKAGE:
300 49500 1200
11500 (t=19,SKY490) 8500 (SKY490) 12000 (t=20,SKY490) 12000 (t=20,SKY490) 7000 (t=20,SKY490)

EXTERIOR STEEL PIPE 2000 (t=19) 6500 (t=20)


Reinforcing Band
PL-9x300
SHEET PILE Joint Pipe Site Welding Pre Cut (Joint Pipe)
Shop Welding
Site Welding Site Welding Site Welding

Type-a

1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 38000
51000

300 49500 1200


10500 (t=19,SKY490) 8500 (SKY490) 12000 (t=20,SKY490) 12000 (t=20,SKY490) 8000 (t=20,SKY490)
3000 (t=19) 5500 (t=20)
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding Site Welding
Shop Welding

Type-b

1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 38000
51000

300 30600 1200

BULKHEAD STEEL PIPE 12000 (t=14,SKY400) 12000 (t=14,SKY400) 8100 (t=14,SKY400)

Reinforcing Band
SHEET PILE Joint Pipe Site Welding Site Welding
PL-9x300

Type-c

1200
Top Slab

1300
Filled Concrete
5500 32000
5400 32100

300 30600 1200


11000 (t=14,SKY400) 12000 (t=14,SKY400) 9100 (t=14,SKY400)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding

Type-d

1200
Top Slab

1300
Filled Concrete
5500 32000
5400 32100

NOTES:
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
sheet piles,and Type-c and Type-d for bulkhead steel pipe
sheet piles.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 007
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200

48742.8
600 47542.8 600
7845.6 31851.6 8445.6

1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8

.8
47
14
7.
8 A A A A C A A A A A A D B

1426.5

226.5
24 B
B

3000
Bulkhead Steel Pipe Sheet Pile
F
5'1
8 "
B
°3
10 F B
F B
F B

F B

16891.2
8200

Internal Pile F

3000
F

10589 10589
1226.5 7923.7 3146.4 5437.2 5437.2 3146.4 7923.7 1226.5

CROSS SECTION S=1/60

type-A type-B type-C type-D type-E type-F


Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe
Joint Pipe
Joint Pipe Joint Pipe Joint Pipe Joint Pipe Joint Pipe
( Mortar Filling )
( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling )
5°17'39"

5°17'39"
5°17'39"

5°17'39"
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 008
SHEET No. :
Sheet of PACKAGE:
300 43500 1200
11500 (t=19,SKY490) 8500 (SKY490) 9000 (t=21,SKY490) 9000 (t=21,SKY490) 7000 (t=21,SKY490)

EXTERIOR STEEL PIPE 2000 (t=19) 6500 (t=21)


Reinforcing Band
PL-9x300
SHEET PILE Joint Pipe Site Welding Pre Cut (Joint Pipe)
Shop Welding
Site Welding Site Welding Site Welding

Type-a

1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32000
45000

300 43500 1200


10500 (t=19,SKY490) 8500 (SKY490) 9000 (t=21,SKY490) 9000 (t=21,SKY490) 8000 (t=21,SKY490)
3000 (t=19) 5500 (t=21)
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding Site Welding
Shop Welding

Type-b

1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32000
45000

300 24600 1200


10000 (t=14,SKY400) 10000 (t=14,SKY400) 6100 (t=14,SKY400)

Reinforcing Band
PL-9x300

BULKHEAD STEEL PIPE Joint Pipe Site Welding Site Welding

SHEET PILE Type-c

1200
Top Slab

1300
Filled Concrete
5500 26000
5400 26100

300 24600 1200


9000 (t=14,SKY400) 10000 (t=14,SKY400) 7100 (t=14,SKY400)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding

Type-d

1200
Top Slab

1300
Filled Concrete
5500 26000
5400 26100

10000 (t=14,SKK400) 10000 (t=14,SKK400) 6100 (t=14,SKK400)

Reinforcing Band
PL-9x300

INTERNAL PILE Site Welding Site Welding

NOTES:
1200

Top Slab
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
1300
sheet piles,and Type-c and Type-d for bulkhead steel pipe
Filled Concrete
sheet piles.
5500 26000
5400 26100

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 009
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200

48742.8
600 47542.8 600
7845.6 31851.6 8445.6

1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8

.8
47
14
7.
8 A A A A C A A A A A A D B

1426.5

226.5
24 B
F B
Bulkhead Steel Pipe Sheet Pile
5'1
8 "
B
°3
10 F B
F B
F B

F B

16891.2
8200

Internal Pile
F

10589 10589
1226.5 8002.1 3220.5 5121.9 5121.9 3220.5 8002.1 1226.5

CROSS SECTION S=1/60

type-A type-B type-C type-D type-E type-F


Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe
Joint Pipe
Joint Pipe Joint Pipe Joint Pipe Joint Pipe Joint Pipe
( Mortar Filling )
( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling )
5°17'39"

5°17'39"
5°17'39"

5°17'39"
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 010
SHEET No. :
Sheet of PACKAGE:
300 40500 1200
8500 (t=14,SKY490) 12000 (SKY490) 12000 (t=17,SKY490) 9500 (t=17,SKY490)

EXTERIOR STEEL PIPE 2000 (t=14) 10000 (t=17)


Reinforcing Band
PL-9x300
SHEET PILE Joint Pipe Site Welding Pre Cut (Joint Pipe)
Shop Welding
Site Welding Site Welding

Type-a

1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
10000 (Cut Off) 32000
42000

300 40500 1200


7500 (t=14,SKY490) 12000 (SKY490) 12000 (t=17,SKY490) 10500 (t=17,SKY490)
3000 (t=14) 9000 (t=17)
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding
Shop Welding

Type-b

1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
10000 (Cut Off) 32000
42000

300 24600 1200


10000 (t=14,SKY400) 10000 (t=14,SKY400) 6100 (t=14,SKY400)

Reinforcing Band
PL-9x300

BULKHEAD STEEL PIPE Joint Pipe Site Welding Site Welding

SHEET PILE Type-c

1200
Top Slab

1300
Filled Concrete
5500 26000
5400 26100

300 24600 1200


9000 (t=14,SKY400) 10000 (t=14,SKY400) 7100 (t=14,SKY400)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding

Type-d

1200
Top Slab

1300
Filled Concrete
5500 26000
5400 26100

10000 (t=14,SKK400) 10000 (t=14,SKK400) 6100 (t=14,SKK400)

Reinforcing Band
PL-9x300

INTERNAL PILE Site Welding Site Welding

Type-e NOTES:
1200

Top Slab
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
1300
sheet piles,and Type-c and Type-d for bulkhead steel pipe
Filled Concrete
sheet piles.
5500 26000
5400 26100

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 011
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200

48742.8
600 47542.8 600
7845.6 31851.6 8445.6

1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8

.8
47
14
7.
8 A A A A C A A A A A A D B

1426.5

226.5
24 B
F B
Bulkhead Steel Pipe Sheet Pile
8" B
5' 1
‹3
10 F B
F B
F B

F B

16891.2
8200

1226.5 7923.7 3146.4 5437.2 5437.2 3146.4 7923.7 1226.5

CROSS SECTION S=1/60

type-A type-B type-C type-D type-E type-F


Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe
Joint Pipe
Joint Pipe Joint Pipe Joint Pipe Joint Pipe Joint Pipe
( Mortar Filling )
( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling )
5°17'39"

5°17'39"
5°17'39"

5°17'39"
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 012
SHEET No. :
Sheet of PACKAGE:
300 45000 1200
11500 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490) 8000 (t=16,SKY490)

EXTERIOR STEEL PIPE Reinforcing Band


PL-9x300
SHEET PILE Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding Site Welding

Type-a

1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 33500
46500

300 45000 1200


10500 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding Site Welding

Type-b

1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 33500
46500

300 26100 1200


10000 (t=14,SKY400) 10000 (t=14,SKY400) 7600 (t=14,SKY400)

Reinforcing Band
PL-9x300

BULKHEAD STEEL PIPE Joint Pipe Site Welding Site Welding

SHEET PILE Type-c

1200
Top Slab

1300
Filled Concrete
5500 27500
5400 27600

300 26100 1200


9000 (t=14,SKY400) 10000 (t=14,SKY400) 8600 (t=14,SKY400)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding

Type-d

1200
Top Slab

1300
Filled Concrete
5500 27500
5400 27600

NOTES:
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
sheet piles,and Type-c and Type-d for bulkhead steel pipe
sheet piles.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 013
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200

48742.8
600 47542.8 600
7845.6 31851.6 8445.6

1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8

.8
47
14
7.
8 A A A A C A A A A A A D B

1426.5

226.5
24 B
B

3000
Bulkhead Steel Pipe Sheet Pile
F
5'1
8 "
B
°3
10 F B
F

3000
B
F B

3500
F B

16891.2
8200

3500
Internal Pile F

3000
F

3000
F

3000 3000 3000 3000 3000 3000 3000 3000


1226.5 7767 2998.1 6067.6 6067.6 2998.1 7767 1226.5

CROSS SECTION S=1/60

type-A type-B type-C type-D type-E type-F


Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe Steel Pipe
Joint Pipe
Joint Pipe Joint Pipe Joint Pipe Joint Pipe Joint Pipe
( Mortar Filling )
( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling ) ( Mortar Filling )
5°17'39"

5°17'39"
5°17'39"

5°17'39"
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 014
SHEET No. :
Sheet of PACKAGE:
300 44000 1200
11500 (t=20,SKY490) 11000 (t=20,SKY490) 12000 (t=20,SKY490) 11000 (t=20,SKY490)

EXTERIOR STEEL PIPE Reinforcing Band


PL-9x300
SHEET PILE Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding

Type-a

1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32500
45500

300 44000 1200


10500 (t=20,SKY490) 11000 (t=20,SKY490) 12000 (t=20,SKY490) 12000 (t=20,SKY490)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding

Type-b

1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32500
45500

300 25100 1200


10000 (t=14,SKY400) 10000 (t=14,SKY400) 6600 (t=14,SKY400)

Reinforcing Band
PL-9x300

BULKHEAD STEEL PIPE Joint Pipe Site Welding Site Welding

SHEET PILE Type-c

1200
Top Slab

1300
Filled Concrete
5500 26500
5400 26600

300 25100 1200


9000 (t=14,SKY400) 10000 (t=14,SKY400) 7600 (t=14,SKY400)

Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding

Type-d

1200
Top Slab

1300
Filled Concrete
5500 26500
5400 26600

10000 (t=14,SKK400) 10000 (t=14,SKK400) 6600 (t=14,SKK400)

Reinforcing Band
PL-9x300

INTERNAL PILE Site Welding Site Welding

Type-e NOTES:
1200

Top Slab
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
1300
sheet piles,and Type-c and Type-d for bulkhead steel pipe
Filled Concrete
sheet piles.
5500 26500
5400 26600

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 015
SHEET No. :
Sheet of PACKAGE:
PILE TOE REINFORCING
BAND DETAIL S=1/50 PRE-CUT DETAIL S=1/20 FIELD JOINT DETAIL OF PIPE JOINT S=1/20 LIFTING LUG DETAIL S=1/10
300 18 (Pre-cut Position)

500 500 600 A


o re Ti
o rm CONNECTION PIECE ore E E
2~5 4 5° m
or
Dead Water Material 4 5°

11
Dead Water Material

D
Ø1200

30±5

Ø165.2
11

C
Ø165.2

B
Temporary Attaching
a
10 10
300 300
A/2 A/2
8 1000 8
PILE TOE REINFORCING BAND Bead Width (Non Welding)
Bead Width
PL-300x9x3798
6

MAX. LIFTING LOAD


(TON) A B C D E Ti Ø a

LIFTING LOAD = 3 120 100 55 25 25 12 40 6


3 < LIFTING LOAD = 5 120 100 55 25 25 16 40 9
5 < LIFTING LOAD = 10 200 150 90 30 30 22 65 15
10 < LIFTING LOAD = 20 300 250 150 50 50 22 80 15

PIPE INTERLOCKING
FIELD WELD DETAIL - A S=1/ 3 DETAIL - B S=1/10 DETAIL - C S=1/10 JOINT DETAIL S=1/ 5

Ø1200

2
5.

Ø1200
16
Ø
BACKING STRIP
TOE SHOE
PL-70x6x3663
0~2.4
6
30 ±5 8
Bead Width

82.6 (61.3)
4 5°

35

Ø1
6 .1

65
70 11
70

.2
1~4

30
35

3.0
6

.2
25

247.8 (226.5)

±5
82.6 (103.9)
15

65

50
Ø1
Root Gap Retention Bead 15
9.2
80 - (8 LOCATIONS)

30
Filled Concrete
30

2~5 99 6 TOE SHOE

±5
6 .1

45°
Ø165.2

11
12

Copper Band STOPPER (8 LOCATIONS)

82.6 (61.3)
30
6 PL-12x6x30
3 0°

247.8
t 6 8 Bead Width

30
Ø165.2
TOE SHOE

INFORMATION ONLY.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda DETAIL OF STEEL PIPE SHEET PILE


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 016
SHEET No. :
Sheet of PACKAGE:
DETAIL S=1/30 DETAIL OF STEADY REST S=1/20 "a" DETAIL S=1/3

Ø1200 16 14

X N02-D13-150
X N02-D13-150
A-A 14 Steady rest
PL-32*16*3597 16

Ø1200

32
300
14 1172 14 Steady rest
"a"
A A PL-32*16*3597

25
L1

32
Stopper N = 3 / Ring

25
12 N01 12 N01 PL-25*9*50

300
50
100

32
Top Slab

25
300

Lower Side
300

Steady rest
1200
1300

15mm or more

B B

STEADY REST S=1/30 STOPPER S=1/3


100

4 N03-D13-250 X N02-D13-150

4 N03-D13-250 3597
(Neutral Line)

Filled Concrete

50
14 1172 14
Ø1200 B-B
25 9

Ø1200
14 1172 14
100 1000 100

12 N01

No. of Bulkhead X : No. of


Pylon No. & Internal Pile Rebar N01 L1 Rebar N02 35±10
16
P12 40 D16 810 6

32
P13 46 D20 1000 7 PL-32*16*3597

P14 46 D20 1000 7

P15 40 D22 1080 7

P16 70 D25 1240 8

4 N03-D13-250

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. N0.

H. Ikeda PILE HEAD DETAIL


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING N0. : C - 2a - 017
SHEET N0. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5

+9.50 +9.50 +9.50 +9.50 +9.50 +9.50 +9.50

500

2500

1000

4500
+7.00

6500
9170

1000
+5.00

12500

1000
+3.00
+1.33 +1.33 +1.33 +1.33 +1.33 +1.33

19000

19000

19000
23000
22000
Concrete Fill Bottom Slab
11000

-12.50

Leveling Sand

1)EXCAVATE INSIDE EXTERIOR SHEET 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR
PILES AND FILLED WITH CONCRETE AS -12.50M LEVEL AFTER THE 1ST FOLLOWED BY CASTING UNDERWAR UP TO +5.00M LEVEL AFTER THE 2ND UP TO +3.00M LEVEL AFTER THE 3RD
SHOWN. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +7.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.

STEP6 STEP7 STEP8 STEP9 STEP10

500
+9.50 +9.50 +9.50 +9.50 +9.50

3@2000=6000
9500

13500
12500

2@3000=6000
+1.33 +1.33 +1.33 +1.33 +1.33
19000

19000

19000
18000

18000

18000
1000

+0.00
Top Slab
1000

1000
-3.00

6500

5500
-8.50 -8.50 -8.50

5003500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO +0.00M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.

NOTES:
For information only and the contractor shall develop construction
sequence and steel temporary timbering/bracing for the
engineer's approval.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P12)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 018
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5

+9.50 +9.50 +9.50 +9.50 +9.50 +9.50 +9.50

500

2500

1000

4500
+7.00

6500
10320

1000
+5.00

12500

1000
+3.00

19000

19000

19000
+0.18 +0.18 +0.18 +0.18 +0.18 +0.18

23000
22000
Concrete Fill Bottom Slab
11000

-12.50

Leveling Sand

1)EXCAVATE INSIDE EXTERIOR SHEET 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR
PILES AND FILLED WITH CONCRETE AS -12.50M LEVEL AFTER THE 1ST FOLLOWED BY CASTING UNDERWAR UP TO +5.00M LEVEL AFTER THE 2ND UP TO +3.00M LEVEL AFTER THE 3RD
SHOWN. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +7.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.

STEP6 STEP7 STEP8 STEP9 STEP10

500
+9.50 +9.50 +9.50 +9.50 +9.50

3@2000=6000
9500

13500
12500

2@3000=6000
19000

19000

19000
18000

18000

18000
1000

+0.18 +0.00 +0.18 +0.18 +0.18 +0.18


Top Slab
1000

1000
-3.00

6500

5500
-8.50 -8.50 -8.50

5003500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO +0.00M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.

NOTES:
For information only and the contractor shall develop construction
sequence and steel temporary timbering/bracing for the
engineer's approval.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P13)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 019
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5

+11.14

1360
+6.14 +6.14 +6.14 +6.14 +6.14

3500
1:
5000

1.

2140
0

1000

4140
+4.00 +4.00
+6.14

1000
+2.00

9140

16000
20500

20000
18640
Concrete Fill Bottom Slab

11000
-12.50

Leveling Sand

1)EXCAVATE OUTSIDE COFFERDAM UP 1)EXCAVATE INSIDE EXTERIOR SHEET 1)DRAINING THE COFFERDAM INTERIOR 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND
TO +6.14M LEVEL. PILES AND FILLED WITH CONCRETE AS UP TO +4.00M LEVEL AFTER THE 1ST -12.50M LEVEL AFTER THE 2ND FOLLOWED BY CASTING UNDERWAR
SHOWN. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +2.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.

STEP6 STEP7 STEP8 STEP9 STEP10

500
+6.14 +6.14 +6.14 +6.14 +6.14

2@2000=4000
6640

2@2500=5000

10500
9140
1000

16000

16000

16000
-0.50

14640

14640

14640
Top Slab
1000

1000
-3.00

6500

5500
-8.50 -8.50 -8.50

3500
500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO -0.50M LEVEL AFTER THE 3RD UP TO -3.00M LEVEL AFTER THE 4TH UP TO -8.50M LEVEL AFTER THE 5TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
3)BACKFILL UP TO THE EXISTING
GROUND LEVEL.

NOTES:
For information only and the contractor shall develop construction
sequence including excavation outside cofferdam and steel
temporary timbering/bracing for the engineer's approval.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P14)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 020
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5

+9.50 +9.50 +9.50 +9.50 +9.50 +9.50

3500
3000

5500
+6.50

7500
11700

11700

11700
1000

1000
+4.00 +4.00

12500

1000
+2.00

19000
23000
-1.20 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20

22000
Concrete Fill Bottom Slab
11000

-12.50

Leveling Sand

1)EXCAVATE INSIDE EXTERIOR SHEET 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND
PILES AND FILLED WITH CONCRETE AS UP TO +6.50M LEVEL AFTER THE 1ST UP TO +4.00M LEVEL AFTER THE 2ND -12.50M LEVEL AFTER THE 3RD FOLLOWED BY CASTING UNDERWAR
SHOWN. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +2.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.

STEP6 STEP7 STEP8 STEP9 STEP10

500
+9.50 +9.50 +9.50 +9.50 +9.50

2@2500=5000
10000

2000

13500
12500

2@2500=5000
19000

19000

19000
18000

18000

18000
1000

-0.50
-1.20 -1.20 -1.20 -1.20 Top Slab -1.20
1000

1000
-3.00

6500

5500
-8.50 -8.50 -8.50

3500
500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO -0.50M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.

NOTES:
For information only and the contractor shall develop construction
sequence and steel temporary timbering/bracing for the
engineer's approval.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P15)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 021
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5 STEP6

+10.58

1000
+9.50 +9.50 +9.50 +9.50 +9.50 +9.50 +9.50

500

2500
5000

1000

4500
1: +7.00

6500
1
+5.58 +5.58 +5.58 +5.58 +5.58 +5.58 +5.58

1000
+5.00

12500

1000
+3.00

19000

19000

19000
9500

22500
22000
Concrete Fill Bottom Slab

11000
-12.50

Leveling Sand

1)EXCAVATE OUTSIDE COFFERDAM UP 1)EXCAVATE INSIDE EXTERIOR SHEET 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR
TO +5.58M LEVEL. PILES AND FILLED WITH CONCRETE AS -12.50M LEVEL AFTER THE 1ST FOLLOWED BY CASTING UNDERWAR UP TO +5.00M LEVEL AFTER THE 2ND UP TO +3.00M LEVEL AFTER THE 3RD
SHOWN. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +7.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.

STEP7 STEP8 STEP9 STEP10 STEP11

500
+9.50 +9.50 +9.50 +9.50 +9.50

3@2000=6000
+5.58 +5.58 +5.58 +5.58 +5.58
9500

13500
12500

2@3000=6000
19000

19000

19000
18000

18000

18000
1000

+0.00
Top Slab
1000

1000
-3.00

6500

5500
-8.50 -8.50 -8.50

3500
500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO +0.00M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
3)BACKFILL UP TO THE EXISTING
GROUND LEVEL.

NOTES:
For information only and the contractor shall develop construction
sequence including excavation outside cofferdam and steel
temporary timbering/bracing for the engineer's approval.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P16)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 022
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION

Top Layer No.2 @300

5500

5500
Bottom Layer No.3 @150
Bottom Layer No.2 @150

48743
14491

14491
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.

H. Ikeda REINFORCMENT OF TOP SLAB


in association with ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 023
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION

Top Layer No.2 @300

5500

5500
Bottom Layer No.3 @150
Bottom Layer No.2 @150

48743
14491

14491
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCMENT OF TOP SLAB


in association with ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 024
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION

Top Layer No.2 @300

5500

5500
Bottom Layer No.3 @300
Bottom Layer No.2 @150

48743
14491

14491
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCMENT OF TOP SLAB


in association with ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 025
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION

Top Layer No.2 @300

5500

5500
Bottom Layer No.3 @150
Bottom Layer No.2 @150

48743
14491

14491
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCMENT OF TOP SLAB


in association with ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 026
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION

Top Layer No.2 @300

5500

5500
Bottom Layer No.2 @150

48743
14491

14491
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCMENT OF TOP SLAB


in association with ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 027
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40

A-A B-B
A ELEVATION S=1/100

Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200

N03-D22-100-NF N03-D22-100-NF

450

450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF

4@100=400

4@100=400
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement

450

450
4@100

4@100
=400

=400
125

125

125

125
34@100=3400

34@100=3400
5500

5500
125

125
4@100

4@100
=400

=400
34@100=3400

34@100=3400
Shear reinforcement

600

600
5500

5500
D D

1560 N01-D22 5460 N03-D22

14°19'26"

14°19'26"
309 309
125

125

691 391
4@100=400

4@100=400

Moment reinforcement

5460 N04-D22
1560 N02-D22
600

600

4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40

C-C D-D

Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0

0
10

10
150 150 150

150 150 150


Ø1200

Ø1200
100

100
0

0
10

10

301 301

309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.

H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 028
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40

A-A B-B
A ELEVATION S=1/100

Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200

N03-D22-100-NF N03-D22-100-NF

450

450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF

4@100=400

4@100=400
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement

450

450
4@100

4@100
=400

=400
125

125

125

125
34@100=3400

34@100=3400
5500

5500
125

125
4@100

4@100
=400

=400
34@100=3400

34@100=3400
Shear reinforcement

600

600
5500

5500
D D

1560 N01-D22 5460 N03-D22

14°19'26"

14°19'26"
309 309
125

125

691 391
4@100=400

4@100=400

Moment reinforcement

5460 N04-D22
1560 N02-D22
600

600

4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40

C-C D-D

Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0

0
10

10
150 150 150

150 150 150


Ø1200

Ø1200
100

100
0

0
10

10

301 301

309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.

H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 029
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40

A-A B-B
A ELEVATION S=1/100

Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200

N03-D22-100-NF N03-D22-100-NF

3@100=300 450

3@100=300 450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement

120 450

120 450
3@100

3@100
120

120

=300

=300
38@95=3610

38@95=3610
5500

5500
3@100
600 120

3@100

600 120
=300

=300
38@95=3610

38@95=3610
Shear reinforcement

5500

5500
D D

1248 N01-D22 6084 N03-D22

14°19'26"

14°19'26"
309 309
691 391
120

120
3@100=300

3@100=300

Moment reinforcement

6084 N04-D22
1248 N02-D22
600

600

4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40

C-C D-D

Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0

0
10

10
150 150 150

150 150 150


Ø1200

Ø1200
100

100
0

0
10

10

301 301

309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.

H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 030
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40

A-A B-B
A ELEVATION S=1/100

Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200

N03-D22-100-NF N03-D22-100-NF

3@100=300 450

3@100=300 450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement

450

450
3@100

3@100
=300

=300
275

275

275

275
33@100=3300

33@100=3300
5500

5500
275

275
3@100

3@100
=300

=300
33@100=3300

33@100=3300
Shear reinforcement

600

600
5500

5500
D D

1248 N01-D22 5304 N03-D22

14°19'26"

14°19'26"
309 309
275

275

691 391
3@100=300

3@100=300

Moment reinforcement

5304 N04-D22
1248 N02-D22
600

600

4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40

C-C D-D

Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0

0
10

10
150 150 150

150 150 150


Ø1200

Ø1200
100

100
0

0
10

10

301 301

309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.

H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 031
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40

A-A B-B
A ELEVATION S=1/100

Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200

N03-D22-100-NF N03-D22-100-NF

3@100=300 450

3@100=300 450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement

450

450
3@100

3@100
=300

=300
325

325

325

325
33@100=3300

33@100=3300
5500

5500
325

325
3@100
3@100

=300
33@100=3300

33@100=3300

=300
Shear reinforcement

500

500
5500

5500
D D

1248 N01-D22 5304 N03-D22

14°19'26"

14°19'26"
309 309
691 391
325

325
3@100=300

3@100=300

Moment reinforcement

5304 N04-D22
1248 N02-D22
500

500

4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40

C-C D-D

Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0

0
10

10
150 150 150

150 150 150


Ø1200

Ø1200
100

100
0

0
10

10

301 301

309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.

H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 032
SHEET No. :
Sheet of PACKAGE:
1 .0
1 +25
ELEVATION S=1/200 A
PIER 10 PYLON 12

C B
14900 - West 3500
A - A 3500 14900 - East
4900
1050 1400 1100 1350 450
500 1800 5395 6000 1705 500 500 1935 6000 5165 1800 500 4451210 795
755 985 400

50 50
478

61
451
1.0 % 1.0 %

550
571
Tie-down cable

451

71
+27.20

25
1999

1999
100 1900 825 1450 625

1000 1500

1000 1500

1000 1500
CL

R32101
1900

R32101
2500

2500

2500

2968
B
E E
800 3000 8300 3000 800 800 3000 8300 3000 800 1400
15900 3000 3000 15900 950 3000 950

18201
20200

11300 5300 5300 11300

D D

2600 3000 8300 3000 7600 3000 8300 3000 2600 4500 3000 4500

+7.00
3000

1500
150

+4.00
100
200

-30.00

1500 8@4800=38400 1500 1500 2@4500=9000 1500


100 41400 100 100 12000 100

PLAN A
S=1/200

1500
4500
Ø
15
00
6000

PYLON 12
2@4500=9000
12000
3000

400
1+251.0

PIER 10
NOTES:
1 . bearing shall be as specified on dwg. C-4-005
3000 2600
6000

2 . tie-down shall be as specified on dwg. C-3b-073 and -74


3 . install rebar for crack prevention in bearing mortar.
4 . fill non-shrink mortar in block out provided for anchor bolts of bearing.

1500
1500 8@4800=38400 1500 All dimensions are in mm, unless otherwise shown.
41400

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N.H.NGHIA DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H.Ikeda END PIER 11 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2b - 001
SHEET No. :
Sheet of PACKAGE:
SUPPORT BEAM PLAN S=1/200

14900 3500 3500 14900

1800 5650 5650 1800 C 1800 5650 5650 1800


L

625

1450 625
1100 1350

1100 1350

PYLON 12
255

2450

2450
985 1900
755
345 1210 345 485

4900

4900
1075 1450 1075

1050 1400

1050 1400
345

PIER 10
2450

2450
1210

1900
345
100
500 1800 5395 6000 1705 500 500 1935 6000 5165 1800 500

SECTIONS B - B AND C - C S=1/100 SECTION D - D S=1/100 SECTION E - E S=1/100


3000
4900 3000 500 2000 500
1050 1400 1100 1350 650 1700 650 1860
"a" Steel plate
445 1210 795 375 1450 625

150
1.0 % 1.0 %
441 50

650

650

500
58
760

3000

3000
25

25

1700

1700
155
1500

1999
2500

1900

650

650
240

650 1700 650


3000
2450 2450

DETAIL "a" S=1/30


65 80 80 80 80 80 80 80 80 80 80 65

70 70 70 70 70 70 70 70 70 70 70
30

10 10

50

NOTES:
1 . bearing shall be as specified on dwg. C-4-005
2 . tie-down shall be as specified on dwg. C-3b-073 and -74
3 . install rebar for crack prevention in bearing mortar.
4 . fill non-shrink mortar in block out provided for anchor bolts of bearing.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N.H.NGHIA DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H.Ikeda END PIER 11 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2b - 002
SHEET No. :
Sheet of PACKAGE:
1 .0
ELEVATION S=1/200
PYLON 16
2 +75
PIER 18
CL
4150
B 36800
A 450 1350 725 1375 700
500 2500 15900 625 1450 825 1100 150 SUPPORT BEAM PLAN S=1/200
1145 540 6@2200=13200 2160 775 C
L
1.0 %
6@2200=13200

71 550 57
500 2500 540 2160

2000

1682 11
Tie-down cable 1.0 %

150
280

1375 700
+27.2

1100
1682

540
42

2075

2075
280
1000 1500

1000 1500
2387

2500
1075
1729

825
540

1797

4150

4150
2968

1350 725

625 1450

2075
R179105
D D A 1025
1800 11000 5600
18400
800 3000 8000 3000 4100

575 3000 575


SECTIONS A - A AND B - B S=1/100
11000 5600 2075 2075
17500

1350 725 825 1100 150


15771

550 550
625 1450 825 280 540 280

15088
C C 1.0 %

425 45

11
130
1.0 %

2000
2600 3000 8000 3000 4100 4500 3000 4500

58

42
+9.7

4500
1500
1729
3000

3000
1500

2500
150

150
+6.7
100
200

240

-34.3

8@4800=38400 2@4500=9000 2075 2075


1500 1500 1500
4150
100 41400 100 12000 100

SECTION C - C S=1/100 SECTION D - D S=1/100


PLAN S=1/200

3000 3000
1500

650 1700 650 650 1700 650


"a"

Ø
15
00

650
650
PIER 18
2@4500=9000

2+751.0

3000
1700
775

3000
1700
12000

PYLON 16

500
650
650

150
Steel plate
1860
500 2000 500
1500

3000

NOTES:
8@4800=38400 All dimensions are in mm, unless otherwise shown. 1 . bearing shall be as specified on dwg. C-4-005
1500
2 . tie-down shall be as specified on dwg. C-3b-073 and -74
41400
3 . install rebar for crack prevention in bearing mortar.
4 . fill non-shrink mortar in block out provided for anchor bolts of bearing.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N.H.NGHIA DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H.Ikeda END PIER 17


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2b - 003
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/100

NB12-D16-150 31 NB01-D36-150
31 NB02-D36-150 1
C
L SECTION 1 - 1 S=1/50

250
1.0 % 1.0 %

1500
NB13-D16-150

NC02-D20-100
31 NB01-D36-150
31 NB02-D36-150

1500
NB05-D20-150 31 NB04-D36-150
Skin 31 NB03-D36-150

1
SECTION 2 - 2 S=1/50
max 360mm
NB05-D20-150

NC02-D20-200
31 NB04-D36-150
NC04-D20 31 NB03-D36-150

2 2
Ls

77 NF10-D36-150 274 NF07-D22-150 76 NF09-D32-150 NF16-D18-600

1500
NF15-D18-150 NF13-D18-150

NC02-D20-100
Skin Skin 77 NF11-D36-150

D36 D32 NF14-D18-150

1500
NF08-D16-750

NF12-D18-150

D43 D36

77 NF06-D43-150 77 NF05-D36-150
77 NF04-D43-150 77 NF03-D36-150
NOTES:
274 NF01-D32-150 NF02-D16-750 1 . Ls : splice length shall be conformed to 22TCN272-05
2 . Every hooks , lap lengths spacing minimum shall be conformed to
22TCN272-05 and AASHTOLRFD 4th edition with seismic zone 2
3 . Rebar shall be arranged to avoid interference with anchor bolt of
tie-down cable.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT (BASIC DESIGN)

N. H. Nghia DRAWING TITLE:


CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda REINFORCEMENT OF END PIER P11


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2b - 004
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/100
C
L
NB15-D16-150 D16@150
1

SECTION 1 - 1 S=1/50
NB17-D16-150
27 NB02-D32-150 27 NB01-D36-150
NB14-D16-150
27 NB04-D32-150 27 NB03-D36-150
D36
NB16-D16-150 D32

250
NB13-D20-150
1.0 %

1500
NB12-D20-150

NC02-D20-100
D36

D28

1500
NB09-D22-125 27 NB07-D36-150
Skin 27 NB08-D28-150 27 NB05-D36-150
27 NB06-D28-150
1
SECTION 2 - 2 S=1/50
1.0 %
64 NC01-D36-150NF

NC02-D20-200
NC04-D20

2 2

Ls

274 NF07-D22-150 77 NF09-D36-150

1500
NF15-D18-150 NF13-D18-150 77 NF10-D38-150

NC02-D20-100
Skin Skin 77 NF11-D38-150 NF08-D16-750
Clear cover for Pilecap : 75mm

NF14-D18-150

1500
D38 D36
NF11-D18-150

NF16-D18-600
D43 D36

77 NF06-D43-150 77 NF05-D36-150
77 NF04-D43-150
NF01-D16-750
77 NF03-D36-150
274 NF01-D32-150 NOTES:
1 . Ld : development length shall be conformed to 22TCN272-05
2 . Every hooks , lap lengths spacing minimum shall be conformed to
22TCN272-05 and AASHTOLRFD 4th edition with seismic zone 2
3.REBAR SHALL BE ARRANGED TO AVOID INTERFERENCE WITH
ANCHOR BOLT OF TIE-DOWN CABLE.

MATERIALS:
1 . Normal concrete , grade C30
All dimensions are in mm, unless otherwise shown. 2 . Reinforcements shall be conformed to JIS - SD390

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT (BASIC DESIGN)

N. H. Nghia DRAWING TITLE:


CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda REINFORCEMENT OF END PIER P17


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2b - 005
SHEET No. :
Sheet of PACKAGE:
DETAIL OF REINFORCEMENT CAGE S=1/100 TESTING PIPE ARRANGEMENT S=1/100 SECTION 1-1 S=1/30 SECTION 2-2 S=1/30 SECTION 5-5 S=1/30
(Hoop ties not shown)
24 NK01-D32-168 24 NK01-D32-168 24 NK02-D28-168

Ld
24 NK01-D32-168
NK06-D28
NK08-D28

100
Bottom of

150
pile cap
30x75=2250

Steel Pipe (STK400 : JIS G 3444)


D out =114.3mm t=3.5mm

Bottom of
pile cap
NK03-D16-75
NK03-D16-75 NK04-D16-225
Steel Pipe (STK400 : JIS G 3444)
D out =60.5mm t=2.3mm
1 1 110 1280 110
1500

SECTION 3-3 SECTION 4-4 SPACER


35x225=7875

4 4 S=1/30 S=1/30 S=1/20


Steel Pipe (STK400 : JIS G 3444)
D out =114.3mm t=3.5mm 340
NK03-D16 42 90 77 90 42

NK06-D28

86 8
12
5
11x3000=33000

2 2
34000

24 NK01-D28-168

34000
NK05-D16
NK04-D16-225
5 5

Steel Pipe (STK400 : JIS G 3444)


D out =60.5mm t=2.3mm

HOOP TIES SPACING S=1/30


105x225=23625

Welding Welding

Welding

Ø1 Ø1 Ø1
NK04-D16 10 23 25
NK07-D16 0 6 0
1050

NK05-D16
50 114

Bottom of hole Bottom of hole NK05-D16 NK06-D28 NK07-D16


86

3 3
110 1280 110
Ø1500 NOTE:
1 . Ld : development length shall be conformed to 22TCN272-05
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N. H. Nghia DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda CIP PILE REINFORCEMENT P11


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2b - 006
SHEET No. :
Sheet of PACKAGE:
DETAIL OF REINFORCEMENT CAGE S=1/100 TESTING PIPE ARRANGEMENT S=1/100 SECTION 1-1 S=1/30 SECTION 2-2 S=1/30 SECTION 5-5 S=1/30
(Hoop ties not shown)
24 NK01-D32-168 24 NK01-D32-168 24 NK02-D28-168

Ld
24 NK01-D32-168
NK06-D28
NK08-D28

100
Bottom of

150
pile cap
30x75=2250

Steel Pipe (STK400 : JIS G 3444)


D out =114.3mm t=3.5mm

Bottom of
pile cap
NK03-D16-75
NK03-D16-75 NK04-D16-225
Steel Pipe (STK400 : JIS G 3444)
D out =60.5mm t=2.3mm
1 1 110 1280 110
1500
35x225=7875

4 4 SECTION 3-3 S=1/30 SECTION 4-4 S=1/30 SPACER S=1/20


Steel Pipe (STK400 : JIS G 3444)
Dout =114.3mm t=3.5mm 340
NK03-D16
42 90 77 90 42
NK06-D28

86 8
13x3000=39000

12
5

2 2
41000

24 NK01-D28-168

41000
NK05-D16
5 5 NK04-D16-225

NK04-D16

Steel Pipe (STK400 : JIS G 3444)


D out =60.5mm t=2.3mm

HOOP TIES SPACING S=1/30


136x225=30600

Welding Welding

Welding

NK07-D16

Ø1 Ø1 Ø1
10 23 25
0 6 0
2050

NK05-D16
50 139

Bottom of hole Bottom of hole NK05-D16 NK06-D28 NK07-D16


86

3 3
110 1280 110
Ø1500 NOTE:
1 . Ld : development length shall be conformed to 22TCN272-05
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N. H. Nghia DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda CIP PILE REINFORCEMENT P17


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 2b - 007
SHEET No. :
Sheet of PACKAGE:
1-1 2-2

EXTERNAL FORM OF PYLON COLUMNS:


THE PYLON COLUMN AXIS IS DEFINED IN THE BROKEN
5700 LINE WHICH PASSES POINTS 1 , 2 AND 3 .
THE UPPER SECTIONS OF THE PYLON COLUMN IS LINEARLY
CHANGE FROM SECTION A-A TO SECTION B-B.
THE LOWER SECTIONS OF THE PYLON COLUMN IS LINEARLY
CHANGE FROM SECTION C-C TO SECTION D-D.
・THE UPPER PORTION ABOVE SECTION C-C EXTENDS
LINEARLY AND MEETS AT SECTION B-B.
・THE LOWER PORTION BELOW SECTION D-D EXTENDS
LINEARLY TO THE TOP OF TOP SLAB.

BaseLine Elevation
+27.910m
+29.410m
2 2 50 +30.160m
586

586
0"
°0'
90

30910

30910
32410
32574
0"
°0'
2910

2910
4410
90

5160
2250

2250
750
189 566
3750700
2
1200

PYLON 14 PYLON 14 PYLON 13 PYLON 12


(PYLON 15) (PYLON 16)
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GEOMETRY CONTROL OF PYLON 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 001
SHEET No. :
Sheet of PACKAGE:
1-1 2-2
CROSS SECTION S = 1 / 200

5700

30910

30910

INTERIOR FORM OF PYLON COLUMNS:


THE PYLON COLUMN AXIS IS DEFINED IN THE
BROKEN LINE WHICH PASSES POINTS 1 , 2 AND 3 .
2500

THE UPPER SECTIONS IN THE PYLON COLUMN IS


LINEARLY CHANGE FROM SECTIONS I-I , J-J , K-K
2910

2910

4
77
00 AND L-L.
5
THE LOWER SECTIONS IN THE PYLON COLUMN IS
LINEARLY CHANGE FROM SECTIONS M-M , N-N ,
O-O AND P-P.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GEOMETRY CONTROL OF PYLON 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 002
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION S = 1 / 200

3450
450 3000
1500 1500

1500 1500
3000
A-A
A-A

5700
1200 4500
2250 2250
EXTERNAL FORM OF CROSSBEAM:
THE CROSSBEAM AXIS IS DEFINED IN THE LINE

4000
WHICH PASSES POINTS 4 AND 5 .
THE CROSSBEAM SECTIONS ARE DEFINED AT E-E

8000
AND F-F POSITIONS.
THE TOP OF THE CROSSBEAM IS LEVELED.

4000
THE BOTTOM IS A CIRCULAR ARC WHICH PASSES
POINTS a , b AND c .

TOP STRUT
5700
1200 4500
G-G H-H 2250 2250

B-B

4100
2723 2700
C-C

8200
2800

2800
B-B

4100
C-C
7200

7200
20000

20000
10000

10000

C
L
11400
1200 7500 2700
3750 3750

11000

3606
4100
"A"
TOP STRUT DETAILS:

8200
988
THE TOP STRUT SECTION IS DEFINED AT SECTION
H-H. D-D

4100
3606
THE BOTTOM IS DEFINED IN A PARABOLA WHICH D-D
PASSES POINTS d , e AND f .
THE TOP IS DEFINED IN A PARABOLA WHICH
PASSES POINTS g , h AND i .

