CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
LIST OF DRAWINGS 1
in association with
TRANSPORT ENGINEERING DESIGN INCORPORATED SCALE: --- DRAWING No. : C - 1 - 001
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
C-3b-025 REINFORCEMENT OF LIGHTING POLE BASE C- 4 -018 DRAINAGE DETAIL 1
C-3b-026 REINFORCEMENT OF STAY CABLE BOOT SUPPORT BASE C- 4 -019 DRAINAGE DETAIL 2
C-3b-027 EDGE GIRDER SHEDULE 1 C- 4 -020 WIND FAIRING
C-3b-028 EDGE GIRDER SHEDULE 2 C- 4 -021 LONGITUDINAL LOCATION OF INSPECTION WAY
C-3b-029 CABLE ANCHORAGE DETAILS C- 4 -022 TRANSVERSE LOCATION OF INSPECTION WAY
C-3b-030 FIELD CONNECTION OF EDGE GIRDERS C- 4 -023 HANDRAIL FOR PYLON CROSSBEAM
C-3b-031 EDGE GIRDER 1 C- 4 -024 TRANSVERSE INSPECTION WAY
C-3b-032 EDGE GIRDER 2 C- 4 -025 INSPECTION WAY DETAIL 1
C-3b-033 EDGE GIRDER 3 C- 4 -026 INSPECTION WAY DETAIL 2
C-3b-034 EDGE GIRDER 4 C- 4 -027 STAIRS AND LADDERS FOR PYLON
C-3b-035 EDGE GIRDER 5 C- 4 -028 STAIRS AND LADDER DETAIL 1
C-3b-036 EDGE GIRDER DETAILS C- 4 -029 STAIRS AND LADDER DETAIL 2
C-3b-037 INTERMEDIATE FLOORBEAM 1 C- 4 -030 STAIRS AND LADDER DETAIL 3
C-3b-038 INTERMEDIATE FLOORBEAM 2 C- 4 -031 STAIRS AND LADDER DETAIL 4
C-3b-039 INTERMEDIATE FLOORBEAM 3 C- 4 -032 STAIRS AND LADDER DETAIL 5
C-3b-040 PYLON FLOORBEAM 1 C- 4 -033 MAINTENANCE FACILITIES AT PYLON TOP AND ACCESS DOOR FOR PYLON
C-3b-041 PYLON FLOORBEAM 2 C- 4 -034 PLATFORM OF ELECTRIC SUBSTATION
C-3b-042 PYLON FLOORBEAM 3 C- 4 -035 LAYOUT OF SUBSTATIONS ON ELECTRIC PLATFORM
C-3b-043 END FLOORBEAM 1 C- 4 -036 NAVIGATION LIGHTS ARRANGEMENT
C-3b-044 END FLOORBEAM 2
C-3b-045 END FLOORBEAM 3 ERECTION SEQUENCE AND TEMPORARY STRUCTURES
C-3b-046 UPPER BRACKET OF TIE-DOWN CABLE C- 5 -001 ERECTION SEQUENCE
C-3b-047 LOWER BRACKET OF TIE-DOWN CABLE C- 5 -002 ERECTION METHOD
STAY CABLE
C-3c-001 STAY CABLE LAYOUT 1
C-3c-002 STAY CABLE LAYOUT 2
C-3c-003 STAY CABLE LAYOUT 3
C-3c-004 STAY CABLE LAYOUT 4
C-3c-005 CROSS SECTION OF STAY CABLE
C-3c-006 STAY CABLE SOCKET
C-3c-007 SHIM PLATE AND BEARING PLATE
C-3c-008 STAY CABLE BOOT AT GIRDER EXIT
ACCESSORIES
C- 4 -001 ELASTOMERIC BEARING AT P12 AND P16 1
C- 4 -002 ELASTOMERIC BEARING AT P12 AND P16 2
C- 4 -003 ELASTOMERIC BEARING AT P13, P14 AND P15 1
C- 4 -004 ELASTOMERIC BEARING AT P13, P14 AND P15 2
C- 4 -005 POT BEARING AT P11 AND P17
C- 4 -006 EXPANSION JOINT P11 1
C- 4 -007 EXPANSION JOINT P11 2
C- 4 -008 EXPANSION JOINT P11 3
C- 4 -009 EXPANSION JOINT P11 4
C- 4 -010 EXPANSION JOINT P17 1
C- 4 -011 EXPANSION JOINT P17 2
C- 4 -012 EXPANSION JOINT P17 3
C- 4 -013 EXPANSION JOINT P17 4
C- 4 -014 METAL BRIDGE RAILING AT SHOULDER TYPE 1
C- 4 -015 METAL BRIDGE RAILING AT MEDIAN
C- 4 -016 DRAINAGE ARRANGEMENT 1
C- 4 -017 DRAINAGE ARRANGEMENT 2
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
LIST OF DRAWINGS 2
in association with
TRANSPORT ENGINEERING DESIGN INCORPORATED SCALE: --- DRAWING No. : C - 1 - 002
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
5.3 DYNAMIC LOAD ALLOWANCE, IM
1 GENERAL - DYNAMIC LOAD ALLOWANCE IS APPLIED IN ACCORDANCE WITH SECTION 3.6.2 OF 22TCN-272-05.
- ALL STATIONS, COORDINATES AND ELEVATIONS ARE IN METERS.
- DYNAMIC LOAD ALLOWANCE IS APPLIED TO STAY CABLES AND ANCHORS.
- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED.
- DYNAMIC LOAD ALLOWANCE IS NOT APPLIED TO PYLON FOUNDATIONS THAT ARE ENTIRELY BELOW GROUND.
- DYNAMIC LOAD ALLOWANCE IS NOT APPLIED TO LANE LOAD AND PEDESTRIAN LOAD.
2 DESIGN STANDARDS
2.1 SPECIFICATIONS FOR DESIGN WORKS 5.4 PEDESTRIAN LOAD
DESCRIPTION NAME OF SPECIFICATIONS CODE PEDESTRIAN LOAD IS APPLIED WITH AN INTENSITY OF 3 X 10-3 MPA.