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GEOMETRY CONTROL OF PYLON 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 003
SHEET No. :
Sheet of PACKAGE:
DRAINAGE ARRANGEMENT OF PYLON S=1/200

VP75 CROSS SECTION S = 1 / 100 PLAN OF TOP OF PYLON S=1/50

3-3 Ventilation

150
VP75
629 800
545

VP50 Obstacle Light 150

700
1269

500
"A"
Manhole
SEE C-4-033 Lighting Arrester
150

1350
@500
VP75

150
2-2 Stair

"A" "A" 3115 484

100
100
15 0

1 8 00

2650
90 0
60 0

1 621
"A"

VP50

1 49 0
2 3 3 100

1-1

250 250
VP75

500
1601
"A"

100
1

1 "A"
100
10 30

30
10
50

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi DRAINAGE FOR PYLON


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 004
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/200 DETAIL "a" S=1/100

38213
2506 2000 2150 6x4150=24900 2150 2000 2506
NON-SHRINKAGE MORTAR
14200 800 14200
C
L

t2 t1
ACCESS HATCH 800 500 Z + 30 MM
S1 S2

30
C1 C2 C3 C4 C5 C6 C7 C8 C9

t3
Level

800

3200
300 300

300

300

300

300
H
h1
300 300 d

4500

4500
"a"

300

300
800
300 300
300 300
t1 t2 t3 d

300

300
P12,P16 72 170 900 180
ACCESS OPENING

R106635
P13,P15 57 70 1200 210
P14 59 70 1200 210
DRAIN PIPE Ø25 DRAIN PIPE Ø25

PLAN S=1/200

38213

720
2506 2000 2150 6x4150=24900 2150 2000 2506
WEST 14200 800 14200 EAST

2600
3500
620
S1 C1 C2 C3 C4 C5 C6 C7 C8 C9 S2

720
800

300

300

300

300
ACCESS HATCH
300 300 300 300
ACCESS OPENING
END BULKHEAD
4400
6000

800
INTERMEDIATE BULKHEAD 2120
800 2900
300 300 300 300 3700
300

300

300

300
800

CROSS SECTION OF PYLON CROSSBEAM S=1/100 ELEVATION OF


PYLON CROSSBEAM
CROSS SECTION S=1/50
ELEVATION (Z)
SECTIONS S1 AND S2 (BEARING) SECTION C5 (CROSSHEAD) TYPICAL SECTION P12 27.410 ACCESS OPENING ACCESS HATCH
P13 28.910
30

30

30
P14 29.660 800 800
1.0 % 1.0 % 1.0 % 1.0 % 1.0 % 1.0 % Z 200 400 200 100 600 100
800

800

P15 28.910

800
P16 27.410
ACCESS OPENING

200

100
300

300

300

300

300

300
3200
1600

300 300 300 300 300 300 SCHEDULE OF WEB DEPTH

H
3200
4500

1000
h1

600

800
600
H h1
2900

300 300
H

S1 4500 2900
4500

300

300

100
C1 4204 2604
800

200
300 300
C2 3929 2329
300

300
300 300
800
C3 3524 1924
C4 3281 1681 NOTES:
300

300
800

1. GALVANIZED STEEL HATCH SHALL BE PROVIDED


800 4400 800 C5 3200 1600 FOR ACCESS OPENING ON THE CROSSBEAM TOP.
6000 C6 3281 1681 2. DRAIN PIPE SHALL BE EXTENDED 100MM BELOW
THE CROSSBEAM BOTTOM.
800 4400 800 C7 3524 1924 3. INSTALL REBAR FOR CRACK PREVENTION IN BEARING
MORTAR.
6000 C8 3929 2329 4. FILL NON-SHRINK MORTAR IN BLOCK OUT PROVIDED
800 4400 800 FOR ANCHOR BOLTS OF BEARING.
C9 4204 2604
6000
S2 4500 2900
All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

H. Ikeda CROSSBEAM DETAILS


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C-3a-005
SHEET No. :
Sheet of PACKAGE:
TRANSVERSE ELEVATION S=1/200 LONGITUDINAL ELEVATION S=1/200 SECTION 1-1 S=1/100
N11 N21
N1

N13
N12
NC01-LONGITUDINAL REBAR

N2 NC03-CROSS TIE
E1
NOT

NC02-HOOPS

MAX@360
N14

N5
NOTES:
SEE

N3

N4

N6
1.LONGITUDINAL REBAR SHALL BE
ARRANGED TO MAINTAIN REQUIRED
N15 N16 COVER MEASURED VERTICAL FROM
WALL SURFACE.

2.HOOP AND CROSS TIE SHALL BE


NC06-D18-300 HORIZONTALLY ARRANGED.

REINFORCEMENT FROM BASE OF STEM TO CROSSBEAM TOP 3.ALL SPLICES OF VERTICAL REBAR SHALL
BE MECHANICAL JOINT WITH STAGGERED
NUMBER OF LONGITUDINAL REBARS
LOCATIONS.
P12,16 ELEV. P13,15 ELEV. P14 ELEV. REBAR DIAM. N1 N2 N3 N4 N5 N6
NC05-D51-300
HAUNCH REBARS -3.00 - -0.09 -3.00 - 1.41 -3.00 - 2.16 D51 51 46 19 16 19 16
-0.09 - 2.41 1.41 - 3.91 2.16 - 4.66 D51 49 45
4.REBAR SHALL BE ARRANGED TO AVOID
2.41 - 4.91 3.91 - 6.41 4.66 - 7.16 D51 47 43 INTERFERENCE WITH PRESTRESSING
4.91 - 7.41 6.41 - 8.91 7.16 - 9.66 D51 45 41 TENDONS.
NC02-HOOPS 7.41 - 9.91 8.91 - 11.41 9.66 - 12.16 D51 43 39
9.91 - 12.41 11.41 - 13.91 12.16 - 14.66 D51 41 37 5.CONNECTION REBAR SHALL BE
12.41 - 14.91 13.91 - 16.41 14.66 - 17.16 D51 40 36 ARRANGED TO AVOID INTERFERENCE
14.91 - 17.41 16.41 - 18.91 17.16 - 19.66 D51 39 35 WITH TOP SLAB REBAR.
17.41 - 19.91 18.91 - 21.41 19.66 - 22.16 D51 37 33 NO. OF THE REBAR SHALL BE THE SAME
19.91 - 22.91 21.41 - 24.41 22.16 - 25.16 D51 35 31 AS THOSE FOR PYLON STEM AND
22.91 - 25.81 24.41 - 27.31 25.16 - 28.06 D51 33 29 EXTENDED ON TO TOP LAYER OF
MECHANICAL 25.81 - 27.91 27.31 - 29.41 28.06 - 30.16 D51 31 27
SPLICES BOTTOM REBAR OF TOP SLAB.
NUMBER OF HORIZONTAL REBARS
VERTICAL HOOPS CROSS TIE
6.CONNECTION REBAR SHALL BE
P12,16 ELEV. P13,15 ELEV. P14 ELEV. ARRANGED TO CLOSER TO THE
SPACING N11 - N16 N21
-3.00 - 9.91 -3.00 - 11.41 -3.00 - 12.16 100 D22 D22 MAX@360 ADJACENT PYLON REBAR.
9.91 - 27.91 11.41 - 29.41 12.16 - 30.16 100 D28 D28
7.Ld:DEVELOPMENT LENGTH SHALL BE
CONFORMED TO 22TCN272-05.
NC01-LONGITUDINAL REBARS
N1 - N6, SEE TABLE

1 1 SECTION 2-2 S=1/100

NC04-CONNECTION REBARS
SEE NOTE 5,6
Ld

-3.00

2 2

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCEMENT OF PYLON COLUMN 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 006
SHEET No. :
Sheet of PACKAGE:
TRANSVERSE ELEVATION S=1/200 LONGITUDINAL ELEVATION S=1/200 SECTION 1-1 S=1/100 DETAIL "a" S=1/50
DOOR OPENING

32 NR03-D22
NC08-HOOPS
N11 N21 ALL CORNERS
NC07-LONGITUDINAL REBAR
N1
16 NR02-D22
NC09-CROSS TIE OTHER SIDES

ANCHOR BOX N13


N12
N2

MAX@360
NC11-D18-300 N14

N3

N5
NC10-D51-300

N4

N6
16 NR01-D22

Ld
HAUNCH REBARS NR04-D18-300 OTHER SIDES
ALL OTHER SIDES
N15 N16

"b" "b"
OBSTACLE LIGHT OBSTACLE LIGHT
OPENING OPENING

NC08-HOOPS
REINFORCEMENT FROM TOP OF CROSSBEAM TO ANCHOR BOX BOTTOM
NUMBER OF LONGITUDINAL REBARS DETAIL "b" S=1/50
P12,16 ELEV. P13,15 ELEV. P14 ELEV. REBAR DIAM. N1 N2 N3 N4 N5 N6
OBSTACLE LIGHT OPENING
1 27.91 - 29.91 29.41 - 31.41 30.16 - 32.16 D51 29 24 18 15 18 15
29.91 - 40.06 31.41 - 41.56 32.16 - 42.31 D51 29 24 18 15 18 15

1 MECHANICAL
40.06 - 50.21 41.56 - 51.71 42.31 - 52.46
50.21 - 60.36 51.71 - 61.86 52.46 - 62.61
D51
D51
27
25
22
20
17
15
14
12
17
15
14
12 16 NR07-D22
SPLICES
60.36 - 70.51 61.86 - 72.01 62.61 - 72.76 D51 25 20 14 11 14 11 ALL CORNERS
70.51 - 73.51 72.01 - 75.01 72.76 - 75.76 D51 23 18 11 8 11 8
8 NR06-D22

NUMBER OF HORIZONTAL REBARS OTHER SIDES

VERTICAL HOOPS CROSS TIE


P12,16 ELEV. P13,15 ELEV. P14 ELEV.
"a" "a" SPACING N11 - N16 N21
DOOR OPENING DOOR OPENING 27.91 - 33.61 29.41 - 35.11 30.16 - 35.86 100 D22 D22 MAX@360
33.61 - 39.31 35.11 - 40.81 35.86 - 41.56 200 D22 D22 8 NR05-D22
39.31 - 73.51 40.81 - 75.01 41.56 - 75.76 300 D22 D22 NR08-D18-300 OTHER SIDES
ALL OTHER SIDES

NOTES:
NC07-LONGITUDINAL REBARS
1.LONGITUDINAL REBAR SHALL BE
N1 - N6, SEE TABLE
ARRANGED TO MAINTAIN REQUIRED
COVER MEASURED VERTICAL FROM WALL
SURFACE.

2.HOOP AND CROSS TIE SHALL BE


HORIZONTALLY ARRANGED.

3.ALL SPLICES OF VERTICAL REBAR SHALL


BE MECHANICAL JOINT WITH STAGGERED
LOCATIONS.

CONCRETE JOINT CONCRETE JOINT


4.REBAR SHALL BE ARRANGED TO AVOID
INTERFERENCE WITH PRESTRESSING
TENDONS.

5.Ld:DEVELOPMENT LENGTH SHALL BE


CONFORMED TO 22TCN272-05.

6.ACCESS DOOR FOR PYLON SHALL BE AS


SPECIFIED ON DWG. C-4-027 AND C-4-033.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCEMENT OF PYLON COLUMN 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 007
SHEET No. :
Sheet of PACKAGE:
TRANSVERSE ELEVATION S=1/200 LONGITUDINAL ELEVATION S=1/200 SECTION 1-1 S=1/100
SEE DWG. C-4-033 FOR DETAIL.

PBL NC13-HOOPS
N11 N1 N2

E1
N21

NOT
N12 N13

SEE

N6
NC12-LONGITUDINAL REBAR

N3

N4

N5
NC14-CROSS TIE

MAX@360
N14

STUD

REINFORCEMENT FROM ANCHOR BOX BOTTOM TO PYLON TOP


NUMBER OF LONGITUDINAL REBARS
2 P12,16 ELEV. P13,15 ELEV. P14 ELEV. REBAR DIAM. N1 N2 N3 N4 N5 N6
73.51 - 81.31 75.01 - 82.81 75.76 - 83.56 D51 5 5 16 16 16 16
81.31 - 83.31 82.81 - 84.81 83.56 - 85.56 D43 5 5 14 14 14 14
83.31 - 85.31 84.81 - 86.81 85.56 - 87.56 D43 3 3 14 14 14 14
85.31 - 89.31 86.81 - 90.81 87.56 - 91.56 D43 3 3 13 13 13 13
89.31 - 93.31 90.81 - 94.81 91.56 - 95.56 D38 3 3 12 12 12 12
93.31 - 99.31 94.81 - 100.81 95.56 - 101.56 D38 3 3 11 11 11 11
99.31 - 106.31 100.81 - 107.81 101.56 - 108.56 D38 3 3 10 10 10 10

NUMBER OF HORIZONTAL REBARS


VERTICAL HOOPS CROSS TIE
NC13-HOOPS P12,16 ELEV. P13,15 ELEV. P14 ELEV.
SPACING N11 - N16 N21
73.51 - 106.31 75.01 - 107.81 75.76 - 108.56 292 D22 D22 MAX@360

MECHANICAL
SPLICES
NOTES:
1.LONGITUDINAL REBAR SHALL BE
ARRANGED TO MAINTAIN REQUIRED
ANCHOR BOX COVER MEASURED VERTICAL FROM
WALL SURFACE.
1
2.LONGITUDINAL REBAR SHALL BE
1 ARRANGED TO MAINTAIN REQUIRED
NC14-D18-100 NC12-LONGITUDINAL REBARS COVER MEASURED VERTICAL FROM WALL
N1 - N6, SEE TABLE
SURFACE.

3.HOOP AND CROSS TIE SHALL BE


HORIZONTALLY ARRANGED.

SEE DWG. C-4-032 SEE DWG. C-4-032 4.ALL SPLICES OF VERTICAL REBAR SHALL
BE MECHANICAL JOINT WITH STAGGERED
CONCRETE JOINT CONCRETE JOINT CONCRETE JOINT
LOCATIONS.

5.REBAR SHALL BE ARRANGED TO AVOID


INTERFERENCE WITH HEADED STUDS.

All dimensions are in mm, unless otherwise shown.

TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCEMENT OF PYLON COLUMN 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 008
SHEET No. :
Sheet of PACKAGE:
SECTION 3 - 3 S=1/100
C
L

R=10000

400 200
5 5

1400
800
2 6 6
1 800

800
7 7

3200

4500

6000
1600
2

800
1 33200

800
1400
200 400

R=10000
SECTION 4 - 4 S=1/100
SECTION 1 - 1 S=1/100 SECTION 2 - 2 S=1/100

R=10000
8200
6000 6000
2@800=1600 2@800=1600 9°

400 200
600 1600 600 1400 800 1600 800 1400
650 650 200 800 800 200

800
400 400
700

200

3 3
100

200
900
5@700=3500

200

4400
6000
4@500=2000
3200
4500

4 4
300
1800

200 400
800
R=1000

0
All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

H. Ikeda PYLON CROSSBEAM PRESTRESSING 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C-3a-009
SHEET No. :
Sheet of PACKAGE:
SECTION 5 - 5 S=1/100 SECTION 6 - 6 S=1/100

R=10000

R=10000

200

900
R=10000

700

400
4@700=2800

R=10000

4@500=2000.0
R=10000
R=10000


200

SECTION 7 - 7 S=1/100

15°
NOTES:
R=10000
R=10000
2@700=1400

1. TOTAL NUMBER OF TENDONS IS 30, AND EACH WITH 19S15.2(SWPR 7BL).


2. PRESTRESSING TENDON SHALL BE LOW-RELAXATION TYPE.

=400 200
10° 3. PRESTRESSING TENDON IS TENSIONED FROM ONE END ALTERNATELY.
4. INITIAL STRESSING SHALL BE EQUIVALENT TO 1300N/mm2 PER STRAND.

2@200
5. THE TENDON SHALL BE SMOOTH PARABOLIC CURVES BETWEEN
THE SPECIFIED CONTROL POINTS AS SPECIFIED IN THE PLAN.
6. STRAIGHT LENGTH ACCORDING TO SYSTEM REQUIREMENTS
BY THE MANUFACTURER SHALL BE PROVIDED.
7. EACH TENDON SHALL BE ANCHORED IN A BLOCKOUT.
8. THE SIZE SHALL BE THE MIN. REQUIRED BY ANCHORAGE AND JACK.
9. THE BLOCKOUT SHALL BE FILLED WITH NON-SHRINK CONCRETE C40 WITH SAME COLOR AS
THE PYLON CONCRETE.
10. THE CONTRACTOR SHALL DESIGN AND DETAIL THE ANCHORAGE REINFORCEMENT TO BE
COMPATIBLE WITH THE PRESTRESSING SYSTEM PROVIDED.

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

H. Ikeda PYLON CROSSBEAM PRESTRESSING 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C-3a-010
SHEET No. :
Sheet of PACKAGE:
BEARING(S1,S2) S=1/50 CROSSHEAD (C5) S=1/50

6000 6000

800 4400 800 800 4400 800


200 400 800 800 1600 800 800 400 200
200 400 800 800 1600 800 800 400 200

31 NB05-D32-T(NO. OF REBAR AT TOP LAYER OF TOP SLAB) 31 NB06-D25-T(NO. OF REBAR AT TOP LAYER OF TOP SLAB)
27 NB05-D32-B(NO. OF REBAR AT BOTTOM LAYER OF TOP SLAB) 27 NB06-D25-B(NO. OF REBAR AT BOTTOM LAYER OF TOP SLAB)

NB01-D22-150-T NB22-D16 BEARING ANCHOR BOLT


NB07-D22-150 NB02-D18-300-T NB08-D18-300

30
NB23-D16 BOTH SIDES BOTH SIDES

30
NB24-D16
1.0 % 1.0 % 1.0 % 1.0 %

800

200
800

200
300 200
300

300

300

300
NB02-D18-300-B

3200

500
1600
300 300 300 300

NB06-D25-200
BOTH SIDES
NB01-D22-150-B

3200
500
4500

300
2900

300
NB05-D32-200
BOTH SIDES

NB02-D18-300-T

500
4500

300

300
NB04-D18-300

800
BOTH SIDES

500
300
300 300
NB03-D22-150
NB01-D22-150-T BOTH SIDES
300

300

NB02-D18-300-B NB09-D16-300 (HAUNCH REBAR)


BOTH SIDES
800

27 NB06-D25-T(NO. OF REBAR AT TOP LAYER OF BOTTOM SLAB)


31 NB06-D25-B(NO. OF REBAR AT BOTTOM LAYER OF BOTTOM SLAB)

NB01-D22-150-B 64 NB09-D16-300 (HAUNCH REBAR)


BOTH SIDES

27 NB05-D32-T(NO. OF REBAR AT TOP LAYER OF BOTTOM SLAB)


31 NB05-D32-B(NO. OF REBAR AT BOTTOM LAYER OF BOTTOM SLAB)
NOTE:
1. HAUNCH REBAR SHALL BE ARRANGED NOT TO INTERFERE WITH PRESTRESSING TENDONS.

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

H. Ikeda
REINFORCEMENT OF
in association with PYLON CROSSBEAM 1
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3a-011
SHEET No. :
Sheet of PACKAGE:
SECTION 1 - 1 S=1/100
C
L
38213
4506 14200 800
TRANSVERSE REIN. 7106 2100 9900
LONGITUDINAL REIN. 7106 12000

316 NB01-D22-150 112 NB02-D18-150 260 NB02-D18-300

Access Hatch

800
Access Opening
DETAIL "a" S=1/50
1 NB24-D16 ACCESS HATCH REINFORCEMENT

4400

6000
800
25 NB22-D16

"a" 12 NB27-D16,ALL CORNERS


800

800
16 NB25-D18,ALL CORNERS

NB05-D32 NB06-D25

16 NB26-D18,ALL CORNERS
23 NB23-D16

SECTION 2 - 2 S=1/100
C
L
38213
TRANSVERSE REIN. 7106 2100 9900
LONGITUDINAL REIN. 7106 12000

NB05-D32-200 NB06-D25-200
NB22-D16 NB23-D16
180 NB03-D22-150 56 NB04-D18-150 130 NB04-D18-300
NB24-D16 Level Access Hatch
Reinforcement For Access Opening 2
1 1

800
3200
1600
4500

12 NB10-D22
2

800
R106635
Access Opening

NOTES:
1. ALL REINFORCEMENT IS SYMMETRICAL ABOUT CROSSBEAM CENTERLINE.
2. THE LONGITUDINAL REBAR SHALL BE EXTENDED BEYOND THE N.A. OF
THE STEM SECTION WITH THE REQUIRED DEVELOPMENT LENGTH.
3. NUMBER OF REBAR SHOWN IS PER PYLON.

B1 C1 C2 C3 C4 C5 C6 C7 C8 C9 B2

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

H. Ikeda
REINFORCEMENT OF
in association with PYLON CROSSBEAM 2
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C-3a-012
SHEET No. :
Sheet of PACKAGE:
END BULKHEAD S=1/50
SECTION 1 - 1 SECTION 2 - 2

2
6000 1
890 4220 890 2506 2000
800

NB12-D22

46 NB12-D22

46 NB11-D22

4204.2
4553.3
4500
2900

NB14-D22

NB14-D22

64 NB15-D16
800

144 NB14-D22 64 NB13-D16


NB14-D22

2 1
INTERMEDIATE BULKHEAD S=1/50
SECTION 3 - 3 SECTION 4 - 4
4 ACCESS OPENING
3
6000
900 4200 900 ACCESS OPENING REINFORCEMENT
800

800
76 NB18-D16
NB16-D18
14 NB28-D16,ALL CORNERS
8 NB20-D18,OTHER SIDES

8 NB19-D18,OTHER SIDES
3200

3200
1600

1600

19 NB16-D18

16 NB21-D18,ALL CONERS
800

800

NOTE:
1. NUMBER OF REBAR SHOWN IS PER PYLON.
NB17-D18
24 NB17-D18
All dimensions are in mm,unless otherwise shown
4
3

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
REINFORCEMENT OF
H. Ikeda
in association with PYLON CROSSBEAM 3
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3a-013
SHEET No. :
Sheet of PACKAGE:
TRANSVERSE ELEVATION S=1/200 LONGITUDINAL ELEVATION S=1/200

4-4 5-5
5 ALL CORNERS WITH STEEL
1 4
NS08-D18-300
ANCHOR BOX AND CONCRETE
SHALL BE SEALED BY

2700
SILYCONE SEALANT. TRANSVERSE ELEVATION S=1/100
850 1000 850 NT08-D18-300 NT04-D18-300
HOOPS
NT06-D18-300

CONCRETE FILL NT01-D18-300

@ 30
Ld
NT02-D18-300

3100
NS01-D32-150 NT07-D18-300 NT05-D18-300

0
3 3

7200
NT03-D18-300
2 2

2500

@ 30

Ld
NS05-D20-150

0
NS04-D32-150

1600
NS06-D20-150

Ld
NS02-D32-150
ANCHOR BOX

Ld
CROSS BEAM OF ANCHOR BOX
NS09-D20-300 SEE DWG. C-3a-024 FOR DETAIL.

1 "a" 4 NT09-D18-300
NT10-D18-300
HOOPS
NS10-D32-300 5 HOOPS

NS07-D18-300

NS11-D18-300 SECTION 3-3 S=1/100

NT04-D18-300
ANCHOR BOX 800

NT05-D18-300

700
NT10-D18-300
HOOPS

SECTION 1-1 S=1/100 NT07-D18-300

NS02-D32-150
NS08-D18-300
SECTION 2-2 S=1/100 DETAIL "a" S=1/30
NT06-D18-300
PBL

NS01-D32-146 NS03-D32-146
PBL

CONCRETE FILL

STUD
NS04-D32-150
NS01-D32-146

NS01-D32-146

NOTES:
NS03-D32-146

NS03-D32-146

1.Ld:DEVELOPMENT LENGTH SHALL BE


NS01-D32 CONFORMED TO 22TCN272-05.
NS05-D20-150
STUD 2.REBAR SHALL BE ARRANGED TO AVOID
NS06-D20-150 INTERFERENCE WITH HEADED STUDS.
NS04-D32-150
NC13-D22 3.HOOPS OF PYLON AND HORIZONTAL
HOOPS
REBARS OF TOP STRUT SHALL BE
NS07-D18-300 ARRANGED THROUGH THE PBL.
NS02-D32-150
All dimensions are in mm, unless otherwise shown.

TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.

H. Ikeda REINFORCEMENT OF TOP STRUT


in association with AND TOP OF PYLON
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 3a - 014
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/200

South Side North Side


A-A B-B
1 8 00 1 8 00
1 0 40 0 40
76 0 76 0 1
A B
Top Plate t=25 5700 Top Plate t=25 DETAIL "a" S=1/200
Cable Cable

2979.5
"a"

2017
500 3500 500

2842
BLK1 600 600

3477
3507
1000

3 47 7
CJP

3 5 07
R1

450

1650 300 1500 450

450
U22

2568.5
U1

2250
10
500 3500 500

10
U1 U22

1800
BLK2

4000
° 600 600
62
.5 1 29

2139
2139
8

300

300
09 2.9

2 13 9
2 1 39
° 6

1650

1650
2 BLK3 21

11
11
2 21
R2 °
61 25

2155
2153
.2 3 8
1.6

2 15 5
2 1 53
07 6
°

2250
BLK4 20
3

11
12

4200
59 2 °

2181

2180
.77 68

2 18 0
2 1 81

80 .1
° 60

2250
BLK5

12
4 19
13

R3
57 6°
LOCATION

2213
2

2213
.9 5
.3 5 S=1/500

2 21 3
2 2 13

76 58
°

2250

13
18 Flange t=34
14

5 BLK6

4500
7057
Flange t=34 °
55 68

2257
2257
.76 .14

2 25 7

3 06 1
2 2 57
7

44 56
3 0 61

° 1 8 00

2250

15

7
15

6 BLK7 17
Web t=40 R4 Web t=40
30617

3000
°
53 03

2327
2327

2 32 7
2 3 27

.1 2 8
20° 5 3 .4

2400

17
17

7 BLK8 16
4700

49. 8°

2 43 6
2436
2436
2 4 36

828 155
7° 50.

2250
20

19
8 BLK9 15
R5

2 62 6
2 6 27

4 5.

2626
2627

707 995
8° 4 5.

3 06 1
2550

23
23

BLK10

4
29800

1.000
9 14

1 .027
5000

7
300

3 01 0
3 0 09

1500

3010
04 5
3009

40.4 BLK11
54 2
° 40.7 0.2357

30
30

10 R6

1500
BLK12 13
3000

3 3.6

3 96 3
3 9 64

2250
645° 364° BLK13

3963
3964

3 3.8
R7

43
43

7024
1950
L11 BLK14 L12
3200

1 83 4
1 8 05

450

1834
1805

925

BLK15
3 x 44 0
24 0 0 24.8 4 2° 3 x 44 40
= 1 32 8 7° 4.9 47 0 2
0 24 0
2 = 1 32
1 8 00 24 0
1 8 00 NOTES:
1) Steel grade : SM490YB
A B 2) This position is P12.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF ANCHOR BOX 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 3a - 015
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/200

South Side North Side


A-A B-B
1 8 00 1 8 00
1 0 40 0 40
76 0 76 0 1 P12<P16> P13<P15> P14 P12<P16> P13<P15> P14
A B L1 <L24> 3507 3507 3495 1 < 22> 62.5109 62.5055 62.7007
Top Plate t=25 5700 Top Plate t=25 2 < 21>
L2 <L23> 2139 2138 2139 61.2307 61.2316 61.4084
L3 <L22> 2153 2154 2154 3 < 20> 59.7780 59.7607 59.9263
Cable Cable
L4 <L21> 2181 2181 2180 4 < 19> 57.9576 57.9500 58.1229

2979.5
"a" L5 <L20> 2213 2213 2213 5 < 18> 55.7644 55.7514 55.9169

2017
6 < 17>

2842
BLK1 L6 <L19> 2257 2257 2256 53.1220 53.1220 53.2826
1000

L24
L1
L7 <L18> 2327 2327 2327 7 < 16> 49.8287 49.8306 49.9694
R1

L2 4
L1
L8 <L17> 2436 2436 2436 8 < 15> 45.7078 45.7060 45.8340

450
U1 U22
L9 <L16> 2627 2626 2625 9 < 14> 40.4542 40.4678 40.5763

L2 5

L4 6
<U1>

2568.5
<U22>

1800
BLK2 L10 <L15> 3009 3010 3010 10 < 13> 33.6645 33.6647 33.7453

4000
L11 <L14> 3964 3964 3963 11 < 12> 24.8487 24.8485 24.8955
22

300

L23
1

L2

L2 3
2 21 L12 <L13> 1805 1805 1819 12 < 11> 24.9472 24.9450 24.8955
L2

1650

L4 5
L2 6
<21> BLK3 <2> L13 <L12> 1834 1833 1819 13 < 10> 33.8364 33.8315 33.7453
R2 L14 <L11> 3963 3963 3963 14 < 9> 40.7045 40.6944 40.5763
21 15 < 8>

L22
2 L15 <L10> 3010 3010 3010 45.9950 45.9790 45.8340

L3

L2 2
L3

3 20 16 < 7>

2250
BLK4 L16 <L9> 2626 2625 2625 50.1558 50.1386 49.9694

L4 4
L2 7

<20> <3>
L17 <L8> 2436 2435 2436 17 < 6> 53.4803 53.4561 53.2826

4200
L18 <L7> 2327 2326 2327 18 < 5> 56.1468 56.1045 55.9169
20

L21
3
L4
19 < 4>

L2 1
L19 <L6> 2257 2256 2256 58.3526 58.3218 58.1229
L4

4 19

2250

L4 3
L2 8

<19> BLK5 <4> L20 <L5> 2213 2213 2213 20 < 3> 60.1682 60.1460 59.9263
R3 L21 <L4> 2180 2180 2180 21 < 2> 61.6825 61.6362 61.4084
L22 <L3> 2155 2154 2154 22 < 1> 62.9829 62.9257 62.7007
19

L20
4
L5

L2 0
L5

5 18 L23 <L2> 2139 2139 2139

L4 2
L2 9

2250
<18> BLK6 <5> Flange t=34 L24 <L1> 3477 3480 3495
4500

Flange t=34 L25 <L46> 10 10 10


18

L19

3 06 1
7

L26 <L45> 11 11 11

L1 9
L6

5
3 0 61

L6

6 17 L27 <L44> 12 12 12
L3 0

L4 1
2250

7
<17> BLK7 <6>
L28 <L43> 13 13 12
Web t=40 R4 Web t=40
30617

L29 <L42> 14 14 14
17

L18

L1 8
L7

6 L30 <L41> 15 15 15
L7

7 16

L4 0
L3 1

L31 <L40> 17 17 17

2400
<16> BLK8 <7>
4700

L32 <L39> 20 20 19
L33 <L38> 23 23 23

L1 7
L17
7 16
L8
L8

L34 <L37> 30 30 30
15
L3 2

L3 9
8

2250
L35 <L36> 43 43 43
<15> BLK9 <8>
R5 L36 <L35> 43 43 43
L37 <L34> 30 30 30

L1 6
15

L16
L38 <L33> 23 23 23
L9

L9

2550

L3 8
L3 3

9 14 L39 <L32> 19 19 19
BLK10 <9>
<14> L40 <L31> 17 17 17
5000

300
L41 <L30> 15 15 15
L42 <L29> 13 13 14

1500

L1 5
L1 0

14

L15
L10

9 BLK11 L43 <L28> 12 12 12

L3 7
L3 4

10 13 L44 <L27> 11 11 12
<13> R6 BLK12
1500 <10> L45 <L26> 11 11 11
L46 <L25> 10 10 10
3000

10
2250

L1 4
L1 1

13 BLK13
L11

L14

R7

L3 6
L3 5

L11 L12
1950

<L12> BLK14 <L11>


3200

L1 3
L1 2

450

L13
L12

925

BLK15
3 x 44 0
24 0 0 11 3 x 44 40
= 1 32 12 0 2
0 24 0 = 1 32
1 8 00 24 0
1 8 00 NOTE:
1) Steel grade : SM490YB
A B

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL VIEW OF ANCHOR BOX 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 3a - 016
SHEET No. :
Sheet of PACKAGE:
CABLE ANCHORAGE S=1/100 TRANSVERSE RIB S=1/100

R1 R5
5700 5700 5700 5700
1600 1250 1250 1600 "b" 1600 1250 1250 1600
Cable Cable Cable Cable "a"

34 500 12 12 500 34

34 500 12 12 500 34
1040

1040

1040

1040
1800

1800

1800

1800
U1 U22 7 16
88 87
.4 °
760

760

760

760
80 .2 65


4 8

23
0° 97 .3
87

.6
°

88
Flange 120 x 12 Web 500 x 9 Flange 120 x 12 Web 500 x 9

5700 5700
R2 R6
5700 5700
1600 1250 1250 1600 1600 1250 1250 1600

34 500 12 12 500 34

34 500 12 12 500 34
1040

1040

1040

1040
1800

1800
2 21 8 15
86 °

1800

1800
88
52
760

760

760

760
.7


.3 1 5

21
80 73 .8
86
.5
1° 88 °

5700 5700 Flange 120 x 12 Web 500 x 9 Flange 120 x 12 Web 500 x 9
"c"

R3 R7
5700 5700
1600 1250 1250 1600 1600 1250 1250 1600
1040

1040

1040

1040
1800

1800

34 500 12 12 500 34

34 500 12 12 500 34
3 20 9 14

88 85 °
760

760

760

760
.2 .9 85
°

00
93

7 35 04
8° .
9

86

1800

1800
.3

°
88

5700 5700

Flange 120 x 12 Web 500 x 9 Flange 120 x 12 Web 500 x 9

R4
1040

1040

1040

1040
5700
1800

1800

4 19 10 13 1600 1250 1250 1600


88 84 °
1° 43

34 500 12 12 500 34
760

760

760

760
.1 1 .4 3
0 85 4 92 .6
° .2 4° 84
88

1800
5700 5700

Flange 120 x 12 Web 500 x 9


1040

1040

1040

1040
1800

1800

5 18 L11 L12
87 ° 81
760

760

760

0° 760
.8 09 .4
9 3 39
56
° 88
.0 92
5° 8 1 .6
DETAIL "a" S=1/30 DETAIL "b" S=1/30 DETAIL "c" S=1/30
5700 100 Flange Flange Flange

200 34
5

5
310

R3

R3
TYP. TYP. Web
1040

1040

R3 TYP. Web
1800

6 17 5

5
L.RIB 310 x 30 NOTES:

R2
87 6° 1) Steel grade
760

760

.6 2
2 66 76 t=9-16 SM490YA
° 8 7. 20 300
t=17-40 SM490YB
2) This position is P12.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.

K. Itabashi CROSS SECTIONS OF ANCHOR BOX 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 3a - 017
SHEET No. :
Sheet of PACKAGE:
CABLE ANCHORAGE S=1/100

5700 5700

Cable Cable Cable Cable

P12<P16> P13<P15> P14

1040

1040

1040

1040
U1 U22 7 16 1 < 22> 88.4800 88.4783 88.5379

1800

1800
<U22> <U1> <16> <7>
2 < 21> 88.3801 88.3803 88.4357

760

760

760

760
3 < 20> 88.2735 88.2680 88.3215
1 7 16

22
4 < 19> 88.1085 88.1060 88.1641
5 < 18> 87.8956 87.8910 87.9497
5700 5700 6 < 17> 87.6266 87.6266 87.6877
7 < 16> 87.2497 87.2505 87.3096
8 < 15> 86.7173 86.7164 86.7781
9 < 14> 85.9008 85.9086 85.9729
10 < 13> 84.4924 84.4926 84.5592
1040

1040

1040

1040
2 21 8 15 11 < 12> 81.4925 81.4922 81.5623
1800

1800
<21> <2> <15> <8>
12 < 11> 81.6390 81.6357 81.5623
760

760

760

760
13 < 10> 84.6343 84.6302 84.5592
8 15

21
2
14 < 9> 86.0485 86.0426 85.9729
15 < 8> 86.8552 86.8476 86.7781
5700 5700 16 < 7> 87.3865 87.3794 87.3096
17 < 6> 87.7626 87.7534 87.6877
18 < 5> 88.0309 88.0161 87.9497
19 < 4> 88.2411 88.2308 88.1641
20 < 3> 88.3993 88.3921 88.3215
1040

1040

1040

1040
3 20 9 14 21 < 2> 88.5211 88.5067 88.4357
1800

1800
<20> <3> <14> <9>
22 < 1> 88.6236 88.6063 88.5379
760

760

760

760
3 9 14

20
5700 5700
1040

1040

1040

1040
4 19 10 13
1800

1800
<19> <4> <13> <10>
760

760

760

760
4 19 10 13

5700 5700
1040

1040

1040

1040
5 18 L11 L12
1800

1800

<18> <5> <L12> <L11>


760

760

760

760
5 18 11 12

5700
1040

1040

6 17
1800

<17> <6>
760

760

6 17

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.

K. Itabashi CROSS SECTIONS OF ANCHOR BOX 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 3a - 018
SHEET No. :
Sheet of PACKAGE:
THROUGH HOLE S=1/50 ANCHOR PIPE S=1/30

1040 760 L1
300 L2
P12,P16 35 230 35
Anchor Pipe
Cable No. a1 a2 a3 b1 b2 b3 (deg) CJP
(SCW490-CF)
U1 1155 635 585 1090 570 520 2.9195
Stiffening Plate

t
t=40 2 1077 597 547 1010 530 480 2.9486
3 1086 606 556 1010 530 480 2.9621
TYP.

D1
D3

D2
4 1021 581 521 940 500 440 3.0203
Anchor Box Web
5 1035 595 535 940 500 440 3.0908
6 975 575 505 870 470 400 3.1622

t
7 1001 601 531 870 470 400 3.2568

a3
8 1050 650 570 880 480 400 3.3647

a2
a1
Taper Pipe
9 1159 749 649 920 510 410 3.4970 (SCW550)
10 1052 732 602 770 450 320 3.6745
L11 1573 1173 993 980 580 400 3.9627
Cable No. L1 L2 D1 D2 D3 t
L12 1569 1169 989 980 580 400 3.9112
U1 1700 1400 600 500 700 50
b3 13 1039 719 599 760 440 320 3.6028
2 1700 1400 550 460 660 45
b2 14 1155 745 645 920 510 410 3.4008
3 1600 1300 550 460 660 45
15 1047 647 567 880 480 400 3.2557
b1 4 1600 1300 500 420 620 40
16 999 599 529 870 470 400 3.1309
5 1600 1300 500 420 620 40
17 963 563 503 860 460 400 3.0203
6 1600 1300 450 380 580 35
18 1033 593 533 940 500 440 2.9340
7 1600 1300 450 380 580 35
19 1008 568 518 930 490 440 2.8523
8 1600 1300 450 380 580 35
20 1083 603 553 1010 530 480 2.7899
9 1600 1300 450 390 590 30
21 1074 594 544 1010 530 480 2.7431
10 1600 1300 350 300 500 25
U22 1152 632 582 1090 570 520 2.6979
L11 1600 1300 450 380 580 35
L12 1600 1300 450 380 580 35
13 1600 1300 350 300 500 25
14 1600 1300 450 390 590 30
15 1600 1300 450 380 580 35
16 1600 1300 450 380 580 35
17 1600 1300 450 380 580 35
18 1600 1300 500 420 620 40
19 1600 1300 500 420 620 40
20 1600 1300 550 460 660 45

ANCHOR PLATE DETAILS S=1/50


21
U22
1700
1700
1400
1400
550
600
460
500
660
700
45
50

1-1 P12,P16
Cable No. L1 L2 L3 L4 L5 L6 L7 L8 t1 t2 t3 h1 h2 (deg)
Socket 200 L5 L6 200 U1 1500 1300 950 250 472 260 494 238 40 40 40 240 220 1.3485
150 2 1500 1300 950 250 495 287 519 263 38 38 40 200 200 1.4201
3 1400 1200 850 260 496 286 518 264 38 38 40 190 190 1.4920
Bearing Plate 4 1400 1200 850 260 518 314 542 290 32 28 40 190 190 1.6035
h1
15

5 1399 1199 849 290 514 318 540 292 32 28 40 190 190 1.7400
t3

6 1399 1199 849 290 535 347 563 319 25 16 40 180 160 1.8989
h1

R 7 1399 1199 849 320 529 353 560 322 22 16 40 180 160 2.1022
10
0 8 1399 1199 849 400 519 363 554 328 22 16 40 180 160 2.3510
100

9 1399 1199 849 600 502 380 542 340 22 16 35 180 160 2.6624
1 1
150
t1

10 1398 1198 848 1200 508 474 554 428 11 11 35 110 110 3.0596

CJP
Anchor Pipe
CJP
2-2 L11
L12
1398
1398
1198
1198
848
848
1800
1800
399
402
483
480
452
454
430
428
25
25
16
16
40
40
180
180
160
160
3.5968
3.5472
13 1398 1198 848 1200 511 471 555 427 11 11 35 110 110 2.9938
L3

L1
L2

200 L7 L8 200
14 1399 1199 849 600 505 377 543 339 22 16 35 180 160 2.5793
15 1399 1199 849 400 522 360 555 327 22 16 40 180 160 2.2631
2 2 16 1399 1199 849 320 531 351 561 321 22 16 40 180 160 2.0072
200
t2

17 1399 1199 849 290 537 345 564 318 25 16 40 180 160 1.7984
100

h2 h2

18 1400 1200 850 290 516 316 541 291 32 28 40 190 190 1.6354
t3

19 1400 1200 850 260 520 312 543 289 32 28 40 190 190 1.4975
20 1400 1200 850 260 498 284 519 263 38 38 40 190 190 1.3887
L4

21 1500 1300 950 250 498 284 520 262 38 38 40 200 200 1.3020
CJP U22 1500 1300 950 250 475 257 495 237 40 40 40 240 220 1.2263
1040 760
1800 NOTE:
1) Steel grade
Stiffening Plates : SM490YB
Anchor Plates : t=11-16 SM490YA
t=17-40 SM490YB
Others : Shown

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.

K. Itabashi ANCHOR BOX DETAILS 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C - 3a - 019
SHEET No. :
Sheet of PACKAGE:
P13,P15 P13,P15
Cable No. a1 a2 a3 b1 b2 b3 (deg) Cable No. L1 L2 L3 L4 L5 L6 L7 L8 t1 t2 t3 h1 h2 (deg)
U1 1155 635 585 1090 570 520 2.9219 U1 1500 1300 950 250 472 260 494 238 40 40 40 240 220 1.3499
2 1077 597 547 1010 530 480 2.9482 2 1500 1300 950 250 495 287 519 263 38 38 40 200 200 1.4199
3 1086 606 556 1010 530 480 2.9695 3 1400 1200 850 260 495 287 518 264 38 38 40 190 190 1.4965
4 1021 581 521 940 500 440 3.0235 4 1400 1200 850 260 518 314 542 290 32 28 40 190 190 1.6055
5 1036 596 536 940 500 440 3.0960 5 1399 1199 849 290 514 318 540 292 32 28 40 190 190 1.7435
6 975 575 505 870 470 400 3.1622 6 1399 1199 849 290 535 347 563 319 25 16 40 180 160 1.8989
7 1001 601 531 870 470 400 3.2561 7 1399 1199 849 320 529 353 560 322 22 16 40 180 160 2.1017
8 1050 650 570 880 480 400 3.3653 8 1399 1199 849 400 519 363 554 328 22 16 40 180 160 2.3515
9 1158 748 648 920 510 410 3.4920 9 1399 1199 849 600 502 380 542 340 22 16 35 180 160 2.6580
10 1052 732 602 770 450 320 3.6744 10 1398 1198 848 1200 508 474 554 428 11 11 35 110 110 3.0595
L11 1573 1173 993 980 580 400 3.9628 L11 1398 1198 848 1800 399 483 452 430 25 16 40 180 160 3.5969
L12 1569 1169 989 980 580 400 3.9124 L12 1398 1198 848 1800 402 480 454 428 25 16 40 180 160 3.5484
13 1039 719 599 760 440 320 3.6048 13 1398 1198 848 1200 511 471 555 427 11 11 35 110 110 2.9957
14 1155 745 645 920 510 410 3.4047 14 1399 1199 849 600 504 378 543 339 22 16 35 180 160 2.5827
15 1048 648 568 880 480 400 3.2618 15 1399 1199 849 400 522 360 555 327 22 16 40 180 160 2.2679
16 999 599 529 870 470 400 3.1376 16 1399 1199 849 320 531 351 561 321 22 16 40 180 160 2.0122
17 963 563 503 860 460 400 3.0299 17 1399 1199 849 290 537 345 564 318 25 16 40 180 160 1.8052
18 1033 593 533 940 500 440 2.9515 18 1400 1200 850 290 516 316 540 292 32 28 40 190 190 1.6470
19 1008 568 518 930 490 440 2.8655 19 1400 1200 850 260 520 312 543 289 32 28 40 190 190 1.5057
20 1084 604 554 1010 530 480 2.7999 20 1400 1200 850 260 498 284 519 263 38 38 40 190 190 1.3946
21 1074 594 544 1010 530 480 2.7645 21 1500 1300 950 250 498 284 520 262 38 38 40 200 200 1.3141
U22 1152 632 582 1090 570 520 2.7251 U22 1500 1300 950 250 475 257 495 237 40 40 40 240 220 1.2411

P14 P14
Cable No. a1 a2 a3 b1 b2 b3 (deg) Cable No. L1 L2 L3 L4 L5 L6 L7 L8 t1 t2 t3 h1 h2 (deg)
U1 1153 633 583 1090 570 520 2.8312 U1 1500 1300 950 250 473 259 495 237 40 40 40 240 220 1.2994
2 1076 596 546 1010 530 480 2.8685 2 1500 1300 950 250 496 286 519 263 38 38 40 200 200 1.3737
3 1085 605 555 1010 530 480 2.8971 3 1400 1200 850 260 497 285 518 264 38 38 40 190 190 1.4527
4 1010 570 520 930 490 440 2.9505 4 1400 1200 850 260 519 313 542 290 32 28 40 190 190 1.5591
5 1034 594 534 940 500 440 3.0286 5 1399 1199 849 290 515 317 540 292 32 28 40 190 190 1.6983
6 964 564 504 860 460 400 3.0989 6 1399 1199 849 290 536 346 564 318 25 16 40 180 160 1.8539
7 1000 600 530 870 470 400 3.2019 7 1399 1199 849 320 530 352 560 322 22 16 40 180 160 2.0607
8 1049 649 569 880 480 400 3.3169 8 1399 1199 849 400 520 362 555 327 22 16 40 180 160 2.3123
9 1157 747 647 920 510 410 3.4503 9 1399 1199 849 600 503 379 542 340 22 16 35 180 160 2.6220
10 1041 721 601 760 440 320 3.6408 10 1398 1198 848 1200 509 473 554 428 11 11 35 110 110 3.0287
L11 1571 1171 991 980 580 400 3.9382 L11 1398 1198 848 1800 400 482 453 429 25 16 40 180 160 3.5733
L12 1571 1171 991 980 580 400 3.9382 L12 1398 1198 848 1800 400 482 453 429 25 16 40 180 160 3.5733
13 1041 721 601 760 440 320 3.6408 13 1398 1198 848 1200 509 473 554 428 11 11 35 110 110 3.0287
14 1157 747 647 920 510 410 3.4503 14 1399 1199 849 600 503 379 542 340 22 16 35 180 160 2.6220
15 1049 649 569 880 480 400 3.3169 15 1399 1199 849 400 520 362 555 327 22 16 40 180 160 2.3123
16 1000 600 530 870 470 400 3.2019 16 1399 1199 849 320 530 352 560 322 22 16 40 180 160 2.0607
17 964 564 504 860 460 400 3.0989 17 1399 1199 849 290 536 346 564 318 25 16 40 180 160 1.8539
18 1034 594 534 940 500 440 3.0286 18 1399 1199 849 290 515 317 540 292 32 28 40 190 190 1.6983
19 1010 570 520 930 490 440 2.9505 19 1400 1200 850 260 519 313 542 290 32 28 40 190 190 1.5591
20 1085 605 555 1010 530 480 2.8971 20 1400 1200 850 260 497 285 518 264 38 38 40 190 190 1.4527
21 1076 596 546 1010 530 480 2.8685 21 1500 1300 950 250 496 286 519 263 38 38 40 200 200 1.3737
U22 1153 633 583 1090 570 520 2.8312 U22 1500 1300 950 250 473 259 495 237 40 40 40 240 220 1.2994

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.

K. Itabashi ANCHOR BOX DETAILS 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C - 3a - 020
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/200 STUD S=1/30 DETAIL "a" S=1/100 DETAIL "b" S=1/100

32x150=4800
Stud Ø22 x 200 209 166 15x150=2250 166 209
OUTSIDE INSIDE

4800
158 158 158
209 11x150=1650

300
5700 5700 209 12x150=1800
158
300 300
209 c150 209 209 c150 209
158 158 158 158

217
PBL

32x150=4800
2767.3
3191.6

2767.3

c150
3191.6
PBL

4800
"b"
2842

BLK1
1000
S=1/30 PBL
450

450

300
2 5 00
CJP

2568.5
2568.5
1800

BLK2
300

300
158

300
209 12x150=1800
1650

BLK3

300
100 4x150
=600
80

150 150
209 13x150=1950

700
Ø 209 175 17x150=2550 175 209
158
2250

BLK4 158 158


t=12(SM400A)
180 209 13x150=1950
158

PBL PBL
2250

BLK5 S ym. Sym.

TOP PLATE S=1/100


outside
2250

BLK6 5700
3000 700 2000
outside inside
South side Manhole North side
2250

202x150=30300
BLK7
LOCATION

150 3x500=1500 150


S=1/500
30617

30617

1100
1800
7057
2400

BLK8

600

R
1 8 00

10
0
100
2250

BLK9

3000
150 596 3x600=1800 546 100
1254 3191 1254
2550

BLK10

Number of Stud(Ø22x200) outside inside


300

300

outside inside total


1500

BLK11
BLK1 286 286 572
BLK2 250 222 472
1500

3 06 1
BLK12 "a" BLK3 260 240 500

4
29800

1.000
1 .027

7
BLK4 300 284 584
BLK5 300 300 600
2250

BLK13
BLK6 330 330 660
0.2357
BLK7 330 330 660
BLK8 380 380 760
1950

BLK14
BLK9 360 360 720
450

450

BLK10 386 386 772


925

BLK15 100 BLK11 308 308 616


BLK12 264 264 528
209 c150 209 209 c150 209 BLK13 420 420 840
158 158 158 158 7024
BLK14 282 282 564
BLK15 258 258 516

NOTE:
Steel grade
Stud : JIS B 1198
Others : Shown
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

H. Ikeda STUD ARRANGEMENTS OF ANCHOR BOX


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 3a - 021
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/60 A-A S=1/30 C-C S=1/30 ANCHOR BOLT S=1/30
(SS400+SR235)
34 406 M110
206 200 220 Nut M110(SS400)
386 20

22 88100
CJP

450 250 Anchor Bolt


M110(SS400)

22
22
CJP
R4

25
25
0

15

1085
150
75 25 25 75

450
TYP. 350

1000

1000
TYP.

3005
925

88 22
75
75

0
R4

60

60
22

22

19x75=1425
450 450 550 4x700=2800 550 450 450

1600
40 5620 40

Ø9
860 3900 860

100
WASHER S=1/30
PLAN S=1/60 (SS400)
20
5700 Ø2
304 5092 304
2046 1000 2046 Ø
11
B-B
3
S=1/30
764

D-D S=1/30 E-E S=1/30


34 206 440 440

Manhole 450
914

40 370 40 34 1732
Ø 13

A B E CJP
34
0

R1
206

00
450

22
4391

R1
00

25
A B E CJP CJP
R4
=1320
3x440
1800

1732
850

C C

25

25
D D

1000
500

TYP.
206

700

700
34

675

675
CJP CJP
0

0
914

R4

R4
60

60

60
22

450 450 550 4x700=2800 550 450 450


NOTES:
860 3900 860
1) Steel grade : t=17-40 SM490YB
40 5620 40 t=41-100 SM520C
2) Round bar Ø9 shall be wound and welded around anchor bolt.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.

K. Itabashi BASE OF ANCHOR BOX


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30,60 DRAWING No. : C - 3a - 022
SHEET No. :
Sheet of PACKAGE:
300
9 9
Elastomer Shealing

Opening of Web Plate

30
of Anchor Box

. =. 25
0m
m

125
15
30 15

125

A
Elastomer Shealing
(Polybutadiene)
Fixed by Web of Anchor Box
elastomer shealing

t=9mm(SM400)

A
30

Bolt M10

Web of Anchor Box


A-A S=1/5
Welding

Nut to be welded to Steel Pipe


60

Ø
135
15

25
0

99
30
30

Welding of connection
e
ra n c pieses to Steel Pipe
C le a inimum
5 m mm
2

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi STAY CABLE BOOT AT PYLON EXIT


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 10 DRAWING No. : C - 3a - 023
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/100
7057
A-A S=1/50 DETAIL "b" S=1/50

1000
700 5175 700
25 950 25 1240

2 97 9
2900
.5
1588 2000 1588

2 9 79
125 300 150 300 125 300 20 600 20 300

.5
487.5 7x600=4200 487.5 Cross Beam Flange
120 120 Stud Ø22 x 200

80
3x85 3x85 3x85 3x85
=255 =255 =255 =255

200 400 200


25
125
10 10

20
R3
R
10
A

5
700

840
0

2x85 105
=170 105
400 "a"

B B

45

20
=170
2x85
1533
1 5 75

2 56 8
.5

2500
2 5 68

80
5x450=2250
.5
19x100
=1900

=1900
2450

2450
CJP Manhole

2450
2500
1100
967
Stiffening Plate

99 4
1061 t=25

105 =170

=170
2x85

105 2x85
ts_w=10

C C
A
1289 5175 1289

700

125
25
B-B S=1/100
Diaphram t=9 (SM400A)
1849 6575 1849
399 800 650 700 5175 700 650 800 399
1588 2000 1588
487.5
3287.5
7x600=4200
3287.5
487.5
LOCATION S=1/500
120 120
3x85 3x85 3x85 3x85 7057
2350

=255 =255 =255 =255


10 10
DETAIL "a"
"b" 1 8 00
50 50 50 50
ts_t=11
S=1/20
Air Hole Ø30 Manhole
117.5 =765 117.5

117.5 9x85 117.5


150

3000

2 97 9
10
250 500 250

R1 PL 100 x 10 (SM400A) 20 20

2500 2900
00
5700

=765
1000

1000

9x85

1000

.5 2 5
00
R1

6 8.5
Concrete Fill up Hole Ø300 00
R1
2350

PL 90 x 10 (SM400A)

3 06 1
29800

1.000

7
C-C S=1/100 0.236
1849 7753 1849 D-D S=1/100
399 800 650 1289 5175 1289 650 800 399
1588 2000 1588
487.5 7x600=4200 487.5
1 8 00
120 120
3x85 3x85 3x85 3x85 97 4
82 7
=255 =255 =255 =255
10 10
7024
2350

ts_b=11
Manhole
117.5 9x85 117.5
117.5 =765 117.5

1339
CJP 0

1533
60
250 500 250

Ø
R1
00

2500
5700

=765
1000

1000

9x85

1000

00
R1
NOTES:
1) Steel grade

1161

967
Plates : t=10-16 SM490YA
t=17-40 SM490YB
D D Others Shown
Socket Drawing in Hole Stud : JIS B 1198
2350

2) Bolt material : S10T


3) Bolt diameter : M24

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi CROSS BEAM OF ANCHOR BOX


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 3a - 024
SHEET No. :
Sheet of PACKAGE:
LONGITUDINAL ELEVATION S=1/1000
1.0
25 0)
1 + 7 5 1.
( 2 +
1500000
600 900 148500 300000
Cable 4500 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10x12000=
4500 36 x 4000 = 144000 75 x 4000 = 300000 120000
Floorbeam

32.310
31.560
3000 0.500%

Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
=120000

PLAN S=1/1000
1.0
25 0)
1 + 7 5 1.
( 2+ 1500000
600 900 148500 300000
Floorbeam 4500 36 x 4000 = 144000 75 x 4000 = 300000
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38

FB39
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB2

FB3
FB4
FB5
FB6
FB7
FB8
FB9
1200

S1

W1

1200
W2
1150

WEG
W3
15200
35600
33200

33200
W4
500
L
C

E4
15200

E3
1150

1200
EEG
E2
1200

E1 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
=120000

TYPICAL GIRDER CROSS SECTION S=1/200


C
L
35600
1200 1200
400 750 3300 150 3 x 3750=11250 500 500 3 x 3750=11250 150 3300 750 400
500
W2

W3

E3

E2
W1

W4

E1
E4

PH PH 1500000
As Pave. t=75mm 150000 300000 300000 300000 300000 150000
1000
250 750

Waterproofing
260
1100
150

2% 2%
2700
1250

2000

3000
R=364013
WEG EEG
3280 4x3330=13320 4x3330=13320 3280 All dimensions are in mm, unless otherwise shown.
800 800

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL LAYOUT 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000, 200 DRAWING No. : C - 3b - 001
SHEET No. :
Sheet of PACKAGE:
LONGITUDINAL ELEVATION S=1/1000

1500000
300000 300000
Cable 10x12000= 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10x12000=
Floorbeam 120000 75 x 4000 = 300000 75 x 4000 = 300000 120000

33.810
0.500%

Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000

VCL=600m VCR=60000m

PLAN S=1/1000

1500000
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000 = 300000

FB100
FB101
FB102
FB103
FB104
FB105
FB106
FB107
FB108
FB109
FB110
FB111
FB112
FB113

FB114
FB115
FB116
FB117
FB118
FB119
FB120
FB121
FB122
FB123
FB124
FB125
FB126
FB127
FB128
FB129
FB130
FB131
FB132
FB133
FB134
FB135
FB136
FB137
FB138
FB139
FB140
FB141
FB142
FB143
FB144
FB145
FB146
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB80
FB81
FB82
FB83
FB84
FB85
FB86
FB87
FB88
FB89
FB90
FB91
FB92
FB93
FB94
FB95
FB96
FB97
FB98
FB99
1200

W1

1200
W2
1150

WEG
W3
15200
35600
33200

33200
W4
500
L
C

E4
15200

E3
1150

1200
EEG
E2
1200

E1 J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-39 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54
Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000

MEDIAN CURB S=1/20 SIDEWALK S=1/20

500 750 400 1200

CL 20 150 980
1.5%
150

1500000
250
250

265
75 350 75
150000 300000 300000 300000 300000 150000
75

PH PH
2.0% Level 2.0% 2.0%
2.0%
73.5
75

2.0% Level 2.0%


260

284
260

260
75
260

30 x 30 75 75
Chloroprene Rubber(TYP.)
30

K.L (Floorbeam T.Flg)


Level
31.5

30 x 30
Floorbeam T.Flg Chloroprene Rubber(TYP.) 570 (TYP.)
Floorbeam T.Flg 30 x 30
Chloroprene Rubber(TYP.) Edge Girder T.Flg
30 x 30
Support Strut Chloroprene Rubber(TYP.)
500 All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\takada.tif ..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\DATE-03.tif

Rev. No.1

K. Itabashi ..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\Itabashi.tif ..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\DATE-02.tif


GENERAL LAYOUT 2
in association with
H. Ohashi ..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\Ohashi.tif ..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000, 20 DRAWING No. : C - 3b - 002
SHEET No. :
Sheet of PACKAGE:
LONGITUDINAL ELEVATION S=1/1000
Symmetry

1500000
300000 300000
Cable 10x12000= 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10x12000=
120000 75 x 4000 = 300000 75 x 4000 = 300000 120000
Floorbeam

SUBSTATIONS

34.560

Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 5000 5000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000

VCL=600m VCR=60000m

PLAN S=1/1000

1500000
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000 = 300000
SUBSTATIONS
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB155
FB156
FB157
FB158
FB159
FB160
FB161
FB162
FB163
FB164
FB165
FB166
FB167
FB168
FB169
FB170
FB171
FB172
FB173
FB174
FB175
FB176
FB177
FB178
FB179
FB180
FB181
FB182
FB183
FB184
FB185
FB186
FB187
FB188

FB187
FB186
FB185
FB184
FB183
FB182
FB181
FB180
FB179
FB178
FB177
FB176
FB175
FB174
FB173
FB172
FB171
FB170
FB169
FB168
FB167
FB166
FB165
FB164
FB163
FB162
FB161
FB160
FB159
FB158
FB157
FB156
FB155
FB154
FB153
FB152
FB151
FB150
FB149
FB148
FB147
1200

W1

1200
W2
1150

WEG
W3
15200
35600
33200

33200
W4
500
L
C

E4
15200

E3
1150

1200
EEG
E2
1200

E1 J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65 J-65 J-64 J-63 J-62 J-61 J-60 J-59 J-58 J-57 J-56 J-55 J-54 J-53 J-52 J-51
Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 5000 5000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000

1500000
150000 300000 300000 300000 300000 150000
SUBSTATIONS

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi GENERAL LAYOUT 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 3b - 003
SHEET No. :
Sheet of PACKAGE:
y PLAN
1.0 1.0
25 75
1+ 2+

1500 148500 300000 300000 300000 300000 148500 1500


WEG

15

15
66

66
30 31 30 31 30 31 30 31

21

21
21

21
18 18 18 18 18 18 18 18
31 31 31 31

66

66
15

15
30 30 30 30
33200

1500 148500 300000 300000 300000 300000 148500 1500


EEG

S1 S1

P11 P12 P13 P14 P15 P16 P17

Bearing Plan Coordinate


P11(S1) P12 P13 P14 P15 P16 P17(S1) Institute of Local Coordinate System
X 2332878.4762 2333014.8752 2333290.4290 2333565.9827 2333841.5364 2334117.0901 2334253.4892
Grobal WEG Local coordinate system is defined by at Station No.1+251.0 along
Y 507064.3338 507123.0495 507241.6672 507360.2849 507478.9025 507597.5202 507656.2359 centerline of roadway as the origin (x=0, y=0), and increase toward P16.
Coordinate
System X 2332865.3491 2333001.7482 2333277.3019 2333552.8556 2333828.4094 2334103.9631 2334240.3622
EEG
Y 507094.8284 507153.5441 507272.1618 507390.7795 507509.3971 507628.0148 507686.7305
y 1.0 1.0
x 1.5000 150.0000 450.0000 750.0000 1050.0000 1350.0000 1498.5000 25 75
WEG 1+ 2+
Local y 16.6000 16.6000 16.6000 16.6000 16.6000 16.6000 16.6000
Coordinate
System x 1.5000 150.0000 450.0000 750.0000 1050.0000 1350.0000 1498.5000 1500000
EEG
y -16.6000 -16.6000 -16.6000 -16.6000 -16.6000 -16.6000 -16.6000

X=2332870.5349 X=2334248.3034
Y= 507078.9880 Y= 507672.0763
x= 0.0000 x= 1500.0000

X
y= 0.0000 y= 0.0000
Elevation of Top of Fulcrum x
P11(S1) P12 P13 P14 P15 P16 P17(S1)
WEG,EEG WEG,EEG WEG,EEG WEG,EEG WEG,EEG WEG,EEG WEG,EEG

T1
Elevation of Roadway Z1 31.166 31.908 33.408 34.158 33.408 31.908 31.166 P12 P13 Y P14 P15 P16
Z1
Thickness of Deck + Haunch Depth T1(mm) 469 284 284 284 284 284 469
Z2
Elevation of Top of Top Flange Z2 30.697 31.624 33.124 33.874 33.124 31.624 30.697
Girder Depth H1(mm) 2815 3000 3000 3000 3000 3000 2815
Coordinate at intersection with Direction angle of Intersection angle with
Sole Plate Thickness T2(mm) 61 38 58 56 58 38 61 Station centerline of roadway Grobal Coordinate centerline of roadway

H1
Bearing Height H2(mm) 550 904 999 999 999 904 550 X Y θ α
Elevation of Bearing Bottom Z3 27.271 27.682 29.067 29.819 29.067 27.682 27.271 P11 1+251.0000 2332870.5349 507078.9880 23°17'25.58 90°00'00
Thickness of Mortar T3(mm) 71 72 57 59 57 72 71 P12 1+401.0000 2333008.3117 507138.2968 23°17'25.58 90°00'00
Height of Pedestal H3(mm) 0 200 100 100 100 200 0 P13 1+701.0000 2333283.8654 507256.9145 23°17'25.58 90°00'00
Sum Up Σ(mm) 3966 4498 4498 4498 4498 4498 3966

T2
P14 2+ 1.0000 2333559.4192 507375.5322 23°17'25.58 90°00'00
Elevation of End Pier and Pylon Top Z4 27.200 27.410 28.910 29.660 28.910 27.410 27.200 P15 2+301.0000 2333834.9729 507494.1498 23°17'25.58 90°00'00

H2
P16 2+601.0000 2334110.5266 507612.7675 23°17'25.58 90°00'00

T3
P17 2+751.0000 2334248.3034 507672.0763 23°17'25.58 90°00'00
Z3

H3
NOTES:
1. T3 and H3 of P11 shall be as specified on dwg.C-2b-001 and -002
Z4 2. T3 and H3 of P12,P13,P14,P15 and P16 shall be as specified on dwg.C-3a-002
3. T3 and H3 of P17 shall be as specified on dwg.C-2b-003

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi LAYOUT OF BEARINGS


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 3b - 004
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/500

1.0
25 0)
1 + 7 5 1.
( 2+ 1500000
600 900 148500 300000
Floorbeam 4500 36 x 4000 = 144000 75 x 4000
= 300000

Cable Anchorage 6000 10 x 12000 = 120000 24000


Wind Fairing 3900 34 x 4000 = 136000 4000 4000
Slab Drain 3000 4500 4500 34 x 4000 = 132000 6000
Catch Pit 3000 9000 11 x 12000 = 132000 6000
Road Lighting Pole 3000 24000 35000 35000 35000 18000
Decorative Lighting 18000 45000 45000 42000
Cable Pipe Hole at Slab 9193 11806 11790 11792 11781 11766 11755 11738 11720 11701 11679 23279

Inspection Ladder (P17 Only)


Decorative Lighting Catch Pit CIP Concrete
Cable Anchorage
Precast Deck Panel Wind Fairing
Cable Pipe Hole at Slab Road Lighting Pole Slab Drain
(1500)
1410 2895 2980 2980 2980 2980 2980 2980 2980 2980 2895 1410

(300)

1200
WEG

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
35600

33200
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
L
C

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A

EEG

1200
300

1500

3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350

Inspection Ladder (P11 Only)

1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T. Takada LAYOUT OF PRECAST DECK PANEL 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-005
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/500

1500000
148500 300000
Floorbeam 36 x 4000 75 x 4000 = 300000
= 144000

Cable Anchorage 24000 10 x 12000 = 120000 12000 10 x 12000


4000 4000 71 x 4000 = 284000 = 120000
Wind Fairing
Slab Drain 6000 36 x 4000 = 144000 36x4000=144000
Catch Pit 6000 12 x 12000 = 144000 12x12000=144000
Road Lighting Pole 18000 35000 35000 35000 27000 27000
Decorative Lighting 42000 45000 45000 36000
Cable Pipe Hole at Slab 23279 11679 11701 11719 11738 11755 11766 11781 11789 11797 11808 9188 9194

Road Lighting Pole CIP Concrete Catch Pit


Cable Anchorage
Precast Deck Panel Slab Drain Wind Fairing
Cable Pipe Hole at Slab Decorative Lighting
1410 2895 2980 2980 2980 2980 2980 2980 2980 2980 2895 1410

1200
WEG

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
35600

33200
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
L
C

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B

EEG

1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350

1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T. Takada LAYOUT OF PRECAST DECK PANEL 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-006
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/500

300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000
= 300000

Cable Anchorage 10 x 12000 12000 10 x 12000 = 120000 24000


= 120000 71 x 4000 = 284000 4000 4000
Wind Fairing
Slab Drain 36x4000=144000 36 x 4000 = 144000 6000
Catch Pit 12x12000=144000 12 x 12000 = 144000 6000
Road Lighting Pole 27000 27000 35000 35000 35000 18000
Decorative Lighting 36000 45000 45000 42000
Cable Pipe Hole at Slab 9188 9194 11805 11793 11791 11782 11765 11754 11738 11719 11701 11679 23279

Decorative Lighting Catch Pit CIP Concrete


Cable Anchorage
Precast Deck Panel Wind Fairing
Cable Pipe Hole at Slab Road Lighting Pole Slab Drain
1410 2895 2980 2980 2980 2980 2980 2980 2980 2980 2895 1410

1200
WEG

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
35600

33200
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
L
C

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A

EEG

1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350

1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T. Takada LAYOUT OF PRECAST DECK PANEL 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-007
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/500

1500000
148500 300000
Floorbeam 36 x 4000 75 x 4000 = 300000
= 144000

Cable Anchorage 24000 10 x 12000 = 120000 12000 10 x 12000


23279 11679 11701 11719 11738 11754 11764 11781 11790 11793 11805 9197 = 120000
Cable Pipe Hole Slab
Wind Fairing 4000 4000 71 x 4000 = 284000
Slab Drain 6000 36 x 4000 = 144000 36x4000=144000
Catch Pit 6000 12 x 12000 = 144000 12x12000=144000
Road Lighting Pole 18000 35000 35000 35000 27000 27000
Decorative Lighting 42000 45000 45000 36000

Road Lighting Pole CIP Concrete Catch Pit


Cable Anchorage
Precast Deck Panel Slab Drain Wind Fairing
Cable Pipe Hole at Slab Decorative Lighting
1410 2895 2980 2980 2980 2980 2980 2980 2980 2980 2895 1410

1200
WEG

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
35600

33200
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
L
C

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350

A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B

EEG

1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350

1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T. Takada LAYOUT OF PRECAST DECK PANEL 4


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-008
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/500

1500000
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000
= 300000

Cable Anchorage 10 x 12000 12000 10 x 12000 = 120000 24000


= 120000 71 x 4000 = 284000 4000 4000
Wind Fairing
Slab Drain 36x4000=144000 36 x 4000 = 144000 6000
Catch Pit 12x12000=144000 12 x 12000 = 144000 6000
Road Lighting Pole 27000 27000 35000 35000 35000 18000
Decorative Lighting 36000 45000 45000 42000
Cable Pipe Hole at Slab 9197 9197 11806 11793 11788 11781 11764 11755 11737 11719 11701 11679 23279

Decorative Lighting Catch Pit CIP Concrete


Cable Anchorage
Precast Deck Panel Wind Fairing
Cable Pipe Hole at Slab Road Lighting Pole Slab Drain
1410 2895 2980 2980 2980 2980 2980 2980 2980 2980 2895 1410

1200
WEG

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
35600

33200
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
L
C

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350

B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A

EEG

1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350

1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T. Takada LAYOUT OF PRECAST DECK PANEL 5


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-009
SHEET No. :
Sheet of PACKAGE:
1.0
PLAN S=1/500
25 0)
1 + 7 5 1.
( 2 +
1500000
600 900 148500 300000
Cable 4500 10 x 12000 = 120000 24000 24000
Floorbeam 4500 36 x 4000 = 144000 75 x 4000
= 300000
#1 TENDON GROUP CIP Concrete Deck
#2 TENDON GROUP
Precast Deck Panel
1500
1 2 3

1200
35600

33200
L
C

1200
"a" "b"
1 2 3

CIP Concrete Deck

DETAIL"a" S=1/30 DETAIL "b" S=1/50


2 Longitudinal
1500
3650(Precast Deck Length)
802 1358 1490
58 300 1000
1500000
Girder End 150000 300000 300000 300000 300000 150000
80 400 80

Transverse
400
560

1 1

2
NOTES:
1. TOTAL NUMBER OF TENDON IS 38 PAR GROUP, AND EACH WITH 1S28.6.
1-1 S=1/50 2-2 S=1/50 2. PRESTRESSING TENDONS SHALL BE LOW-RELAXATION TYPE.
3. INITIAL STRESSING FORCE SHALL BE EQUIVALENT TO 1200N/mm2 PER STRAND.
3650 4. STRESSING SEQUENCES:
STAGE1-INSTALL ALL PRECAST DECK PANELS.
STAGE2-#1TENDON GROUP SHALL BE TENSIONED.
STAGE3-CAST CIP CONCRETE DECK.
250 260

250 260 STAGE4-#2TENDON GROUP SHALL BE TENSIONED.


150 100

150 100
5. TIE-DOWN CABLE AND EXPANSION JOINT SHOULD BE INSTALLED AFTER ALL
PRESTRESSING IS FINISHED.
6. THE ANCHORAGE SHALL BE FILLED WITH NON-SHRINK MORTAR.

58 300 1000
80 400 80 All dimensions are in mm,unless otherwise shown
802 1358 1490

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada LAYOUT OF PRESTRESSING TENDON 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C-3b-010
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/500

1500000
300000
Cable 10 x 12000 = 120000 12000 10 x 12000 = 120000
Floorbeam 75 x 4000 = 300000

#1 TENDON GROUP #1 TENDON GROUP


#2 TENDON GROUP
CIP Concrete
C
L
4 5 6 7 8 Precast Deck Panel

1200
35600

33200
L
C

1200
4 5 6 7 8

1500000 NOTES:
150000 300000 300000 300000 300000 150000 1. TOTAL NUMBER OF TENDON IS 38 PAR GROUP, AND EACH WITH 1S28.6.
2. PRESTRESSING TENDONS SHALL BE LOW-RELAXATION TYPE.
3. INITIAL STRESSING FORCE SHALL BE EQUIVALENT TO 1200N/mm2 PER STRAND.
4. STRESSING SEQUENCES:
STAGE1-INSTALL PRECAST DECK PANELS EXCEPT THE CENTER 3 PANELS.
STAGE2-#1TENDON GROUP SHALL BE TENSIONED.
STAGE3-INSTALL THE CENTER 3 PANELS FOR DECK CLOSURE.
STAGE4-#2TENDON GROUP SHALL BE TENSIONED.

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada
in association with LAYOUT OF PRESTRESSING TENDON 2
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-011
SHEET No. :
Sheet of PACKAGE:
SECTION 1 - 1 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#2 TENDON GROUP

250
2%

150

2700
1250

2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

SECTION 2 - 2 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#1 TENDON GROUP #2 TENDON GROUP

250
2%
150

2700
1250

2000

NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.

210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada LAYOUT OF PRESTRESSING TENDON 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C-3b-012
SHEET No. :
Sheet of PACKAGE:
SECTION 3 - 3 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#1 TENDON GROUP #2 TENDON GROUP

250
2%

150

2700
1250

2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

SECTION 4 - 4 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#1 TENDON GROUP

250
2%
150

2700
1250

2000

NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.

210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada LAYOUT OF PRESTRESSING TENDON 4


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C-3b-013
SHEET No. :
Sheet of PACKAGE:
SECTION 5 - 5 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#1 TENDON GROUP

250
2%

150

2700
2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

SECTION 6 - 6 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#1 TENDON GROUP #2 TENDON GROUP

250
2%
150

2700
1250

2000

NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.

210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada LAYOUT OF PRESTRESSING TENDON 5


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C-3b-014
SHEET No. :
Sheet of PACKAGE:
SECTION 7 - 7 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#2 TENDON GROUP
#1 TENDON GROUP

250
2%

150

2700
1250

2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

SECTION 8 - 8 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH

PH

260
#1 TENDON GROUP

250
2%
150

2700
1250

2000

NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.

210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200

All dimensions are in mm,unless otherwise shown

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada LAYOUT OF PRESTRESSING TENDON 6


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C-3b-015
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/30
LONGITUDINAL JOINT ON SUPPORT STRUT S=1/20
REBAR
Transverse 350
CIP Concrete
2895 Precast Deck Panel Precast Deck Panel
1140

CIP Concrete Deck 18 ND01-D16-200


2

260
Apply Foam Release Agent

30
REBAR
125

Support Strut
Chloroprene Rubber
75 75
500

25 ND02-D16

TRANSVERSE JOINT ON FLOORBEAM S=1/20


Bottom

Catch Pit Opening


17 x 200 = 3400 (Bottom Reinforcement)

260

350

S=1/30
STUD
CIP Concrete
Precast Deck Panel Precast Deck Panel

260
D16

SECTION 2 - 2
Longitudinal
17 x 200 = 3400 (Top Reinforcement)

30
1 1
3650

3650
REBAR

Chloroprene Rubber Floorbeam

25 ND02-D16
75 75
500

CATCH PIT OPENING REINFORCEMENT S=1/30


1825

Top

25 ND02-D16 D16 AT OTHER SIDES

D16 AT OTHER SIDES


125

Longitudinal
18 ND01-D16-200
2
D16 AT ALL CORNERS

SECTION 1 - 1 S=1/30 NOTES:


1. SEE LAYOUT OF PRECAST DECK PANEL FOR LOCATION OF CATCH PIT AND SLAB DRAIN.
2. SEE LAYOUT OF PRESTRESSING TENDON FOR ANCHORAGE AND TENDON.
18 ND01-D16-200 3. AT BOLTED CONNECTION FOR TOP FLANGE OF EDGE GIRDER AND FLOORBEAM,
SIZE OF CHLOROPRENE RUBBER SEAL SHALL BE ADJUSTED.
SLAB DRAIN PIPE REINFORCEMENT S=1/30
260

100100100
180°HOOK TOP & BOTTOM BAR
LAP SPLICES

300
2895
100100100
300

8-RB Ø6 x 300 (SR235) All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C-3b-016
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/30

Transverse

2980

18 ND03-D16-200
2
125

25 ND04-D16
25 ND04-D16
Bottom
17 x 200 = 3400 (Bottom Reinforcement)

260

S=1/30
Longitudinal
17 x 200 = 3400 (Top Reinforcement)

SECTION 2 - 2
1 1
3650

3650
Top

25 ND04-D16
125

18 ND03-D16-200
2

2980

SECTION 1 - 1 S=1/30 NOTES:


1. SEE LAYOUT OF PRESTRESSING TENDON FOR ANCHORAGE AND TENDON.
18 ND03-D16-200
260

180° HOOK TOP & BOTTOM BAR


180°HOOK TOP & BOTTOM BAR

2980
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C-3b-017
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/30

S=1/30

6 NF03-D20-125

6 NF04-D20-125
SECTION 2 - 2

2 NF01-D16-100
8 NF05-D14-200
2 NF08-D14-200

Transverse

7 NF06-D14

80
1 1

400
560

80
8 NF05-D14-200

4 NF02-D16-125
2 NF01-D16-100
7 NF06-D14 4 NF02-D16-125

2 NF08-D14-100
2 NF07-D14-100
2

802 1358 1490


260 250
3650

Longitudinal

SECTION 1 - 1 S=1/30

3650

2 NF07-D14-200 NOTES:
2 NF08-D14-200 1. SEE LAYOUT OF PRESTRESSING TENDON FOR LOCATION OF RIB ANCHORAGE AND TENDON.
2. WHERE PRESTRESSING STRANDS ARE INTERFERED WITH REBAR FOR THE PRECAST DECK, REARRANGE THEM.
6 NF03-D20-125 4 NF02-D16-125 8 NF05-D14-200 3. SIDE SURFACES OF PRECAST DECK PANEL SHALL BE ROUGHENED TO BE INTEGRATED WITH CIP CONCRETE.
4. WHEN ANCHORAGE RIB LOCATES NEAR THE END OF PRECAST DECK PANEL, REBAR DESIGNATED AS NF06 AND
NF08 SHALL BE FIXED BY HOOK.
5. ANCHORAGE PORTION SHALL BE FILLED BY NON-SHRINK MORTAR.
260
150 100

13°

R 500
250

6 NF04-D20-125
0

5 NF06-D14-200
2 NF01-D16-100
2 NF06-D14-100

58 300 1000
802 1358 1490

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T.Takada REINFORCEMENT OF
in association with PRESTRESSING CABLE ANCHORAGE
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C-3b-018
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/20

35600
1410 2895 350 2980

14504 ND05-D16(Top)
ND05-D16 14504 ND06-D16(Bottom)

ND06-D16

3
CIP Concrete Deck
17@200=3400

17@200=3400
42 ND07-D16(Top)
42 ND08-D16(Bottom)
ND07-D16

ND08-D16

Precast Deck Panel


S=1/20

S=1/20

ND09-D32
1472 ND09-D32
125

125
SECTION 2 - 2

SECTION 3 - 3
1 1
350

350
CIP Concrete
125

125

ND07-D16

ND08-D16
17@200=3400

17@200=3400

ND10-D20
42 ND07-D16(Top)
42 ND08-D16(Bottom)

54 ND10-D20
2

3
SECTION 1 - 1 S=1/20

1410 2052 350 2985

1.5% ND09-D32
ND07-D16
150

ND05-D16

2.0%
260

CIP Expansive Concrete ND10-D20


15

ND09-D32
CIP Concrete Deck NOTE:
ND06-D16 1. SET UP CUTWATER IN THE PLACE WHERE WIND FAIRING DOESN'T CLING.
100 Edge Girder ND08-D16

Cutwater All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

T.Takada REINFORCEMENT OF CIP CONCRETE SLAB 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C-3b-019
SHEET No. :
Sheet of PACKAGE:
PLAN (TOP) 1 - 1 S=1/50

(Precast Deck Panel)


350 2980 350 2895 1410 2
1

4
260
75 30
PRECAST DECK PANEL PRECAST DECK PANEL

S=1/50

1925
250 ND12-D16
(PER PIER)

185

4075 (CIP Concrete Deck)


SECTION 4 - 4
3 3

150000
5575

300000
1850
CATCH PIT
OPENING

LOCATION

300000
2 ND20-D16
(PER CATCH PIT)

1500000
300

300000
19 ND11-D16

2400
(PER PIER)
CIP* 1360

1500

1500

300000
EXPANSION JOINT 10 NE01-D16 INSPECTION LADOER
(PER PIER) (P11:EAST SIDE ONLY)
(P17:WEST SIDE ONLY)
8 ND18-D16 4 ND19-D16
(PER CATCH PIT) (PER CATCH PIT)

150000
300
4

600
2550 550
35600

1
2

SECTION 3 - 3 S=1/50

35600
1200

1150
290 75

150

NOTES:
1. REFER REINFORCEMENT OF CIP CONCRETE SLAB 1 FOR REBAR
SHOWN IN BROKEN LINES.
2. CIP* ; CIP CONCRETE AFTER INSTALLATION AT EXPANSION.

3330 3280
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

T. Takada REINFORCEMENT OF CIP CONCRETE SLAB 2


in association with (AT GIRDER ENDS)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3b-020
SHEET No. :
Sheet of PACKAGE:
PLAN (BOTTOM) 2 - 2 S=1/50

(Precast Deck Panel)


350 2980 350 2895 1410 2
1

4
260
75 30
PRECAST DECK PANEL PRECAST DECK PANEL

S=1/50

1925
250 ND14-D16
(PER PIER)

185

4075 (CIP Concrete Deck)


SECTION 4 - 4
3 3

150000
5575

300000
1850
CATCH PIT
OPENING

LOCATION

300000
1500000
300

300000
37 ND13-D16

2400
(PER PIER)
CIP*

1500

1500

300000
EXPANSION JOINT 18 NE02-D16 INSPECTION LADOER
(PER PIER) (P11:EAST SIDE ONLY)
(P17:WEST SIDE ONLY)

150000
300
4

600
2550 550
35600

1
2

SECTION 3 - 3 S=1/50

35600
1200

1150
290 75

150

NOTES:
1. REFER REINFORCEMENT OF CIP CONCRETE SLAB 1 FOR REBAR
SHOWN IN BROKEN LINES.
2. CIP* ; CIP CONCRETE AFTER INSTALLATION AT EXPANSION.

3330 3280
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

T. Takada REINFORCEMENT OF CIP CONCRETE SLAB 3


in association with (AT GIRDER ENDS)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3b-021
SHEET No. :
Sheet of PACKAGE:
2
PLAN (TOP) 1 - 1, (BOTTOM) 2 - 2

(Precast Deck Panel)


S=1/50
1
350 2980 350 2895 1410
PRECAST DECK PANEL PRECAST DECK PANEL

4
250 ND17-D16
(PER PYLON)

4175
3 3

150000
S=1/50

300000
(CIP Concrete Deck) 8350
SECTION 4 - 4

LOCATION

300000
1500000
300000
300000
4175

150000
PRECAST DECK PANEL PRECAST DECK PANEL 26030

(Precast Deck Panel)


4

290
40 ND15-D16 (TOP)
40 ND16-D16 (BOTTOM)
(PER PYLON)
SECTION 3 - 3 S=1/50 1
35600
1200
2
1150
290 75

150

NOTE:
1. REFER REINFORCEMENT OF CIP CONCRETE SLAB 1 FOR REBAR
SHOWN IN BROKEN LINES.

All dimensions are in mm, unless otherwise shown.


3330 3280

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

T. Takada REINFORCEMENT OF CIP CONCRETE SLAB 4


in association with (AT PYLON)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3b-022
SHEET No. :
Sheet of PACKAGE:
SIDEWALK S=1/20 MEDIAN CURB S=1/20
980 500

8 NW05-D14 4 NC04-D14

CIP Concrete Deck

1 1 2 2

3650

3650
Precast Deck Panel Precast Deck Panel Precast Deck Panel

3 3 4 4
@200

@200
350

350
CIP Concrete CIP Concrete CIP Concrete

Precast Deck Panel Precast Deck Panel


Precast Deck Panel

3650

3650
NW02-D14-200 NW01-D14-200 NW03-D14-200 NC03-D14-200 NC01-D14-200
NW04-D14-200 NC02-D14-200

SECTION 1 - 1 S=1/20 SECTION 2 - 2 S=1/20


1200 400 750 500

980 150 20
4 NC05-D20(PER POST)
4 NW06-D20(PER POST) NC02-D14-200 C NC01-D14-200
Anchor Re-bar L
NW01-D14-200 Curb Level
1.5% CIP Expansive Concrete
265

250
150
231

Mortar
NW02-D14-200 2.0% 2.0%
Anchor Re-bar

75
2.0% 2.0% 2.0%

260
260

Level

Precast Deck Panel


Precast Deck Panel NW03-D14-200
Anchor Re-bar
CIP Concrete Deck Edge Girder Support Strut
150 All dimensions are in mm, unless otherwise shown.
1410 2895 350

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
REINFORCEMENT OF
T. Takada
in association with SIDEWALK AND MEDIAN 1
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C-3b-023
SHEET No. :
Sheet of PACKAGE:
CIP Concrete Deck

SIDEWALK S=1/20 MEDIAN CURB S=1/20

SECTION 3 - 3 SECTION 4 - 4
1200 400 750 500

980 150 20
CL
4 NW06-D20(PER POST) 4 NC05-D20(PER POST) NC03-D14-200
NW04-D14-200 Curb Level
1.5%

250
150
265

231
Mortar
2.0% 2.0%

75
2.0% 2.0% 2.0%

260
260

Level

Edge Girder

1410 2895

LONGITUDINAL RELIEF JOINT S=1/20

SIDEWALK MEDIAN CURB 5 - 5 (6 - 6) S=1/20


400 750
10000 10000 10000
980 150 20 500
CL ELASTOMER

Curb Level
1.5%
ELASTOMER

250
150
265

231

6 6

980 (500)
5 5 2.0% 2.0%

75
Mortar
ELASTOMER

NOTES:
1. LONGITUDINAL RELIEF JOINT SHALL BE PROVIDED FOR SIDEWALK AND
MEDIAN CURB WITH 10M SPACING (TYPICAL), AND FILLED BY ELASTOMER.
2. ARRANGE CONNECTION REINFORCEMENT BETWEEN CURB AND SIDEWALK.
3. REBAR NW06 AND NC05 IS REINFORCEMENT FOR TRAFFIC BARRIER ANCHOR.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
REINFORCEMENT OF
T.Takada
in association with SIDEWALK AND MEDIAN 2
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C-3b-024
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/20

1150 1200
500 700
250 250

SIDEWALK CIP Concrete Deck

ANCHOR BOLT 4-M24

250
1 1

500
250
8 NL01-D14 3 NL02-D14

REINFORCEMENT OF DECK @200 REINFORCEMENT OF DECK @200

SECTION 1 - 1 S=1/20

1150 1200
500 700

FB 50 x t 3.0
8 NL01-D14
1.5% Level
150

SIDEWALK
265

275
75

2.0%
2.0%
260

Precast Deck Panel

260
NOTES:
Level
1. NUMBER OF REBAR AND ANCHOR BOLT SHOWN IS PER ONE LOCATION.
2. REFER LAYOUT OF PRECAST DECK PANEL FOR THE LOCATION.
Floorbeam U-Flg 3 NL02-D14

Edge Girder U-Flg

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T.Takada REINFORCEMENT OF LIGHTING POLE BASE


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C-3b-025
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/50
NS06-D16
NS02-D16
NS04-D16

1200
NS01-D16

1 1
NS05-D16

SECTION 1 - 1 S=1/50 SECTION 2 - 2 S=1/50

1213

4 NS02-D16
5 NS01-D16
NS03-D16
NS01-D16
4 NS03-D16

NS02-D16 2 NS06-D16

260
NS05-D16
8 NS04-D16
NS04-D16
8 NS05-D16

1250
2

3000
1750
NOTES:
1) The plan shown in the drawing is for
U7 locating between P11 and P12.
2) Refer Technical Specifications for
damper installation.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.