1 LOAD AND ANALYSIS METHOD FOR DESIGN ALL SPECIFICATION FOR BRIDGE DESIGN 22TCN 272-05 5.5 BREAKING FORCE
COMPONENTS OF BRIDGE EXCEPT BELOWS
- BREAKING FORCE IS APPLIED IN ACCORDANCE WITH SECTION 3.6.4 OF AASHTO-LRFD 2004.
2 DESIGN ALL COMPONENTS OF BRIDGE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SI UNITS, 4TH, AASHTO AASHTO LRFD 4TH - THE BREAKING FORCE IS TAKEN AS GREATER OF A) 25% OF THE AXLE WEIGHTS OF THE DESIGN TRUCK OR DESIGN TANDEM
EXCEPT BELOWS 2007
OR, B) 5% OF THE DESIGN TRUCK PLUS LANE LOAD OR 5% OF THE DESIGN TANDEM PLUS LANE LOAD.
3 STEEL PIPE SHEET PILE DESIGN SPECIFICATIONS FOR HIGHWAY BRIDGES, IV. SUBSTRUCTURE SECTION JRA - 2002
GUIDELINE FOR DESIGN AND CONSTRUCTION OF STEEL PIPE 5.6 UNIFORM TEMPERATURE ( REFERENCE TEMPARATURE IS +24°C )
4 STEEL PIPE SHEET PILE DESIGN SHEET PILE FOUNDATIONS, JAPAN ROAD ASSOCIATION JRA - 1997
CONCRETE STRUCTURE +5°C TO +47°C
RECOMMENDATION FOR STAY CABLE DESIGN, TESTING AND CONCRETE DECK ON STEEL GIRDER +1°C TO +55°C
5 STAY CABLES INSTALLATION - 2000, POST TENSIONING INSTITUTE PTI - 2007
STEEL CABLE -3°C TO +63°C
6 PRELIMINARY AERODYNAMIC EXAMINATION DESIGN MANUAL FOR BRIDGE AERODYNAMIC, JAPAN ROAD ASSOCIATION JRA - 1991
5.7 THERMAL GRADIENT
7 AERODYNAMIC ANALYSIS WIND PROOF DESIGN STANDARD FOR HONSHU-SHIKOKU HBS-2001
BRIDGES, HONSHU-SHIKOKU BRIDGE AUTHORITY FOR THERMAL GRADIENT, SECTION 3.12 OF 22TCN-272-05 SHALL BE APPLIED.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No. 1
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
GENERAL NOTES 2
in association with
TRANSPORT ENGINEERING DESIGN INCORPORATED SCALE: --- DRAWING No. : C - 1 - 004
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
GIRDER CROSS SECTION S = 1 / 300 TRANSVERSE ELEVATON (P12) S = 1 / 1000
35600
1200 1200
7200 2800
400 500 400
20000
10000
4500
2700 260
1100
1000
250 750
2500
2500
150
11000
1250
2000
3000
R=364013
800 800
750
8000
1529
4000
8200
6500
1596
1 2 00
8000
8200
3191
10455
4167 750
1596
4000
LC R
-P 12
+1 12L -P
LC .60
750
.16
+1
15455
629 629
1800
1328 4980 AT:+1.33
6308
37500
750
1814
1732
1814
751
4100
6700
2546
4736
8200
-34.40 (P12)
5092
4100
-40.5
1732
750
3641 750
4100
8200
8200
566
987
4100
3817
3606
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
PYLON 16 PIER 18
CL
PIER 10 PYLON 12 4150
36800
450 725 700
14900 - West 3500 4900 1350 1375
500 1800 5395 6000 1705 500 1050 1400 1100 1350 450 500 2500 15900
825 1100 150
6@2200=13200
R32101 50 50
805 1145 540 2160
1.0 % 1.0 %
478
1.0 %
451
11
571
Tie-down cable
50 57
2000
Tie-down cable
25
+27.20 1.0 %
525
1682
1999
1000 1500 CL
1000 1500
150 1800 500 +27.2
1682
2500
2500
42
1000 1500
2968
1000 1500
2387
2500
1729
1797
2968
R179105
800 3000 8300 3000 800 1400 1025
15900 3000 950 3000 950
17500
20200
15771
11300 5300
15088
2600 3000 8000 3000 4100 4500 3000 4500
200 3000
3000
+7.00
1500
150
150
+6.7
3000
100
150
150
+4.00 CIP PILE Ø1500
100
-34.3
200
1500 8@4800=38400 1500 2@4500=9000 1500 100 41400 100 12000 100
100 41400 100 12000 100
1500
Ø Ø
15 15
6000
PYLON 12
00 00
PIER 18
2@4500=9000
12000
PYLON 16
PIER 10
6000
1500
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N. H. Nghia DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
A-A B-B
C-C B D-D
C D A 6-6 3-3
Obstacle Light Obstacle Light
8000 3000 5700
45 0 3 Lighting Arrester Lighting Arrester 3536
0 00 2850
1200 4500
479 3057
7200 2800
3000
3000
3000
10@2000=20000 2000
6
2000
1529
750
6 1529
10@2000=20000
20000
4000
6500
10000
1596
C
8000
8200
29800
29800
L
3191
4167 750
1596
11000
45000
4000
7800
7800
750
4800
629 629
5 1350
1800
5 1328 4980
78400
78400
6308
75500
23300
6x5000=30000
Obstacle Light
5-5 2-2
Obstacle Light
109310
8438
45600
45600
4 4391 1200 5941 1297 "A"
4 764 3628 2971 2971
Access Door
750
1814
1732
22300
33200
4 500 1814
751
4100
1 200 8000
6700
2546
5050 3600
4900
4736
8200
5092
3
2100
2100
2100
6900 757
8200
3200
Access Door
3
2546
30 3
4100
4500
4 5 00
1 2 00 3000
13355
1732
30 5
750
5x4000=20000
MNTK:+13.67
30910
LC R
28810
2 12
"A"
30910
-P
+ 12L -P
LC .60
2 1.16 +1 4-4 1-1
15455
13500
13000
MNNN:+2.33 AT:+1.33 11400
0.0
2910
2910
8200 1200 7500 2700
7000
1 5061
10000
-3.0
3750 3750
1' 1' "A"
35005500
1200
500
750
3606
4100
-18.00
3289
Scour (Flood) 750
37500
37500
5078
6578
8200
48743
988
26500
3528 750
3289
4100
3606
750
-34.40 (P12)
Estimated Bearing Stratum
-40.5 -40.5
"A"
B A
1200
1' - 1'
11992
1227 7767 2998