T. Takada REINFORCEMENT OF
in association with STAY CABLE BOOT SUPPORT BASE
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3b-026
SHEET No. :
Sheet of PACKAGE:
Section Length 7500 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T.Flg 1200 6300 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
570 x 24 570 x 24 570 x 24 570 x 26 570 x 26 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 825 x 47
SM490Y SM570 SM570 SM570 SM570 SM570
T.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Stud Interval Type A B C C C D D D D D D D E F
Cable No. U1 2 3 4 5 6 7 8 9 10 L11

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
2815 185

S1
3000
J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14

T-Stiffener Type a b a e a d a d a c a c a f
L-Stiffener Type 4-2 4-5 4-2 3-5 5-5 3-3 5-5 3-3 5-5 3-1 4-3 3-1 4-3 4-1 4-2 5-2 4-2 5-2 4-3 5-4 4-3 5-4 4-5

Web 1300 6200 6000 5300 6700 5300 6700 5200 6800 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 10000 10000
2936x19 2921x31 2912x28 2912x28 2924x25 2929x25 2938x19 2938x19 2938x19 2938x19 2932x19
2791x19 2928x19 2921x19 2912x19 2912x19 2924x19 2929x19 2938x19 2938x19 2938x19 2938x19 2932x19 2929x19 2875x24
SM570 SM570 SM570 SM570 SM570 SM570
Web Material SM490Y SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
B.Flg 1200 6300 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
910x40 910x48 910 x 55 910 x 62 910 x 62 910 x 52 910 x 47 910 x 38 910 x 38 910 x 38 910 x 38 910 x 44 910 x 47 1500 x 78
SM490Y SM570 SM570 SM570 SM570 SM570
B.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Joint 7500 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
1950
T-Stiffener 800 1750 72 x 2000 = 144000 150x2000=300000
Floorbeam 4500 36 x 4000 = 144000 75x4000=300000
Cable 4500 10 x 12000 = 120000 24000 24000
Span Length 148500 300000

Stud Arrangement - Transverse Direction Stud Interval Types - Longitudinal Direction T-Stiffener Types L-Stiffener Types
570 SM400 3 L-Stiffeners 4 L-Stiffeners 5 L-Stiffeners
105 4x90 105 Type Interval Type Interval Type Interval Type Sizes Type Material Sizes Type Material Sizes Type Material Sizes Type Material Sizes
=360 1 960 1 410 1 410
Stud Ø22 x 200 a 230x15 1 SM400 200x18 1 SM400 170x13 1 SM400 170x13 1 SM400 170x13
2 350 2 390 2 590
3 390 3 400 3 3x600=1800 b 260x17 3-1 2 SM400 200x18 2 SM400 170x13 2 SM400 170x13 2 SM400 170x13
4-1
4 310 4 7x600=4200 G 4 400 5-1 3 SM400 5-5 3 SM400
A c 270x17 3 SM490Y 200x20 3 SM400 170x13 170x13 170x13
5 8x400=3200 D 5 400 5 3x600=1800
6 190 6 5x600=3000 6 590 d 290x19 1 SM400 200x18 4 SM400 170x13 4 SM400 170x13 4 SM490Y 170x15
7 6x400=2400 7 400 7 410 e 310x21 3-2 2 SM490Y 200x20 1 SM400 170x13 5 SM400 170x13 5 SM570 170x17
8 200 8 3x600=1800 1 410
f 375x24 3 SM490Y 200x20 2 SM400 170x13 1 SM400 170x13 1 SM400 170x13
3000

9 400 9 590 2 590 4-2


1 410 10 410 3 3x600=1800 1 SM400 220x18 3 SM400 170x13 2 SM400 170x13 2 SM400 170x13
2 190 1 410 4 400 3-3 2 SM400 5-2 3 SM400 5-6 3 SM490Y
220x18 4 SM490Y 170x15 170x13 170x15
3 400 2 390 D' 5 5x600=3000
B 4 10x400=4000 3 400 6 400 3 SM490Y 220x20 1 SM400 170x13 4 SM400 170x13 4 SM490Y 170x15
5 400 4 6x600=3600 7 7x600=4200 1 SM400 220x18 2 SM400 170x13 5 SM490Y 170x15 5 SM570 170x17
6 190 E 5 400 8 400 4-3
7 410 6 6x600=3600 9 390 3-4 2 SM490Y 220x20 3 SM490Y 170x15 1 SM400 170x13 1 SM400 170x13
910
1 410 7 400 10 410 3 SM490Y 220x20 4 SM490Y 170x15 2 SM400 170x13 2 SM490Y 170x15
2 190 8 390
1 SM400 240x19 1 SM400 170x13 5-3 3 SM400 170x13 5-7 3 SM490Y 170x15
3 400 9 410
C 4 25x400=10000 1 410 3-5 2 SM400 240x19 2 SM490Y 170x15 4 SM490Y 170x15 4 SM490Y 170x15
825 4-4
5 400 2 590
3 SM490Y 240x22 3 SM490Y 170x15 5 SM490Y 170x15 5 SM570 170x17
140 140 6 190 3 550
92.5 4x90 92.5 7 410 4 5x600=3000 1 SM400 240x19 4 SM490Y 170x15 1 SM400 170x13
=360 F 5 2x450=900
Stud Ø22 x 200 3-6 2 SM490Y 240x22 1 SM400 200x16 2 SM400 170x13
6 5x600=3000
7 550 3 SM490Y 240x22 2 SM400 200x16 5-4 3 SM490Y 170x15
4-5
8 590 3 SM400 200x16 4 SM490Y 170x15
9 410
4 SM490Y 200x18 5 SM490Y 170x15
3000

1 3 4 5 6 7 8 10
2 9
3 L-Stiffeners Interval 4 L-Stiffeners Interval 5 L-Stiffeners Interval

400 450 500 600


675
600 750 800 850
1500 1
1

500 550
1 NOTE:

575 625
2
3000

3000

3000
2 The girder depth shown in the drawing is the destance between

600
2 3 the top of the top flange and the bottom of the bottom flange.
3
4
3 4 5

525
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif

Rev. No.1

K. Itabashi ..\..\..\..\..\..\NT100 /成果\01_図面国


\ 内組\00 S IGN\Itabas hi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-02.tif
EDGE GIRDER SCHEDULE 1
in association with
H. Ohashi ..\..\..\..\..\..\N T 100 /成果\01_ 図面国内組
\ \00 SIGN\Ohashi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 3b - 027
SHEET No. :
Sheet of PACKAGE:
Section Length 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 6600 5400 6500 5500 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 26 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 825 x 47
SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
T.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Stud Interval Type E D' D' D' D' D' D' D' D' D' D' D' G D D D D D D D D D D D E F

Cable No. L12 13 14 15 16 17 18 19 20 21 U22 U1 2 3 4 5 6 7 8 9 10 L11

FB100
FB101
FB102
FB103
FB104
FB105
FB106
FB107
FB108
FB109
FB110
FB111
FB112
FB113
FB114
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB80
FB81
FB82
FB83
FB84
FB85
FB86
FB87
FB88
FB89
FB90
FB91
FB92
FB93
FB94
FB95
FB96
FB97
FB98
FB99
3000
J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-39 J-40

T-Stiffener Type a c a c a e a e a e a d a c a f
L-Stiffener Type 5-4 5-3 4-3 5-4 4-3 5-4 4-3 5-4 4-3 5-3 4-3 5-1 4-1 4-2 4-3 3-1 4-3 3-1 4-2 4-1 3-6 5-6 3-5 5-5 3-5 5-5 3-4 5-6 3-1 4-3 5-3 4-3 5-4 4-3 5-3 4-3 5-4 4-3 5-4 5-4 4-5

Web 10000 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6800 5200 6700 5300 6700 5300 6600 5400 6000 5400 6600 5300 6700 5300 6700 5200 6800 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 10000 10000
2933x19 2938x19 2938x19 2936x19 2936x19 2927x19 2924x19 2926x19 2928x19 2921x19 2930x19 2932x19 2925x19 2922x19 2913x19 2921x19 2928x19 2931x19 2936x19 2938x19 2938x19 2938x19 2933x19
2928x19 2933x19 2938x19 2938x19 2936x19 2936x19 2927x19 2924x19 2926x25 2928x25 2921x19 2930x19 2925x31 2922x31 2913x31 2921x28 2928x25 2931x19 2936x19 2938x19 2938x19 2938x19 2933x19 2928x19 2875x24
SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
Web Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
B.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 6600 5400 6500 5500 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
910 x 48 910 x 43 910 x 38 910 x 38 910 x 40 910 x 40 910 x 49 910 x 52 910 x 50 910 x 48 910 x 55 910 x 46 910 x 44 910 x 51 910 x 54 910 x 61 910 x 55 910 x 48 910 x 45 910 x 40 910 x 38 910 x 38 910 x 38 910 x 43 910 x 48 1500 x 78
SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
B.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Joint 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T-Stiffener 150 x 2000 = 300000 150x2000=300000
Floorbeam 75 x 4000 = 300000 75x4000=300000
Cable 24000 10 x 12000 = 120000 12000 10 x 12000 = 120000 24000 24000
Span Length 300000 300000

Section Length 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 825 x 47
SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
T.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Stud Interval Type E D' D' D' D' D' D' D' D' D' D' D' G D D D D D D D D D D D E F

Cable No. L12 13 14 15 16 17 18 19 20 21 U22 U1 2 3 4 5 6 7 8 9 10 L11


FB115
FB116
FB117
FB118
FB119
FB120
FB121
FB122
FB123
FB124
FB125
FB126
FB127
FB128
FB129
FB130
FB131
FB132
FB133
FB134
FB135
FB136
FB137
FB138
FB139
FB140
FB141
FB142
FB143
FB144
FB145
FB146
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB155
FB156
FB157
FB158
FB159
FB160
FB161
FB162
FB163
FB164
FB165
FB166
FB167
FB168
FB169
FB170
FB171
FB172
FB173
FB174
FB175
FB176
FB177
FB178
FB179
FB180
FB181
FB182
FB183
FB184
FB185
FB186
FB187
FB188
FB187
3000

J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65 P14 J-65

T-Stiffener Type a c a c a c a d a d a e a e a e a e a d a c a f
L-Stiffener Type 5-4 5-4 4-3 5-4 4-3 5-3 4-3 5-4 4-3 5-3 4-3 3-2 4-3 3-2 4-3 3-1 4-3 3-3 4-3 3-3 4-3 3-5 4-1 3-6 4-3 3-6 4-3 3-5 5-3 3-4 5-6 3-1 4-3 5-3 4-3 5-3 4-3 5-3 4-3 5-3 4-3 5-4 4-3 5-4 5-4 4-5

Web 10000 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6800 5200 6700 5300 6700 5300 6600 5400 6000 5400 6600 5300 6700 5300 6700 5200 6800 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 10000 10000
2933x19 2938x19 2938x19 2936x19 2936x19 2931x19 2931x19 2928x19 2926x19 2930x19 2932x19 2930x19 2927x19 2925x19 2920x19 2924x19 2930x19 2933x19 2938x19 2938x19 2938x19 2938x19 2933x19
2927 x 19 2933x19 2938x19 2938x19 2936x19 2936x19 2931x25 2931x25 2928x25 2926x28 2930x28 2932x28 2927x31 2925x31 2920x31 2924x28 2930x25 2933x19 2938x19 2938x19 2938x19 2938x19 2933x19 2928x19 2875x24
SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
Web Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
B.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
910 x 49 910 x 43 910 x 38 910 x 38 910 x 40 910 x 40 910 x 45 910 x 45 910 x 48 910 x 50 910 x 46 910 x 44 910 x 46 910 x 49 910 x 51 910 x 56 910 x 52 910 x 46 910 x 43 910 x 38 910 x 38 910 x 38 910 x 38 910 x 43 910 x 48 1500 x 78
SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
B.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Joint 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T-Stiffener 150 x 2000 = 300000 150x2000=300000
Floorbeam 75 x 4000 = 300000 75x4000=300000
Cable 24000 10 x 12000 = 120000 12000 10 x 12000 = 120000 24000 24000
Span Length 300000 300000

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif

Rev. No.1

K. Itabashi ..\..\..\..\..\..\NT100 /成果\01_図面国


\ 内組\00 S IGN\Itabas hi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-02.tif
EDGE GIRDER SCHEDULE 2
in association with
H. Ohashi ..\..\..\..\..\..\N T 100 /成果\01_ 図面国内組
\ \00 SIGN\Ohashi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 3b - 028
SHEET No. :
Sheet of PACKAGE:
CABLE ANCHORAGE DETAILS S=1/100 ANCHOR PIPE S=1/30

L1
Cable U1 ~ 5 Cable 6 ~ 8 A-A S=1/50
300 L2
(18 ~ U22) (15 ~ 17) 35 230 35 Mill to grind
Anchor Pipe
Anchor Pipe CJP
Cable (SCW490-CF)
Cable B

1250

1250

t
Cable
A

D1
D3

D2
A

15
Ground and Smooth R1

800
TYP.

00
15
50

00

t
Ground and Smooth

1750
139 22 22 139

1750
L3

R
TYP.

15
<155> <123>

t2
Taper Pipe

L5
(SCW550)

L5

250
Edge Girder
Web
A B
A 700 L2 500 L1 L2 D1 D2 D3 t

L4
L1 U1 2100 1800 600 470 670 65
2 2000 1700 550 420 620 65
t3 3 2000 1700 550 440 640 55
4 1900 1600 500 390 590 55

26
Cable 9, 10 Cable L11 500
5 1900 1600 500 390 590 55
(13, 14) (L12) < > : L11 (L12) dimension
6 1800 1500 500 400 600 50
7 1800 1500 450 350 550 50
Cable 8 1800 1500 450 350 550 50
Cable
9 1700 1400 450 360 560 45
1250

10 1700 1400 400 330 530 35

1250
150 B-B S=1/50 L11 1800 1500 450 350 550 50

A
15 0 Ground Smooth (TYP.)
00 250 L12 1800 1500 450 350 550 50
A

t=22 13 1700 1400 400 330 530 35


14 1700 1400 450 360 560 45
1750

Anchor Pipe 15 1800 1500 450 350 550 50

1750
20
3 0° 16 1800 1500 450 350 550 50
L5
L5 17 1800 1500 500 400 600 50
18 1900 1600 500 390 590 55

1400

t1
19 1900 1600 500 390 590 55
20 2000 1700 550 440 640 55
A

21 2000 1700 550 420 620 65


A U22 2100 1800 600 470 670 65

t=22

250

Anchor Pipe Fixing Data Fixing Bracket Data


Cable P12 P13 P14 P15 P16 Cable P12 ~ P16 P12 P13 P14 P15 P16
L5
No. (deg) (deg) (deg) (deg) (deg) (deg) (deg) (deg) (deg) (deg) No. L1 L2 L3 L4 t1 t2 t3 t2 t3 t2 t3 t2 t3 t2 t3
U1 25.751 5.344 25.745 5.344 25.599 5.345 25.370 5.346 25.319 5.347 1600 U1 2500 1300 1278 1200 40 19 28 31 24 31 22 28 22 19 26 C C-C S=1/50
2 27.170 5.622 27.171 5.622 27.004 5.623 26.790 5.624 26.739 5.625 1600 2 2400 1200 1178 1200 38 31 24 31 24 31 24 28 24 19 28
3 28.873 5.954 28.855 5.954 28.678 5.956 28.468 5.957 28.402 5.957 1600 3 2400 1200 1178 1200 38 28 19 31 22 31 19 28 19 25 19 Top
4 30.772 6.359 30.764 6.359 30.599 6.360 30.384 6.362 30.340 6.363 1700 4 2300 1100 1078 1100 32 28 22 28 22 28 22 25 22 25 22
5 33.027 6.862 33.013 6.862 32.849 6.864 32.643 6.866 32.623 6.867 1650 5 2300 1100 1078 1200 32 25 22 25 22 25 22 25 22 19 24
6 35.786 7.506 35.786 7.506 35.631 7.508 35.435 7.511 35.407 7.511 1750 6 2200 1000 978 1200 32 19 22 19 22 19 22 25 19 19 22
7 39.148 8.358 39.150 8.358 38.993 8.361 38.826 8.363 38.803 8.363 1800 7 2200 1000 978 1200 32 19 22 19 22 19 22 19 22 19 22
8 43.373 9.536 43.371 9.536 43.234 9.539 43.084 9.542 43.070 9.542 1900 8 2200 1000 978 1200 32 19 22 19 22 19 22 19 22 19 22
Drainage ditch
9 48.760 11.270 48.775 11.271 48.661 11.274 48.536 11.279 48.527 11.279 1550 9 2100 900 878 1100 28 19 22 19 19 19 19 19 19 19 19
Ø6 mm
10 55.716 14.068 55.716 14.068 55.631 14.073 55.540 14.079 55.534 14.079 1750 10 2100 900 878 1000 19 19 14 19 14 19 14 19 14 19 14 C
L11 64.724 19.279 64.723 19.279 64.673 19.287 64.621 19.295 64.619 19.295 1700 L11 2200 1000 978 1100 32 19 22 19 22 19 22 19 22 19 22 Drainage ditch
L12 64.619 19.295 64.621 19.295 64.673 19.287 64.723 19.279 64.724 19.279 1700 L12 2200 1000 978 1100 32 19 22 19 22 19 22 19 22 19 22 Ø6 mm
Bottom
13 55.534 14.079 55.540 14.079 55.631 14.073 55.716 14.068 55.716 14.068 1750 13 2100 900 878 1000 19 19 14 19 14 19 14 19 14 19 14
14 48.527 11.279 48.536 11.279 48.661 11.274 48.775 11.271 48.760 11.270 1550 14 2100 900 878 1100 28 19 19 19 19 19 19 19 19 19 22
15 43.070 9.542 43.084 9.542 43.234 9.539 43.371 9.536 43.373 9.536 1900 15 2200 1000 978 1200 32 19 22 19 22 19 22 19 22 19 22
16 38.803 8.363 38.826 8.363 38.993 8.361 39.150 8.358 39.148 8.358 1800 16 2200 1000 978 1200 32 19 22 19 22 19 22 19 22 19 22
17 35.407 7.511 35.435 7.511 35.631 7.508 35.786 7.506 35.786 7.506 1750 17 2200 1000 978 1200 32 19 22 25 19 19 22 19 22 19 22 Ø6 mm
18 32.623 6.867 32.643 6.866 32.849 6.864 33.013 6.862 33.027 6.862 1650 18 2300 1100 1078 1200 32 19 24 25 22 25 22 25 22 25 22
19 30.340 6.363 30.384 6.362 30.599 6.360 30.764 6.359 30.772 6.359 1700 19 2300 1100 1078 1100 32 25 22 25 22 28 22 28 22 28 22
20 28.402 5.957 28.468 5.957 28.678 5.956 28.855 5.954 28.873 5.954 1600 20 2400 1200 1178 1200 38 25 19 28 19 31 19 31 22 28 19
21 26.739 5.625 26.790 5.624 27.004 5.623 27.171 5.622 27.170 5.622 1600 21 2400 1200 1178 1200 38 19 28 28 24 31 24 31 24 31 24
U22 25.319 5.347 25.370 5.346 25.599 5.345 25.745 5.344 25.751 5.344 1600 U22 2500 1300 1278 1200 40 19 26 28 22 31 22 31 24 19 28 NOTES:
1) Steel grade
Plates : SM570
Others : Shown
2) Drainage ditch shall be provided at the lower side of bottom
surface of shim plates.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

K. Itabashi CABLE ANCHORAGE DETAILS


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100,50,30 DRAWING No. : C - 3b - 029
SHEET No. :
Sheet of PACKAGE:
45 120 45
nx85 nx85
Top Flange Type
=L1 =L1 Type TF-1 TF-2 TF-3 TF-4 TF-5 TF-6

45 140 45
=170 =170
2x85 2x85
n 2 2 3 3 3 3

45 45
ts_to 11 11 11 11 11 12
ts_ti 12 12 12 12 12 13
tf 0 0 0 2.3 23 0
ts_to : Thickness of outside splice plate L1 170 170 255 255 255 255
ts_ti : Thickness of inside splice plate Spl PL material SM490Y SM570 SM570 SM570 SM570 SM570
tf : Thickness of filler plate

45 100 45
Web Type
nx85 nx85 Type W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18
=L1 =L1 n 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

85 L2
ts_w 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11
tf 0 0 0 0 0 0 0 0 0 0 0 0 4.5 0 6 6 0 0

45
L1 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170
ts_w L2 134 134 134 134 134 134 134 134 134 134 134 139 139 139 139 139 139 139
L3 148 150 153 154 155 155 156 157 157 158 159 161 161 163 164 166 167 170
L4 2548 2546 2543 2542 2541 2541 2540 2539 2539 2538 2537 2530 2530 2528 2527 2525 2524 2521

28 x L5 = L4
L5 91.0 90.9 90.8 90.8 90.8 90.8 90.7 90.7 90.7 90.6 90.6 90.4 90.4 90.3 90.3 90.2 90.1 90.0
Spl PL material SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM490Y SM570 SM490Y SM490Y SM490Y SM490Y SM570 SM490Y SM490Y SM490Y SM490Y

Type W-19 W-20 W-21 W-22 W-23 W-24 W-25 W-26 W-27 W-28 W-29 W-30 W-31 W-32 W-33 W-34 W-35 W-36 W-37 W-38 W-39 W-40
n 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4
ts_w 10 10 10 10 10 10 10 10 10 10 11 11 11 11 11 11 11 11 11 11 11 12
tf 3.2 4.5 3.2 3.2 4.5 6 3.2 3.2 3.2 6 0 6 0 6 4.5 4.5 6 3.2 4.5 4.5 2.3 2.3
L1 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 340
L2 139 139 139 139 139 139 139 139 144 144 134 139 144 144 144 146 146 146 146 151 162 162
L3 85

L3 160 161 163 165 165 166 167 170 175 176 158 170 172 174 176 181 181 182 182 187 193 193
L4 2531 2530 2528 2526 2526 2525 2524 2521 2511 2510 2538 2521 2514 2512 2510 2503 2503 2502 2502 2492 2475 2475
45

L5 90.4 90.4 90.3 90.2 90.2 90.2 90.1 90.0 89.7 89.6 90.6 90.0 89.8 89.7 89.6 89.4 89.4 89.4 89.4 89.0 88.4 88.4
Spl PL material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570
tf : Thickness of filler plate

100
Bottom Flange Type
45 nx85 nx85 45 Type BF-1 BF-2 BF-3 BF-4 BF-5 BF-6 BF-7 BF-8 BF-9 BF-10 BF-11 BF-12 BF-13 BF-14 BF-15 BF-16 BF-17 BF-18 BF-19 BF-20 BF-21 BF-22
=L1 =L1 n 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6
45

ts_bo 19 20 20 20 24 19 20 20 20 21 22 22 22 22 23 23 25 26 26 23 24 25
=340
4x85

ts_bi 20 21 21 22 27 20 21 21 22 23 23 23 23 23 24 25 27 28 28 24 25 27
45 45

140

tf 0 0 2.3 4.5 2.3 9 9 4.5 6 8 3.2 3.2 4.5 6 3.2 3.2 7 2.3 3.2 2.3 3.2 9
=340
4x85

L1 340 340 340 340 340 425 425 425 425 425 425 425 425 425 425 425 425 425 425 510 510 510
Spl PL material SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM490Y SM570 SM490Y SM570 SM490Y SM570 SM490Y SM490Y SM570 SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM490Y
45

Type BF-23 BF-24 BF-25 BF-26 BF-27 BF-28 BF-29 BF-30 BF-31 BF-32 BF-33 BF-34 BF-35 BF-36 BF-37 BF-38 BF-39 BF-40 BF-41 BF-42
ts_bo : Thickness of outside splice plate
n 7 7 7 7 7 7 7 7 8 8 8 8 9 9 9 10 10 10 10 10
ts_bi : Thickness of inside splice plate
ts_bo 24 24 24 24 26 26 28 30 25 26 28 28 28 29 30 25 26 26 30 34
tf : Thickness of filler plate
ts_bi 25 25 26 26 27 28 30 32 26 27 29 30 30 31 32 26 27 28 32 36
tf 0 3.2 4.5 6 2.3 2.3 2.3 7 4.5 7 3.2 4.5 10 7 6 31 30 29 7 0
L1 595 595 595 595 595 595 595 595 680 680 680 680 765 765 765 850 850 850 850 850
Spl PL material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570

Joint Type
Joint No J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33
T. Flg TF-2 TF-3 TF-4 TF-6 TF-4 TF-3 TF-2 TF-1 TF-1 TF-1 TF-1 TF-1 TF-5 TF-5 TF-1 TF-1 TF-1 TF-1 TF-1 TF-1 TF-1 TF-3 TF-3 TF-1 TF-1 TF-1 TF-1 TF-3 TF-4 TF-4 TF-3 TF-2 TF-1
Web W-29 W-30 W-37 W-38 W-36 W-25 W-9 W-1 W-1 W-1 W-4 W-8 W-39 W-40 W-10 W-3 W-1 W-2 W-2 W-11 W-17 W-31 W-22 W-27 W-18 W-12 W-16 W-32 W-35 W-34 W-26 W-14 W-5
B. Flg BF-10 BF-32 BF-41 BF-42 BF-35 BF-31 BF-6 BF-1 BF-1 BF-1 BF-9 BF-11 BF-38 BF-39 BF-13 BF-4 BF-1 BF-3 BF-2 BF-7 BF-16 BF-29 BF-27 BF-30 BF-22 BF-5 BF-17 BF-33 BF-36 BF-37 BF-32 BF-15 BF-4

Joint No J-34 J-35 J-36 J-37 J-38 J-39 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65
T. Flg TF-1 TF-1 TF-1 TF-1 TF-1 TF-5 TF-5 TF-1 TF-1 TF-1 TF-1 TF-1 TF-2 TF-3 TF-3 TF-3 TF-3 TF-3 TF-1 TF-1 TF-3 TF-3 TF-3 TF-3 TF-2 TF-1 TF-1 TF-1 TF-1 TF-1 TF-1 TF-5
Web W-2 W-1 W-1 W-3 W-10 W-40 W-40 W-11 W-3 W-1 W-2 W-2 W-6 W-19 W-21 W-22 W-23 W-20 W-13 W-15 W-24 W-28 W-33 W-25 W-7 W-3 W-1 W-1 W-1 W-3 W-10 W-40
B. Flg BF-3 BF-1 BF-1 BF-4 BF-13 BF-39 BF-40 BF-14 BF-4 BF-1 BF-3 BF-2 BF-8 BF-23 BF-24 BF-27 BF-25 BF-20 BF-18 BF-19 BF-28 BF-34 BF-34 BF-26 BF-12 BF-4 BF-1 BF-1 BF-1 BF-4 BF-13 BF-39

J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64
J-2 J-15 J-27 J-39 J-53 J-65

7500 6000 10x12000=120000 10000 10000 10000 11x12000=132000 6000 11x12000=132000 10000 10000 10000 11x12000=132000 6000 11x12000=132000 10000 10000
148500 300000 300000

NOTES:
1 Bolt material : S10T(F10T)
2 Bolt diameter : M24
3 Filler plate material : The same material as basic material
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif

Rev. No.1

K. Itabashi ..\..\..\..\..\..\NT100 /成果\01_図面国


\ 内組\00 S IGN\Itabas hi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-02.tif
FIELD CONNECTION OF EDGE GIRDERS
in association with
H. Ohashi ..\..\..\..\..\..\N T 100 /成果\01_ 図面国内組
\ \00 SIGN\Ohashi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 030


SHEET No. :
Sheet of PACKAGE:
45 120 45
620 110 25x52 Long Hole 2x85 2x85 A-A B-B
(655) CJP =170 =170
570

45 140 45
19 1200 26 19 1200 26

50 470 50

=170 =170
2x85 2x85
K.L.
K.L.
105 4x90 105
570 =360 20 20
Stud

19

19
Ø22 x 200
500

24

20

1048
CJP

35
CJP
20

1668
TYP.

750
500
2100 6300

20
35

1500
20
Section 8400

2186

C
20

800

750
1357
3252
1600
Stud 960 350 390 310 8x400=3200 190 6x400=2400 200 400

3252
2936
3000

35
1800 1850 4750

.24

800

2204
J-1 19 64

243
0

21
R3

35

1584
TYP.
147

1066
00 45 100 45 350
13 3x85 3x85
CJP
Cable(No.U1) Floorbeam

1250

197 81
=255 =255 TYP. B.Flg CJP

85 134
B

K.L.
0.500%
10.5% A

40
185
K.L.

0.500% T.Stiff
0 250 20 250 20

10
50 2 0C 910

675
48
TYP.

0
50

15

28 x 90.6 = 2538
C

2 5 .7 5
00

625
CJP
16


1750
68
2515
2815

2791

00
2815

28

600
22
16

04
00

0
C-C D-D
32

R3
52

575
Anchor pipe
12 TYP. CJP 1800

158 85
CJP
15

28 Anchor pipe
84

525
28 D 3 0°
300

5.344°

65 Ø470 65

65 Ø470 65
Ø600
A B

Ø600
1400
S1 FB2

40
TYP.

800
R1
50
R1
139 1278 139

50
22 22
60 840 890 1450

19
250
2200 6200 Edge Girder
Web D
T.Stiff 100 800 800 1950 1750 2000 2000
700 1300 500

1200
Floorbeam 900 4500 4000
2500
Section 8400
28

26
500
1300

1730
125 7x205=1435 170
240 3x150 300 3x150 290
=450 =450 45 5x85 100 5x85 45
=425 =425 Cable No. U1 2 3 4 5 6 7 8 9 10 L11
20-Ø45 CJP
65

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45

FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
185 200 185

=340
4x85
3x240=720

140 140

2 J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
40
910
850

140

J-2
19

19

Ø
=340
4x85

45
65

Joint 7500 6000 10x12000=120000 10000 10000


20-TCB M24(S10T) Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
2100 6300
Span 148500 300000
Section 8400

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

K. Itabashi EDGE GIRDER 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 031
SHEET No. :
Sheet of PACKAGE:
45 120 45
A-A B-B
2x85 2x85 19 1200 26 19 1200 26
=170 =170 Floorbeam
570 20 20 Web

45 140 45
=170 =170
2x85 2x85
105 4x90 105 500
570

=360

19

19
Stud
Ø22 x 200 CJP 250 250
CJP

35

1172
1977

457
20

24
CJP 500

750
TYP.

20
5200 6800

1500
20
C
35
Section 12000

2772
1043
1000
20

750
1415
3577

35

1600
1800

20

.7 8

2938
3000
TYP. 50 217
Stud 410 390 400 7x600=4200 400 5x600=3000 400 3x600=1800 590 410 T.Stiff R 30 CJP

800

267
19

385
20

55
J-7 J-8

240
35

1600

25
Cable(No.7)

21
350 410
45 100 45 250 800
00

958
500
10 2x85 2x85 CJP

85 134
1250
=170 =170 TYP.
0.500% 20
A B

25
38
11
675

Floorbeam
72

0 20C 250 800


TYP. 50 CJP 910 B.Flg

39.
C
15

148
50
00

28 x 91 = 2548
2000
625

2000

16
1750
3000

19

00
77

00
600

25
TYP. 22
18
00

C-C D-D
35
575

77

30

1000
R

1000
C 22 B

148 85
Anchor pipe
CJP
525

16

1500 CJP
00

D Anchor pipe
30 ‹

8.358 ‹
A

50

50 Ø350 50
FB21 FB22

50 Ø350
Ø450

Ø450
1400
32
800
R1
FB20

50
100

R1
139 978 139
5100 1000

50
22 22

19
T.Stiff 2000 2000 2000 2000 2000 2000 2000

250
Edge Girder
Floorbeam 4000 4000 4000 4000 Web D
Section 12000 700 1000 500

1200
2200

22

26
500
1000

100
45 4x85 4x85 45
CJP =340 =340

45
=340
4x85
910

140
19

19

=340
4x85
Cable No. U1 2 3 4 5 6 7 8 9 10 L11

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45

FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
J-2

5200 6800
Joint 7500 6000 10x12000=120000 10000 10000
Section 12000
Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
Span 148500 300000

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

K. Itabashi EDGE GIRDER 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 032
SHEET No. :
Sheet of PACKAGE:
45 120 45
2x85 2x85
=170 =170
570 A-A B-B
105 4x90 105

45 140 45
=170 =170
2x85 2x85
19 1100 26 19 1100 26
=360 Stud
570

Ø22 x 200

19

19
800
20

24

25
CJP 20 CJP
TYP.
CJP 500

1600
500

1341
5200 6800 Floorbeam

35
Web
20

20
Section 12000

35

750
20

800

1500

2941
2938
3000

1550

3200

750
Floorbeam
19 Web
Stud 410 390 400 7x600=4200 400 5x600=3000 400 3x600=1800 590 410

750

35

1600
20
J-9 J-10

35

1600
45 100 45 CJP
Cable(No.9)
2x85 2x85 TYP. 20

85 134
=170 =170 CJP

1250
0.500%

25
38
13 20
0

41
B
90

910 250 800

25
675

600
20C CJP Floorbeam
250 800
B.Flg
0

48.
50

15
C
A

00

760

550

28 x 91 = 2548
2000
°
625

2000
TYP. 16
00
0
50
3000

1750

2x500=1000
00
24

16
600

00
22

15
50
575

32

1000
450

00

1000
TYP.
22

C-C D-D

148 85
16
C

00
525

400

Anchor pipe
A

CJP
1400 CJP
D Anchor pipe

11.270°
3 0°
FB26 FB27 FB28

45 Ø360 45
45 60

Ø450
1400
Ø450
100

28
4 5 Ø3
800
R1
50
5100 1000

R1
2000 2000 2000 2000 2000 2000 2000 139 878 139
T.Stiff

50
22 22

19
Floorbeam 4000 4000 4000 4000

250
12000 Edge Girder
Section
Web D

1100
700 900 500
2100
22

26
500
900

100
45 4x85 4x85 45
=340 =340
CJP

45
=340
4x85
910

140
19

19

=340
4x85
Cable No. U1 2 3 4 5 6 7 8 9 10 L11

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45

FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
J-2

5200 6800
Joint 7500 6000 10x12000=120000 10000 10000
Section 12000
Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
Span 148500 300000

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

K. Itabashi EDGE GIRDER 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 033
SHEET No. :
Sheet of PACKAGE:
45 120 45
2x85 2x85
A-A B-B
=170 =170 570 19 1100 26 19 1100 26

45 140 45
=170 =170
2x85 2x85
105 4x90 105 800 800
=360 Stud
570

19

19
Ø22 x 200

25

25
20 20

24
CJP CJP CJP

1600
TYP. 500

1600
500

20
5200 6800

35

35
Section 12000 20 20 Floorbeam

900
Web

750
1500
3200

3200
1700
2932
3000

750
800
410 390 400 7x600=4200 400 5x600=3000 400 3x600=1800 590 410 19 Floorbeam 21
Stud Web 0
R3

258
35

35
J-11 J-12

1600

20
Cable(No.L11)

1600
189
45 100 45 6°
CJP 25.3 4 CJP
2x85 2x85
TYP. 20

85 134
=170 =170

1250
20
160 0.500%
0

25

25
44
B

910 250 800 250 800

600
675

20 C CJP
C

64
150
00

.7 2
0
500
10

160

4‹
0

550

28 x 90.7 = 2539
2000
625

2000
A

TYP.
3000

1750

2x500=1000
00
500

25
600

22

160
0
170
575

C-C D-D
0
R3

450

1000

1000
22

TYP.
0

320
0

157 85
160 CJP
A
525

0
C

400

Anchor pipe
150
0


CJP Anchor pipe

19.279
30 ‹
FB32 FB33 FB34

50 Ø350 50
D

50

Ø450
1400
32
35 0
800
R1
100

0
Ø 45
50

50 Ø
5100 1000

R1
155 978 123

250 250
50

250 200
T.Stiff 2000 2000 2000 2000 2000 2000 2000 22 22

19
Floorbeam 4000 4000 4000 4000 Edge Girder
Section 12000 Web

1100
700 1000 500
D
2200
22

26
500
1000

45 5x85 100 5x85 45


=425 =425
CJP

45
=340
4x85
910

140
19

19

=340
4x85
Cable No. U1 2 3 4 5 6 7 8 9 10 L11

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45

FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
J-2

5200 6800
Joint 7500 6000 10x12000=120000 10000 10000
Section 12000
Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
Span 148500 300000

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2

K. Itabashi EDGE GIRDER 4


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 034
SHEET No. :
Sheet of PACKAGE:
45 120 45
3x85 3x85
=255 =255
1:5

45 140 45
=170 =170
2x85 2x85
570

825

24
1:5

637.5 8725 637.5


Section 10000

Stud 410 590 550 5x600=3000 2x450=900 5x600=3000 550 590 410

J-13 J-14 825


45 100 45 93 140 4x90 140 93
4x85 4x85 =360 Stud Ø22 x 200
=340 =340

85 162
0.500%

47
675

TYP.

28 x 88.4 = 2475
2000
2000
625
3000

2700

2875
600

3000
24
575

1000
1000

193 85
525

TYP.

300

78
FB37 FB38 TYP. FB39
TYP. 1500

P12

1400 1200 1400 1000


T.Stiff 2000 2000 2000 2000 2000 2000
Floorbeam 4000 4000 4000 4000
Section 10000

1990
220 3x516.7=1550 220
12-Ø51 45 10x85 100 10x85 45
1:5 =850 =850
345 95

45
=340
4x85
02
1500
1390

Ø5
910

510

140
Cable No. U1 2 3 4 5 6 7 8 9 10 L11
24

=340
4x85

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
95 345

45
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
1:5 J-2

Joint 7500 6000 10x12000=120000 10000 10000

1475 2510 2030 2510 1475 Floor beam 4500 36x4000=144000 75x4000=300000

10000 Cable 4500 10x12000=120000 24000 24000


Section
Span 148500 300000

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif

Rev. No.1

K. Itabashi ..\..\..\..\..\..\NT100 /成果\01_図面国


\ 内組\00 S IGN\Itabas hi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-02.tif
EDGE GIRDER 5
in association with
H. Ohashi ..\..\..\..\..\..\N T 100 /成果\01_ 図面国内組
\ \00 SIGN\Ohashi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 035


SHEET No. :
Sheet of PACKAGE:
TRANSVERSE STIFFENER DETAILS S=1/50 LONGITUDINAL STIFFENER DETAILS S=1/30

End floorbeam section Pylon floorbeam section Intermediate Intermediate stiffener section Transverse stiffener position Connected position
floorbeam section
Alternating flexure section 35 t 35 20 20
CJP
15 CJP 15

10
TYP. TYP. Splice Plate
15C back-filling

R3
15C back-filling

45
L-Stiffener L-Stiffener


TYP.
T-Stiffener

CJP

CJP
Floorbeam position
30 30
DETAIL "1" S=1/5
H

H
tw tw

10
TYP. TCB M24(S10T)

B.Flg

45
L-Stiffener


H/2

H/2
B B
) )
15C back-filling tw TYP. tw
5x 0 5x 0 B-B
15C back-filling (=: 10 (=: 10
R R TYP. Floorbeam L.Flg

20
under 100

under 100
CJP CJP CJP Sole Plate

30 30
Ø26.5
Ø50

BUTT WELD DETAILS S=1/5

CJP
A-A SOLE PLATE S=1/30
CJP 1:5
100 P11, P17 P12, P16 P13 ~ P15
CJP
1:5 1730

Transverse

Transverse
direction

direction
125 7x205=1435 170
A A P14 P14
12-Ø51 16-Ø63
Transverse
direction P14

95

95
20-TCB M24(S10T) 20-Ø45

345

345
65

185 140 100100 140 185


02 02
Detail "1" 02 Ø5 Ø5
CJP Ø4
3x240=720

Longitudinal Longitudinal Longitudinal


direction direction direction

1390

1390
850

850

510

510
BOLT TIGHTENING DIRECTION S=1/20
65

345

345
Outside Inside 240
3x150
=450 150 150
3x150
=450 290

95

95
1730

120 3x516.7=1550 120 120 5x310=1550 120


100 1790 100 100 1790 100
1990 1990

33.6

42.4
56.8

65.4

38
61

t3
t2
t1
12

12
12

12
840 890 100 1790 100 100 1790 100
1730
Steel grade : SM490C Steel grade : SM490C
t1 t2 t3
Steel grade : SM400C
P13,15 53.6 58 62.4
P14 56.0 56 56.0

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif

Rev. No.1

K. Itabashi ..\..\..\..\..\..\NT100 /成果\01_図面国


\ 内組\00 S IGN\Itabas hi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-02.tif
EDGE GIRDER DETAILS
in association with
H. Ohashi ..\..\..\..\..\..\N T 100 /成果\01_ 図面国内組
\ \00 SIGN\Ohashi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50,30,5 DRAWING No. : C - 3b - 036
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/100

TYPICAL FLOORBEAM

33200
1630 9420 11100 9420 1630
570 16065 500 16065 570
3000 IF-1 IF-2 IF-3 3000

K.L

K.L
2.0 % 2.0 %

560
420

420
2000

2000
2700
2098

2098
2552

2552
1580

1580
2140
R = 364013

WEG EEG

2000 4x1985=7940 6x2220=13320 4x1985=7940 2000


3280 8x3330=26640 3280

INTERMEDIATE FLOORBEAM AT ELECTRIC PLATFORM

33200
1630 9420 11100 9420 1630
570 16065 500 16065 570
3000 IF-1 IF-2 IF-3 3000

K.L

K.L
2.0 % 2.0 %

560
420

420
2000

2000
2700
2098

2098
2552

2552
1580

1580
2140
R = 364013

WEG EEG

2000 4x1985=7940 6x2220=13320 4x1985=7940 2000


3280 8x3330=26640 3280

NOTE:
The Contractor shall provide proper bracing for the 1st typical floorbeams
away from pylons against lateral buckling during construction as necessary.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Tokuhashi.tif
Rev. No.