48743 16891
3833 3934 "A"
8446 10135 11582 10135 8446
PYLON 13
"A"
4346 8200 4346
3817
4100
A A
16891
8200
PIER 11
566
B B
100
4100
3817
7767 2998 12135 2998 7767
1227 1227
10 30
P12 118piles x Ø1200 / foundation 30
10
50
1+401.0 "A"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
A-A B-B
C-C B D-D
C D Obstacle Light Obstacle Light
3000
A 6-6 3-3
8000 Lighting Arrester Lighting Arrester
45 0 3 5700
0 00 2850 3536
1200 4500
7200 2800
3000
3000
3000
479 3057
6
10@2000=20000 2000
2000
750
1529
20000
10@2000=20000
4000
6500
10000
C
29800
29800
1596
L
8000
8200
3191
11000 4167 750
45000
1596
4000
7800
7800
4800
750
5 1350
629
1800
629
5 1328 4980
78400
78400
6308
75500
23300
6x5000=30000
Obstacle Light Obstacle Light 5-5 2-2
110810
45600
45600
8438
4 4391 1200 5941 1297
4 "A"
Access Door 764 3628 2971 2971
750
22300
33200 1814
1732
4 500
1814
1 200 751
4100
8000
6700
5050 3600
2546
4900
4736
8200
3
2100
2100
2100
5092
8200 6900 757
3200
Access Door
30 3 3
4500
2546
450
4100
1 2 00 0 3000
13355
30 5
1732
750
5x4000=20000
32410
MNTK:+13.67
2
30310
32410
LC R "A"
-P 13
+20 13L -P
.41 LC 0.43
4-4 1-1
16955
13500
12597 + 11688
MNNN:+2.33
0.0 4410 AT:+0.18 1200 7651 2836
8200
1 5061
7000
-3.0 3826 3826 "A"
1' 1' -5.58
35005500
4240
DE=2/3 by Liquefaction
11000
1200
500
750
3788
4100
48743
-18.00
31500
31500
3289
Scour (Flood) 750
8200
624
20500
5078
6578
-28.09 (P13) 3528 750
4100
3289
3788
Estimated Bearing Stratum
750
-34.5 -34.5
1200
"A"
B A
1' - 1'
16891 12297
1227 7924 3146
48743
3910 4014 "A"
8446 10135 11582 10135 8446
10589 10589
PYLON 12 PYLON 14
"A"
3000
4346 8200 4346
4006
4100
A A
16891
8200
189
B
3000
100
4100
4006
7924 3146 10874 3146 7924
1227 1227
10 30
30
10
P13 124piles x Ø1200 / foundation
50
"A"
1+701.0
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
A-A B-B
C-C B D-D
C D
8000
Obstacle Light Obstacle Light
3000
A 6-6 3-3
45 0 3 Lighting Arrester Lighting Arrester
0 00 2850 5700
3536
7200 2800
3000
3000
3000
1200 4500
479 3057
10@2000=20000 2000
6
2000
750
1529
10@2000=20000
20000
4000
10000
6500
C
29800
29800
L
1596
8000
8200
3191
11000
45000
4167 750
1596
4000
7800
7800
4800
750
5 1350
629 629
5 1800
78400
78400
1328 4980
75500
6308
23300
6x5000=30000
Obstacle Light Obstacle Light 5-5 2-2
111560
45600
45600
8438
4
4 4391 1200 5941 1297 "A"
Access Door 764 3628 2971 2971
750
33200
4 500 1814
1732
1814
1 200 8000 751
4100
5050 3600
6700
2546
4900
4736
8200
2100
2100
2100
5092
8200
3200
4 5 00
2546
4100
LC1 2 00 30 3000
13355
- R
+1 P14
5
14
-P 14
1732
1.0 L C
L 1 .
750
5x4000=20000
0
+1
1. 33160
2 MNTK:+13.67
33160
31060
AT:+11.14 "A"
2
1-1
1:
0
0
1.
1.
17705
+6.14 +6.14
4-4
1:
1:
0
12396
10500
MNNN:+2.33 11831
0.0 20500 20500
5160
987 4074
11000
2037 2037
15000
1200
1 1200
500
750
48743
3879
-18.00
31500
31500
3289
Scour (Flood) 750
20500
5078
6578
8200
442
-28.20 (P14) 3528 750
3289
Estimated Bearing Stratum
3879
750
-34.5 -34.5
1200
B A "A"
1' - 1'
16891 12449
1227 8002 3221
48743
3949 4053
8446 10135 11582 10135 8446 "A"
PYLON 15
"A"
4346 8200 4346
4100
A A
16891
PYLON 13
8200
B B
100
4100
8002 3221 10244 3221 8002
1227 1227
10 30
30
10
P14 124piles x Ø1200 / foundation
50
2+001.0 "A"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
A-A B-B
C-C B D-D
C D Obstacle Light Obstacle Light
3000
A 6-6 3-3
8000 Lighting Arrester Lighting Arrester
45 0 3 5700
0 00 2850 3536
1200 4500
7200 2800
3000
3000
3000
479 3057
6
10@2000=20000 2000
2000
750
1529
20000
10@2000=20000
4000
10000
6500
C
29800
29800
1596
L
8000
8200
3191
11000 4167 750
45000
1596
4000
7800
7800
4800
750
5 1350
629
1800
629
5 1328 4980
78400
78400
6308
75500
23300
6x5000=30000
Obstacle Light Obstacle Light 5-5 2-2
110810
45600
45600
8438
4 4391 1200 5941 1297
4 "A"
Access Door 764 3628 2971 2971
750
22300
33200 1814
1732
4 500
1814
1 200 751
4100
8000
6700
5050 3600
2546
4900
4736
8200
3
2100
2100
2100
5092
8200 6900 757
3200
Access Door
30 3 3
4500
2546
450
4100
1 2 00 0 3000
13355
30 5
1732
750
5x4000=20000
32410
MNTK:+13.67
2
30310
32410
"A"
LC R
2 -P15 15
-P
4-4 1-1
16955
-1. L LC .18
13500
23 12597 -1 MNNN:+2.33 11688
0.0 1200 7651 2836
4410
4410
8200 AT:-1.20
1 -3.0 5061
3826 3826 "A"
7000
1' 1'
35005500
987 4074
9530
DE=2/3 by Liquefaction
11000
750
3795
4100
48743
-18.00
3289
33000
33000
Scour (Flood) 750
8200
610
5078
6578
22000
3528 750
4100
3289
3795
-29.73 (P15)
Estimated Bearing Stratum
750
-36.0 -36.0
1200 B A "A"
1' - 1'