T. Takada INTERMEDIATE FLOORBEAM 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 3b - 037
SHEET No. :
Sheet of PACKAGE:
IF-1,IF-3 S=1/60

Stud 45
4x110
=440
110
125 375 375 8x125 110 180 10x125=1250 152.5 10x125=1250 165 180 10x125=1250 152.5 10x125=1250 155 125 375
SECTION S=1/60 SUPPORT STRUT S=1/20
2x125 =1000 165 180 152.5 180 152.5 165 3x110 125
=250 =330 500 500
500
CJP 45 120 45 A 45 120 45
4x55 4x55 4x55 4x55 0.5 %

16
=220 =220 =220 =220

65 45

65 45

166
TYP. TYP.

65

65
150

150
65

65
65

65
1-PL 500 x 16 x 3461(SM400A)
1- 300 x 150 x 8 x 13 x 3667(SS400)

45

45

2000~2552

2000~2552
A
1-T.Flg PL 700 x 21 x 1340(SM490YB) 1-Spl PL 500 x 10 x 650(SM490YA) 1-T.Flg PL 500 x 21 x 9412(SM490YB) 1-Spl PL 500 x 10 x 650(SM490YA)
A-A S=1/20
36-Stud Ø22 x 200 2-Spl PL 220 x 11 x 650(SM490YA) 268-Stud Ø22 x 200 2-Spl PL 220 x 11 x 650(SM490YA)
32-TCB M24 x 85(S10T) 32-TCB M24 x 85(S10T) 20
4-Stud Ø22 x 200 4-Stud Ø22 x 200 45 85 45 100 160 45 85 45
10 83 83 10

50
20 0.5 % 20
570 1345 9420 500

20 505046
46
(520) P14

166
50

20
166

R2
R

0
20 50
1-Web PL 2056(2055) x 18 x 1610~1616(SM490YB) 2-Spl PL 530 x 11 x 1932(1927)(SM490YA) 1-Web PL 2505(2500) x 13 x 9410(SM490YA) 2-Spl PL 530 x 11 x 2373(2370)(SM490YA)
2-Fill PL 260 x 2.3 x 1932(1927)(SM490YA) 144-TCB M24 x 75(S10T)
126-TCB M24 x 80(S10T)
1-L.Stiff PL 150 x 11 x 570(SM400A) TYP. 140 TYP.
1-L.Stiff PL 150 1-L.Stiff PL 150
x 11 x 588(SM400A) x 11 x 588(SM400A) 100
85 85 85 85
100 1-PL 100 x 9 x 295(SM400A)
85 85 85 85 1-L.Stiff PL 150 x 11 x 786(SM400A) 10
Detail "1" 1-PL 100 x 9 x 335(SM400A)
10

95.7 110
4-TCB M24 x 60(S10T)

21
95.7

515.1
x 2032(2031)(SM400A)

1-L.Stiff PL 150
DETAIL "1" DETAIL "2"
1-T.Stiff PL 140 x 10

1-L.Stiff PL 150 1-L.Stiff PL 150


420

x 11 x 1904(SM400A) x 11 x 1904(SM400A) x 11 x 1904(SM400A) S=1/20 S=1/20


600
110

20
=180
2x90

250 35 35

2502.7(2499.7)
19x100=1900
TYP.
x 2137(2132)(SM400A)

Base Point

x 2240(2235)(SM400A)
2000

2551.7
16x91.9=1470.6

x 2333(2328)(SM400A)
TYP.
1-T.Stiff PL 140 x 10

x 2414(2409)(SM400A)
900

1-T.Stiff PL 140 x 10
TYP.

1-T.Stiff PL 140 x 10
1580

1-T.Stiff PL 140 x 10

2036.6
R3

00
35
t 450 450 5

R1
3000

CJP
678.9
50

523.2
474

110 95.7
=180
2x90

35
(107) 95.7
110

Detail "3"

700

500
18
1-PL 140 x 10 x 2113(2108)(SM400A)

28(31)
1000

WEG Only 1-PL 140 x 10 x 2150(2145)(SM400A)


350 350
TYP. 2-PL 100 x 10 x 640(SM400A)
2(1)-PL 220 x 10 x 570(SM400A)

1-Stiff PL 350 x 35 x 936~962(SM400B) 658 658


3000 1110
2000 1985 1985 1985 1985 2220
3280 3330 3330 3330
1630 9420
11050
DETAIL "3" S=1/20

45 100 45 45 100 45 650 80 200 200 80


Detail "2"
4x55 4x55 6x55 6x55
150 350 150 10 140 10
=220 =220 =330 =330
150 45

65 45
65 65

65
65 65
700

150
65
65
45
45

8 8

8 8
1-Spl PL 500(520) x 14(17) x 850(SM490YA) TYP.

100

100
1-B.Flg PL 700(720) x 21(22) x 1612~1618(SM490YB) 1-Spl PL 500(520) x 10(11) x 630(SM490YA) 1-B.Flg PL 500(520) x 26(31) x 9414(SM490YB) 2-Spl PL 220(230) x 16(20) x 850(SM490YA(B))
TYP.
2-Spl PL 220(230) x 11(12) x 630(SM490YA) 2(0)-Fill PL 220(230) x 2.3 x 420(SM490YA)

(235)
(222)

240
227
2-Fill PL 220(230) x 4.5(9) x 310(SM490YA) 44-TCB M24 x 100(S10T)
32-TCB M24 x 90(S10T)

2-PL 274 x 8 x 640(SM400A) 270 270


2-PL 264 x 8 x 227(222)(SM400A)
2-PL 264 x 8 x 240(235)(SM400A) NOTES:
1) ( ) is Floorbeam at Electric Platform.
2) The girder depth shown in the drawing is the destance between
the top of the top flange and the bottom of the bottom flange.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada INTERMEDIATE FLOORBEAM 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 038
SHEET No. :
Sheet of PACKAGE:
IF-2 S=1/60

Stud 375 215 5x250=1250 165 220 4x250=1000 215 5x250=1250 165 5x250=1250 215 4x250=1000 220 165 5x250=1250 215 375
CIP CONCRETE FILL S=1/20
215 265 215 165 215 265 215

75 350 75
Stud Ø22 x 200
500

260
1-T.Flg PL 500 x 21 x 11092(SM490YB)
180-Stud Ø22 x 200 30 x 30 Chloroprene Rubber

115 3x90=270 115


500

11100

SECTION S=1/60

500 500 500

1-L.Stiff PL 150 1-L.Stiff PL 150 x 11 x 871(SM400A) 0.5 %

21
x 11 x 785(SM400A) 1-L.Stiff PL 150 x 11 x 785(SM400A)

560
21

21
TYP.
1-L.Stiff PL 150
A A

867
1-L.Stiff PL 150 1-L.Stiff PL 150 1-L.Stiff PL 150
x 11 x 2140(SM400A) x 11 x 1815(SM400A) x 11 x 1815(SM400A) x 11 x 2140(SM400A)

2552~2700

2552~2700
TYP.

2700
20 20 140

2651

2700
600
x 2490(2487)(SM400A)

TYP. Detail "4"

900

2140
50 1-T.Stiff PL 140 x 10
2502.7

2502.7
2551.7

2551.7
x 2490(2487)(SM400A)
TYP.
x 2555(2552)(SM400A)

x 2555(2552)(SM400A)

1-T.Stiff PL 140 x 10
1-T.Stiff PL 140 x 10

1-T.Stiff PL 140 x 10
100
912 TYP.

50
28
500
(520) P14
28

28
P14
Detail "5"

1110 2220 1895 650 1895 2220 1110


3330 3330 3330 3330
11100
DETAIL "4" S=1/20 DETAIL "5" S=1/20
1-WEB PL 2651(2648) x 13 x 11090(SM490YA)
2-PL 140 x 10 x 2650(2647)(SM400A)
2-PL 100 x 10 x 640(SM400A) 650 80 200 200 80
PL 100 x 10 150 350 150 10 140 10
PL 140 x 10

10
20
0
R5
20 10

8 8

8 8
100

100
270

270
270
270
TYP.
500

2-PL 274 x 8 x 640(SM400A) 100 100


4-PL 264 x 8 x 270(SM400A) 270 13 270
1-B.Flg PL 500(520) x 28(31) x 11090(SM490YB)

NOTES:
1) ( ) is Floorbeam at Electric Platform.
2) The girder depth shown in the drawing is the destance between
the top of the top flange and the bottom of the bottom flange.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada INTERMEDIATE FLOORBEAM 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 039
SHEET No. :
Sheet of PACKAGE:
PYLON FLOORBEAM
1260
30
1200
30
TOP PLAN S=1/100

825 825
11050 11100 11050
33200

ELEVATION S=1/100

11050 11100 11050


825 100 15838 500 15838 100 825

PF-1 PF-2 PF-3

K.L

K.L
3000 3000
K.L

K.L
2.0 % 2.0 %

660
560
47
2700

3200
1580

3000
3074

3074
2760

2760
1880
3000

560

660
78

R = 771102
D D D D D D

WEG EEG
1500 1500
T.Stiff 2000 1985 1985 1985 1985 6x2220=13320 1985 1985 1985 1985 2000
Dia 5970 3970 3x4440=13320 3970 5970
Support Strut 3280 8x3330=26640 3280

BOTTOM PLAN S=1/100


30
1260
1200
30

12-Ø51 16-Ø63

11050 11100 11050


33200

1500 1500

P12,P16 P13~P15
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif

Rev. No.1

T. Takada ..\..\..\..\..\..\NT100 /成果\01_ 図面国


\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-02.tif
PYLON FLOORBEAM 1
in association with
H. Ohashi ..\..\..\..\..\..\N T 100 /成果\01_ 図面国内組
\ \00 SIGN\Ohashi.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-01.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 3b - 040
SHEET No. :
Sheet of PACKAGE:
PF-1,PF-3 S=1/60
1630
550
DETAIL "3" S=1/20 LONGITUDINAL STIFFENER
2x110 110
Stud 137.5 =220 125 265 375
2x125 110
8x125
=1000
110 180
165 180
10x125=1250 152.5
152.5
10x125=1250 165 180
180
10x125=1250 152.5
152.5
10x125=1250 155 125 375
165 3x110 125 9
18
18
CONNECTION DETAIL S=1/20
=250 =330
45 120 45 45 120 45 TYP.
CJP 85 85 85 85 6-19Ø
J

75 30
Spl PL

30

105 5x90 150 5x90 105

105 5x90 150 5x90 105


PF-L

55

100 140Ø 100


=450

=450
600
1-Rib PL 150 x 14

340Ø
230Ø

120Ø

45 105
x 1193(SM490YA) 1-Rib PL 150 x 14 x 9390(SM490YA)

150

150
1200

=450

=450
TYP.
600

55
Rib PL

30 75
30
PF-R
30

Nut Weld

K.L
45 85 85 120 85 85 45
2-PL 90 x 10 x 550(SM490YA)
1-T.Flg PL 1260 x 14 x 1213(SM490YA) 1-Spl PL 1140 x 10 x 380(SM490YA) 1-T.Flg PL 1260 x 14 x 9412(SM490YA) 1-Spl PL 1140 x 10 x 380(SM490YA) 6-TCB M24 x 70(S10T)
100 40-Stud Ø22 x 200 2-Spl PL 540 x 10 x 380(SM490YA) 335-Stud Ø22 x 200 2-Spl PL 540 x 10 x 380(SM490YA)
48-TCB M24 x 75(S10T) 48-TCB M24 x 75(S10T)
5-Stud Ø22 x 200 5-Stud Ø22 x 200
SCALLOP S=1/20 STUD S=1/60
825 1217.5 9420
3280 3330 3330 3330 80 1200
137.5 100 2-L.Stiff PL 150 x 11 x 786(SM400A) 100
85 85 85 85 85 85 85 85 100 400 400 100
K.L

PF-L PF-R Detail "1" 10 100 100 Stud Ø22 x 200


10
14

105.5 110

150
CJP
110

14
105.5
104.1
47

628

0
R2
100 2-L.Stiff PL 150
560

2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150


x 11 x 1905(SM400A) x 11 x 1905(SM400A)
15C back-filling x 11 x 1903(SM400A) x 11 x 1905(SM400A)
2-T.Stiff PL 170 x 12 x 2743(SM400A)

20
SECTION

2-T.Stiff PL 170 x 12 x 2818(SM400A)


S=1/60

2-T.Stiff PL 170 x 12 x 2952(SM400A)


1260
23x100=2300
2728.2

30 1200 30 1260

24x100=2400
CJP TYP. TYP.
WEG Only
300 600 300 30 1200 30

1779.7
3042
3074
2700
1580

24 450 450
3000

0.5 %

2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150 TYP.


x 11 x 1903(SM400A) x 11 x 1905(SM400A) x 11 x 1905(SM400A) x 11 x 1905(SM400A)
104.1

1300~1674

1270~1644
1300~1674
560

18

Detail "2"
110

666.3
15C back-filling

105.5
105.5
TYP.
300

18
2-L.Stiff PL 150 x 11 x 786(SM400A) 1110

110
78

2(1)-PL 220 x 10 x 570(SM400A)

2700~3074

2700~3074
2700~3074
CJP CJP 2000 TYP.
1985 1985 1985 1985 2220

20 10
2-B.Stiff PL 664 x 26 x 2875(SM570)

10
20
2-B.Stiff PL 414 x 38 x 1422(SM570) 5970 3970 4440 R5
0
2-B.Stiff PL 683 x 26 x 222(SM570) 1630 9420

900

900

940

960
900
11050 10
20 20
1500

10 20

20
10
500
2-Web PL 2728 x 26 x 1613(SM490YB) 4-Spl PL 530 x 10 x 2598(SM490YA) 2-Web PL 3042 x 13 x 9410(SM490YA) 4-Spl PL 530 x 10 x 2912(SM490YA)

500
470
2-Fill PL 260 x 13 x 2598(SM490YA) 348-TCB M24 x 75(S10T)
312-TCB M24 x 90(S10T)
0.5 %
inside outside
1390
12-Ø51 1-Dia PL 1188 x 9 x 2887~3011(SM400A)
100 100 2-PL 100 x 10 x 700(SM400A)
45 85 85 45 45 85 85 45 2-PL 90 x 10 x 940(SM400A)
85 85 30 200 85 85 tw-7 7
Drain Hole Ø24.5
tw

75 30
30

105 5x90 150 5x90 105

105 5x90 150 5x90 105


PF-L
Detail "3"

DETAIL "1" DETAIL "2"


=450

=450
P12,P16
600

TYP.
S=1/20 S=1/20
1-Rib PL 150 x 14 x 9390(SM490YA)
1990

1200

100 80
=450

=450
377.5 35 35
600

P13~P15 Base Point


50

10

30 75
Ø

PF-R
30

K.L
35

R3

170 8 8
1-Rib PL 150 x 14 x 1593(SM490YA) 1-Spl PL 1140 x 10 x 530(SM490YA) 1-B.Flg PL 1260 x 18 x 9411(SM490YB) 1-Spl PL 1140 x 10 x 530(SM490YA)

50
1500 1-B.Flg PL 1260 x 18 x 1610(SM490YB) 2-Spl PL 540 x 10 x 530(SM490YA) 2-Spl PL 540 x 10 x 530(SM490YA)
16-Ø63 72-TCB M24 x 80(S10T) 72-TCB M24 x 80(S10T) 50

170
170
2-PL 100 x 9 x 599(SM400A) NOTES:
HANDHOLE COVER 1) ( ) is P12,P16. Other is P13~P15.
P12,P16 P13~P15 2) The girder depth shown in the drawing is the destance between 25 532 25
the top of the top flange and the bottom of the bottom flange. 170
2 - COV PL 340 x 9 x 340(SS400) 2 - COV PL 340 x 9 x 536(SS400) 582
2 - Doubling PL 340 x 18 x 340(SM490YB) 2 - Doubling PL 340 x 18 x 550(SM490YB)
12 - BN M16 x 80(SS400) 12 - BN M16 x 80(SS400) 1-PL 173 x 8 x 582(SM400A)
All dimensions are in mm, unless otherwise shown.
2-PL 163 x 8 x 170(SM400A)

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T. Takada PYLON FLOORBEAM 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 041
SHEET No. :
Sheet of PACKAGE:
PF-2 S=1/60

Stud 375 215 5x250=1250 165 220 4x250=1000 215 5x250=1250 165 5x250=1250 215 4x250=1000 220 165 5x250=1250 215 375 SECTION S=1/60
215 265 215 165 215 265 215
1260
30 1200 30 1260
PF-L 30 300 600 300 30 1200 30
600
0.5 %
1-Rib PL 150 x 14 x 11070(SM490YA)
1200

TYP.
600

TYP.

1674~1800
PF-R
30

1644~1770
1674~1800
TYP.
1-T.Flg PL 1260 x 14 x 11092(SM490YA)
225-Stud Ø22 x 200

3074~3200

3074~3200
3074~3200
TYP.

20 10

10
20
R5
0
11100

900
PF-L PF-R

900

940

960
900
3330 3330 3330 3330 10
20 20
2-L.Stiff PL 150 x 11 x 784(SM400A) CL 2-L.Stiff PL 150 x 11 x 784(SM400A)

10 20
14

20
10
500

500
470
660
14

14
0.5 %
628

628
2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150 inside outside
2-L.Stiff PL 150
x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A)

1-Dia PL 1188 x 9 x 3126(SM400A)


2-T.Stiff PL 170 x 12 x 3071(SM400A)

2-T.Stiff PL 170 x 12 x 3071(SM400A)


3200
2-T.Stiff PL 170 x 12 x 3168(SM400A)
2-PL 100 x 10 x 700(SM400A)
TYP. tw-7 7

3168
2-PL 90 x 10 x 940(SM400A)

1880
TYP. tw
1779.7

1779.7
3042

3042
3074

3074
2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150
x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A)

660
666.3

666.3
18
18

18
2-L.Stiff PL 150 x 11 x 784(SM400A) 2-L.Stiff PL 150 x 11 x 784(SM400A)

1110 1110
2220 2220 2220 2220 2220 2220
4440 4440 4440
11100

2-Web PL 3168 x 13 x 11090(SM490YA)

200 30
Drain Hole Ø24.5
30

PF-L
600

TYP.
1-Rib PL 150 x 14 x 11070(SM490YA)
1200
600

PF-R
30

30 200 NOTE:
The girder depth shown in the drawing is the destance between
1-B.Flg PL 1260 x 18 x 11090(SM490YB) the top of the top flange and the bottom of the bottom flange.
4-PL 100 x 9 x 599(SM400A)

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada PYLON FLOORBEAM 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 042
SHEET No. :
Sheet of PACKAGE:
END FLOORBEAM

ELEVATION S=1/100
(P11)
11050 11100 11050
EF-R
570 16065 500 16065

EF-1 EF-2 EF-3


Concrete Fill Up

K.L

K.L
3000 3000
2.0 % 2.0 %

610
510
2815
2515

3015
2889

2889
1495

2575

2575

2815
1795
510

610
R = 771102

D D D D D D

T.Stiff 2000 1985 1985 1985 1985 6x2220=13320 1985 1985 1985 1985 2000
Dia 5970 3970 3x4440=13320 3970 5970
Support Strut 3280 8x3330=26640 3280

ELEVATION S=1/100
(P17)
11050 11100 11050
EF-L
570 16065 500 16065

EF-1 EF-2 EF-3


Concrete Fill Up

K.L

K.L
3000
2.0 % 2.0 %

610
510
2815
2515

3015
2889

2889
1495

2575

2575

2815
1795
510

610
R = 771102

D D D D D D

T.Stiff 2000 1985 1985 1985 1985 6x2220=13320 1985 1985 1985 1985 2000
Dia 5970 3970 3x4440=13320 3970 5970
Support Strut 3280 8x3330=26640 3280

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Tokuhashi.tif
Rev. No.

T. Takada END FLOORBEAM 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 3b - 043
SHEET No. :
Sheet 19 of PACKAGE:
EF-1,EF-3 S=1/60 LONGITUDINAL STIFFENER
4x110
CONNECTION DETAIL S=1/20
110
Stud 45 =440 125 375 375 8x125 110 180 10x125=1250 152.5 10x125=1250 165 180 10x125=1250 152.5 10x125=1250 155 125 375
2x125 =1000 165 180 152.5 180 152.5 165 3x110 125
=250 =330 J
Spl PL
45 120 45 Concrete Fill up Hole 45 120 45
CJP 85 85 85 85

75 30

45 105
30

150 7x92.9 105

7x92.9 150 7x92.9 105


EF-L

150

150
=650

=650
800 1-Rib PL 150 x 14 Ø 30
0 30
Rib PL

400
x 1320(SM490YA) 45 85 85 120 85 85 45
1600

1-Rib PL 150 x 14 x 9390(SM490YA) 2-PL 90 x 10 x 550(SM490YA)


500 2x110 950 2x110 902.5 2x110 772.5 2x110 772.5 2x110 772.5 2x110 772.5 2x110 1375 2x110 772.5 2x110 830 255 6-TCB M24 x 70(S10T)

=650
800

7x92.9
=220 =220 =220 =220 =220 =220 =220 =220 =220 110

=650
50 50
TYP.
SCALLOP S=1/20 STUD S=1/60

100 75
100

100
175

175
EF-R
100

80 1600
25×52 Long Hole 30Ø Air Hole
100 5x100 850
1-T.Flg PL 1730 x 14 x 1340(SM490YA) 1-Spl PL 1540 x 10 x 380(SM490YA) 1-T.Flg PL 1730 x 14 x 9412(SM490YA) 1-Spl PL 1540 x 10 x 380(SM490YA) 150 =500

150
27-Stud Ø22 x 200 2-Spl PL 740 x 10 x 380(SM490YA) 223-Stud Ø22 x 200 2-Spl PL 740 x 10 x 380(SM490YA)
64-TCB M24 x 75(S10T) 64-TCB M24 x 75(S10T) Stud Ø22 x 200
1-Stud Ø22 x 200 1-Stud Ø22 x 200

0
R2
570 1345 9420
3280 3330 3330 3330
100
85 85 85 85
2-L.Stiff PL 160 x 12 x 592(SM400A) 2-L.Stiff PL 160 x 12 x 786(SM400A) 100
85 85 85 85 SECTION S=1/60
1730
10 2-L.Stiff PL 160 10
3x87.9 110

EF-L EF-R Detail "1" x 12 x 577(SM400A) 30 1600 100 1730


14

85.3 110
500 600 500 30 1600 100

14
=263.6

85.3
0.5 %

578
2-L.Stiff PL 160 2-L.Stiff PL 160
510

415
2-L.Stiff PL 160
x 12 x 1904(SM400A) x 12 x 1904(SM400A) x 12 x 1904(SM400A)
2-T.Stiff PL 200 x 13 x 2562(SM400A)

TYP.

x 13 x 2637(SM400A)
CJP

1115~1489
600 20
18x100=1800
2547.3

x 13 x 2771(SM400A)
2-T.Stiff PL 200
900

WEG Only

23x100=2300
TYP. TYP. TYP.

1694.7
2-T.Stiff PL 200
19

2861
2889
450 450
2515
1495
2815

2515~2889

2515~2889
Close Up
CJP 2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160
1312.8
=263.6
110 3x87.9

x 12 x 1904(SM400A) x 12 x 1904(SM400A) x 12 x 1904(SM400A)


1121.5

900
1144.7
14
510

200

616.3
85.3
Detail "2"

85.3
300

14

500
110
2-L.Stiff PL 160 x 12 x 577(SM400A)
658 658 Concrete Fill up 2-L.Stiff PL 160 x 12 x 786(SM400A)

2-L.Stiff PL 160 x 12 x 592(SM400A) 0.5 %


3000 1110 inside outside
2000 1985 1985 1985 1985 2220
1-Dia PL 1584 x 9 x 2706~2830(SM400A)
5970 3970 4440
1630 9420
11050 tw-7 7
tw

2-Web PL 2507 x 38 x 616(SM490YB) 2-Web PL 2547 x 20 x 1000(SM490YB) 2-PL 200 x 13 x 2588(SM400A) 2-Web PL 2861 x 15 x 9410(SM490YA) 4-Spl PL 530 x 10 x 2861(SM490YA)
3-B.Stiff PL 416 x 38 x 2751(SM490YB)
3-B.Stiff PL 416 x 38 x 260(SM490YB)
4-Spl PL 530 x 10 x 2417(SM490YA)
2-Fill PL 260 x 4.5 x 2417(SM490YA)
2-PL 200 x 13 x 2613(SM400A)
4-PL 100 x 10 x 637(SM400A)
336-TCB M24 x 75(S10T) DETAIL "1" S=1/20 DETAIL "2" S=1/20
1-B.Stiff PL 416 x 38 x 2486(SM490YB) 300-TCB M24 x 80(S10T) 4(2)-PL 220 x 10 x 570(SM400A)
250 35 35 100 80
45 100 45 45 100 45
Base Point 10
85 85 85 85
Ø45 30 200
Drain Hole Ø24.5

35
75 30

R
30

105 7x92.9 150 7x92.9 105

105 7x92.9 150 7x92.9 105


EF-L

35

170 8 8
50
=650

=650
800

TYP. 50

170
1-Rib PL 150 x 14

170
x 1180(SM490YA) 1-Rib PL 150 x 14 x 9390(SM490YA)
1600

25 532 25
2 170
40 582
=650

=650
Ø
800

1-PL 173 x 8 x 582(SM400A)

30 75
NOTES: 2-PL 163 x 8 x 170(SM400A)
EF-R
30

1) Unit weight of counterweight shall not be less than 23.5N/mm3.


2) Opening at end diaphram shall be closed and watertight before filling concrete.
1-B.Flg PL 1660 x 14 x 1616(SM490YA) 1-Spl PL 1540 x 10 x 360(SM490YA) 1-B.Flg PL 1660 x 14 x 9411(SM490YA) 1-Spl PL 1540 x 10 x 360(SM490YA) 3) Stud avoids and arranges Expansion.
2-Spl PL 740 x 10 x 360(SM490YA) 2-Spl PL 740 x 10 x 360(SM490YA) 4) Refer to Expansion for Set Bolt.
64-TCB M24 x 75(S10T) 64-TCB M24 x 75(S10T) 5) The girder depth shown in the drawing is the destance between
2-PL 100 x 9 x 801(SM400A) the top of the top flange and the bottom of the bottom flange.
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T. Takada END FLOORBEAM 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 044
SHEET No. :
Sheet of PACKAGE:
EF-2 S=1/60

Stud 375 215 5x250=1250 165 220 4x250=1000 215 5x250=1250 165 5x250=1250 215 4x250=1000 220 165 5x250=1250 215 375 SECTION S=1/60
215 265 215 165 215 265 215 1730
30 1600 100 1730
Concrete Fill up Hole 500 600 500 30 1600 100
EF-L 30
Ø 30 Ø 30 Ø 30
800 0 0 0 0.5 %

400
1600

TYP.

1489~1615
1-Rib PL 150 x 14 x 11070(SM490YA) 125
125 TYP.
745 2x110 890 2x110 890 2x110 935 2x110 865 2x110 2x110 865 2x110 935 2x110 890 2x110 890 2x110 745
800

=220 =220 =220 50 =220 =220 =220 =220 50 =220 =220 =220 TYP.

100

100
EF-R
100

2889~3015

2889~3015
25×52 Long Hole 30Ø Air Hole

1-T.Flg PL 1730 x 14 x 11092(SM490YA)

900
231-Stud Ø22 x 200

11100

500
EF-L EF-R
3330 3330 3330 3330
2-L.Stiff PL 160 x 12 x 784(SM400A) CL 2-L.Stiff PL 160 x 12 x 784(SM400A)
0.5 %
inside outside

14
610
1-Dia PL 1584 x 9 x 2944(SM400A)
14

14
2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160
578

578
2-L.Stiff PL 160 tw-7 7
x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A)
tw
2-T.Stiff PL 200 x 13 x 2891(SM400A)

2-T.Stiff PL 200 x 13 x 2891(SM400A)


2-T.Stiff PL 200 x 13 x 2987(SM400A)

3015
1795
TYP. TYP.

2987
1694.7

1694.7
2861

2861
2889

2889
2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160
x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A)

610
616.3

616.3
14
14

14
Concrete Fill up
2-L.Stiff PL 160 x 12 x 784(SM400A) 2-L.Stiff PL 160 x 12 x 784(SM400A)
1110 1110
2220 2220 2220 2220 2220 2220
4440 4440 4440
11100

2-Web PL 2987 x 15 x 11092(SM490YA)

200 30 Drain Hole Ø24.5


30

EF-L
800

TYP.
1-Rib PL 150 x 14 x 11070(SM490YA)
1600
800

EF-R
30

30 200

NOTES:
1-B.Flg PL 1660 x 14 x 11090(SM490YA) 1) Unit weight of counterweight shall not be less than 23.5N/mm3.
4-PL 100 x 9 x 801(SM400A) 2) Opening at end diaphram shall be closed and watertight before filling concrete.
3) Stud avoids and arranges Expansion.
4) The girder depth shown in the drawing is the destance between
the top of the top flange and the bottom of the bottom flange.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada END FLOORBEAM 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 3b - 045
SHEET No. :
Sheet of PACKAGE:
BRACKET DETAILS S=1/30 Convex Bearing S=1/20
4(4)places
300
380
1800 1850
Cable(No.1) Ø180

1250
P11 Division Line
B

K.L.
0.500% F Ø1
( P17 ) 10.5% Convex 40 F

300
185
0.500% Socket (Fixed End)(SCM440H)

K.L.
Bearing
(S45CN)

371
E E

40 90
Bearing PL
(S45CN)

22 60
E-E

2 5 .7 5

70
C C

0
Ø220

R30
1750

400
3000

50
R5

2815
2815

90
22 Ø68
S45CN

22
Ø240 F-F

6000
R3
50 350 50
450

3
R
A A
C-C Bearing PL(Concave Bearing) S=1/20
6000
FB2
CJP
B

250 19
27.200 D
22

60
100 1600 1950 1750 2000 2000 TYP.

550
5
R7 Division Line
900 4500 4000

22
H H

380
150
0
Ø22

350
(S45CN)
1500 1350

225
20 19
2850 G G

60
TYP. 75 60 75 D - D
50 350 50 210
450 380
D
P11 Convex 150 200 150
( P17 ) Bearing 10 Ø180 10
G-G Cut L 50x50x6
900 4500
B-B 6
50

15 15 20 30
R300

70 40 50
775 100 300

10 150
160
570

40 90
4

40 30
155 1800

30
70
250 250
19
50 6
395

5.344°

2x 12 Hole

24
65 470 65

85 210 85 4
600

1223(1215.5)
380
CJP
550

800

H-H
910

R3
R3
19
550

22 400 22
444

2841
2905
R5

1682(1689.5)
20

1238(1245.5)
225 550 550 225

A-A

6000
NOTES :
1 No of wires 7Ø x 55
2 Semi-pararell-wire strand contained

40
Ø6 within an HDPE tube (high density polyethylene tube).
8
910 3 Ultimate strength : fu = 1770 N/mm 2 fa = 1770 / 2.5 = 708 N/mm 2
550

4 The Drawing shows a setting plan of tie-down cables. The tie-down


61

cables shall be vertical at installation. The Contractor shall submit


the setting plan with analysis results of difference of setting temperature
910

550

from the reference temperature (24 deg.) for the Engineer's Approval.
The clearance of tie-down cables and end pier front face shall be checked
61

for all erection stages by the Contractor.


5 The mating surfaces between the concave and convex bearings
shall be lubricated to reduce friction.

Steel grade
Bracket Plates : SM490YB
Others : Shown

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T.Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No. 1

K.Itabashi UPPER BRACKET OF TIE-DOWN CABLE


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60,30,20 DRAWING No. : C - 3b - 046
SHEET No. :
Sheet of PACKAGE:
B-B
BRACKET DETAILS S=1/30
P11 4(4)places

2050(1300)
( P17 )
2850 F-F C-C
1500 1350
B 400(775) 1100(725) C
L
1625 (1250)
20 1605 (1230)
27.200 930
225 1400 (1025)
95 170 285 285 95
30 350
550 380
8-Anchor bolt
C F

1500
D65

(1729)
1999
Cable Boot Cover
(EPDM Rubber)

95

95
2318
Steel Pipe(STK400)

22 278
6000
Ø267.4

100
6000

35 65
2.0%

2968

2968
D D

650
550 550

22
Ø240
CJP

G-G

1300
1110

1110
1300
700
700
95
Drain Hole G
A A

90 40
R5
Ø220 2.0%

650
1300
1110

22
E E

22

70

200
78 189

278
175 175
Ø68

95

95
Bearing PL
G (S45CN)

371
95
C Convex
Bearing
200 350
1860 1300 (975) (S45CN) 550 22
3000 1400 (1025) Ø180
380
Socket (Movable End)
(SCM440H)
F

A-A Convex Bearing S=1/20 Bearing PL(Concave Bearing) S=1/20 E-E ANCHOR BOLT DETAILS S=1/30
(S35CN + SR235)
C
H L 930
300 M64

60
95 170 285 285 95

125(120)
Washer M64
5 (SS400)
Division Line R7 Division Line CJP

J Ø1 L
40 J L
300

380
150

(S45CN) Nut M64


(SS400)
I I
K K
60

1440 (1110)
I-I

(19x45=855)
26x45=1170
Ø6
3000 75 60 75

1400(1025)
S45CN
500 2000 500 210
R5
D-D

1625(1250)
90

70 1860 70 380
50

H 22
930 930
R30

380 550 550 380


K-K H-H
0

95 285 285 170 95 285 285 95 TYP.


95 170 J-J 380
R3

22
85 210 85

75
50 6 2x 12 Hole 0 0
Ø22 Ø24

350
4 Ø65
33.8 40

R3

30 20 15 15

150 10

225
62.4

90 40
1625(1250)

(1025)

4
70

50 40 70
1400

160
TYP. Steel Pipe(STK400)
R300

6
50
Cut L 50x50x6 50 350 50
10 Ø180 10
Convex
M-M 450
225

S=1/1 L-L Bearing 150 200 150


Division Line R5 NOTES:
Drain Hole Drain M Drain 1) Steel grade
Bracket Plates : SM490YB
2

M R3 Others : Shown
R3

4 2) Round bar Ø6 shall be wound and welded around anchor bolt.


3) Shim can be installed as necessary.
4) Top and bottom flanges of the brancket shall be 2% downward
at the tip at the instalation.
5) The mating surfaces between the concave and convex bearings
shall be lubricated to reduce friction.

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R. Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No. 1

H.Ikeda LOWER BRACKET OF TIE-DOWN CABLE


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60,30,20 DRAWING No. : C - 3b - 047
SHEET No. :
Sheet of PACKAGE:
ZX-PLANE S=1/1500 YZ-PLANE S=1/400

A A

No. of Cable

74000
A-A
U1 U22 P (Base Point)
2 21
3 20
4 19
5 18
6 17 1W 22E
7 16
8 15
9 14 2W 21E
10 13
L11 L12
Z STA. 1+251.0
(STA. 2+751.0) 3W 20E

4W 19E

5W 18E

6W 17E

X 7W 16E

8W 15E

9W 14E

Y XY-PLANE S=1/1500
10W 13E

West Plane 11W 12E

East Plane 35600


1200 33200 1200

Stay Cable Configuration (P12) PH PH


(m,deg)
G (Base Point)
Base Point Coordinate Distance between Angle of
2% 2% B
Cable G(Cable Anchorage at Girder) P(Cable Anchorage at Pylon) Base Points Anchor Pipe

1250
No. X Y Z X Y Z LG-P at Girder at Pylon

3000
W, E W E W, E W, E W E W, E W E G P
U 1 6.0000 17.4000 -17.4000 29.6537 150.0000 3.9303 -3.9303 101.3100 161.3978 161.3978 25.653 27.036
B
2 18.0000 17.4000 -17.4000 29.7137 150.0000 4.4070 -4.4070 99.3100 149.7802 149.7802 27.058 28.294 800 33200 800
3 30.0000 17.4000 -17.4000 29.7737 150.0000 4.8842 -4.8842 97.3100 138.2605 138.2605 28.742 29.718 Gy = 17400 Gy = 17400
4 42.0000 17.4000 -17.4000 29.8337 150.0000 5.3641 -5.3641 95.3100 126.8638 126.8638 30.617 31.508
5 54.0000 17.4000 -17.4000 29.8937 150.0000 5.8465 -5.8465 93.3100 115.6273 115.6273 32.839 33.663
Y
6 66.0000 17.4000 -17.4000 29.9537 150.0000 6.3317 -6.3317 91.3100 104.6036 104.6036 35.552 36.256 B-B
7 78.0000 17.4000 -17.4000 30.0137 150.0000 6.8224 -6.8224 89.3100 93.8662 93.8662 38.849 39.484 G (Base Point)
8 90.0000 17.4000 -17.4000 30.0737 150.0000 7.3211 -7.3211 87.3100 83.5263 83.5263 42.976 43.514
9 102.0000 17.4000 -17.4000 30.1337 150.0000 7.8344 -7.8344 85.3100 73.7507 73.7507 48.206 48.633
10 114.0000 17.4000 -17.4000 30.1937 150.0000 8.3786 -8.3786 83.3100 64.7930 64.7930 54.900 55.204
L 11 126.0000 17.4000 -17.4000 30.2537 150.0000 9.0052 -9.0052 81.3100 57.0326 57.0326 63.424 63.621
L 12 174.0000 17.4000 -17.4000 30.4937 150.0000 8.9975 -8.9975 81.3100 56.8190 56.8190 63.313 63.511
13 186.0000 17.4000 -17.4000 30.5537 150.0000 8.3713 -8.3713 83.3100 64.4992 64.4992 54.714 55.020
14 198.0000 17.4000 -17.4000 30.6137 150.0000 7.8271 -7.8271 85.3100 73.3937 73.3937 47.972 48.369
15 210.0000 17.4000 -17.4000 30.6737 150.0000 7.3140 -7.3140 87.3100 83.1172 83.1172 42.672 43.214
16 222.0000 17.4000 -17.4000 30.7337 150.0000 6.8154 -6.8154 89.3100 93.4139 93.4139 38.504 39.144
17 234.0000 17.4000 -17.4000 30.7937 150.0000 6.3248 -6.3248 91.3100 104.1139 104.1139 35.174 35.884
18 246.0000 17.4000 -17.4000 30.8537 150.0000 5.8396 -5.8396 93.3100 115.1043 115.1043 32.436 33.267
19 258.0000 17.4000 -17.4000 30.9137 150.0000 5.3573 -5.3573 95.3100 126.3104 126.3104 30.186 31.099 NOTES :
1 G and P are cable anchorage base points on Girder and Pylon respectively
20 270.0000 17.4000 -17.4000 30.9737 150.0000 4.8776 -4.8776 97.3100 137.6786 137.6786 28.273 29.315
2 L stands for the chord length between G and P
21 282.0000 17.4000 -17.4000 31.0337 150.0000 4.3999 -4.3999 99.3100 149.1725 149.1725 26.628 27.827 3 W and E stand for West side plane and East side plane
U 22 294.0000 17.4000 -17.4000 31.0937 150.0000 3.9232 -3.9232 101.3100 160.7648 160.7648 25.222 26.548 4 G and P stand for angle formed by the anchor pipe and the horizontal plane

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T. Takada STAY CABLE LAYOUT 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1500,400 DRAWING No. : C - 3c - 001
SHEET No. :
Sheet of PACKAGE:
Stay Cable Configuration (P13) Stay Cable Configuration (P15)
(m,deg) (m,deg)
Base Point Coordinate Distance between Angle of Base Point Coordinate Distance between Angle of
Cable G(Cable Anchorage at Girder) P(Cable Anchorage at Pylon) Base Points Anchor Pipe Cable G(Cable Anchorage at Girder) P(Cable Anchorage at Pylon) Base Points Anchor Pipe
No. X Y Z X Y Z LG-P at Girder at Pylon No. X Y Z X Y Z LG-P at Girder at Pylon
W, E W E W, E W, E W E W, E W E G P W, E W E W, E W, E W E W, E W E G P
U 1 306.0000 17.4000 -17.4000 31.1537 450.0000 3.9304 -3.9304 102.8100 161.3977 161.3977 25.647 27.041 U 1 906.0000 17.4000 -17.4000 32.4209 1050.0000 3.9240 -3.9240 102.8100 160.8402 160.8402 25.274 26.607
2 318.0000 17.4000 -17.4000 31.2137 450.0000 4.4070 -4.4070 100.8100 149.7802 149.7802 27.059 28.293 2 918.0000 17.4000 -17.4000 32.3885 1050.0000 4.4007 -4.4007 100.8100 149.2389 149.2389 26.679 27.875
3 330.0000 17.4000 -17.4000 31.2737 450.0000 4.8844 -4.8844 98.8100 138.2602 138.2602 28.724 29.736 3 930.0000 17.4000 -17.4000 32.3537 1050.0000 4.8781 -4.8781 98.8100 137.7367 137.7367 28.338 29.338
4 342.0000 17.4000 -17.4000 31.3337 450.0000 5.3642 -5.3642 96.8100 126.8637 126.8637 30.609 31.516 4 942.0000 17.4000 -17.4000 32.3165 1050.0000 5.3579 -5.3579 96.8100 126.3600 126.3600 30.230 31.131
5 354.0000 17.4000 -17.4000 31.3937 450.0000 5.8466 -5.8466 94.8100 115.6270 115.6270 32.825 33.676 5 954.0000 17.4000 -17.4000 32.2769 1050.0000 5.8402 -5.8402 94.8100 115.1457 115.1457 32.456 33.310
6 366.0000 17.4000 -17.4000 31.4537 450.0000 6.3317 -6.3317 92.8100 104.6036 104.6036 35.552 36.256 6 966.0000 17.4000 -17.4000 32.2349 1050.0000 6.3253 -6.3253 92.8100 104.1481 104.1481 35.202 35.909
7 378.0000 17.4000 -17.4000 31.5137 450.0000 6.8223 -6.8223 90.8100 93.8662 93.8662 38.851 39.482 7 978.0000 17.4000 -17.4000 32.1905 1050.0000 6.8158 -6.8158 90.8100 93.4410 93.4410 38.527 39.162
8 390.0000 17.4000 -17.4000 31.5737 450.0000 7.3211 -7.3211 88.8100 83.5262 83.5262 42.974 43.516 8 990.0000 17.4000 -17.4000 32.1437 1050.0000 7.3144 -7.3144 88.8100 83.1375 83.1375 42.686 43.231
9 402.0000 17.4000 -17.4000 31.6337 450.0000 7.8342 -7.8342 86.8100 73.7511 73.7511 48.221 48.618 9 1002.0000 17.4000 -17.4000 32.0945 1050.0000 7.8274 -7.8274 86.8100 73.4079 73.4079 47.981 48.380
10 414.0000 17.4000 -17.4000 31.6937 450.0000 8.3786 -8.3786 84.8100 64.7930 64.7930 54.900 55.204 10 1014.0000 17.4000 -17.4000 32.0429 1050.0000 8.3715 -8.3715 84.8100 64.5080 64.5080 54.720 55.026
L 11 426.0000 17.4000 -17.4000 31.7537 450.0000 9.0052 -9.0052 82.8100 57.0325 57.0325 63.423 63.621 L 11 1026.0000 17.4000 -17.4000 31.9889 1050.0000 8.9977 -8.9977 82.8100 56.8232 56.8232 63.315 63.513
L 12 474.0000 17.4000 -17.4000 31.9889 450.0000 8.9977 -8.9977 82.8100 56.8232 56.8232 63.315 63.513 L 12 1074.0000 17.4000 -17.4000 31.7537 1050.0000 9.0052 -9.0052 82.8100 57.0325 57.0325 63.423 63.621
13 486.0000 17.4000 -17.4000 32.0429 450.0000 8.3715 -8.3715 84.8100 64.5080 64.5080 54.720 55.026 13 1086.0000 17.4000 -17.4000 31.6937 1050.0000 8.3786 -8.3786 84.8100 64.7930 64.7930 54.900 55.204
14 498.0000 17.4000 -17.4000 32.0945 450.0000 7.8274 -7.8274 86.8100 73.4079 73.4079 47.981 48.380 14 1098.0000 17.4000 -17.4000 31.6337 1050.0000 7.8342 -7.8342 86.8100 73.7511 73.7511 48.221 48.618
15 510.0000 17.4000 -17.4000 32.1437 450.0000 7.3144 -7.3144 88.8100 83.1375 83.1375 42.686 43.231 15 1110.0000 17.4000 -17.4000 31.5737 1050.0000 7.3211 -7.3211 88.8100 83.5262 83.5262 42.974 43.516
16 522.0000 17.4000 -17.4000 32.1905 450.0000 6.8158 -6.8158 90.8100 93.4410 93.4410 38.527 39.162 16 1122.0000 17.4000 -17.4000 31.5137 1050.0000 6.8223 -6.8223 90.8100 93.8662 93.8662 38.851 39.482
17 534.0000 17.4000 -17.4000 32.2349 450.0000 6.3253 -6.3253 92.8100 104.1481 104.1481 35.202 35.909 17 1134.0000 17.4000 -17.4000 31.4537 1050.0000 6.3317 -6.3317 92.8100 104.6036 104.6036 35.552 36.256
18 546.0000 17.4000 -17.4000 32.2769 450.0000 5.8402 -5.8402 94.8100 115.1457 115.1457 32.456 33.310 18 1146.0000 17.4000 -17.4000 31.3937 1050.0000 5.8466 -5.8466 94.8100 115.6270 115.6270 32.825 33.676
19 558.0000 17.4000 -17.4000 32.3165 450.0000 5.3579 -5.3579 96.8100 126.3600 126.3600 30.230 31.131 19 1158.0000 17.4000 -17.4000 31.3337 1050.0000 5.3642 -5.3642 96.8100 126.8637 126.8637 30.609 31.516
20 570.0000 17.4000 -17.4000 32.3537 450.0000 4.8781 -4.8781 98.8100 137.7367 137.7367 28.338 29.338 20 1170.0000 17.4000 -17.4000 31.2737 1050.0000 4.8844 -4.8844 98.8100 138.2602 138.2602 28.724 29.736
21 582.0000 17.4000 -17.4000 32.3885 450.0000 4.4007 -4.4007 100.8100 149.2389 149.2389 26.679 27.875 21 1182.0000 17.4000 -17.4000 31.2137 1050.0000 4.4070 -4.4070 100.8100 149.7802 149.7802 27.059 28.293
U 22 594.0000 17.4000 -17.4000 32.4209 450.0000 3.9240 -3.9240 102.8100 160.8402 160.8402 25.274 26.607 U 22 1194.0000 17.4000 -17.4000 31.1537 1050.0000 3.9304 -3.9304 102.8100 161.3977 161.3977 25.647 27.041