12297
16891
1227 7924 3146
48743 3910 4014 "A"
8446 10135 11582 10135 8446
PYLON 14 PYLON 16
"A"
4346 8200 4346
4006
4100
A A
16891
8200
189
B B
100
4100
4006
7924 3146 10874 3146 7924
1227 1227
10 30
30
10
50
P15 118piles x Ø1200 / foundation
"A"
2+301.0
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
A-A B-B
C-C B D-D
C D A 6-6 3-3
Obstacle Light Obstacle Light
8000 3000 5700
45 0 3 Lighting Arrester Lighting Arrester 3536
0 00 2850
1200 4500
479 3057
7200 2800
3000
3000
3000
10@2000=20000 2000
6
2000
1529
750
6 1529
10@2000=20000
20000
4000
6500
10000
1596
C
8000
8200
29800
29800
L
3191
4167 750
1596
11000
45000
4000
7800
7800
750
4800
629 629
5 1350
1800
5 1328 4980
78400
78400
6308
75500
23300
6x5000=30000
Obstacle Light
5-5 2-2
Obstacle Light
109310
8438
45600
45600
4 4391 1200 5941 1297 "A"
4 764 3628 2971 2971
Access Door
750
1814
1732
22300
33200
4 500 1814
751
4100
1 200 8000
6700
2546
5050 3600
4900
4736
8200
5092
3
2100
2100
2100
6900 757
8200
3200
Access Door
3
2546
30 3
4100
4500
L1C2 0 4 5 00 R
+1 -P01630 5 16 3000
13355
1732
-P
0.3 L LC 0.42
750
0
+1
5x4000=20000
MNTK:+13.67
30910
28810
2 "A"
30910
AT:+10.58
1:
1:
0
0
2 4-4 1-1
1.
1.
1.
1.
+5.58 +5.58
15455
1:
1:
0
13500
13000 MNNN:+2.33 11400
0.0
2910
2910
9500 9500 8200 9500 5061 1200 7500 2700
1 -3.0
3750 3750
1' 1' "A"
35005500
987 4074
11000
2037 2037
1
15000
1200
1200
500
750
3606
4100
48743 -18.00
3289
32000
32000
Scour (Flood) 750
21000
5078
6578
8200
988
-28.98 (P16) 3528 750
3289
4100
3606
Estimated Bearing Stratum
750
-35.0 -35.0
1200 B A
"A"
16891
1' - 1'
11992
48743 1227 7767 2998
8446 10135 11582 10135 8446 3833 3934 "A"
3000 3000 3000 3000
3000 3000 3000 3000
"A"
PYLON 15 PIER 17
3000
4346 8200 4346
3817
3000
4100
3500
A A
16891
3500
3000
8200
566
B
3000
100
4100
3817
7767 2998 12135 2998 7767
1227 1227
10 30
30
10
50
P16 148piles x Ø1200 / foundation
2+601.0 "A"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
48742.8
600 47542.8 600
7845.6 31851.6 8445.6
1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8
.8
47
14
7.
8 A A A A C A A A A A A D B
1426.5
226.5
24 B
F B
Bulkhead Steel Pipe Sheet Pile
5'1
8 "
B
°3
10 F B
F B
F B
F B
16891.2
8200
5°17'39"
5°17'39"
5°17'39"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 006
SHEET No. :
Sheet of PACKAGE:
300 49500 1200
11500 (t=19,SKY490) 8500 (SKY490) 12000 (t=20,SKY490) 12000 (t=20,SKY490) 7000 (t=20,SKY490)
Type-a
1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 38000
51000
Type-b
1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 38000
51000
Reinforcing Band
SHEET PILE Joint Pipe Site Welding Site Welding
PL-9x300
Type-c
1200
Top Slab
1300
Filled Concrete
5500 32000
5400 32100
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding
Type-d
1200
Top Slab
1300
Filled Concrete
5500 32000
5400 32100
NOTES:
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
sheet piles,and Type-c and Type-d for bulkhead steel pipe
sheet piles.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 007
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200
48742.8
600 47542.8 600
7845.6 31851.6 8445.6
1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8
.8
47
14
7.
8 A A A A C A A A A A A D B
1426.5
226.5
24 B
B
3000
Bulkhead Steel Pipe Sheet Pile
F
5'1
8 "
B
°3
10 F B
F B
F B
F B
16891.2
8200
Internal Pile F
3000
F
10589 10589
1226.5 7923.7 3146.4 5437.2 5437.2 3146.4 7923.7 1226.5
5°17'39"
5°17'39"
5°17'39"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 008
SHEET No. :
Sheet of PACKAGE:
300 43500 1200
11500 (t=19,SKY490) 8500 (SKY490) 9000 (t=21,SKY490) 9000 (t=21,SKY490) 7000 (t=21,SKY490)
Type-a
1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32000
45000
Type-b
1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32000
45000
Reinforcing Band
PL-9x300
1200
Top Slab
1300
Filled Concrete
5500 26000
5400 26100
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding
Type-d
1200
Top Slab
1300
Filled Concrete
5500 26000
5400 26100
Reinforcing Band
PL-9x300
NOTES:
1200
Top Slab
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
1300
sheet piles,and Type-c and Type-d for bulkhead steel pipe
Filled Concrete
sheet piles.
5500 26000
5400 26100
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 009
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200
48742.8
600 47542.8 600
7845.6 31851.6 8445.6
1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8
.8
47
14
7.
8 A A A A C A A A A A A D B
1426.5
226.5
24 B
F B
Bulkhead Steel Pipe Sheet Pile
5'1
8 "
B
°3
10 F B
F B
F B
F B
16891.2
8200
Internal Pile
F
10589 10589
1226.5 8002.1 3220.5 5121.9 5121.9 3220.5 8002.1 1226.5
5°17'39"
5°17'39"
5°17'39"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 010
SHEET No. :
Sheet of PACKAGE:
300 40500 1200
8500 (t=14,SKY490) 12000 (SKY490) 12000 (t=17,SKY490) 9500 (t=17,SKY490)
Type-a
1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
10000 (Cut Off) 32000
42000
Type-b
1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
10000 (Cut Off) 32000
42000
Reinforcing Band
PL-9x300
1200
Top Slab
1300
Filled Concrete
5500 26000
5400 26100
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding
Type-d
1200
Top Slab
1300
Filled Concrete
5500 26000
5400 26100
Reinforcing Band
PL-9x300
Type-e NOTES:
1200
Top Slab
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
1300
sheet piles,and Type-c and Type-d for bulkhead steel pipe
Filled Concrete
sheet piles.
5500 26000
5400 26100
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 011
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200
48742.8
600 47542.8 600
7845.6 31851.6 8445.6
1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8
.8
47
14
7.
8 A A A A C A A A A A A D B
1426.5
226.5
24 B
F B
Bulkhead Steel Pipe Sheet Pile
8" B
5' 1
‹3
10 F B
F B
F B
F B
16891.2
8200
5°17'39"
5°17'39"
5°17'39"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 012
SHEET No. :
Sheet of PACKAGE:
300 45000 1200
11500 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490) 9000 (t=16,SKY490) 8000 (t=16,SKY490)
Type-a
1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 33500
46500
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding Site Welding
Type-b
1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 33500
46500
Reinforcing Band
PL-9x300
1200
Top Slab
1300
Filled Concrete
5500 27500
5400 27600
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding
Type-d
1200
Top Slab
1300
Filled Concrete
5500 27500
5400 27600
NOTES:
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
sheet piles,and Type-c and Type-d for bulkhead steel pipe
sheet piles.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 013
SHEET No. :
Sheet of PACKAGE:
LAYOUT S=1/200
48742.8
600 47542.8 600
7845.6 31851.6 8445.6
1447.8 1447.8
Exterior Steel Pipe Sheet Pile
247.8 247.8
.8
47
14
7.
8 A A A A C A A A A A A D B
1426.5
226.5
24 B
B
3000
Bulkhead Steel Pipe Sheet Pile
F
5'1
8 "
B
°3
10 F B
F
3000
B
F B
3500
F B
16891.2
8200
3500
Internal Pile F
3000
F
3000
F
5°17'39"
5°17'39"
5°17'39"
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
LAYOUT OF STEEL PIPE SHEET PILE
in association with ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 014
SHEET No. :
Sheet of PACKAGE:
300 44000 1200
11500 (t=20,SKY490) 11000 (t=20,SKY490) 12000 (t=20,SKY490) 11000 (t=20,SKY490)
Type-a
1200
Top Slab
1500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32500
45500
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Pre Cut (Joint Pipe) Site Welding Site Welding
Type-b
1200
Top Slab
2500 500 11000
Protruded portion for cofferdam
Filled Concrete
13000 (Cut Off) 32500
45500
Reinforcing Band
PL-9x300
1200
Top Slab
1300
Filled Concrete
5500 26500
5400 26600
Reinforcing Band
PL-9x300
Joint Pipe Site Welding Site Welding
Type-d
1200
Top Slab
1300
Filled Concrete
5500 26500
5400 26600
Reinforcing Band
PL-9x300
Type-e NOTES:
1200
Top Slab
Between adjacent piles,welding position shall be staggered
in such a way that Type-a and Type-b for exterior steel pipe
1300
sheet piles,and Type-c and Type-d for bulkhead steel pipe
Filled Concrete
sheet piles.
5500 26500
5400 26600
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
H. Ikeda
ARRANGEMENT OF STEEL
in association with PIPE SHEET PILES ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 200 DRAWING No. : C - 2a - 015
SHEET No. :
Sheet of PACKAGE:
PILE TOE REINFORCING
BAND DETAIL S=1/50 PRE-CUT DETAIL S=1/20 FIELD JOINT DETAIL OF PIPE JOINT S=1/20 LIFTING LUG DETAIL S=1/10
300 18 (Pre-cut Position)
11
Dead Water Material
D
Ø1200
30±5
Ø165.2
11
C
Ø165.2
B
Temporary Attaching
a
10 10
300 300
A/2 A/2
8 1000 8
PILE TOE REINFORCING BAND Bead Width (Non Welding)
Bead Width
PL-300x9x3798
6
PIPE INTERLOCKING
FIELD WELD DETAIL - A S=1/ 3 DETAIL - B S=1/10 DETAIL - C S=1/10 JOINT DETAIL S=1/ 5
Ø1200
2
5.
Ø1200
16
Ø
BACKING STRIP
TOE SHOE
PL-70x6x3663
0~2.4
6
30 ±5 8
Bead Width
82.6 (61.3)
4 5°
35
Ø1
6 .1
65
70 11
70
.2
1~4
30
35
3.0
6
.2
25
247.8 (226.5)
±5
82.6 (103.9)
15
65
50
Ø1
Root Gap Retention Bead 15
9.2
80 - (8 LOCATIONS)
30
Filled Concrete
30
±5
6 .1
45°
Ø165.2
11
12
82.6 (61.3)
30
6 PL-12x6x30
3 0°
247.8
t 6 8 Bead Width
30
Ø165.2
TOE SHOE
INFORMATION ONLY.
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
Ø1200 16 14
X N02-D13-150
X N02-D13-150
A-A 14 Steady rest
PL-32*16*3597 16
Ø1200
32
300
14 1172 14 Steady rest
"a"
A A PL-32*16*3597
25
L1
32
Stopper N = 3 / Ring
25
12 N01 12 N01 PL-25*9*50
300
50
100
32
Top Slab
25
300
Lower Side
300
Steady rest
1200
1300
15mm or more
B B
4 N03-D13-250 X N02-D13-150
4 N03-D13-250 3597
(Neutral Line)
Filled Concrete
50
14 1172 14
Ø1200 B-B
25 9
Ø1200
14 1172 14
100 1000 100
12 N01
32
P13 46 D20 1000 7 PL-32*16*3597
4 N03-D13-250
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. N0.
500
2500
1000
4500
+7.00
6500
9170
1000
+5.00
12500
1000
+3.00
+1.33 +1.33 +1.33 +1.33 +1.33 +1.33
19000
19000
19000
23000
22000
Concrete Fill Bottom Slab
11000
-12.50
Leveling Sand
1)EXCAVATE INSIDE EXTERIOR SHEET 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR
PILES AND FILLED WITH CONCRETE AS -12.50M LEVEL AFTER THE 1ST FOLLOWED BY CASTING UNDERWAR UP TO +5.00M LEVEL AFTER THE 2ND UP TO +3.00M LEVEL AFTER THE 3RD
SHOWN. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +7.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.
500
+9.50 +9.50 +9.50 +9.50 +9.50
3@2000=6000
9500
13500
12500
2@3000=6000
+1.33 +1.33 +1.33 +1.33 +1.33
19000
19000
19000
18000
18000
18000
1000
+0.00
Top Slab
1000
1000
-3.00
6500
5500
-8.50 -8.50 -8.50
5003500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO +0.00M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
NOTES:
For information only and the contractor shall develop construction
sequence and steel temporary timbering/bracing for the
engineer's approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P12)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 018
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5
500
2500
1000
4500
+7.00
6500
10320
1000
+5.00
12500
1000
+3.00
19000
19000
19000
+0.18 +0.18 +0.18 +0.18 +0.18 +0.18
23000
22000
Concrete Fill Bottom Slab
11000
-12.50
Leveling Sand
1)EXCAVATE INSIDE EXTERIOR SHEET 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR
PILES AND FILLED WITH CONCRETE AS -12.50M LEVEL AFTER THE 1ST FOLLOWED BY CASTING UNDERWAR UP TO +5.00M LEVEL AFTER THE 2ND UP TO +3.00M LEVEL AFTER THE 3RD
SHOWN. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +7.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.
500
+9.50 +9.50 +9.50 +9.50 +9.50
3@2000=6000
9500
13500
12500
2@3000=6000
19000
19000
19000
18000
18000
18000
1000
1000
-3.00
6500
5500
-8.50 -8.50 -8.50
5003500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO +0.00M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
NOTES:
For information only and the contractor shall develop construction
sequence and steel temporary timbering/bracing for the
engineer's approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P13)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 019
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5
+11.14
1360
+6.14 +6.14 +6.14 +6.14 +6.14
3500
1:
5000
1.
2140
0
1000
4140
+4.00 +4.00
+6.14
1000
+2.00
9140
16000
20500
20000
18640
Concrete Fill Bottom Slab
11000
-12.50
Leveling Sand
1)EXCAVATE OUTSIDE COFFERDAM UP 1)EXCAVATE INSIDE EXTERIOR SHEET 1)DRAINING THE COFFERDAM INTERIOR 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND
TO +6.14M LEVEL. PILES AND FILLED WITH CONCRETE AS UP TO +4.00M LEVEL AFTER THE 1ST -12.50M LEVEL AFTER THE 2ND FOLLOWED BY CASTING UNDERWAR
SHOWN. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +2.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.
500
+6.14 +6.14 +6.14 +6.14 +6.14
2@2000=4000
6640
2@2500=5000
10500
9140
1000
16000
16000
16000
-0.50
14640
14640
14640
Top Slab
1000
1000
-3.00
6500
5500
-8.50 -8.50 -8.50
3500
500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO -0.50M LEVEL AFTER THE 3RD UP TO -3.00M LEVEL AFTER THE 4TH UP TO -8.50M LEVEL AFTER THE 5TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
3)BACKFILL UP TO THE EXISTING
GROUND LEVEL.
NOTES:
For information only and the contractor shall develop construction
sequence including excavation outside cofferdam and steel
temporary timbering/bracing for the engineer's approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P14)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 020
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5
3500
3000
5500
+6.50
7500
11700
11700
11700
1000
1000
+4.00 +4.00
12500
1000
+2.00
19000
23000
-1.20 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20 -1.20
22000
Concrete Fill Bottom Slab
11000
-12.50
Leveling Sand
1)EXCAVATE INSIDE EXTERIOR SHEET 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND
PILES AND FILLED WITH CONCRETE AS UP TO +6.50M LEVEL AFTER THE 1ST UP TO +4.00M LEVEL AFTER THE 2ND -12.50M LEVEL AFTER THE 3RD FOLLOWED BY CASTING UNDERWAR
SHOWN. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +2.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.
500
+9.50 +9.50 +9.50 +9.50 +9.50
2@2500=5000
10000
2000
13500
12500
2@2500=5000
19000
19000
19000
18000
18000
18000
1000
-0.50
-1.20 -1.20 -1.20 -1.20 Top Slab -1.20
1000
1000
-3.00
6500
5500
-8.50 -8.50 -8.50
3500
500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO -0.50M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
NOTES:
For information only and the contractor shall develop construction
sequence and steel temporary timbering/bracing for the
engineer's approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P15)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 021
SHEET No. :
Sheet of PACKAGE:
STEP1 STEP2 STEP3 STEP4 STEP5 STEP6
+10.58
1000
+9.50 +9.50 +9.50 +9.50 +9.50 +9.50 +9.50
500
2500
5000
1000
4500
1: +7.00
6500
1
+5.58 +5.58 +5.58 +5.58 +5.58 +5.58 +5.58
1000
+5.00
12500
1000
+3.00
19000
19000
19000
9500
22500
22000
Concrete Fill Bottom Slab
11000
-12.50
Leveling Sand
1)EXCAVATE OUTSIDE COFFERDAM UP 1)EXCAVATE INSIDE EXTERIOR SHEET 1)UNDERWATER EXCAVATION UP TO 1)PLACEMENT OF LEVELING SAND 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR
TO +5.58M LEVEL. PILES AND FILLED WITH CONCRETE AS -12.50M LEVEL AFTER THE 1ST FOLLOWED BY CASTING UNDERWAR UP TO +5.00M LEVEL AFTER THE 2ND UP TO +3.00M LEVEL AFTER THE 3RD
SHOWN. TEMPORARY TIMBERING INSTALLATION. BOTTOM SLAB CONCRETE. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION.