Stay Cable Configuration (P14) Stay Cable Configuration (P16)


(m,deg) (m,deg)
Base Point Coordinate Distance between Angle of Base Point Coordinate Distance between Angle of
Cable G(Cable Anchorage at Girder) P(Cable Anchorage at Pylon) Base Points Anchor Pipe Cable G(Cable Anchorage at Girder) P(Cable Anchorage at Pylon) Base Points Anchor Pipe
No. X Y Z X Y Z LG-P at Girder at Pylon No. X Y Z X Y Z LG-P at Girder at Pylon
W, E W E W, E W, E W E W, E W E G P W, E W E W, E W, E W E W, E W E G P
U 1 606.0000 17.4000 -17.4000 32.4509 750.0000 3.9275 -3.9275 103.5600 161.1562 161.1562 25.502 26.840 U 1 1206.0000 17.4000 -17.4000 31.0937 1350.0000 3.9232 -3.9232 101.3100 160.7648 160.7648 25.222 26.548
2 618.0000 17.4000 -17.4000 32.4785 750.0000 4.4042 -4.4042 101.5600 149.5421 149.5421 26.893 28.110 2 1218.0000 17.4000 -17.4000 31.0337 1350.0000 4.3999 -4.3999 99.3100 149.1725 149.1725 26.628 27.827
3 630.0000 17.4000 -17.4000 32.5037 750.0000 4.8816 -4.8816 99.5600 138.0266 138.0266 28.547 29.565 3 1230.0000 17.4000 -17.4000 30.9737 1350.0000 4.8776 -4.8776 97.3100 137.6786 137.6786 28.273 29.315
4 642.0000 17.4000 -17.4000 32.5265 750.0000 5.3613 -5.3613 97.5600 126.6362 126.6362 30.445 31.337 4 1242.0000 17.4000 -17.4000 30.9137 1350.0000 5.3573 -5.3573 95.3100 126.3104 126.3104 30.186 31.099
5 654.0000 17.4000 -17.4000 32.5469 750.0000 5.8437 -5.8437 95.5600 115.4068 115.4068 32.662 33.505 5 1254.0000 17.4000 -17.4000 30.8537 1350.0000 5.8396 -5.8396 93.3100 115.1043 115.1043 32.436 33.267
6 666.0000 17.4000 -17.4000 32.5649 750.0000 6.3287 -6.3287 93.5600 104.3926 104.3926 35.398 36.089 6 1266.0000 17.4000 -17.4000 30.7937 1350.0000 6.3248 -6.3248 91.3100 104.1139 104.1139 35.174 35.884
7 678.0000 17.4000 -17.4000 32.5805 750.0000 6.8183 -6.8183 91.5600 93.6668 93.6668 38.694 39.337 7 1278.0000 17.4000 -17.4000 30.7337 1350.0000 6.8154 -6.8154 89.3100 93.4139 93.4139 38.504 39.144
8 690.0000 17.4000 -17.4000 32.5937 750.0000 7.3179 -7.3179 89.5600 83.3418 83.3418 42.836 43.382 8 1290.0000 17.4000 -17.4000 30.6737 1350.0000 7.3140 -7.3140 87.3100 83.1172 83.1172 42.672 43.214
9 702.0000 17.4000 -17.4000 32.6045 750.0000 7.8309 -7.8309 87.5600 73.5865 73.5865 48.107 48.504 9 1302.0000 17.4000 -17.4000 30.6137 1350.0000 7.8271 -7.8271 85.3100 73.3937 73.3937 47.972 48.369
10 714.0000 17.4000 -17.4000 32.6129 750.0000 8.3752 -8.3752 85.5600 64.6548 64.6548 54.813 55.118 10 1314.0000 17.4000 -17.4000 30.5537 1350.0000 8.3713 -8.3713 83.3100 64.4992 64.4992 54.714 55.020
L 11 726.0000 17.4000 -17.4000 32.6189 750.0000 9.0015 -9.0015 83.5600 56.9300 56.9300 63.370 63.568 L 11 1326.0000 17.4000 -17.4000 30.4937 1350.0000 8.9975 -8.9975 81.3100 56.8190 56.8190 63.313 63.511
L 12 774.0000 17.4000 -17.4000 32.6189 750.0000 9.0015 -9.0015 83.5600 56.9300 56.9300 63.370 63.568 L 12 1374.0000 17.4000 -17.4000 30.2537 1350.0000 9.0052 -9.0052 81.3100 57.0326 57.0326 63.424 63.621
13 786.0000 17.4000 -17.4000 32.6129 750.0000 8.3752 -8.3752 85.5600 64.6548 64.6548 54.813 55.118 13 1386.0000 17.4000 -17.4000 30.1937 1350.0000 8.3786 -8.3786 83.3100 64.7930 64.7930 54.900 55.204
14 798.0000 17.4000 -17.4000 32.6045 750.0000 7.8309 -7.8309 87.5600 73.5865 73.5865 48.107 48.504 14 1398.0000 17.4000 -17.4000 30.1337 1350.0000 7.8344 -7.8344 85.3100 73.7507 73.7507 48.206 48.633
15 810.0000 17.4000 -17.4000 32.5937 750.0000 7.3179 -7.3179 89.5600 83.3418 83.3418 42.836 43.382 15 1410.0000 17.4000 -17.4000 30.0737 1350.0000 7.3211 -7.3211 87.3100 83.5263 83.5263 42.976 43.514
16 822.0000 17.4000 -17.4000 32.5805 750.0000 6.8183 -6.8183 91.5600 93.6668 93.6668 38.694 39.337 16 1422.0000 17.4000 -17.4000 30.0137 1350.0000 6.8224 -6.8224 89.3100 93.8662 93.8662 38.849 39.484
17 834.0000 17.4000 -17.4000 32.5649 750.0000 6.3287 -6.3287 93.5600 104.3926 104.3926 35.398 36.089 17 1434.0000 17.4000 -17.4000 29.9537 1350.0000 6.3317 -6.3317 91.3100 104.6036 104.6036 35.552 36.256
18 846.0000 17.4000 -17.4000 32.5469 750.0000 5.8437 -5.8437 95.5600 115.4068 115.4068 32.662 33.505 18 1446.0000 17.4000 -17.4000 29.8937 1350.0000 5.8465 -5.8465 93.3100 115.6273 115.6273 32.839 33.663
19 858.0000 17.4000 -17.4000 32.5265 750.0000 5.3613 -5.3613 97.5600 126.6362 126.6362 30.445 31.337 19 1458.0000 17.4000 -17.4000 29.8337 1350.0000 5.3641 -5.3641 95.3100 126.8638 126.8638 30.617 31.508
20 870.0000 17.4000 -17.4000 32.5037 750.0000 4.8816 -4.8816 99.5600 138.0266 138.0266 28.547 29.565 20 1470.0000 17.4000 -17.4000 29.7737 1350.0000 4.8842 -4.8842 97.3100 138.2605 138.2605 28.742 29.718
21 882.0000 17.4000 -17.4000 32.4785 750.0000 4.4042 -4.4042 101.5600 149.5421 149.5421 26.893 28.110 21 1482.0000 17.4000 -17.4000 29.7137 1350.0000 4.4070 -4.4070 99.3100 149.7802 149.7802 27.058 28.294
U 22 894.0000 17.4000 -17.4000 32.4509 750.0000 3.9275 -3.9275 103.5600 161.1562 161.1562 25.502 26.840 U 22 1494.0000 17.4000 -17.4000 29.6537 1350.0000 3.9303 -3.9303 101.3100 161.3978 161.3978 25.653 27.036

NOTES :
1 G and P are cable anchorage base points on Girder and Pylon respectively
2 L stands for the chord length between G and P
3 W and E stand for West side plane and East side plane
4 G and P stand for angle formed by the anchor pipe and the horizontal plane

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T. Takada STAY CABLE LAYOUT 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1500,400 DRAWING No. : C - 3c - 002
SHEET No. :
Sheet of PACKAGE:
Cable and Socket Dimension (mm)
Cable Anchorage at Girder (Movable) Cable Anchorage at Pylon (Fixed)
Stay Cable
Socket Socket Span No. 1 2 3 4 5
Bearing Plate Shim Plate Bearing Plate

74000

74000

74000
Cable No. of Casing Duct Casing Duct Middle Portion
Dc
No. Wires D Lm Do Inner Dia. Outer Dia. Thickness Inner Dia. Outer Dia. Thickness D Lf Do D' Lf ' Inner Dia. Outer Dia. Thickness
U 1 313 155 395 775 189 249 570 155 249 435 100 425 430 189 325 260 375 600 125
Z
2 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110 U22 U1
U1 U22 U1
3 223 136 340 645 170 230 540 145 230 380 100 370 365 170 285 210 335 560 110
4 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 2 3 4 5 6 7 8 9 10 L11 L12 13 14 15 16 17 18 19 20 21 2 3 4 5 6 7 8 9 10 L11 L12 13 14 15 16 17 18 19 20 21 2 3 4 5 6 7 8 9 10 L11
5 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135
1 6 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 X
7 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125
8 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 Cable No.
9 163 115 290 560 145 205 460 115 205 330 90 290 505 145 - - 205 490 125
10 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95
L 11 187 121 310 545 151 211 450 115 211 350 90 310 545 151 - - 211 480 125
L 12 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125
13 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95
14 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125
15 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125
16 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 Stay Cable Layout (P12) (m)
2 17 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 Cable Anchorage Coordinate Elastic Cable
Chord Length
18 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 Cable at Grider at Pylon by Sag Elongation
19 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo
20 241 139 350 675 173 233 540 145 233 390 100 380 380 173 290 225 350 560 110 W, E W E W, E W, E W E W, E W, E W, E W, E W, E
21 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110 U 1 4.7018 17.5214 -17.5214 29.0275 149.0013 4.0237 -4.0237 100.8132 161.733 0.004 0.396 161.342
U 22 295 151 380 750 185 245 570 155 245 420 100 410 420 185 315 250 365 600 125 2 16.7794 17.5201 -17.5201 29.0872 148.9655 4.5088 -4.5088 98.7647 149.991 0.003 0.377 149.617
U 1 313 155 395 775 189 249 570 155 249 435 100 425 430 189 325 260 375 600 125 3 28.7892 17.5263 -17.5263 29.1061 148.8598 5.0031 -5.0031 96.6684 138.342 0.002 0.403 137.941
2 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110 4 40.8720 17.5257 -17.5257 29.1620 148.8484 5.4925 -5.4925 94.6119 126.836 0.001 0.363 126.474
3 253 142 355 695 176 236 540 145 236 395 100 390 390 176 300 230 350 560 110 5 52.8999 17.5324 -17.5324 29.1786 148.8313 5.9871 -5.9871 92.5381 115.545 0.001 0.318 115.228
4 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 6 64.9721 17.5354 -17.5354 29.2127 148.7681 6.4941 -6.4941 90.4103 104.350 0.001 0.289 104.061
5 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 7 77.0297 17.5426 -17.5426 29.2238 148.7186 7.0106 -7.0106 88.2549 93.461 0.000 0.246 93.215
3 6 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 8 89.0913 17.5526 -17.5526 29.2152 148.6765 7.5434 -7.5434 86.0476 82.949 0.000 0.214 82.735
7 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 9 101.2157 17.5563 -17.5563 29.2392 148.6632 8.1008 -8.1008 83.7735 72.902 0.000 0.190 72.712
8 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 10 113.3360 17.5664 -17.5664 29.2198 148.7585 8.6897 -8.6897 81.4784 63.754 0.000 0.176 63.578
9 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125 L 11 125.4719 17.5847 -17.5847 29.1353 148.6334 9.4832 -9.4832 78.4030 55.040 0.000 0.154 54.886
10 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95 L 12 174.5301 17.5856 -17.5856 29.3764 151.3611 9.4741 -9.4741 78.4284 54.852 0.000 0.153 54.698
L 11 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125 13 186.6670 17.5673 -17.5673 29.5820 151.2342 8.6808 -8.6808 81.5016 63.483 0.000 0.174 63.309
L 12 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125 14 198.7881 17.5572 -17.5572 29.7221 151.3294 8.0922 -8.0922 83.7953 72.566 0.000 0.203 72.363
13 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95 15 210.9132 17.5535 -17.5535 29.8201 151.3160 7.5352 -7.5352 86.0679 82.559 0.000 0.212 82.347
14 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125 16 222.9750 17.5433 -17.5433 29.9497 151.2738 7.0026 -7.0026 88.2739 93.026 0.001 0.243 92.784
15 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 17 235.0327 17.5362 -17.5362 30.0596 151.2243 6.4862 -6.4862 90.4281 103.876 0.001 0.286 103.591
16 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 18 247.1051 17.5331 -17.5331 30.1464 151.1611 5.9794 -5.9794 92.5547 115.037 0.001 0.314 114.724
4 17 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 19 259.1329 17.5263 -17.5263 30.2506 151.1442 5.4849 -5.4849 94.6279 126.297 0.001 0.353 125.946
18 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 20 271.2159 17.5269 -17.5269 30.3162 151.1330 4.9958 -4.9958 96.6838 137.774 0.002 0.374 137.401
19 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 21 283.2256 17.5207 -17.5207 30.4163 151.0271 4.5011 -4.5011 98.7788 149.397 0.003 0.387 149.012
20 241 139 350 675 173 233 540 145 233 390 100 380 380 173 290 225 350 560 110 U 22 295.3033 17.5220 -17.5220 30.4771 150.9914 4.0160 -4.0160 100.8267 161.113 0.004 0.412 160.705
21 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110
U 22 295 151 380 750 185 245 570 155 245 420 100 410 420 185 315 250 365 600 125
U 1 295 151 380 750 185 245 570 155 245 420 100 410 420 185 315 250 365 600 125
2 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110
CURVED CABLE LENGTH
3 241 139 350 675 173 233 540 145 233 390 100 380 380 173 290 225 350 560 110
4 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 PF
5 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135
th
5 6 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 ng Base Point at Pylon
Le
7 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 ble
8 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 Ca Top of
ed Edge Girder
9 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125 rv
Cu
10 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95 NOTES :
Pylon Center 1 Coordinate system is tentative because road profile is not determined.
L 11 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125
2 GF is the location of forehead of socket at girder

1250
3 PF is the location of forehead of socket at pylon
4 Chord length Lc is the distance between GF and PF
Catenary Curve 5 Ls is the length increased by cable sag
6 Le is the elastic elongation by cable stress
7 Lo is unstressed length of cable expressed as
Lo = Lc + Ls - Le
8 Semi-pararell-wire-strand contained within an HDPE tube (high density polyethylene tube).
Base Point at Girder 9 Ultimate strength : fu = 1770N / mm2
fa = 1770 / 2.5 = 708 N / mm2
GF

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAY CABLE LAYOUT 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 4000 DRAWING No. : C - 3c - 003
SHEET No. :
Sheet of PACKAGE:
Stay Cable Layout (P13) (m) Stay Cable Layout (P15) (m)
Cable Anchorage Coordinate Elastic Cable Cable Anchorage Coordinate Elastic Cable
Chord Length Chord Length
Cable at Grider at Pylon by Sag Elongation Cable at Grider at Pylon by Sag Elongation
No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo
W, E W E W, E W, E W E W, E W, E W, E W, E W, E W, E W E W, E W, E W E W, E W, E W, E W, E W, E
U 1 304.7018 17.5214 -17.5214 30.5277 449.0013 4.0238 -4.0238 102.3132 161.733 0.004 0.392 161.345 U 1 904.6973 17.5219 -17.5219 31.8032 1049.0077 4.0169 -4.0169 102.3251 161.187 0.004 0.410 160.781
2 316.7794 17.5201 -17.5201 30.5872 448.9655 4.5088 -4.5088 100.2647 149.991 0.003 0.378 149.617 2 916.7750 17.5206 -17.5206 31.7700 1048.9720 4.5019 -4.5019 100.2773 149.462 0.003 0.388 149.076
3 328.7892 17.5263 -17.5263 30.6066 448.8598 5.0033 -5.0033 98.1684 138.342 0.002 0.386 137.957 3 928.7846 17.5268 -17.5268 31.6947 1048.8663 4.9964 -4.9964 98.1823 137.830 0.002 0.390 137.442
4 340.8720 17.5257 -17.5257 30.6623 448.8484 5.4926 -5.4926 96.1119 126.836 0.001 0.357 126.480 4 940.8675 17.5263 -17.5263 31.6525 1048.8551 5.4856 -5.4856 96.1265 126.346 0.001 0.358 125.989
5 352.8999 17.5324 -17.5324 30.6789 448.8313 5.9873 -5.9873 94.0381 115.544 0.001 0.308 115.238 5 952.8953 17.5330 -17.5330 31.5693 1048.8383 5.9801 -5.9801 94.0534 115.077 0.001 0.305 114.773
6 364.9721 17.5354 -17.5354 30.7127 448.7681 6.4941 -6.4941 91.9103 104.350 0.001 0.289 104.061 6 964.9676 17.5361 -17.5361 31.5002 1048.7752 6.4868 -6.4868 91.9269 103.909 0.001 0.287 103.623
7 377.0297 17.5426 -17.5426 30.7237 448.7186 7.0106 -7.0106 89.7549 93.461 0.000 0.248 93.213 7 977.0253 17.5433 -17.5433 31.4060 1048.7258 7.0031 -7.0031 89.7727 93.052 0.000 0.245 92.807
8 389.0913 17.5526 -17.5526 30.7153 448.6765 7.5434 -7.5434 87.5476 82.949 0.000 0.213 82.736 8 989.0871 17.5535 -17.5535 31.2899 1048.6836 7.5357 -7.5357 87.5669 82.578 0.000 0.211 82.368
9 401.2157 17.5563 -17.5563 30.7387 448.6632 8.1006 -8.1006 85.2735 72.902 0.000 0.205 72.698 9 1001.2121 17.5571 -17.5571 31.2028 1048.6703 8.0926 -8.0926 85.2944 72.579 0.000 0.203 72.377
10 413.3360 17.5664 -17.5664 30.7198 448.7585 8.6897 -8.6897 82.9784 63.754 0.000 0.176 63.577 10 1013.3331 17.5673 -17.5673 31.0711 1048.7656 8.6811 -8.6811 83.0009 63.491 0.000 0.175 63.317
L 11 425.4719 17.5847 -17.5847 30.6353 448.6334 9.4832 -9.4832 79.9030 55.040 0.000 0.154 54.886 L 11 1025.4699 17.5856 -17.5856 30.8715 1048.6388 9.4742 -9.4742 79.9279 54.855 0.000 0.153 54.703
L 12 474.5301 17.5856 -17.5856 30.8715 451.3612 9.4742 -9.4742 79.9279 54.855 0.000 0.153 54.703 L 12 1074.5281 17.5847 -17.5847 30.6353 1051.3666 9.4832 -9.4832 79.9030 55.040 0.000 0.154 54.886
13 486.6669 17.5673 -17.5673 31.0711 451.2344 8.6811 -8.6811 83.0009 63.491 0.000 0.175 63.317 13 1086.6640 17.5664 -17.5664 30.7198 1051.2415 8.6897 -8.6897 82.9784 63.754 0.000 0.176 63.577
14 498.7879 17.5571 -17.5571 31.2028 451.3297 8.0926 -8.0926 85.2944 72.579 0.000 0.203 72.377 14 1098.7843 17.5563 -17.5563 30.7387 1051.3368 8.1006 -8.1006 85.2735 72.902 0.000 0.205 72.698
15 510.9129 17.5535 -17.5535 31.2899 451.3164 7.5357 -7.5357 87.5669 82.578 0.000 0.211 82.368 15 1110.9087 17.5526 -17.5526 30.7153 1051.3235 7.5434 -7.5434 87.5476 82.949 0.000 0.213 82.736
16 522.9747 17.5433 -17.5433 31.4060 451.2742 7.0031 -7.0031 89.7727 93.052 0.000 0.245 92.807 16 1122.9703 17.5426 -17.5426 30.7237 1051.2814 7.0106 -7.0106 89.7549 93.461 0.000 0.248 93.213
17 535.0324 17.5361 -17.5361 31.5002 451.2248 6.4868 -6.4868 91.9269 103.909 0.001 0.287 103.623 17 1135.0279 17.5354 -17.5354 30.7127 1051.2319 6.4941 -6.4941 91.9103 104.350 0.001 0.289 104.061
18 547.1047 17.5330 -17.5330 31.5693 451.1617 5.9801 -5.9801 94.0534 115.077 0.001 0.305 114.773 18 1147.1001 17.5324 -17.5324 30.6789 1051.1687 5.9873 -5.9873 94.0381 115.544 0.001 0.308 115.238
19 559.1325 17.5263 -17.5263 31.6525 451.1449 5.4856 -5.4856 96.1265 126.346 0.001 0.358 125.989 19 1159.1280 17.5257 -17.5257 30.6623 1051.1516 5.4926 -5.4926 96.1119 126.836 0.001 0.357 126.480
20 571.2154 17.5268 -17.5268 31.6947 451.1337 4.9964 -4.9964 98.1823 137.830 0.002 0.390 137.442 20 1171.2108 17.5263 -17.5263 30.6066 1051.1402 5.0033 -5.0033 98.1684 138.342 0.002 0.386 137.957
21 583.2250 17.5206 -17.5206 31.7700 451.0280 4.5019 -4.5019 100.2773 149.462 0.003 0.388 149.076 21 1183.2206 17.5201 -17.5201 30.5872 1051.0345 4.5088 -4.5088 100.2647 149.991 0.003 0.378 149.617
U 22 595.3027 17.5219 -17.5219 31.8032 450.9923 4.0169 -4.0169 102.3251 161.187 0.004 0.410 160.781 U 22 1195.2982 17.5214 -17.5214 30.5277 1050.9987 4.0238 -4.0238 102.3132 161.733 0.004 0.392 161.345

Stay Cable Layout (P14) (m) Stay Cable Layout (P16) (m)
Cable Anchorage Coordinate Elastic Cable Cable Anchorage Coordinate Elastic Cable
Chord Length Chord Length
Cable at Grider at Pylon by Sag Elongation Cable at Grider at Pylon by Sag Elongation
No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo
W, E W E W, E W, E W E W, E W, E W, E W, E W, E W, E W E W, E W, E W E W, E W, E W, E W, E W, E
U 1 604.6999 17.5216 -17.5216 31.8280 749.0041 4.0207 -4.0207 103.0683 161.497 0.004 0.409 161.091 U 1 1204.6967 17.5220 -17.5220 30.4771 1349.0086 4.0160 -4.0160 100.8267 161.113 0.004 0.412 160.705
2 616.7775 17.5204 -17.5204 31.8555 748.9684 4.5058 -4.5058 101.0202 149.758 0.003 0.382 149.379 2 1216.7744 17.5207 -17.5207 30.4163 1348.9729 4.5011 -4.5011 98.7788 149.397 0.003 0.387 149.012
3 628.7872 17.5265 -17.5265 31.8403 748.8627 5.0003 -5.0003 98.9246 138.114 0.002 0.384 137.731 3 1228.7841 17.5269 -17.5269 30.3162 1348.8670 4.9958 -4.9958 96.6838 137.774 0.002 0.374 137.401
4 640.8700 17.5260 -17.5260 31.8582 748.8514 5.4893 -5.4893 96.8685 126.614 0.001 0.362 126.253 4 1240.8671 17.5263 -17.5263 30.2506 1348.8558 5.4849 -5.4849 94.6279 126.297 0.001 0.353 125.946
5 652.8978 17.5327 -17.5327 31.8352 748.8345 5.9840 -5.9840 94.7951 115.331 0.001 0.310 115.022 5 1252.8949 17.5331 -17.5331 30.1464 1348.8389 5.9794 -5.9794 92.5547 115.037 0.001 0.314 114.724
6 664.9700 17.5357 -17.5357 31.8266 748.7714 6.4906 -6.4906 92.6680 104.146 0.001 0.294 103.852 6 1264.9673 17.5362 -17.5362 30.0596 1348.7757 6.4862 -6.4862 90.4281 103.876 0.001 0.286 103.591
7 677.0276 17.5429 -17.5429 31.7933 748.7220 7.0062 -7.0062 90.5132 93.269 0.001 0.243 93.027 7 1277.0250 17.5433 -17.5433 29.9497 1348.7262 7.0026 -7.0026 88.2739 93.026 0.001 0.243 92.784
8 689.0893 17.5530 -17.5530 31.7375 748.6798 7.5397 -7.5397 88.3068 82.773 0.000 0.211 82.562 8 1289.0868 17.5535 -17.5535 29.8201 1348.6840 7.5352 -7.5352 86.0679 82.559 0.000 0.212 82.347
9 701.2140 17.5567 -17.5567 31.7111 748.6666 8.0968 -8.0968 86.0335 72.747 0.000 0.204 72.543 9 1301.2119 17.5572 -17.5572 29.7221 1348.6706 8.0922 -8.0922 83.7953 72.566 0.000 0.203 72.363
10 713.3346 17.5668 -17.5668 31.6400 748.7619 8.6855 -8.6855 83.7393 63.626 0.000 0.175 63.451 10 1313.3330 17.5673 -17.5673 29.5820 1348.7658 8.6808 -8.6808 81.5016 63.483 0.000 0.174 63.309
L 11 725.4709 17.5851 -17.5851 31.5010 748.6360 9.4788 -9.4788 80.6652 54.950 0.000 0.153 54.797 L 11 1325.4699 17.5856 -17.5856 29.3764 1348.6389 9.4741 -9.4741 78.4284 54.852 0.000 0.153 54.698
L 12 774.5291 17.5851 -17.5851 31.5010 751.3640 9.4788 -9.4788 80.6652 54.950 0.000 0.153 54.797 L 12 1374.5281 17.5847 -17.5847 29.1353 1351.3666 9.4832 -9.4832 78.4030 55.040 0.000 0.154 54.886
13 786.6654 17.5668 -17.5668 31.6400 751.2381 8.6855 -8.6855 83.7393 63.626 0.000 0.175 63.451 13 1386.6640 17.5664 -17.5664 29.2198 1351.2415 8.6897 -8.6897 81.4784 63.754 0.000 0.176 63.578
14 798.7860 17.5567 -17.5567 31.7111 751.3334 8.0968 -8.0968 86.0335 72.747 0.000 0.204 72.543 14 1398.7843 17.5563 -17.5563 29.2392 1351.3368 8.1008 -8.1008 83.7735 72.902 0.000 0.190 72.712
15 810.9107 17.5530 -17.5530 31.7375 751.3202 7.5397 -7.5397 88.3068 82.773 0.000 0.211 82.562 15 1410.9087 17.5526 -17.5526 29.2152 1351.3235 7.5434 -7.5434 86.0476 82.949 0.000 0.214 82.735
16 822.9724 17.5429 -17.5429 31.7933 751.2780 7.0062 -7.0062 90.5132 93.269 0.001 0.243 93.027 16 1422.9703 17.5426 -17.5426 29.2238 1351.2814 7.0106 -7.0106 88.2549 93.461 0.000 0.246 93.215
17 835.0300 17.5357 -17.5357 31.8266 751.2286 6.4906 -6.4906 92.6680 104.146 0.001 0.294 103.852 17 1435.0279 17.5354 -17.5354 29.2127 1351.2319 6.4941 -6.4941 90.4103 104.350 0.001 0.289 104.061
18 847.1022 17.5327 -17.5327 31.8352 751.1655 5.9840 -5.9840 94.7951 115.331 0.001 0.310 115.022 18 1447.1001 17.5324 -17.5324 29.1786 1351.1687 5.9871 -5.9871 92.5381 115.545 0.001 0.318 115.228
19 859.1300 17.5260 -17.5260 31.8582 751.1486 5.4893 -5.4893 96.8685 126.614 0.001 0.362 126.253 19 1459.1280 17.5257 -17.5257 29.1620 1351.1516 5.4925 -5.4925 94.6119 126.836 0.001 0.363 126.474
20 871.2128 17.5265 -17.5265 31.8403 751.1373 5.0003 -5.0003 98.9246 138.114 0.002 0.384 137.731 20 1471.2108 17.5263 -17.5263 29.1061 1351.1402 5.0031 -5.0031 96.6684 138.342 0.002 0.403 137.941
21 883.2225 17.5204 -17.5204 31.8555 751.0316 4.5058 -4.5058 101.0202 149.758 0.003 0.382 149.379 21 1483.2206 17.5201 -17.5201 29.0872 1351.0345 4.5088 -4.5088 98.7647 149.991 0.003 0.377 149.617
U 22 895.3001 17.5216 -17.5216 31.8280 750.9959 4.0207 -4.0207 103.0683 161.497 0.004 0.409 161.091 U 22 1495.2982 17.5214 -17.5214 29.0275 1350.9987 4.0237 -4.0237 100.8132 161.733 0.004 0.396 161.342

NOTES :
1 Coordinate system is tentative because road profile is not determined.
2 GF is the location of forehead of socket at girder
3 PF is the location of forehead of socket at pylon
4 Chord length Lc is the distance between GF and PF
5 Ls is the length increased by cable sag
6 Le is the elastic elongation by cable stress
7 Lo is unstressed length of cable expressed as
Lo = Lc + Ls - Le
8 Semi-pararell-wire-strand contained within an HDPE tube (high density polyethylene tube).
9 Ultimate strength : fu = 1770N / mm2
fa = 1770 / 2.5 = 708 N / mm2

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAY CABLE LAYOUT 4


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: - DRAWING No. : C - 3c - 004
SHEET No. :
Sheet of PACKAGE:
No. of Wires Ø7 x 121 Ø7 x 151 Ø7 x 163 Ø7 x 187 Ø7 x 199 Ø7 x 223

HDPE
HDPE HDPE (Colored as specified)
HDPE HDPE (Colored as specified)
HDPE (Colored as specified)
(Colored as specified) (Colored as specified) HDPE
(Colored as specified) HDPE
HDPE HDPE Filament Tape
HDPE HDPE Filament Tape Filament Tape
Filament Tape
Filament Tape Filament Tape
Galvanized Galvanized Galvanized Galvanized Galvanized Galvanized
Steel Wires Steel Wires Steel Wires Steel Wires Steel Wires Steel Wires

Cross Section

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 6 6 4
8 Ø85 8 8 Ø94 8 8 Ø99 8 8 Ø105 8 8 Ø108 8 10 Ø116 10
Ø101 Ø110 Ø115 Ø121 Ø124 Ø136

1 -10 , 2 -13 , 3 -13 , 4 -10 , 5 -10 2 -14 , 3 -9 , 4 -14 , 5 -9 1 -9 1 -7,8 , 2 -15,16 , 3 -7,8 , 4 -15,16 , 5 -7,8 1 -6 , 2 -17 , 3 -6 , 4 -17 , 5 -6 1 -3,4,5 , 2 -18,19 , 3 -4,5
Cable No. 1 -L11 , 2 -L11 , 3 -L11 , 4 -L11 , 5 -L11 4 -18,19 , 5 -4,5

4,657 5,811 6,273 7,197 7,658 8,582

Tensile strength(kN) 8,240 10,290 11,100 12,740 13.560 15,190

195

No. of Wires Ø7 x 241 Ø7 x 253 Ø7 x 283 Ø7 x 295 Ø7 x 313

HDPE HDPE
HDPE HDPE HDPE (Colored as specified) (Colored as specified)
(Colored as specified) (Colored as specified) (Colored as specified)
HDPE HDPE
HDPE HDPE HDPE
Filament Tape Filament Tape
Filament Tape Filament Tape Filament Tape Galvanized Galvanized
Galvanized Galvanized Galvanized Steel Wires Steel Wires
Steel Wires Steel Wires Steel Wires

Cross Section

4 6 6 4 4 6 6 4 4 6 6 4 4 6 6 4 4 6 6 4
10 Ø119 10 10 Ø122 10 10 Ø129 10 10 Ø131 10 10 Ø135 10
Ø139 Ø142 Ø149 Ø151 Ø155

2 -20 , 4 -20 , 5 -3 3 -3 1 -2 , 2 -21 , 3 -2 , 4 -21 , 5 -2 2 -U22 , 4 -U1 , 5 -U22 1 -U1 , 3 -U1


Cable No.

9,275 9,737 10,891 11,353 12,046

Tensile strength(kN) 16,420 17,230 19,280 20,090 21,320

195

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi CROSS SECTION OF STAY CABLE


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1/5 DRAWING No. : C - 3c - 005
SHEET No. :
Sheet of PACKAGE:
FOREHEAD BEARING TYPE SOCKET MIDDLE POINT BEARING TYPE SOCKET
Epoxy resin Zinc alloy Endcap Detail Epoxy resin Zinc alloy Endcap Detail
Chloroprene Rubber t=5mm Low-alloyed steel Chloroprene Rubber t=5mm
Low-alloyed steel
SCM440H Endcap Pl (SS400) t=6mm SCM440H Chloroprene Endcap Pl (SS400) t=6mm
Chloroprene Rubber
Lf Rubber
30 Endcap
30 Endcap

Fixed End Dead End

TrDs xp

TrDs xp
ØDo

ØDa

ØDo
ØD

ØD
Movable End Live End

Ls
Lo Lm 56 ØD Lo L Lf 56 ØDa

Socket Dimension Unit:mm Socket Dimension Unit:mm


No. of Duct Casing No. of Duct Casing
Wires Wires
Do Lo D Lf Lm Do Lo D L Da Lf
313 189 180 395 - 775 313 189 180 325 260 425 430
295 185 180 380 - 750 295 185 180 315 250 410 420
283 183 180 375 - 735 283 183 180 310 245 405 410
253 176 160 355 - 695 253 176 160 300 230 390 390
241 173 160 350 - 675 241 173 160 290 225 380 380
223 170 160 340 575 645 223 170 160 285 210 370 365
199 154 160 315 560 625
187 151 160 310 545 605
163 145 160 290 505 560
151 140 140 280 490 540
121 131 140 250 435 480

ANCHORAGE DETAIL MATERIAL


Endcap Stay Cable Wire:
Compound
Minimum Tensile Strength 1,770 MPa
Anchorage Minimum Proof Strength at 0.8% Strain 1,370 MPa
2
stay cable wire shall be hot dip galvanized 300g/m
Epoxy resin Zinc Alloy
Cable

Heat-shrinkage polyethylene
Chloroprene Rubber
400 ~ 500 mm Galvanized wire

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAY CABLE SOCKET


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 3c - 006
SHEET No. :
Sheet of PACKAGE:
SHIM PLATE S=1/10 BEARING PLATE S=1/10

D5 Outer Dia.

M20 x 30 M20 x 30
Top
Top

SS400

S45CN

D4

Outer Dia.
D4
D5
2

C2
C2
ia.
rD
ne

2
C2 I n
C2

Bottom 4-Ø19
Bottom
Upper Surface

Bottom Surface M20 x 30


Upper Surface
Drainage ditch Ø6 mm

D5

Bottom Surface

Ø6 mm Outer Dia.

Shim Plate Dimension


Stay No. of Socket Shim Shim Total Thickness
Cable Dia. Duct Dia. of
Cable No. 7mm Dia. Dia. Inner Dia. Outer Dia.
D1(mm) D2(mm) Shim Plates
No. Wires D3(mm) D4(mm) D5(mm) (mm)
1 313 155 189 395 214 435 100
2 295 151 185 380 210 420 100
3 283 149 183 375 208 415 100
1 4 253 142 176 355 201 395 100
to 5 241 139 173 350 198 390 100
8 6 223 136 170 340 195 380 100
7 199 122 154 315 179 355 100
8 187 119 151 310 176 350 100
NOTES:
1) Shim plate shown is design shims and the Contractor shall decide
9 187 119 151 310 176 350 90 the thickness of shim plates for the Engineer's Approval.
9 2) Drainage ditch shall be provided at the lower side of bottom
10 163 113 145 290 170 330 90 surface of shim plates.
to
11 151 108 140 280 165 320 90
11
12 121 99 131 250 156 290 90

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada SHIM PLATE AND BEARING PLATE


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1/10 DRAWING No. : C - 3c - 007
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/50 SECTION S=1/50 DAMPER S=1/10

Ø1
21
Damping Facility Using 1200 200
High Damping Rubber

Stay Cable

Anchor Plate Rod

Elastic Buffer(Polybutadiene)
Steel Pipe(STK400) Damper

262.3
Cover (Rubber)
Cable Boot Cover
(EPDM Rubber)

284.3
284.3 262.3

260
C

1250
Back Up Material High Damping Elastomeric Damper
(Polyethylene)
Ø4

1250
50

Casing
00
15 C
Elastic Seal(Polybutadiene) .7
89
57

3000
RC Slab

C-C

1750
0 Plate fixed to stay cable
75

0
30 A
00 5
1 11
B
Plate fixed to deck slab

800
A-A B-B
Plate fixed to stay cable

ANCHOR PLATE STEEL PIPE C


S=1/30 S=1/20
PLAN S=1/50
Division Line
4000

1500 Plate fixed to deck slab


Steel Pipe(STK400)
Connecter Rib
Ø20 x 40

Rib
Spl PL(SS400)
Ø450

Rib PL(SM400A)
1200

Steel Pipe(STK400)
NOTES:
1) The plan shown in the drawing is for
U7 locating between P11 and P12.
2) Anchor Plate assembly is hot-dip
galvanized.
3) Drawing for damper and the attachment to the stay cable
12-M16 and fixture to the deck is for reference only.
Anchor Bolt When it is required to install the damper, the Contractor
Nut to be welded to Steel Pipe shall propose and design the damper to meet the
requirements as specified in these Technical
Specifications and with instruction by the Engineer.
Elastic buffer and back-up material at the mouth of the

30 3 0
15 60
steel pipe may be removed when damper is required to be

Ø4
installed.

135

135
15
06
3 0 30

.7

60
Welding of connection All dimensions are in mm, unless otherwise shown.
pieses to Steel Pipe

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

K. Itabashi STAY CABLE BOOT AT GIRDER EXIT


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C - 3c - 008
SHEET No. :
Sheet of PACKAGE:
Longitudinal Direction Design Conditions
Transverse Direction
Reaction
Total Reaction R 8719 kN
15 1390 15 1770 Dead Load Reaction Rd 5291 kN

Fill-in after Installation 345 510 345 3 x 516.7 = 1550 Longitudinal Reaction due to EQ Rh1e 2152 kN
Transverse Reaction due to EQ Rh2e 5650 kN
Ø500
Uplift due to EQ V 1587 kN

30
Displacement
8
Displacement on Service Loading UB +240mm, -285mm
11 6 Displacement on Service Loading
UB +272mm, -317mm
plus Assumed Allowance (±5°C)

4 2 Displacement on Earthquake UBe ± 186 mm

904
Rubber Bearing
3 5
Shear Modulus of Elasticity Ge 1.0 N/mm 2
9 1 Fracture Strain γu 600 %

7 Test Displacement ∆L ± 186 mm


13
Equivalent Stiffness KB 9.786 kN/mm
10 21.1 %
Equivalent Damping Factor hB
65
12 Rotation Checking Load R1 8719 kN
δr 2.833 mm
800

Vertical Displacement by Rotation


note) Equivalent Stiffness and Damping Factor as shown is determined
based on test displacement.

Component Material
2120 720 620 720
No. Component Material Nos Weight (kg) Note
2560 2380 1 Bottom Plate SM490A 1 8544.8 JIS B 3106
2 Top Plate SM490A 1 1304.2 JIS B 3106
1 SM490A 3 Rubber Bearing
+SS400 1 3351.2

4 Side Block SCW480N 2 3480.6 JIS G 5102*


25
3 ( ) HDR-S+SM490A+SS400 2x130=260 1550 2x130=260 5 Bolt and Washer 48 172.8 JIS B 1180
48-M42 Screw 8-M80 Screw
7 x 190 = 1330 6 Bolt and Washer 12 57.2 JIS B 1180
2 x 28 - M27 Screw Depth 70 Depth 70 (Back Side) 7 Anchor Bolt S35CN 8 273.1 JIS G 4051*
Depth 28 1200
8 Shear Key SM490A 1 200.4 JIS B 3106
9 Shear Key SM490A 4
1 75.5 JIS B 3106
2-Air Vent 10 Mid Plate SM490A 1 889.8 JIS B 3106
11 28 14.0 JIS B 1176
12 JIS B 1176

720
28 10.6
13 Bolt and Washer 28 16.8 JIS B 1180

3x130
=390
Total Weight 18391.0 (kg)
7 x 200 = 1400

Exterior Surface Corrosion Protection


Components with are to be coated.
1700

1720

7 x 260 = 1820
Hot Dip
Deposit is not less than 550 g/m 2 for general,
Galvanizing

2380
Detail A S=1:6

400
620
and not less than 350g/m 2 for bolts and washers.

* "-N" indicates the steel is normalized and heat treated.