2)DRAINING THE COFFERDAM INTERIOR
UP TO +7.00M LEVEL AFTER BOTTOM
SLAB CONCRETE GAINED REUIRED
STRENGTH.
500
+9.50 +9.50 +9.50 +9.50 +9.50
3@2000=6000
+5.58 +5.58 +5.58 +5.58 +5.58
9500
13500
12500
2@3000=6000
19000
19000
19000
18000
18000
18000
1000
+0.00
Top Slab
1000
1000
-3.00
6500
5500
-8.50 -8.50 -8.50
3500
500
1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIOR 1)DRAINING THE COFFERDAM INTERIORO 1)WELDING OF REINFORCING BAR STUDS 1)REMOVAL OF ALL TEMPORARY
UP TO +0.00M LEVEL AFTER THE 4TH UP TO -3.00M LEVEL AFTER THE 5TH UP TO -8.50M LEVEL AFTER THE 6TH TO INTERIOR FACE OF EXTERIOR STEEL TIMBERINGS AFTER TOP SLAB
TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. TEMPORARY TIMBERING INSTALLATION. PIPE SHEET PILES AND PLACEMENT OF CONCRETE GAINED REQUIRED
TOP SLAB CONCRETE IN THE AIR. STRENGTH.
2)CUT OUT PROTRUDING PORTION OF
EXTERIOR SHEET PILES.
3)BACKFILL UP TO THE EXISTING
GROUND LEVEL.
NOTES:
For information only and the contractor shall develop construction
sequence including excavation outside cofferdam and steel
temporary timbering/bracing for the engineer's approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
CONSTRUCTION SEQUENCE OF STEEL
H. Ikeda
in association with PIPE SHEET PILE FOUNDATION(P16)
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: DRAWING No. : C - 2a - 022
SHEET No. :
Sheet of PACKAGE:
CROSS SECTION
5500
5500
Bottom Layer No.3 @150
Bottom Layer No.2 @150
48743
14491
14491
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
5500
5500
Bottom Layer No.3 @150
Bottom Layer No.2 @150
48743
14491
14491
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
5500
5500
Bottom Layer No.3 @300
Bottom Layer No.2 @150
48743
14491
14491
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
5500
5500
Bottom Layer No.3 @150
Bottom Layer No.2 @150
48743
14491
14491
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
5500
5500
Bottom Layer No.2 @150
48743
14491
14491
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
A-A B-B
A ELEVATION S=1/100
Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200
N03-D22-100-NF N03-D22-100-NF
450
450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
4@100=400
4@100=400
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement
450
450
4@100
4@100
=400
=400
125
125
125
125
34@100=3400
34@100=3400
5500
5500
125
125
4@100
4@100
=400
=400
34@100=3400
34@100=3400
Shear reinforcement
600
600
5500
5500
D D
14°19'26"
14°19'26"
309 309
125
125
691 391
4@100=400
4@100=400
Moment reinforcement
5460 N04-D22
1560 N02-D22
600
600
4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40
C-C D-D
Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0
0
10
10
150 150 150
Ø1200
100
100
0
0
10
10
301 301
309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P12 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 028
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40
A-A B-B
A ELEVATION S=1/100
Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200
N03-D22-100-NF N03-D22-100-NF
450
450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
4@100=400
4@100=400
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement
450
450
4@100
4@100
=400
=400
125
125
125
125
34@100=3400
34@100=3400
5500
5500
125
125
4@100
4@100
=400
=400
34@100=3400
34@100=3400
Shear reinforcement
600
600
5500
5500
D D
14°19'26"
14°19'26"
309 309
125
125
691 391
4@100=400
4@100=400
Moment reinforcement
5460 N04-D22
1560 N02-D22
600
600
4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40
C-C D-D
Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0
0
10
10
150 150 150
Ø1200
100
100
0
0
10
10
301 301
309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P13 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 029
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40
A-A B-B
A ELEVATION S=1/100
Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200
N03-D22-100-NF N03-D22-100-NF
3@100=300 450
3@100=300 450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement
120 450
120 450
3@100
3@100
120
120
=300
=300
38@95=3610
38@95=3610
5500
5500
3@100
600 120
3@100
600 120
=300
=300
38@95=3610
38@95=3610
Shear reinforcement
5500
5500
D D
14°19'26"
14°19'26"
309 309
691 391
120
120
3@100=300
3@100=300
Moment reinforcement
6084 N04-D22
1248 N02-D22
600
600
4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40
C-C D-D
Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0
0
10
10
150 150 150
Ø1200
100
100
0
0
10
10
301 301
309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P14 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 030
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40
A-A B-B
A ELEVATION S=1/100
Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200
N03-D22-100-NF N03-D22-100-NF
3@100=300 450
3@100=300 450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement
450
450
3@100
3@100
=300
=300
275
275
275
275
33@100=3300
33@100=3300
5500
5500
275
275
3@100
3@100
=300
=300
33@100=3300
33@100=3300
Shear reinforcement
600
600
5500
5500
D D
14°19'26"
14°19'26"
309 309
275
275
691 391
3@100=300
3@100=300
Moment reinforcement
5304 N04-D22
1248 N02-D22
600
600
4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40
C-C D-D
Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0
0
10
10
150 150 150
Ø1200
100
100
0
0
10
10
301 301
309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P15 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 031
SHEET No. :
Sheet of PACKAGE:
ARRANGEMENT OF REINFORCING BAR STUD S=1/40
A-A B-B
A ELEVATION S=1/100
Ø1200
Shear reinforcement
B 375 150 75150 375 16891
Moment reinforcement 75
1200 7245.5 7245.5 1200
N03-D22-100-NF N03-D22-100-NF
3@100=300 450
3@100=300 450
N04-D22-100-FF N04-D22-100-FF
N01-D22-100-NF N01-D22-100-NF
N02-D22-100-FF N02-D22-100-FF
C C Moment reinforcement
450
450
3@100
3@100
=300
=300
325
325
325
325
33@100=3300
33@100=3300
5500
5500
325
325
3@100
3@100
=300
33@100=3300
33@100=3300
=300
Shear reinforcement
500
500
5500
5500
D D
14°19'26"
14°19'26"
309 309
691 391
325
325
3@100=300
3@100=300
Moment reinforcement
5304 N04-D22
1248 N02-D22
500
500
4°46'29"
4°46'29"
301 399
B 301 699
A
CROSS SECTION S=1/40
C-C D-D
Stud weld Moment reinforcement D22 Stud weld Shear reinforcement D22
0
0
10
10
150 150 150
Ø1200
100
100
0
0
10
10
301 301
309
699
309
399
NOTES:
691 391 1.STUD WELDING MUST SATISFY A PERMISSIBLE VALUE.