Notes :
20 * 10
1. Organic zinc rich paint shall be applied to the top and bottom surface
45°

3x130
=390

of rubber , shear key and contact surface between shear key and plate.
2. Black oxide film treatment should be applied to Hex socket head screw cap,
2

45

720

and after bearing fabrication, high concentrated zinc powder should be painted.
7 x 150 = 1050 3. Bolt of strength class 10.9 should be painted by high concentrated zinc powder.
46

1220 4. The longitudinal position of bearing is at its center at 10 years after the bridge
completion when the reference temperature is 24 deg. The Contractor shall set the
6

bearing in a position by considering the difference of setting temperature from the


Ø500 A 2120
referance temperature, elastic shortening, and effect of creep and shrinkage. The top
* : Convering Rubber plate shall be jacked to deform the rubber bearing. The Contractor shall submit the
25

25 28-M27Screw
Rubber Thickness Te = 46mm x 10Layers (HDR-S) 2560 setting plan and method and means with analysis results for the Engineer's Approval.
Depth 45
Reinforcing Plate t = 6mm x 9 (SS400)
Layout
Top & Bottom Plate t = 45mm x 2 (SM490A)
E E E E E
604

180
25
25

Ø500
P11 P12 P13 P14 P15 P16 P17
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 001
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
25 25 25
2 ( ) SM490A 10 ( ) SM490A 4 ( ) SCW480N

12-M48Screw 345 510 345


B 28-Dia29Drilling 7 x 190 = 1330 24-Dia43 Drilling 3x130 400 3x130
=390 =390

Detail B S=1:6

235
2x130
=260
25 50

3
C
22

65
3 x 516.7 = 1550

7 x 200 = 1400
300

7 x 260 = 1820

7 x 200 = 1400
1770
290 2-M64Screw
90
Depth100

1910

105
R1

719
0
25

230
25
7 x 150 = 1050 1310 560

1390
7 x 150 = 1050
28-Dia29 Drilling
1410
Ø500 Ø43 Spot Facing Depth 29
25

Ø500
Note :

45
25
75

25
25 The rubber material of elastomeric bearing shall satisfy the characteristics hereafter.
1. Equivalent Shear Stiffness
Ø490 KB = G ( ) x Ae / te
28-Dia29Drilling
G ( ) = a 0 + a1 + a2 2 + a3 3... + a i
i
Ø43 Spot Facing Depth29
KB : Equivalent Stiffness of Elastomeric Bearing ( N/mm )
Ae : Effective Area ( mm2 )
G( ) : Equivalent Shear Modulus at a Shear Strain ( N/mm2 )
ai : Coefficient dependent on G( ). See Table 1.
: Design Shear Strain
7 S35CN Table 1 Coefficient ai

Ge a0 a1 a2 a3 a4 a5

Ordinary 2.505 -4.637 3.367


25
8 25
SM490A 9 SM490A M80 1.0
Seismic 3.961 -5.980 4.740 -1.813 0.3320 -0.02267
5 Hexagon Head Bolt (JIS) M42 x 300 8.8

65
(Washer) 2. Equivalent Damping Factor
00 00
Ø5
2 3
Ø5 hB ( ) = b 0+ b 1 + b 2 +b3
3
6 Hexagon Head Bolt (JIS) M48 x 195 8.8 hB( ) : Equivalent Damping Factor at Shear Strain

12 x 55 = 660
bi : Coefficient dependent on hB( ). See Table 2.
(Washer)

865
: Shear Strain
Table 2 Coefficient bi
11 Hexagon Holed Bolt M27 x 70 10.9
b0 b1 b2 b3
12 Hexagon Holed Bolt M27 x 40 10.9
C C Ge = 1.0 0.2091 0.01611 -0.02704 0.003519
2 2

55
13 Hexagon Head Bolt (JIS) M27 x 90 10.9 Ø80
130

(Washer)
2
49

C
2
C

Ø6 Spiral Wound Round Bar

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 002
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
Transverse Direction Longitudinal Direction
Design Conditions
15 1390 15 1770
Reaction
Fill-in after Installation 345 510 345 5 x 310 = 1550 Total Reaction R 8735 kN
Ø500 Dead Load Reaction Rd 5289 kN
2145 kN

50
Longitudinal Reaction due to EQ Rh1e
Transverse Reaction due to EQ Rh2e 10203 kN
8
Uplift due to EQ V 1587 kN
11 6
Displacement
4 2 Displacement on Service Loading UB +153mm, -173mm
Displacement on Service Loading
UB +169mm, -189mm

999
plus Assumed Allowance (±5°C)
3 5
Displacement on Earthquake UBe ± 185 mm
9 1
Rubber Bearing
13 7 Shear Modulus of Elasticity Ge 1.0 N/mm 2
Fracture Strain γu 600 %
10
Test Displacement ∆L ± 185 mm
12 Equivalent Stiffness KB 9.815 kN/mm
85
Equivalent Damping Factor hB 21.1 %
Rotation Checking Load R1 8735 kN
1100

Vertical Displacement by Rotation δr 2.833 mm


note) Equivalent Stiffness and Damping Factor as shown is determined
based on test displacement.

Component Material
No. Component Material Nos Weight (kg) Note
2120 720 620 720
1 Bottom Plate SCW480N 1 12687.8 JIS G 5102*
2680 2380 2 1549.4 JIS B 3106
Top Plate SM490A 1
25 3 Rubber Bearing 1 3351.2
1 ( ) SCW480N +SS400
4 Side Block SCW480N 2 6266.2 JIS G 5102*
25
3 ( ) HDR-S+SM490A+SS400 2x170=340 1590 2x170=340
5 Bolt and Washer 48 327.4 JIS B 1180
48-M56 Screw 8-M110 Screw
Depth 95 7 x 190 = 1330
Depth 95 (Back Side) 6 Bolt and Washer 16 99.7 JIS B 1180
2 x 28 - M27 Screw
Depth 28 7 Anchor Bolt S35CN 8 710.2 JIS G 4051*
1200
8 Shear Key SM490A 1 254.3 JIS B 3106
9 Shear Key SM490A 1
4 75.5 JIS B 3106
2-Air Vent 10 Mid Plate SM490A 1 889.8 JIS B 3106
11 28 15.9 JIS B 1176

720
12 28 10.6 JIS B 1176

3x170
=510
13 Bolt and Washer 28 16.8 JIS B 1180
Total Weight 26254.8 (kg)
7 x 200 = 1400

Exterior Surface Corrosion Protection


1700

1720

Components with are to be coated.

7 x 260 = 1820
Hot Dip
Deposit is not less than 550 g/m 2 for general,

2380
Detail A S=1:6 Galvanizing
620

540
and not less than 350g/m 2 for bolts and washers.

* "-N" indicates the steel is normalized and heat treated.


Notes :
20 * 10
1. Organic zinc rich paint shall be applied to the top and bottom surface

45

of rubber , shear key and contact surface between shear key and plate.
3x170
=510

2. Black oxide film treatment should be applied to Hex socket head screw cap,
2

45

720

and after bearing fabrication, high concentrated zinc powder should be painted.
7 x 150 = 1050 3. Bolt of strength class 10.9 should be painted by high concentrated zinc powder.
46

1220 4. The longitudinal position of bearing is at its center at 10 years after the bridge
completion when the reference temperature is 24 deg. The Contractor shall set the
6

bearing in a position by considering the difference of setting temperature from the


Ø500 A 2120
referance temperature, elastic shortening, and effect of creep and shrinkage. The top
* : Convering Rubber plate shall be jacked to deform the rubber bearing. The Contractor shall submit the
25

25 28-M27Screw
Rubber Thickness Te = 46mm x 10Layers (HDR-S) 2680 setting plan and method and means with analysis results for the Engineer's Approval.
Depth 45
Reinforcing Plate t = 6mm x 9 (SS400) Layout
Top & Bottom Plate t = 45mm x 2 (SM490A) E E E E E
604

25

260
25
25

Ø500
P11 P12 P13 P14 P15 P16 P17

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 003
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
25 25 25
2 ( ) SM490A 10 ( ) SM490A 4 ( ) SCW480N

28-Dia29 Drilling 7 x 190 = 1330

16-M60Screw 345 510 345 B 24-Dia58 Drilling 3x170=510 540 3x170=510

Detail B S=1:6

195
2x170
=340
25 50

3
C
22
5 x 310 = 1550

7 x 200 = 1400

7 x 260 = 1820

7 x 200 = 1400

85
300

1770

1910

25
400 2-M64Screw
90 Depth100

105
R1
0
25

734
320
7 x 150 = 1050
25
1730 620
1390 7 x 150 = 1050

1410
28-Dia29 Drilling
Ø500 Ø43 Spot Facing Depth 29
25

Ø500
Note :

45
25

25
90
25 The rubber material of elastomeric bearing shall satisfy the characteristics hereafter.
1. Equivalent Shear Stiffness
Ø490 KB = G ( ) x Ae / te
28-Dia29 Drilling
G ( ) = a 0 + a1 + a2 2 + a3 3... + a i
i
Ø43 Spot Facing Depth29
KB : Equivalent Stiffness of Elastomeric Bearing ( N/mm )
Ae : Effective Area ( mm2 )
G( ) : Equivalent Shear Modulus at a Shear Strain ( N/mm2 )
ai : Coefficient dependent on G( ). See Table 1.
: Design Shear Strain
7 S35CN Table 1 Coefficient ai

Ge a0 a1 a2 a3 a4 a5

Ordinary 2.505 -4.637 3.367


25
8 25
SM490A 9 SM490A M110 1.0
Seismic 3.961 -5.980 4.740 -1.813 0.3320 -0.02267
Hexagon Head Bolt (JIS) M56 x 420 8.8

90
5
Washer 2. Equivalent Damping Factor
00 00
Ø5
2 3
Ø5 hB ( ) = b 0+ b 1 + b 2 +b3
6 Hexagon Head Bolt (JIS) M60 x 200 8.8 4 hB( ) : Equivalent Damping Factor at Shear Strain
bi : Coefficient dependent on hB( ). See Table 2.
(Washer) : Shear Strain

12 x 75 = 900
Table 2 Coefficient bi

1190
11 Hexagon Holed Bolt M27 x 85 10.9
b0 b1 b2 b3
12 Hexagon Holed Bolt M27 x 40 10.9
C C Ge = 1.0 0.2091 0.01611 -0.02704 0.003519
2 2
13 Hexagon Head Bolt (JIS) M27 x 90 10.9

(Washer)
165

75
2
49

C
2 Ø110
C
Ø9 Spiral Wound Round Bar

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 004
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
Transverse Direction Longitudinal Direction 25 6.3 1.6
2 ( ) SCW480
850 1730
3x240=720
3x240=720 9 890 840
20-M42
17 170 7x205=1435 125
ScrewDepth 55
2 Design Conditions
2

10

170
Reactions
Total Reaction R 8252 kN
15
7
Dead Load Reaction Rd 1388 kN

10

890
8 R H1f 825 kN
550

25
18

4 Longitudinal Reaction due to EQ R H1e ---- kN


6 Transverse Reaction due to EQ R H2e 4345 kN

7x205=1435
5 Uplift due to EQ V 139 kN

1710

1730
1 Displacement
750
00 Total Movable Distance e -509, +564 mm
1170 Ø4
3
Friction Coefficient
Design Friction Coefficient f 0.10
10

840
4 3.2
( 25
) SM490A Allowable Bearing Stress
1400

3 PTFE Concrete σba 8 N/mm 2


0
62
Ø Steel σba 190 N/mm 2

125
0

10
62
Ø
930

850 Component Material


Component Material Weight (kg) Note

2
C
750 1 Bottom Plate SCW480N 1 2119.6 JIS G 5102*

54
M12 Screw Depth 25
1170
Install before shipping 2 Top Plate SCW480N 1 3111.9 JIS G 5102*

318
264

47
3 Sliding Plate PTFE 1 2.7
Ø670

50

3
4 Middle Plate SM490A 1 171.1 JIS B 3106

R0

2.8
940 5 Rubber 1 21.7

.5
25 3.2
1 ( ) SCW480N

63.8
7.5
15
Bond to Middle Plate 6 Seal Ring 1 1.0
11 SUS316

.5
R0
1170 7 Side Block SS400 2 171.8 JIS B 3106
210 750 210 9.5
Surface Lubrication 8 Hex. Bolts 10.7 JIS B 1180
Ø679 8
R33
4-Ø147Hole S 25 9 Hex. Bolts, Washers 20 48.2
7 SS400
R585

4-Ø235Seat
10 Anchor Bolts, Nuts S35CN 4 862.4 JIS B 1181
11 Stainless Plate SUS316 1 38.1
123
90
210

R 4-39Drill
R3

5 Chloroprene Rubber 6 Chloroprene Rubber Plate Total Weight 6559.2 (kg)

55 50
(with Compressive Seal Ring) Exterior Surface Corrosion Protection

200
R3
B Components with are to be coated.
Hot Dip
3x120=360 173 75 Deposit is not less than 550 g/m 2 for general,
Galvanizing
1170

A
750

2
0 470 248
C Ø67
D
* "-N" indicates the steel is normalized and heat treated.
Detail "a" S=1:10
Notes :
210

R1
0 10 S35CN 1. Organic zinc rich paint shall be applied to the top and bottom surface
of rubber , shear key and contact surface between shear key and plate.
5

2. Black oxide film treatment should be applied to Hex socket head screw cap,
4 225 M140x6 and after bearing fabrication, high concentrated zinc powder should be painted.
Ø680 Ø2
Compressive RIng 3. Bolt of strength class 10.9 should be painted by high concentrated zinc powder.
Ø3
2 4. The longitudinal position of bearing is at its center at 10 years after the bridge

112
175
completion when the reference temperature is 24 deg.

250
46

Connection shall be directed


to transverse direction of the bridge The Contractor shall set the bearing in a position by considering the difference of
setting temperature from the referance temperature,elastic shortening,
5 130
and effect of creep and shrinkage. The top plate shall be longitudinally displaced
970 130 5 470
relative to the bottom plate. The Contractor shall submit the setting plan
Ø680 3x120=360
and method and means with analysis results for the Engineer's Approval.
8-M36 Surface Lubrication
C5 Screw Depth 50

1650

12x100=1200
8 Hex. Bolt (JIS) M36 x 120 4.6 Layout
55
155

1400
175 86
346

261
115 5

9 Hex. Bolt (JIS) M42 x 155 8.8 E E E E E


80

A Round Washer 42 x 78 x 7.0 -22H


40 15 40 15
15 70 15 15 15

100
1150 510 70 510 P11 P12 P13 P14 P15 P16 P17
30 30
All dimensions are in mm, unless otherwise shown.
Section A-B-C-D Ø140

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

H. Ikeda POT BEARING AT P11 AND P17


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 005
SHEET No. :
Sheet of PACKAGE:
A-A S=1/80

1200 33200
550 15860
600 6805 8395 60 380 60
Support box pitch 940 1200 995 990 995 990 995 300 300 995 990 4x1110=4440 1200 530
Control box pitch 1655 940 1985 1985 840 1765 2085 1110 1110 1155 1230 TABLE OF INSTALLATION CLEARANCE
It is ventilation hole 50 (PER ONE CELL)
of the size of Ø25. C
L
F C D E
EJ-2
80

70
52

1100

60
"a"
80

"a"(mm)
50
30.8mm
(24℃)
2235

40
1944

750

30
500

20

10

0
EJ-1 200 250 -10 0 10 20 30 40 50

F C D E Temperature( C)
Shifting amount by a change of
Control box pitch 20 1455 2135 1985 1830 755 1985 1310 1110 1110 1155 1030 20 temperature per 1 °C (per one cell) = 0.755mm

1200 33200
EJ-2 550 15860
1150 15200 500
600 6805 8395 60 380 60

18 535 250 5
C
L

Joint
18 535 167.9
17.3

535 255
265.3

1.0%
150
304
535

A 2.0% A

15
445

1.5%

15
15
24

18

LOCATION
B B

30
P11 P17
30

K.L
706

K.L 100 400 100 5060


855 50 350 50

EJ-1

EJ-2
3x165 130 187.5 60 160 200 150 150 190 190
Stud interval 115 =495 80 130 60 187.5 60 160 60 80 200 80 60 190 60 60 200 60 140 140

EJ-3

EJ-4
1730 20 690 500 260 440 500 495 550 440 500 495 550 440 500 495 550 550 495 500 440 550 610 500 560 550 610 500 560 550 700 500 280 170
1200 2000 4x1985=7940 3x2220=6660 20

33200
EJ-1 550 15860
1150 15200 500
600 6805 8395 60 380 60

470 250 5
C
L
Joint
470 167.9
17.3

470 255
1.0%
150
304
470

A 2.0% A
1.5%
NOTES
1. The Drawing shows a condition with 10-year creep and shrinkage
B B with reference temperature of 24 deg. The Contractor shall set the
expansion joints in a position by considering elastic shortening,
effect of 10-year creep and shrinkage and difference of setting
641

temperature from the reference temperature. The Contractor shall


submit the plan and method and means with analysis results for the
3x165 60 187.5 60 185 150 150 190 190 Engineer's Approval.
Stud interval 115 =495 80 105 105 187.5 60 185 60 60 190 60 60 200 60 140 140 2. This drawing shows the state “a”=40mm (at time of neutrality)
690 500 490 210 500 495 500 490 500 495 500 490 500 495 550 550 495 500 490 500 610 500 610 500 610 500 610 500 700 500 280 interval per one cell.
530 20 7405 8455 20 170

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T. Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P11 1


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80 DRAWING No. : C - 4 - 006


SHEET No. :
Sheet of PACKAGE:
A-A S=1/80

33200 900
15860 550
60 380 60 8395 6805 600
530 1200 4x1110=4440 990 995 300 300 995 990 995 990 995 1200 940 Support box pitch
1230 1155 1110 1110 2085 1765 840 1985 1985 940 1655 Control box pitch
50 It is ventilation hole
C
L of the size of Ø25.
E D C F
EJ-4

52
1100

"a"
80

2235
1944
750
500
250 200
EJ-3
E D C F

20 1030 1155 1110 1110 1310 1985 755 1830 1985 2135 1455 20 Control box pitch

33200 900
15860 550 EJ-4
500 15200 1150
60 380 60 8395 6805 600
535 250 5

C
18 535 255

Joint

168

17
1.0%

150

265
304
18 535
2.0%

18 535
A A
15

24 445
1.5%

15

15
LOCATION
B B
30

P11 P17

30
K.L
5060 100 400 100 K.L

706
50 350 50 855

EJ-1

EJ-2
190 190 150 150 200 160 60 187.5 130 3x165
140 140 60 200 60 60 190 60 80 200 80 60 160 60 187.5 60 130 80 =495 115 Stud interval

EJ-3

EJ-4
170 280 500 700 550 560 500 610 550 560 500 610 550 440 500 495 550 550 495 500 440 550 495 500 440 550 495 500 440 260 500 690 20 1430
20 3x2220=6660 4x1985=7940 2000 900

33200
15860 550 EJ-3
500 15200 1150
60 380 60 8395 6805 600
470 250 5

C
470 255

L
Joint

168

17
1.0%

150

304
470

470
A 2.0% A
1.5%
NOTE
1. The Drawing shows a condition with 10-year creep and shrinkage
B B with reference temperature of 24 deg. The Contractor shall set the
expansion joints in a position by considering elastic shortening,
effect of 10-year creep and shrinkage and difference of setting

641
temperature from the reference temperature. The Contractor shall
submit the plan and method and means with analysis results for the
140 190 190 150 150 185 60 187.5 60 3x165 Engineer's Approval.
140 60 200 60 60 190 60 60 185 60 187.5 105 105 80 =495 115 Stud interval
280 500 700 500 610 500 610 500 610 500 610 500 490 500 495 550 550 495 500 490 500 495 500 490 500 495 500 210 490 500 690
170 20 8455 7405 20 530

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T. Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P11 2


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80 DRAWING No. : C - 4 - 007


SHEET No. :
Sheet of PACKAGE:
B-B S=1/80

1200 550 1450 4x1985=7940 3x2220=6660


300 250 400 400 400 400 400 400 300
27×52 Long Hole
(Expansion side) 100 100 100 50 150 50 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 100 100

EJ-2 C
L

65 110 45
220
10
12

575

575
1920
1900
750

750
575

150 720
12

10
80

EJ-1

Reinforcement 3x170 4x192.5 3x188.3 3x186.7 3x188.3 3x186.7 3x188.3 170 3x188.3 3x186.7 4x170 4x170 4x170 4x170 4x192.5 170
steel rod pitch 215 =510 430 =770 430 =565 430 =560 430 =565 430 =560 430 =565 430 430 =565 430 =560 430 =680 430 =680 430 =680 430 =680 430 =770 430 145
1200 33200

3x2220=6660 4x1985=7940 1450 550 900


300 400 400 400 400 400 400 250 300 27×52 Long Hole
100 100 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 50 150 50 100 100 100 (Expansion side)

C
L
EJ-4

65 110 45

220
10

12
575

575
1900
1920
750

750
LOCATION

575
150 720

P11 P17

12
10
80
EJ-3

EJ-1

EJ-2
170 4x192.5 4x170 4x170 4x170 4x170 3x186.7 3x188.3 170 3x188.3 3x186.7 3x188.3 3x186.7 3x188.3 4x192.5 3x170 Reinforcement

EJ-3

EJ-4
145 430 =770 430 =680 430 =680 430 =680 430 =680 430 =560 430 =565 430 430 =565 430 =560 430 =565 430 =560 430 =565 430 =770 430 =510 215 steel rod pitch
33200 900

Filler Plate Details S=1/20


(EJ-2 , EJ-4)
300 250 400
100 100 100 50 150 50 100 200 100
4-Ø30 Hole 4-Ø30 Hole 4-Ø30 Hole
65 110 45

65 110 45

65 110 45
220

220

220
NOTE
1. The Drawing shows a condition with 10-year creep and shrinkage
with reference temperature of 24 deg. The Contractor shall set the
expansion joints in a position by considering elastic shortening,
effect of 10-year creep and shrinkage and difference of setting
15

15

15
temperature from the reference temperature. The Contractor shall
submit the plan and method and means with analysis results for the
Engineer's Approval.
1-Fill Pl 220 x 15 x 300 1-Fill Pl 220 x 15 x 250 1-Fill Pl 220 x 15 x 400
4-HTB M24 x 90 (F10T) 4-HTB M24 x 90 (F10T) 4-HTB M24 x 90 (F10T)

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T. Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P11 3


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80,20 DRAWING No. : C - 4 - 008
SHEET No. :
Sheet of PACKAGE:
Section C - C S=1/30 Section D - D S=1/30
EJ-1 3428 EJ-2 EJ-1 2118 EJ-2
EJ-3 742 1944 742 EJ-4 EJ-3 87 1944 87 EJ-4
12 1920 12 12 1920 12
Bearing(Frame)(Polyamide)
80 "a" 52 80 "a" 52
Middle Beam(SM490YB) <0~80> <0~80>
Edge Beam(SM400A) Rubber Packing(CR) Spring(Box)(NR+PTFE) Rubberfit Plate(Box)(SM400A) Rubberfit Plate(MB)(SM400A)
Support Beam(S355K2G3)

16 106

16 106
336 12 110

336 12 110
200

200
470

470
b b
500

500
535

535
550

550
320

320
a a

397

397
12

12
30

30
Connection Plate(SM400A)

16

16
15

15
Control Spring(NR)
Bearing(Box)(Polyamide) Shoe(Polyurethene Rubber) Welding Wire Net(SWM-P) Control Box(SM400A)

Spring(Frame)(NR+PTFE)
Support Box(SM400A)

10 10 10 10
80 575 575 220 80 575 575 220
12 1920 12 12 1920 12
1500 750 1500 1500 750 1500

Section a - a S=1/30 Section b - b S=1/30


Middle Beam Center
3428
2740

200
Shoe(Polyurethene Rubber)
Support Box(SM400A)

290
Guide(SM400A)
Support Box(SM400A)

200

290
200
500

500
Control Box(SM400A)

Connection Plate(SM400A)

Frame (Mov)(SM400A) Support Beam(S355K2G3)

Section E - E S=1/30 Section F - F S=1/20


(Joint Detail)
EJ-1 2235 EJ-2 EJ-1 EJ-2
52 80 80 52
EJ-3 93 1944 198 EJ-4 EJ-3 EJ-4
Upper Flange(SM400A)
12 1920 12 Ø25
Casting concrete Rib(SM400A)
80 "a" 52
<0~80>

16 106
12 110
NJ02-D16(SD390) Stud(NSD400) 8
120 225 Casting concrete

115 56

57
R3
5
16 106
336 12 110

470

145

535
6

336

397
80

80
D25

D25

50 115
470
500

535
550

50 145
NJ03~06 D16 NJ07-D16(SD390)
397
350

Lower Flange(SM400A)
(SD390) 0
R2
500
60

12
12
30

60

50 80 50
16

16
15
150

Joint(SM400A)
180 12 50 80 50
NJ01-D16(SD390)
Filler Plate(SS400) 12 180

10 10 NOTE
HTB M22(F10T)
150 720 65110 45 1. The Drawing shows a condition with 10-year creep and shrinkage
with reference temperature of 24 deg. The Contractor shall set the
300 300
expansion joints in a position by considering elastic shortening,
80 575 575 220
effect of 10-year creep and shrinkage and difference of setting
158 12 1920 12 188 temperature from the reference temperature. The Contractor shall
1500 750 1500 submit the plan and method and means with analysis results for the
Engineer's Approval.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T.Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P11 4


in a sociation with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1/30,20 DRAWING No. : C - 4 - 009
SHEET No. :
Sheet of PACKAGE:
A-A S=1/80

900 33200
550 15860
600 6805 8395 60 380 60
Support box pitch 1035 1200 995 990 995 990 995 205 205 995 990 3x1110=3330 1200 1200 535
Control box pitch 1540 1190 1985 1985 705 1695 2260 1110 1110 1245 1035 TABLE OF INSTALLATION CLEARANCE
It is ventilation hole 50 (PER ONE CELL)
F C D E C
of the size of Ø25. L
EJ-2
80

70

60
600

"a"(mm)
50
29.1mm
(24℃)
40
2064

800
2355

30

20
80

1100
"a"

10
52

0
EJ-1 -10 0 10 20 30 40 50

F C D E Temperature( C)
200
Shifting amount by a change of
Control box pitch 20 1740 1985 1985 1695 700 1945 3x1110=3330 1245 1235 20 temperature per 1 °C (per one cell) = 0.781mm

33200
EJ-2 550 15860
1150 15200 500
600 6805 8395 60 380 60

470 250 5
C
L

Joint
168
17

470 255
1.0%
150
304

470
470

A 2.0% A
1.5%

LOCATION
45 75

B B
P11 P17
521

K.L
101
177 373 47 5

EJ-1

EJ-2
170 90 202.5 200 180 60 140 60 140
Stud interval 110 170 80 105 105 202.5 90 60 290 60 90 200 90 60 60 140 60 60 425 60 60 380 145

EJ-3

EJ-4
530 300 410 580 210 410 585 410 580 410 585 410 580 410 585 410 410 585 410 580 410 300 400 410 300 400 410 300 400 410 300 400 545 300 400 500 285
530 20 7405 8455 20 170

900 33200
EJ-1 550 15860
1150 15200 500
600 6805 8395 60 380 60

5
C
L

535 250
Joint
168
17

535 255
1.0%
150
265

304

18 535
535

A 2.0% A

15
1.5%
445

15

18
15

NOTES
18
24

1. The Drawing shows a condition with 10-year creep and shrinkage


B B with reference temperature of 24 deg. The Contractor shall set the
30 expansion joints in a position by considering elastic shortening,
30

K.L
effect of 10-year creep and shrinkage and difference of setting
706

K.L 100 400 100 5060


temperature from the reference temperature. The Contractor shall
50 350 50 submit the plan and method and means with analysis results for the
170 90 202 90 200 180 60 140 60 140 Engineer's Approval.
Stud interval 110 170 80 105 105 203 90 60 290 60 200 90 60 60 140 60 60 425 60 60 380 145
2. This drawing shows the state “a”=40mm (at time of neutrality)
1430 20 530 300 410 210 580 410 585 410 580 410 585 410 580 410 585 410 410 585 410 580 410 400 300 410 400 300 410 400 300 410 400 300 545 400 300 500 285 170
interval per one cell.
900 2000 4x1985=7940 3x2220=6660 20

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T.Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P17 1


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80 DRAWING No. : C - 4 - 010


SHEET No. :
Sheet of PACKAGE:
A-A S=1/80

33200 1200
15860 550
60 380 60 8395 6805 600
535 1200 1200 3x1110=3330 990 995 205 205 995 990 995 990 995 1200 1035 Support box pitch
1035 1245 1110 1110 2260 1695 705 1985 1985 1190 1540 Control box pitch

F 50 It is ventilation hole
C E D C
L of the size of Ø25.
EJ-4

600

2064
800

2355
80
1100
"a"
52
EJ-3
E D C F
200

20 1235 1245 3x1110=3330 1945 700 1695 1985 1985 1740 20 Control box pitch

33200
15860 550 EJ-4
500 15200 1150
60 380 60 8395 6805 600
470 250 5

C
470 255

Joint

17
168
1.0%

150

304
470

470
A 2.0% A
1.5%
LOCATION
P11 P17

45 75
B B

521
K.L
101

EJ-1

EJ-2
5 47 373 177

140 60 140 60 180 200 202.5 90 170

EJ-3

EJ-4
145 380 60 60 425 60 60 140 60 60 90 200 90 60 290 60 90 202.5 105 105 80 170 110 Stud interval
285 500 400 300 545 400 300 410 400 300 410 400 300 410 400 300 410 580 410 585 410 410 585 410 580 410 585 410 580 410 585 410 210 580 410 300 530
170 20 8455 7405 20 530

33200 1200
15860 550 EJ-3
500 15200 1150
60 380 60 8395 6805 600
535 250 5

C
18 535 255

L
Joint

17
18 535 168

1.0%

150

265
304
2.0%

18 535
A A
15

445
1.5%
15

15

24
NOTE
1. The Drawing shows a condition with 10-year creep and shrinkage
B B with reference temperature of 24 deg. The Contractor shall set the
30

expansion joints in a position by considering elastic shortening,

30
K.L
effect of 10-year creep and shrinkage and difference of setting

706
5060 100 400 100 K.L
temperature from the reference temperature. The Contractor shall
50 350 50 submit the plan and method and means with analysis results for the
140 60 140 60 180 200 90 202 90 170 Engineer's Approval.
145 380 60 60 425 60 60 140 60 60 90 200 60 290 60 90 203 105 105 80 170 110 Stud interval
170 285 500 300 400 545 300 400 410 300 400 410 300 400 410 300 400 410 580 410 585 410 410 585 410 580 410 585 410 580 410 585 410 580 210 410 300 530 20 1730
20 3x2220=6660 4x1985=7940 2000 1200

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T.Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P17 2


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80 DRAWING No. : C - 4 - 011


SHEET No. :
Sheet of PACKAGE:
B-B S=1/80

900 33200
Reinforcement
steel rod pitch 185 4x180 300 5x180 300 4x173.8 300 4x172.5 300 4x173.8 300 4x172.5 300 4x173.8 300 300 4x173.8 300 4x172.5 300 5x162 300 5x162 300 5x162 300 5x180 300 5x180 300 155
=720 =900 =695 =690 =695 =690 =695 110 =695 =690 =810 =810 =810 =900 =900 230

EJ-2

150
80
10
12

755
610
2040
2020
800

800
610

610
45 110 65
12
220
10

EJ-1 C
L LOCATION
27×52 Long Hole
100 100 100 50 150 50 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 100 100
(Expansion side) P11 P17
300 250 400 400 400 400 400 400 300
900 550 1450 4x1985=7940 3x2220=6660

EJ-1

EJ-2
33200 1200
Reinforcement

EJ-3

EJ-4
155 300 5x180 300 5x180 300 5x162 300 5x162 300 5x162 300 4x172.5 300 4x173.8 300 300 4x173.8 300 4x172.5 300 300 4x172.5 300 4x173.8 300 5x180 300 4x180 185 steel rod pitch
230 =900 =900 =810 =810 =810 =690 =695 110 =695 =690 =695 =690 =695 =900 =720

EJ-4
150

80
10

12
755

610
2020
2040
800

800
610

610
45 110 65

12
220
10
C
L
EJ-3
100 100 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 50 150 50 100 100 100 27×52 Long Hole
(Expansion side)
300 400 400 400 400 400 400 250 300
3x2220=6660 4x1985=7940 1450 550 1200

Filler Plate Details S=1/20


(EJ-1)
300 250 400
100 100 100 50 150 50 100 200 100
4-Ø30 Hole 4-Ø30 Hole 4-Ø30 Hole
110 65

45 110 65

45 110 65
NOTE
220

220

220
1. The Drawing shows a condition with 10-year creep and shrinkage
with reference temperature of 24 deg. The Contractor shall set the
45

expansion joints in a position by considering elastic shortening,


effect of 10-year creep and shrinkage and difference of setting
temperature from the reference temperature. The Contractor shall
15

15

15
submit the plan and method and means with analysis results for the
Engineer's Approval.

1-Fill Pl 220 x 15 x 300 1-Fill Pl 220 x 15 x 250 1-Fill Pl 220 x 15 x 400


4-HTB M24 x 90 (F10T) 4-HTB M24 x 90 (F10T) 4-HTB M24 x 90 (F10T)

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T.Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P17 3


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80,20 DRAWING No. : C - 4 - 012
SHEET No. :
Sheet of PACKAGE:
Section C - C S=1/30 Section D - D S=1/30
EJ-1 3628 EJ-2 EJ-1 2238 EJ-2
742 2064 822 87 2064 87
12 2040 12 12 2040 12
Bearing(Frame)(Polyamide)
80 "a" 52 80 "a" 52
Middle Beam(SM490YB) <0~80> <0~80>
Edge Beam(SM400A) Rubber Packing(CR) Spring(Box)(NR+PTFE) Rubberfit Plate(Box)(SM400A) Rubberfit Plate(MB)(SM400A)
Support Beam(S355K2G3)
397 16 106

16 106
336 12 110

336 12 110
200

200
470

470
b b

500

500
535

535
550

550
320

320
a a

397
12

12
30

30
Connection Plate(SM400A)
16

16
15

15
Control Box(SM400A) Control Spring(NR)
Welding Wire Net(SWM-P)
Shoe(Polyurethene Rubber)
Bearing(Box)(Polyamide)
Spring(Frame)(NR+PTFE)

10 10 10 10
220 610 610 80 220 610 610 80
12 2040 12 12 2040 12
1500 800 1600 1500 800 1600

Section a - a S=1/30 Section b - b S=1/30


Middle Beam Center
3628
2900

200
Shoe(Polyurethene Rubber)

220
Guide(SM400A)

200
Support Box(SM400A)

220
Support Box(SM400A)

200
205

205
Control Box(SM400A)

Connection Plate(SM400A)

Frame (Mov)(SM400A) Frame (Fix)(SM400A) Support Beam(S355K2G3)

Section E - E S=1/30 Section F - F S=1/20


(Joint Detail)
EJ-1 EJ-2 EJ-1 EJ-2
2355
EJ-3 198 2064 93 EJ-4 EJ-3 52 80 80 52 EJ-4
Upper Flange(SM400A)
12 2040 12 Ø25
Rib(SM400A) Casting concrete
80 "a" 52
<0~80>

16 106

12 110
Stud(NSD400) NJ10-D16(SD390) 8
Casting concrete 225 120

57

115 56
5
R3

470
397 16 106

336 12 110

145
535
6

336
397
80

80
D25

D25

50 115
470
500
535
550

50 145
NJ08-D16(SD390) NJ11~14 D16
350

Lower Flange(SM400A) R2
(SD390) 0
500

12
60
12
30
60

50 80 50
16

16
15

150

50 80 50 12 180
Joint(SM400A)
NJ09-D16(SD390) 180
Filler Plate(SS400) 12
NOTE
10 10
HTB M22(F10T)
755 150 1. The Drawing shows a condition with 10-year creep and shrinkage
45 110 65
with reference temperature of 24 deg. The Contractor shall set the
300 300
expansion joints in a position by considering elastic shortening,
220 610 610 80 effect of 10-year creep and shrinkage and difference of setting
188 12 2040 12 158 temperature from the reference temperature. The Contractor shall
1500 800 1600 submit the plan and method and means with analysis results for the
Engineer's Approval.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1

T.Takada ..\..\00 SIGN\takada.tif ..\..\00 SIGN\DATE.tif EXPANSION JOINT P17 4


in association with
H. Ohashi ..\..\00 SIGN\Ohashi.tif ..\..\00 SIGN\DATE.tif

TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1/30,20 DRAWING No. : C - 4 - 013
SHEET No. :
Sheet of PACKAGE:
SECTION A-A DETAIL "a"
SECTION B-B A B (Scale 1/20) (Scale 1/20)

(Scale 1/20) 2000

202.5 11x145=1595 202.5 1550(1650) 1000

8 1 8
250 1 1a 1a

37.5
75
7

225

237.5
150
2 100 7 100
50 2 2a 5b 2a
100

9
5 300 8b 1b
9 6b 2b
125 125 5

480
6
380

125
1100

1100

1100
6
3 300 3 10

875
3a
10
100

3b

175
4 11
125
295

11 9b
170

170
7b 4a 4b
1.5%

11.25
4

150

230
Ø225 Ø225

Deck slab
B No
SHOULDER REILING (TYPE 1)
Description Remarks

1 75 x 75 x t4.5 STKR 400 (JIS G3466)


A 2 150 x 100 x t9
3 100 x 100 x t12
4 75 x 45 x t3.2
6 125 x 125 x t12
7 100 x 50 x t3.2
5 PL 40 x 9 SS 400 (JIS G3101)
1a 66 x 66 x t5
2a 132 x 82 x t12
3a 76 x 76 x t16
4a PL 189 x 3.2
1b L 95 x 60 x t7
) 2b L 45 x 35 x t4
1.0
75 3b L 45 x 35 x t4
2+
0(
1+
25
1. SHOULDER RAILING TYPE 1 ARRANGEMENT 4b L 70 x 25 x t6
5b L 70 x 40 x t6
150(200) 600 (Scale 1/50)
6b [ 75 x 25 x 40 x t5 x t7 x t7
500(600) 750(800) 1100 1000 1300 746x2000=1492000 7b [ 75 x 25 x 40 x t5 x t7 x t7
800(850) 750(800) 800(850) Detail "a" Other incidentals
8 M16 x 40 JIS B1051
9 M20 x 50 (Strength class 8.8)
10 M20 x 50
11 M16 x 40
8b M4
9b M4

NOTES:
Center Line of

Center Line of
P11 1- All dimension are in millimeter.
Girder End

Girder End

Floorbeam

Floorbeam
( P17 ) 2- The railing shall satisfy the requirements for the level "L3"
stipulated in Article 13.7.2 of the specification for bridge 22TCN-272-05.
3- Refer to the Technical Specification for the surface finish.
4- The post for the railing shall be spaced typically at every 2 m.
The Contractor shall submit the plan and calculation sheets for the
arrangement of the posts and their anchor and horizontal beams at
the ends with Approach Bridges for the Engineer's approval.
5- Additional post for shoulder railing shall be fabricated and installed
inside expansion joints at Approach Bridge side as shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T. Takada
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 4 - 014
SHEET No. :
Sheet of PACKAGE:
SECTION A-A DETAIL "a"
SECTION B-B B (Scale 1/20) (Scale 1/20)
(Scale 1/20)

A 2000 1550(1650) 1000

300 300
1a 1 1b
1

100
200 4

350
4
200

2 5
2a 2
750

750

750
100

1000
250 2b
100

300
100
250

3 3
100

230
250

250
Ø225 Ø225

250 250

500
B
MEDIAN REILING
No Description Remarks

A 1 200 x 200 x t8
2 100 x 50 x t3.2 STKR 400 (JIS G3466)
3 100 x 100 x t12
1a 184 x 184 x t10
2a 93.6 x 43.6 x t4 SS 400 (JIS G3101)
Other incidentals
4 M20 x 50 JIS B1051
5 M16 x 40 (Strength class 8.8)

)
1.0
75
( 2+

1+
25
1 .0 MEDIAN RAILING ARRANGEMENT
150(200) 600 (Scale 1/50)
500(600) 750(800) 1100 1000 1300 746x2000=1492000
800(850) 750(800) 800(850)
Detail "a"
1b

2b

NOTES:
Center Line of

Center Line of
P11 1- All dimension are in millimeter.
Girder End

Girder End

Floorbeam

Floorbeam
( P17 ) 2- The railing shall satisfy the requirements for the level "L3"
stipulated in Article 13.7.2 of the specification for bridge 22TCN-272-05.
3- Refer to the Technical Specification for the surface finish.
4- The post for the railing shall be spaced typically at every 2 m.
The Contractor shall submit the plan and calculation sheets for the
arrangement of the posts and their anchor and horizontal beams at
the ends with Approach Bridges for the Engineer's approval.
5- Additional post for shoulder railing shall be fabricated and installed
inside expansion joints at Approach Bridge side as shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1

T. Takada METAL BRIDGE RAILING AT MEDIAN


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 4 - 015
SHEET No. :
Sheet of PACKAGE:
FRAMING PLAN S=1/1000
1.0
25 0)
1 + 7 5 1.
( 2+ 1500000
600 900 148500 300000
Cable 4500 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10 x 12000
4500 36 x 4000 = 144000 75 x 4000 = 300000 = 120000
Floorbeam
Spiral mesh drain pipe
Spiral mesh drain pipe

FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38

FB39
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB2

FB3
FB4
FB5
FB6
FB7
FB8
FB9
400 1200

S1

1200
WEG
750
15200
35600
32400

33200
500
L
C

15200
1200 400
750

1200
EEG
1500 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
4500 4500 33 x 4000 = 132000 12000 72 x 4000 = 288000 =120000
Slab Drain Pipe
Catch Pit 2400 9000 61 x 12000 = 732000

1500000
300000 300000
Cable 10 x 12000 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10 x 12000
= 120000 75 x 4000 = 300000 75 x 4000 = 300000 = 120000
Floorbeam
Spiral mesh drain pipe

FB100
FB101
FB102
FB103
FB104
FB105
FB106
FB107
FB108
FB109
FB110
FB111
FB112
FB113

FB114
FB115
FB116
FB117
FB118
FB119
FB120
FB121
FB122
FB123
FB124
FB125
FB126
FB127
FB128
FB129
FB130
FB131
FB132
FB133
FB134
FB135
FB136
FB137
FB138
FB139
FB140
FB141
FB142
FB143
FB144
FB145
FB146
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB80
FB81
FB82
FB83
FB84
FB85
FB86
FB87
FB88
FB89
FB90
FB91
FB92
FB93
FB94
FB95
FB96
FB97
FB98
FB99
400 1200

1200
WEG
750
15200
35600
32400

33200
500
L
C

15200
1200 400
750

1200
EEG
J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-39 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54
Joint 10x12000=120000 6000 10 x 12000 = 120000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000=120000
Slab Drain Pipe 72 x 4000 = 288000 12000 72 x 4000 = 288000
Catch Pit 61 x 12000 = 732000

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi DRAINAGE ARRANGEMENT 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 4 - 016
SHEET No. :
Sheet of PACKAGE:
FRAMING PLAN S=1/1000

1500000
300000 300000
Cable 10 x 12000 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10 x 12000
= 120000 75 x 4000 = 300000 75 x 4000 = 300000 = 120000
Floorbeam
Spiral mesh drain pipe
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB155
FB156
FB157
FB158
FB159
FB160
FB161
FB162
FB163
FB164
FB165
FB166
FB167
FB168
FB169
FB170
FB171
FB172
FB173
FB174
FB175
FB176
FB177
FB178
FB179
FB180
FB181
FB182
FB183
FB184
FB185
FB186
FB187
FB188

FB187
FB186
FB185
FB184
FB183
FB182
FB181
FB180
FB179
FB178
FB177
FB176
FB175
FB174
FB173
FB172
FB171
FB170
FB169
FB168
FB167
FB166
FB165
FB164
FB163
FB162
FB161
FB160
FB159
FB158
FB157
FB156
FB155
FB154
FB153
FB152
FB151
FB150
FB149
FB148
FB147
400 1200

1200
WEG
750
15200
35600
32400

33200
500
L
C

15200
1200 400
750

1200
EEG
J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65 J-65 J-64 J-63 J-62 J-61 J-60 J-59 J-58 J-57 J-56 J-55 J-54 J-53 J-52 J-51
Joint 10x12000=120000 6000 10 x 12000 = 120000 12000 10000 5000 5000 10000 12000 10 x 12000 = 120000 6000 10x12000=120000
Slab Drain Pipe 72 x 4000 = 288000 12000 72 x 4000 = 288000
Catch Pit 61 x 12000 = 732000 6000 6000 61 x 12000 = 732000