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF Rev. No.
H. Ikeda
CONNECTION BETWEEN TOP SLAB
in association with AND SHEET PILES ( P16 )
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 2a - 032
SHEET No. :
Sheet of PACKAGE:
1 .0
1 +25
ELEVATION S=1/200 A
PIER 10 PYLON 12
C B
14900 - West 3500
A - A 3500 14900 - East
4900
1050 1400 1100 1350 450
500 1800 5395 6000 1705 500 500 1935 6000 5165 1800 500 4451210 795
755 985 400
50 50
478
61
451
1.0 % 1.0 %
550
571
Tie-down cable
451
71
+27.20
25
1999
1999
100 1900 825 1450 625
1000 1500
1000 1500
1000 1500
CL
R32101
1900
R32101
2500
2500
2500
2968
B
E E
800 3000 8300 3000 800 800 3000 8300 3000 800 1400
15900 3000 3000 15900 950 3000 950
18201
20200
D D
2600 3000 8300 3000 7600 3000 8300 3000 2600 4500 3000 4500
+7.00
3000
1500
150
+4.00
100
200
-30.00
PLAN A
S=1/200
1500
4500
Ø
15
00
6000
PYLON 12
2@4500=9000
12000
3000
400
1+251.0
PIER 10
NOTES:
1 . bearing shall be as specified on dwg. C-4-005
3000 2600
6000
1500
1500 8@4800=38400 1500 All dimensions are in mm, unless otherwise shown.
41400
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N.H.NGHIA DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
625
1450 625
1100 1350
1100 1350
PYLON 12
255
2450
2450
985 1900
755
345 1210 345 485
4900
4900
1075 1450 1075
1050 1400
1050 1400
345
PIER 10
2450
2450
1210
1900
345
100
500 1800 5395 6000 1705 500 500 1935 6000 5165 1800 500
150
1.0 % 1.0 %
441 50
650
650
500
58
760
3000
3000
25
25
1700
1700
155
1500
1999
2500
1900
650
650
240
70 70 70 70 70 70 70 70 70 70 70
30
10 10
50
NOTES:
1 . bearing shall be as specified on dwg. C-4-005
2 . tie-down shall be as specified on dwg. C-3b-073 and -74
3 . install rebar for crack prevention in bearing mortar.
4 . fill non-shrink mortar in block out provided for anchor bolts of bearing.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N.H.NGHIA DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
71 550 57
500 2500 540 2160
2000
1682 11
Tie-down cable 1.0 %
150
280
1375 700
+27.2
1100
1682
540
42
2075
2075
280
1000 1500
1000 1500
2387
2500
1075
1729
825
540
1797
4150
4150
2968
1350 725
625 1450
2075
R179105
D D A 1025
1800 11000 5600
18400
800 3000 8000 3000 4100
550 550
625 1450 825 280 540 280
15088
C C 1.0 %
425 45
11
130
1.0 %
2000
2600 3000 8000 3000 4100 4500 3000 4500
58
42
+9.7
4500
1500
1729
3000
3000
1500
2500
150
150
+6.7
100
200
240
-34.3
3000 3000
1500
Ø
15
00
650
650
PIER 18
2@4500=9000
2+751.0
3000
1700
775
3000
1700
12000
PYLON 16
500
650
650
150
Steel plate
1860
500 2000 500
1500
3000
NOTES:
8@4800=38400 All dimensions are in mm, unless otherwise shown. 1 . bearing shall be as specified on dwg. C-4-005
1500
2 . tie-down shall be as specified on dwg. C-3b-073 and -74
41400
3 . install rebar for crack prevention in bearing mortar.
4 . fill non-shrink mortar in block out provided for anchor bolts of bearing.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N.H.NGHIA DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
NB12-D16-150 31 NB01-D36-150
31 NB02-D36-150 1
C
L SECTION 1 - 1 S=1/50
250
1.0 % 1.0 %
1500
NB13-D16-150
NC02-D20-100
31 NB01-D36-150
31 NB02-D36-150
1500
NB05-D20-150 31 NB04-D36-150
Skin 31 NB03-D36-150
1
SECTION 2 - 2 S=1/50
max 360mm
NB05-D20-150
NC02-D20-200
31 NB04-D36-150
NC04-D20 31 NB03-D36-150
2 2
Ls
1500
NF15-D18-150 NF13-D18-150
NC02-D20-100
Skin Skin 77 NF11-D36-150
1500
NF08-D16-750
NF12-D18-150
D43 D36
77 NF06-D43-150 77 NF05-D36-150
77 NF04-D43-150 77 NF03-D36-150
NOTES:
274 NF01-D32-150 NF02-D16-750 1 . Ls : splice length shall be conformed to 22TCN272-05
2 . Every hooks , lap lengths spacing minimum shall be conformed to
22TCN272-05 and AASHTOLRFD 4th edition with seismic zone 2
3 . Rebar shall be arranged to avoid interference with anchor bolt of
tie-down cable.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT (BASIC DESIGN)
SECTION 1 - 1 S=1/50
NB17-D16-150
27 NB02-D32-150 27 NB01-D36-150
NB14-D16-150
27 NB04-D32-150 27 NB03-D36-150
D36
NB16-D16-150 D32
250
NB13-D20-150
1.0 %
1500
NB12-D20-150
NC02-D20-100
D36
D28
1500
NB09-D22-125 27 NB07-D36-150
Skin 27 NB08-D28-150 27 NB05-D36-150
27 NB06-D28-150
1
SECTION 2 - 2 S=1/50