TYPICAL GIRDER CROSS SECTION S=1/200


C
L
35600
1200 1200
400 750 3300 150 3 x 3750=11250 500 500 3 x 3750=11250 150 3300 750 400
500
W2

W3

E3

E2
400 400
W1

W4

E1
E4
PH PH
97 303 303 97
As Pave. t=75mm

Waterproofing

260
250
150

2% 2%

2700
1250

2000

3000
R=364013
WEG EEG

1247 1247

800 33200 800

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi DRAINAGE ARRANGEMENT 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 4 - 017
SHEET No. :
Sheet of PACKAGE:
BEAM END S=1/60
400 400
303 97 303 97
ELEVATION
150

1500 900 1000 75

46 20
100 214
370 20

495 20
390

515

550

185
500

500
B1

600
500
B1

00
R6

1183.2
1800

1800

2515
1675
3000
3092

2875
00

2967
R6

Tie down
B1 B1 cable

1216.8
700

700

700

300
EEG
100

100

100
EEG EEG WEG
WEG WEG
1225 1200
1247 1200 1247 1200
1-PIPE 25A x 123 (SGPW) (per1 place)
450
1-VP 200A x 3092 (per1 place) 1-Bent pipe (VP) (per1 place) 550 1150

BENT PIPE S=1/60 WATERPROOF MEMBRANE END DETAIL S=1/20

WEG side EEG side Transverse direction

Ø216 Ø216 Median


Sidewalk

10
2%

10
467

467

Pavement
0

0
60

60
591.6

591.6
R

Waterproof Membrane
Deck
591.6

591.6
2967

2967
0

0
60

60
R

Longitudinal direction
1316.8

1316.8

A-A A-A

Waterproof membrane is raised up to pavement surface


Spiral mesh drain pipe Ø18
4 5°
4 5°

Pavement
1000 1000

1-VP 200A x 3468 (per1 place) 1-VP 200A x 3468 (per1 place) Expansion joint etc Waterproof Membrane

Deck

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi DRAINAGE DETAIL 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 4 - 018
SHEET No. :
Sheet of PACKAGE:
CATCH PIT S=1/20 METALLIC PARTS S=1/20 SLAB DRAIN PIPE S=1/6 SOCKET S=1/3
400 B1
110 500
290 Ø 10
4 0
250 250
20 50 260 50 20
20 50 360 50 20
Ø30x60 drain hole 30 .5 Ø3
40 20 Ø 41 0.3

27
1:5 Ø30x60 drain hole .2
55 20

Ø
15 90 19 33
Cap t=6 (SM400) Ø

60
85
(Galvanizing)
35

180
Ø100
100

165
450(575)

6
6
200 Weld

1000
6
Ø10 bolt for chain

21
10

Ø
300 installation 4-M10 tap bolt holes

46
200
(SUS304) Steel pipe Ø25x215

6
(ND SGPW)

40

40
10 Ø174 10 10 Ø174 10

215
6
Ø41.5
Ø194 Ø194

455

8
400 6 71.5 3x100 71.5 6
=300 M12 bolt (SUS304) 1247

3.5 34.8mm pitch 3.5


Ø15 hole 2-18 x 38 long holes
4-Ø18 bolt holes Ø34
(Conn.PL side)
PL 55x6

50 25

25 50 25
355

100

100
500

Crossbar 8x8

25
25
PL 55x35 Bearing bar 7x4x55 15 15 SLAB DRAIN PIPE INSTALLATION S=1/20
70

25 30 228 30 25
55

70 30 29.5
R1

288 1043.5 Wire mesh


5

Chain Ø5x450 Ø2.6 (SS400) Cap


As for cover galvanizing (550g/m 2) 2-PL 100 x 8 x 90 (SM400A) (Galvanizing) 150 Waterproof
2-PL 100 x 6 x 451 (SS400)
2-PL 100 x 6 x 1224 (SS400)

75
20
4-B.N M16 x 45 (1-W,SW) (SS400)
TAP BOLT M12 Bolt BOLT FOR CHAIN

Deck thick
S=1/4 S=1/4 4-B.N M16 x 50 (2W) (SS400) Slab reinforcing bar
(SUS304) INSTALLATION S=1/4 Steel pipe Deck slab
(SUS304)
21.9
M10

M12
Ø16

Socket 25A Steel pipe Ø25


8 30 (ND SGPW)
Ø20
Ø10

7 30 (ND SGPW)
M8

Installation after the form removing


20
35
M8
6

per 1 places
Mark Item name Material quantity Mass (Kg) Remarks column
2
1 Main body FC250 1 66.2 (71.9) Painting area:0.7 (0.8) m
2 Grating SS400 1 13.7 Galvanizing
3 M12 bolt SUS304 4 0.1
4 Chain SS400 1 0.1 Galvanizing
5 Ø10 Bolt for chain installation SUS304 1 0.1
6 Tap bolt SS400 4 0.096 Galvanizing
1 grouping total 80.3 (86.0) kg
( ) is catch pit at near end of girder

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi DRAINAGE DETAIL 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 4 - 019
SHEET No. :
Sheet of PACKAGE:
ELEVATION A-A S=1/30 SECTION B-B S=1/30

1 - Unit L = 3990 mm STEP-1 STEP-2

Cup Head Bolt B

50

200
50 00
B C D

1
680 612 612 617 580 580 37 1200 200 500

Detail "2"
A
6
200

2.0 %

128 60

60 120 80

60 120 80
260

260

6
156
Wedge Anchors M16

1150
Detail "1" FB 75 x 6

8x150=1200

6
156

1500
1566

B 2
87
72

350
152
1 - L 90 x 90 x 10

50 128
A
1 - CT 95 x 152 x 8
6
B C D 95

2000 2000
4000

1 - PL 3990 x 6 x 1568
1 - PL 3990 x 6 x 214
5 - FB 75 x 6 x 1346
1 - FB 75 x 6 x 604
2 - L 90 x 90 x 10 x 1655
2 - PL 223 x 6 x 140
DETAIL "1" S=1/10 CUP HEAD BOLT DETAIL S=1/5
1 - PL 3990 x 6 x 280 2 - FB 75 x 6 x 574 2 - PL 110 x 6 x 140
1 - CT 95 x 152 x 8 x 1568 1 - FB 75 x 6 x 579 2 - PL 237 x 6 x 210
1 - CT 95 x 152 x 8 x 178 1 - FB 75 x 6 x 529 8 - BN M16 x 35 (Anti-loosen Nuts) 35 6 35
1 - L 90 x 90 x 10 x 1568 1 - FB 75 x 6 x 504
1 - L 90 x 90 x 10 x 178 4 - BN M16 x 35 (Anti-loosen Nuts)

M16
2 - L 90 x 90 x 10 x 1904 85 - BN M16 x 35 (Cup Head Bolt)
2 - L 90 x 90 x 10 x 1814 8 - W.ANC M16 x 125

10

75
6
32Ø 9 35
45°

SECTION C-C S=1/30 SECTION D-D S=1/30

700
700
200 500
200 500

2.0 % DETAIL "2" S=1/15

Silicone Seal

1 - L 90 x 90 x 10

1150

80
210
1500

1500

25
FB 75 x 6 1 - L 90 x 90 x 10

45
42
NOTES:
1 ) Examine details separately about the joint with web of edge girder at cable anchorage
2 ) Refer to LAYOUT OF PRECAST DECK PANEL for arrangement of fairing panel
237 3 ) Nut shall be filet welded to plate. (3 filet-weldings per 1 nut)
350

1 - L 90 x 90 x 10

1 - L 90 x 90 x 10 6 All dimensions are in mm, unless otherwise shown.


90

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi WIND FAIRING


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 4 - 020
SHEET No. :
Sheet of PACKAGE:
LONGITUDINAL ELEVATION S=1/1000
1.0
25 0)
1 + 7 5 1.
(2 +
1500000
600 900 148500 300000
Cable 4500 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10x12000=
4500 36 x 4000 = 144000 75 x 4000 = 300000 120000
Floorbeam

Transverse Inspection Way


Transverse Inspection Way Longitudinal Inspection Way Longitudinal Inspection Way
32.310
31.560
0.500%
3000

Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
=120000

1.0
25 0)
1 + 7 5 1.
PLAN S=1/1000
( 2+ 1500000
600 900 148500 300000
Floorbeam 3700 35 x 4000 = 140000 3400 3400 73 x 4000 = 292000

Transverse Inspection Way Rack for Electric Cables Longitudinal Inspection Way Ladder Longitudinal Inspection Way Transverse Inspection Way
(Ladder)
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38

FB39
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB2

FB3
FB4
FB5
FB6
FB7
FB8
FB9
1200

S1

W1

1200
W2
1150

WEG
3000

W3
(Ladder)
15200

13600

(Man Hole)
1600 1200
35600
33200

33200
W4
500
L
C

E4
13600
15200

Man Hole
Ladder
3000

E3
1150

1200
EEG
E2
1200

E1 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
Ladder Rack for Fiber Optic Cables =120000

TYPICAL GIRDER CROSS SECTION S=1/200


C
L
35600
1200 33200 1200
400 750 3300 150 3 x 3750=11250 500 500 3 x 3750=11250 150 3300 750 400
500
W2

W3

E3

E2
W1

W4

E1
E4

PH PH 1500000
As Pave. t=75mm 150000 300000 300000 300000 300000 150000

Waterproofing
260

Man Hole Man Hole


250
150

2% 2%
2700
1800

1901

1800
1250

2000

3000
NOTES:
1) Because electric platform of substation is set up between FB185 and FB186,
Rack for Electric Cables Longitudinal Inspection Way Man Hole Rack for Fiber Optic Cables longitudinal inspection way on west side is not set up.
WEG EEG 2) Inspection access ladder of P11 or P17 is set up respectively only in one side.
3000 13600 13600 3000
3280 4x3330=13320 4x3330=13320 3280 All dimensions are in mm, unless otherwise shown.
800 33200 800

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi LONGITUDINAL LOCATION OF


in association with INSPECTION WAY
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000, 200 DRAWING No. : C - 4 - 021
SHEET No. :
Sheet of PACKAGE:
SECTION AT P11 S=1/300
CL
Inspection Way Inspection Way
CL CL DETAIL "1"
B Inspection Access Ladder
1200 2342 1316
+31.560
2342 900 with Security Cage Rack
CL
SECTION AT P11 S=1/300

2052
20.5
2052

2052
1+251.0
"1" 4900 A
1050 2500 1350
+27.200 600 4500 35x4000=14000
150 900
10001500

1500
C C 550
Access Door

1000
Transverse Inspection Way Longitudinal Inspection Way

1700 352
Tie-Down Cable PC BOX

2052
800 3000 8300 2900 800 800 3000 8300 3000 800
15900 3000 3000 15900
B
SECTION AT P11 S=1/300 C M M C
Rack

2250 33200 2250


3000 27200 3000
2342 1316 CL 2342 Tie-Down Cable
950 3000 950
WEG Intermediate Floorbeam EEG
Longitudinal Inspection Way Edge Girder

A
Transverse Inspection Way
1170 415 Ladder

4500
Man Hole

550
1100 1350

1600
P12

100
4900

1+251.0
P10

End Floorbeam Ladder


SECTION AT P17 S=1/300
Rack for Electric Cables 1+251.0 Rack for Fiber Optic Cables
3000 1000
2+751.0
SECTION AT P17 S=1/300 A
4150
Inspection Way
CL
Inspection Way
CL
B
CL 1350 2100 700
Inspection Access Ladder 900 2342 1316 2342 1200
with Security Cage 35x4000=14000 4500 600
+31.560
900 200
550
Access Door
Longitudinal Inspection Way Transverse Inspection Way
1552

1552

352
"1" Super T

500 1200
2052
1700
+27.200
1500

1500
C C Rack
+27.200

C M M C

2500
500 500
Tie-Down Cable
800 3000 8000 3000 8200 3000 8000 3000 800
37800
Tie-Down Cable 575 3000 575

B
SECTION AT P17 S=1/300
1000 3000 A
Rack for Electric Cables CL Rack for Fiber Optic Cables
End Floorbeam
2+751.0
Ladder
P18

2+751.0
4150
13501500
100

P16
1600
4500
550

Ladder Man Hole


415 1170
Transverse Inspection Way

Longitudinal Inspection Way


Edge Girder
Intermediate Floorbeam
WEG EEG
2342 1316 2342
3000 27200 3000
33200
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi TRANSVERSE LOCATION OF


in association with INSPECTION WAY
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 300 DRAWING No. : C - 4 - 022
SHEET No. :
Sheet of PACKAGE:
ELEVATION OF PYLON CROSSBEAM S=1/200
42600
2193.6 38212.8 2193.6
2506.4 2000 2150 6x4150=24900 2150 2000 2506.4
14200 800 14200

WEG C EEG
L
600
1200 Pylon Crossbeam Access Ladder 600

1901

1800
1800

4900
Handrail
Access Hatch
800 500

Level

3200
4500

4500
Pylon Crossbeam Access Hatch
Inside Access Ladder

PLAN OF PYLON CROSSBEAM S=1/200


42600
2193.6 38212.8 2193.6
2506.4 2000 2150 6x4150=24900 2150 2000 2506.4
WEST 14200 800 14200 EAST

500
800

Access Hatch
Pylon Floorbeam
Access Hatch
4400
6000

800
800
Ladder
800

500
34 x 1100 = 37400

Handrail

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi HANDRAIL FOR PYLON CROSSBEAM


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 4 - 023
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/200

TYPICAL END FLOORBEAM FLOORBEAM AT CABLE ANCHORAGE


(P11)
33200 33200
As Pave. t=75mm As Pave. t=75mm
C Detail "a" C
PH L PH Man Hole PH L PH Man Hole
Waterproofing Waterproofing

2.0 % 2.0 % 2.0 % Man Hole 2.0 %

1901 166
Man Hole

1716 166

1800

1800
1615

2700
1615

100 1700

100 1700
1001515

2000
3015
1001515

2515

3000
2815

1922.3

633
1922.3
1133
Rack for Electric Cables
WEG Detail "c" Rack for Fiber Optic Cables EEG
Rack for Electric Cables Rack for Fiber Optic Cables
WEG 6449 20 6449 6449 20 6449 EEG

3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5


582 50 12918 50 582 50 12918 582 3000 13600 13600 3000
3000 13600 13600 50 3000 800 33200 800

TYPICAL END FLOORBEAM CENTER SPAN FLOORBEAM


(P17)
33200 33200
As Pave. t=75mm As Pave. t=75mm
Detail "b" C Man Hole C Man Hole
PH L PH Waterproofing PH L PH Waterproofing
Rack for Electric Cables Rack for Fiber Optic Cables
2.0 % 2.0 % 2.0 % Man Hole 2.0 %

1901 166
Man Hole 1716 166

1800

1800
1615

2700
1615
1015
600 1015

100 1700

100 1700
2000
3015

2515

3000
2815

1922.3

633
1922.3
1122

600
Rack for Electric Cables
WEG Rack for Fiber Optic Cables EEG

WEG 6449 20 6449 6449 20 6449 EEG 6449 20 6449 6449 20 6449
3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5
582 50 12918 50 582 50 12918 582 582 50 12918 50 582 50 12918 50 582
3000 13600 13600 50 3000 3000 13600 13600 3000

DETAIL "a" S=1/100 DETAIL "b" S=1/100 DETAIL "c" S=1/100

Man Hole Man Hole 600

1015
1615

1615
Man Hole
600 600
1515

900

1901
600

900
900

300
100

300
300

1922.3

1922.3

Rack for Fiber Optic Cables


450 450 450

270
322.5

350
322.5

150 150
Rack for Electric Cables
650

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi TRANSVERSE INSPECTION WAY


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 4 - 024
SHEET No. :
Sheet of PACKAGE:
PLATFORM CROSS SECTION AND STRUCTURE DETAILS S=1/20 LADDER S=1/40
900 100
Ø34

R
20
0
4
Longitudinal Inspection Way Ø3

300

300
10 284
2

30 30
650
6

60
65 606 65 65
Ring

1100

1100
20
500 35 30 (Horizontal Brace)

1250
C

300
75

42.7Ø
C

56
20

100
150
375
Support Fittings

21.7Ø
(Slab)

34

1200
Ring
RACK DETAIL

4 x 600 = 2400
S=1/20

2700
(Vertical Brace)

1258.2
1100
375
For Electric and Fiber Optic Cables Support Fittings
(Edge Girder)

21.7Ø
550

34

4500
STEP 12 x 300 = 3600
160 10 370 10
350 130 10 350 10
Ch.PL t=3.2 50x3.2
FB 90x9

1200
100

25 100 25
10 50

150
103.2

90
23.7
1010

10
18Ø 760
L 90 x 90 x 10 6
50 50 25 135 25 Roofing board
1200
6 6 582 6 6 185

60 60

6 3.2

1450
6

1150
1024.7
END DETAIL S=1/20 ELEVATION S=1/60

100
20 542 20
15 512 15 4000
200 3600 200
200 1600 1600 200
Ø21.7 Ø21.7 Ø42.7
375

2 - PIPE Ø42.7 x 2.3 x 3600 (STK400)


25 100 100 100

4 - PIPE Ø21.7 x 1.9 x 3600 (STK400) Step


6 - L 65 x 65 x 6 x 1258 2 - L 50 x 50 x 6 x 4500
1100
375

4 - PL 50 x 3.2 x 1768 13 - RB Ø22 x 430


12 - PL 150 x 6 x 185 (SM400A) 2 - PIPE Ø34.0 x 2.3 x 1708 (STK400)
24 - BN M16 x 45 (2-W)
350

2 - FB 50 x 6 x 192
10 75

25

6 - U.BOLT 32C
103.2

12 - U.BOLT 15C 4 - BN M12 x 35 (2-W)


L-75x75x6
Ring Roofing Board
50 482 50
6 - FB 50 x 4.5 x 2101 1 - PL 1200 x 6 x 997
3 - FB 50 x 4.5 x 2750 1 - PL 1200 x 6 x 760
5 572 5 12 - BN M16 x 40 (2-W) 1 - FB 50 x 6 x1200
45 1 - FB 50 x 6 x1200
4 Ø10 Hole Support Fittings 2 - FB 50 x 6 x 946
2 - FB 90 x 6 x 315 2 - FB 50 x 6 x 694
541 20
20
75
8 100

2 - W.ANC M16 2 - FB 65 x 6 x 163


582

4-L 65 x 65 x 6 x 715 2 - FB 65 x 6 x 178


4 4 - GUSS PL 65 x 6 x 140 4 - FB 65 x 6 x 155
1 - Ch.PL 542 x 3.2 x 3750 (SS400Eq.)
12 - BN M12 x 35 (2-W) 8 - BN M12 x 35 (2-W)
20

2 - CH 100 x 50 x 5 x 7.5 x 3600


200 800 800 800 800 200 2 - L 75 x 75 x 6 x 572
5 - FB 90 x 9 x 572
50 250 7x200=1400 200 7x200=1400 250 50 36 - BN M10 x 30 (1-W,1-TW)
200 3600 200 2 - PL 60 x 8 x 562 (SM400A)
NOTES:
1) All materials without special mention are assumed to be SS400.
2) The nut with U.Bolt other than must use all loose stop nut.
30 30
10 60

19x40
All dimensions are in mm, unless otherwise shown.
140 282 140
10 562 10

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi INSPECTION WAY DETAIL 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C - 4 - 025
SHEET No. :
Sheet of PACKAGE:
PYLON FLOORBEAM ACCESS LADDER S=1/40 END FLOORBEAM ACCESS LADDER S=1/40

6 300 500
100 (800) 50 400 50

50

50
200
105 105
90

1800<1901>
Inspection Man Hole

Handrail

900
600(1100)

1615
400
105 105
500

90
100 50 400 50
100 100 65

2628
Step

50

50
900

160 50

160 50
300
90

90
350

350
12x300=3600

12x300=3600
3700

3700
105 105

2x300=600

2x300=600
90

150

6x300=1800

6x300=1800
1900

1900
150 90

150 90
C

342

342
C
600

1700
800 800
1600 B B

2 - L 50 x 50 x 6 x 3700 2 - L 50 x 50 x 6 x 1900

50

50
6 - FB 90 x 6 x 118 4 - L 50 x 50 x 6 x 1269
1 - FB 90 x 6 x 150 12 - FB 90 x 6 x 83
7 - RB Ø22 x 430
12 - RB Ø22 x 430
50

50
4 - RB Ø16 x 557
1 - RB Ø22 x 780(1380) 900

735 ( ) : WEG side


< > : CENTER

PYLON CROSS BEAM ACCESS LADDER S=1/40 HANDRAIL S=1/20


65
100 900 900 35 30
800 500
26

34Ø
6 17
100 600 100 50 400 50
Access Door
400

100

375

375
800

90 50

50
400

200
105 105

21.7Ø
50
1100

1100

1100

1068
375

375
Access Hatch Ø12 Hole
6x300=1800

6x300=1800

21.7Ø
Access Hatch
2214

2214
2014

350

350
9
150
1100 1100 200
364

364

1 - PIPE Ø34 x 2.3 x 2300 (STK400) 3 - RIB PL 65 x 6 x 65 (SM400A)


2 - PIPE Ø21.7 x 1.9 x 2300 (STK400) 3 - U.BOLT 25C (2-W)
NOTES:
3 - L 65 x 65 x 6 x 1068 6 - U.BOLT 15C (2-W)
1) All materials without special mention are assumed to be SS400.
2 - L 50 x 50 x 6 x 2214 3 - PL 115 x 6 x 80 (SM400A) 12 - W.ANC M16
2) The nut with U.Bolt other than must use all loose stop nut.
4 - FB 90 x 6 x 218 3 - BASE PL 150 x 9 x 150 (SM400A)
7 - RB Ø22 x 430
4 - W.ANC M16x125
2 - PL 90 x 6 x 180
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi INSPECTION WAY DETAIL 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 40 DRAWING No. : C - 4 - 026
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/500 A-A
2850 2850
3 0 00
3 0 00 3000
A

.2
3 0 82

3000

3000
.5
2 0 16
4 0 00
R1

4 2 00
R2

4 5 00
R3

6.5
3 0 61

29800

29800
4 7 00
R4

5 0 00
R5

3 0 00
R6

3 2 00
R7

3000

3000
1632.2

1632.2
"B" "B"

1454.5

1454.5
S1
S2

1750

1750
80500

80500
S3

77500
S4

5x2500=12500

5x2500=12500
S5

S6

S7
1500
S8

L1
"A" "A"
S9

S10

7x3000=21000

7x3000=21000
S11

S12

S13

PH PH = Z1 S14

2.0 % 2.0 %
2000
S15 2000

Z1 Z2 L1 L2 L3
P12 +32.310 +1.330 109310 28810 13000
P13 +33.810 +0.180 110810 30310 12597
P14 +34.560 +11.140 111560 31060 12396
6000
P15 +33.810 -1.200 110810 30310 12597
P16 +32.310 +10.580 109310 28810 13000

MNTK:+13.67
L2

L2
L3

MNNN:+2.33
AT : Z2
0.0

-3.0
A 8200 All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAIRS AND LADDERS FOR PYLON


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C - 4 - 027
SHEET No. :
Sheet of PACKAGE:
SECTIONS 6-6 AND 7-7 S=1/100
CL of 6-6 CL of 7-7

ELEVATION DETAIL "A" S=1/100 SECTION A-A S=1/100 2300

745
1121
1150 1150 Plan7-7

376
Plan6-6

800
Column-D32 550 1210 750

1100
40 C250 x 90 150 2844 50

6041
3800

6099
C250 x 90 UP

1100
10x250=2500
C250 x 90 150 Handrail-D32
2500

2500
C250 x 90

800
1500
40

376
1121
6 6

745
Handrail-D32
C250 x 90

10x250=2500
BR1 BR2 "C" C250 x 90
150
2500

2500
C250 x 90

Column-D32 1500 SECTIONS 7-7 AND 8-8 S=1/100


40 CL of 8-8
CL of 7-7

7 7 Plan8-8

700
C250 x 90

10x250=2500
C250 x 90 150 Plan7-7
"D"
2500

2500

800
C250 x 90
1500
40
UP

1600
8 8 C250 x 90

4300
Handrail-D32

6200

6259
C250 x 90 Handrail-D32 C250 x 90

12x250=3000
150 2918 50

1100
3000

3000
150 C250 x 90 650 1210 750

2000

800
Column-D32
40

455
1175 1175
9 9

1200
2350

745
C250 x 90 C250 x 90

12x250=3000
3000

3000
C250 x 90 150

2000
SECTIONS 8-8 AND 9-9 S=1/100
CL of 8-8 CL of 9-9
40
2300
Plan9-9

800 35 745
780
1150 1150
Plan8-8
C250 x 90 Handrail-D32 C250 x 90

12x250=3000
3000

3000
150 C250 x 90
750 1210 550

1600
2000 150 2837 50

Column-D32
40

4800
6360

6418
UP

1600
C250 x 90 C250 x 90
Handrail-D32

745 35 800
All dimensions are in mm, unless otherwise shown.

780
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAIR AND LADDER DETAIL 1


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 4 - 028
SHEET No. :
Sheet of PACKAGE:
ELEVATION DETAIL "B" S=1/100 SECTION B-B S=1/100
SECTIONS 1-1 AND 2-2 S=1/100
B CL of 1-1 CL of 2-2

1300 600 200

917
1430
Plan1-1

513
Ladder Type-1 Plan2-2

800 50 800
"E"

1650
1 7 32 10 0
46 6

5360

5415
60 0 Column-D32
46 6
10 0 4
1050 1050

1363
2100
50 0 Ladder Type-2
80 0
4 50 0 C250 x 90 150 2389 50

2280
Ladder Type-3
200
BR3

917
SECTIONS 2-2 AND 3-3 S=1/100
CL of 2-2 CL of 3-3

2400

746
1200 1200

1476
Ladder Type-2 Plan2-2

731
Plan3-3

800
450
5453

5508
Ladder Type-1 800 1160 650

3150
1632

1100
150 2941 50
UP

1 1

746 81 800
1455

1455

826
Handrail-D32
150

2 2

7x250=1750
1750

1750
C250 x 90
Column-D32 C250 x 90
850

3 3 SECTIONS 4-4 S=1/100


2500

2500
C250 x 90
C250 x 90 5700

B 1900 1500 2300


1500 950 550
675 550 275

100
100
C250 x 90

666
Handrail-D32

1332
1532

1800
600
666
Ladder Type-3

100
100
All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAIR AND LADDER DETAIL 2


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 4 - 029
SHEET No. :
Sheet of PACKAGE:
DETAIL "C" S=1/30 SECTION 1-1 S=1/30 SECTION 2-2 S=1/30

L8
02 01
L2 L1 L3 L9 L9
<2xL4=L3>
30 740 30
35 670 35

450

450
1070

1070
handrail, D32

620

620
Grating
FB 32 x 3 x 670
250 32

"F"
C250 transverse bar, steel shape transverse bar, steel shape
150 x 9 x 782 150 x 9

800 supported beam, C250


transverse bar, steel shape
150 x 9 x 782 variable length supported beam, C250
variable length
02 01
[S1] S2 - 14 <S15>
4-D32 x 1086 3-D32 x 1086
4-D32 x 1086 5-D32 x 1086
2-D32 x L5 4-D32 x L10
2-D32 x L5 2-D32 x L5
2-D32 x L6 2-D32 x L6 4-D32 x L7 FLOOR DETAIL S=1/20
L1 L2 L3 L4 L5 L6 L7 L8 L9 L10
S1 600 1300 200 - 1268 168 - 2100 1050 1018
S2 1160 800 650 - 768 618 - 2400 1200 1168
65 670 65
S3 1210 200 850 - 168 818 - 2050 1025 993
S4 1210 300 800 - 268 768 - 2100 1050 1018
S5 1210 400 800 - 368 768 - 2200 1100 1068

DETAIL "F" S=1/20


S6
S7
1210
1210
550
650
750
750
-
-
518
618
718
718
-
-
2300
2350
1150
1175
1118
1143
S8 1210 750 550 - 718 518 - 2300 1150 1118
S9 1210 750 650 - 718 618 - 2300 1150 1118
S10 1210 700 750 - 668 718 - 2450 1225 1193
S11 1210 700 850 - 668 818 - 2550 1275 1243

10 75
S12 1210 700 900 - 668 868 - 2600 1300 1268

25
S13 1210 700 1000 - 668 968 - 2700 1350 1318 L-75x75x6
40 60 40

S14 1210 700 1100 - 668 1068 - 2800 1400 1368 90 620 90
140

S15 1210 550 1900 950 518 1868 918 2750 1375 1343
9 782 9
81
10 40 40

DETAIL "D" S=1/2

30
90

75
250
225

8
6.4mm checkered tread
25
10 80
90

50

30 30
10 60
9 432 9
450
19x40 Slotted Hole
200 380 200
2-PL 140 x 9 x 90
175 10 780 10
4-BN M16 x 45(2-W)

16 dia machine bolts 2/L50x50x5x175


All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAIR AND LADDER DETAIL 3


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 030
SHEET No. :
Sheet of PACKAGE:
DETAIL "E" S=1/30 SECTION 1 - 1 S=1/30 SECTION 2 - 2 S=1/30

02 01 R1,R5-7 R3,R4
1332 1332 1332
30 1440 30
666 666 266 800 266 666 666
35 1370 35

450

450
1070

1070
620

620

620
Grating
FB 32 x 3 x 1370

250 32
C250
transverse bar, steel shape transverse bar, steel shape transverse bar, steel shape
150 x 9 150 x 9 150 x 9

550 950

transverse bar, steel shape transverse bar, steel shape supported beam, C250 supported beam, C250 supported beam, C250
150 x 9 x 541 150 x 9 x 932 variable length variable length variable length
02 01 3-D32 x 1086 4-D32 x 1086 3-D32 x 1086
4-D32 x 634 1-D32 x 768 4-D32 x 634
4-D32 x 234

BR-1 S=1/20 BR-2 S=1/20 BR-3 S=1/20


230 130 34 180
150 80 80 50 100 80

Wedge Anchor M16


Wedge Anchor M16

50

120
50

50
120

117
50

120

116
8

8 8
12 0

170

350

8
170

8
170
50

50
50
17 0

351

339
360

350

230
200

200

200
200
36 0

234

223
240

230
150

150
150

130
24 0
140

130
14 0

9
10
100 70
840 37 188
20 800 20
25 750 25
25 1450 25
75 3x200=600 75
130

40 40
117

380
37 80
13

34
80 100
13
230
207

214
10 170
40 40

40 40
80
10

380 1130

75 3x200=600 75
25 750 25
20 800 20
840

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAIR AND LADDER DETAIL 4


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C - 4 - 031
SHEET No. :
Sheet of PACKAGE:
LADDER TYPE-1 S=1/50 LADDER TYPE-2 S=1/50 LADDER TYPE-3 S=1/50
450
160 85 0 1000
"a" 450 45 0
00 275 450 275 20 0
20 0 2
70 0

50
125
300

20 0
10 0
3x300=900
Anchor Box Flange

1300
1175
FB 64 x 10

55 0

1 2 00
FB 64 x 10
Rung D19@300mm
Ring
(Horizontal Brace)
100 Rung D19@300mm

60 0
490

1 2 00
490 Ring
(Vertical Brace)

0 0
0
0 , 61

60 0
12 0
20 0

08 3
00 = 4

00 , 1
1 4 x3
4 5 00

0
L=12
1 2 00
FB 64 x 10

90 0
Rung D19@300mm

490

1 2 00
85 0

126 10 0
60 0
LADDER TYPE-4 S=1/50 DETAIL "a" S=1/10 FIXTURE DETAIL S=1/20 RING S=1/20
160
100 470 100 200 (250) 470
110 18 32 32
40 60 60 40 64

54 10
10 25 50 25 10

32 32
32 32
64
10
125 450 125

375
200 (250)
123 300 100
273 250

10 158 32 32
(208) 0
523

10 75
Ø
17 7

TYP.

222
20 0 (272)
172 10
62 7

10 450 10 166
0
= 2 10

(666) 64
64
60 0

FB 64 x 10
9 x 30
2 3 77

64
490
166 (666)
90 0

Rung D19@300mm
24(524)
110 32 32
10 0

10 25 25 10
50
25 0

188 All dimensions are in mm, unless otherwise shown.


(688)

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada STAIR AND LADDER DETAIL 5


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C - 4 - 032
SHEET No. :
Sheet of PACKAGE:
PLAN OF TOP OF PYLON S=1/50 ELEVATION OF ACCESS DOOR FOR PYLON S=1/20 SECTION 2 - 2 S=1/20

584 ventilation

500 2 Steel Shape


800 L50x50x5

10
342 545
147 522

500

225
325
475
Obstacle Light

600

700
1 1

500
Rein. Stiffener

400
10x20x420

20
L25x5 EA
Manhole
(Outward-opening
steel hatch) Handle

450
400

1600
inside outside

1000
400
handle
100 100

20
150
Rein. Stiffener
Stair 10x20x420

450

400
2723 2920 438
Steel Shape
L50x50x5
steel plate
10x80x1400

10 55 90 20

275
ELEVATION S=1/50
175 175

175
15 0
2 Steel Shape
1 8 00
L50x50x5
300 300
90 0 503 166
600
60 0

1 621
1091 1601
145 800 146
SECTION 1 - 1 S=1/20

200
250 250

600 - opening
500

5 590 5

inside
69
100

Shape Steel
Anchor Bar - D10 Anchor bar - D10
L50x50x5
40
123 300

120

75
17 7

Type-4 Ladder 150 10 150


64 x 10 x 2900 mm
Steel Plate Steel Plate

518
15x50x1400 10x80x1400

Supported Beam
64x10

outside
Chamfer 50x50
0 2 10
30 0=

60 0
10 0 Access Door
7x

70 0
10 0

All dimensions are in mm, unless otherwise shown.

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

T. Takada MAINTENANCE FACILITIES AT PYLON TOP


in association with AND ACCESS DOOR FOR PYLON
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50, 20 DRAWING No. : C - 4 - 033
SHEET No. :
Sheet of PACKAGE:
PLATFORM OF ELECTRIC SUBSTATION
SECTION C - C
33200
16600 16600
3000 13600 13600 1200
300 600 300
2.0 % 2.0 %

166

375
888
600

600

1100
375
600
"a"

1679.7
1811

1912

350
2700
900

129.5
900
per place (6 places)

290
1 - PIPE Ø42.7 x 2.3 x 1200 (STK400)

131.3

311
2 - PIPE Ø21.7 x 1.9 x 1200 (STK400)

367.9
2 - L 65 x 65 x 6 x 1285 (SS400)
B B 1 - PL 90 x 3.2 x 1200 (SS400)

622
2 - PL 215 x 12 x 185 (SM400A)
8 - BN M16 x 45 (2-W) (SS400)
8 - BN M10 x 35 (2-W) (SS400)
1 2 2 2 - U.BOLT ND 32C (SS400)
R = 364013 2 2 2 2 2 4 - U.BOLT ND 15C (SS400)

7221 6941
406 5x1363=6815 20 5x1306=6529 412
WEG 616 660 3x1985=5955 2220 2220 1895 616 DETAIL "a" S=1/30
2709 14182 16309
300
100

SECTION B - B

30 60
90
1 2 2 2 2 2 2 2 C
FB186

180

12 3.2
4x300=1200
1200
D D

20
C
per panel (3 panels) per panel (3 panels)

4x300=1200
1 - Ch.PL 1160 x 4.5 x 7176 (SS400) 1 - Ch.PL 1160 x 4.5 x 6896 (SS400)
2 - CH 125 x 65 x 6 x 8 x 7221 (SS400) 2 - CH 125 x 65 x 6 x 8 x 6941 (SS400)

4000
3640
1200
1 - CH 125 x 65 x 6 x 8 x 1200 (SS400) 1 - CH 125 x 65 x 6 x 8 x 1200 (SS400)
5 - CH 125 x 65 x 6 x 8 x 1188 (SS400) 5 - CH 125 x 65 x 6 x 8 x 1188 (SS400)
1 - L 125 x 75 x 10 x 1188 (SS400) 1 - L 125 x 75 x 10 x 1188 (SS400)
4 - FB 90 x 12 x 1357 (SS400) 4 - FB 90 x 12 x 1300 (SS400)

20
1 - FB 90 x 12 x 1337 (SS400) 1 - FB 90 x 12 x 1286 (SS400)
3 - FB 90 x 12 x 400 (SS400) 3 - FB 90 x 12 x 400 (SS400)
1 - PL 60 x 8 x 1180 (SM400A) 1 - PL 60 x 8 x 1180 (SM400A)

4x300=1200
4 - PL 160 x 8 x 1180 (SM400A) 3 - PL 160 x 8 x 1180 (SM400A)

1200
180
FB185
7221 6941
406 5x1363=6815 20 5x1306=6529 412
616 660 3x1985=5955 2220 2220 1895 616
14182

SUPPORT BEAMS 1 , 2 S=1/30


4000
13 140 20.5 3666 20.5 140 13 20 160
1 per place
13 1200 20 1200 20 1200 13 30 10 30100 30 1 - H 175 x 175 x 7.5 x 11 x 3666 (SS400)
Supporting PL Supporting PL
30 2 - SPL PL 100 x 9 x 290 (SS400)
40 - BN M16 x 50 (2-W) (SS400)

2 per place
1 - H 200 x 200 x 8 x 12 x 3666 (SS400)
(175)
200

2 - SPL PL 100 x 9 x 290 (SS400)


40 - BN M16 x 50 (2-W) (SS400)
50 100 50 (37.5) (37.5)
50 100 50
163 3x300=900 320 3x300=900 320 3x300=900 163 200
(37.5)

200
(175)
50 100 50
9 10

(175)
200
(37.5)

19x40 Long Hole ( ) size : 1

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi PLATFORM OF ELECTRIC SUBSTATION


in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60,30 DRAWING No. : C - 4 - 034
SHEET No. :
Sheet of PACKAGE:
ELEVATION
33200
16600 16600
3000 13600 13600

SUBSTATION 50KVA X 1 SUBSTATION 300KVA X 1 SUBSTATION 300KVA X 1

166
2.0 % 2.0 %

888
50

50
600

600
600

1912
1811
1679.7

2700
900
1800

1800
900

1300

1300
A A

131.3

290
367.9

311

622
R = 364013
Electric Platform

836 800 200 800 200 800 1065 2000 1330 2000 1030 800 2030 291
WEG 7221 20 6941
2709 14182 16309

SECTION A - A
14182
7221 20 6941

Electric Platform

FB186

180
1020

1020

1200
1370
1420

20
500 500
700
600

4000
3640

3640
1200
1800

1800
200
100

20
700
600

600

1200
Exhaust Fan Exhaust Fan
820

820

820
770

180
FB185

836 800 200 800 200 800 1065 1000 1000 530 800 1000 1000 1030 800 2321
786 900 100 900 100 900 1015 2000 1330 2000 980 900 2271

CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.

K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 4 - 035
SHEET No. :
Sheet of PACKAGE:
1.0 .0
25 75
1
1+ 2+
1500000
150000 150000 150000 150000 150000 150000 150000 150000 150000 150000 To DONG ANH

Navigation Clearance Navigation Clearance


P11 P12 P13 P14 P15 P16 P17

Upstream

Upstream
150000 110000 40000 40000 110000 300000 300000 110000 40000 40000 110000 150000

Downstream

Downstream
P11 P12 P13 P14 P15 P16 P17

Detail "A" Detail "B" Detail "C" Detail "D" Detail "E" Detail "F"
scale 1:50 scale 1:50 scale 1:50 scale 1:100 scale 1:50
scale 1:500
"F" c - 5.2
1800
B - 5.1 black

10@100
12 12 pylon shaft

1000
00 12 00 00 12 00 00 black
yellow

n@100
12 00 0 12 00 12
1 20
yellow
yellow yellow

10@100
1000
1800
90°

90°

90°

90°
1 black 200
C - 1.1.3 2
C - 1.1.4 C - 1.1.3 C - 1.1.4 3
"e" 4 150 1000
red white green green white red

10000
5
6 1150
7
8
9 +13.41: Navigation water (MNTT)
10
11
12
BH140A BH140A BH140A BH140A BH140A BH140A 13
light (red) light (green) yellow flash light light (yellow) light (green) light (red) 14
15
sign :
16
17 c - 1.1.3 : Signal plate ( white - green)
18
19 (allowing to go through between two signal plates)
20 +2.33: Lowest Water (MNTN)
+1.41 21 C - 1.1.4 : Signal plate (red - white)
22
Notations: (forbiding to go through outside two signal plates)

1.- Arrangement of signal lights, signal plates, contrary water gauges are followed C - 5.2 : Contrary water gauge
4.- Contrary water gauges are laid all both up-tream and down-stream on pylon shaft P13, P15
"internal waterway signal rules of Viet Nam, 22tcn 269-2000" (informing direct clearance)
the numbers of contrary water gauge have the height of 600mm and the thickness of 100mm

2.- Positions of signal lights, signal plates are given relatively. the final positions will B - 5.1 : Signal plate (yellow)
5.- Signal lights are used solar energy light type.
be decided in the construction stage, base on ship passage and determining by (Indication of navigable clearance, mechanical and primitive ships can go through)
6.- This drawing are shown the domastic navigation signal system for service stage.
domestic navigation management agency of Nhat Tan bridge area. BH 140A : Signal lights including red, green, yellow and yellow flash
7.- If the main passage are transfered, the signal navigation plates can be placed
3.- Signal plates, signal lights are placed in advantage positions for exploitation,
between P13 - P14 or P14 - P15.
maintainance.

CONSULTANTs Title name signature date Socialist republic of viet nam NHAT TAN BRIDGE CONSTRUCTION PROJECT
P.B. Trong drawing title: Rev. No.
Chodai co., ltd AND Nippon Engineering co., ltd
K. Itabashi Navigation lights arrangement
in association with
H. Ohashi
transport engineering design incorporated Y. Kajimura scale: 1 / 1000 DRAWING No. : C - 4 - 036
SHEET No. :
Sheet of PACKAGE:
erection sequences
Scale 1:5000

80000 Temporary bridge

10000
- Construct the temporary bridge and
STEP-1
temporary road.
MNTK:+13.67
MNNN:+2.33
- Construct pylons

- Construct the temporary supports


80000

10000
- Complete pylon construction
STEP-2
- Complete girder erection on bent

MNTK:+13.67 - Erect stayed cables and tension


MNNN:+2.33

- Erect girders and precast deck panels by


80000
cantilever erection method
10000

STEP-3 - Erect stay cables and tension as cantilever

erection proceeds
MNTK:+13.67
MNNN:+2.33

80000 80000
- Erect the closure segments

STEP-4
10000

10000
- Erect wind fairing, expansion joints,

tie-down cables...ect.
MNTK:+13.67 MNNN:+2.33
- Deck surfacing

This drawing for information only

CONSULTANTs Title name signature date Socialist republic of viet nam NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba drawing title: Rev. No.1
Chodai co., ltd AND Nippon Engineering co., ltd
K. Itabashi erection sequence
in association with
H. Ohashi
transport engineering design incorporated Y. Kajimura scale: 1 / 1000 DRAWING No. : C - 5 - 001
SHEET No. :
Sheet of PACKAGE:
this drawing is for information only

CONSULTANTs Title name signature date Socialist republic of viet nam NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba drawing title: Rev. No.1
Chodai co., ltd AND Nippon Engineering co., ltd
K. Itabashi erection method
in association with
H. Ohashi
transport engineering design incorporated Y. Kajimura scale: 1 / 1000 DRAWING No. : c - 5 - 002
SHEET No. :
Sheet of PACKAGE: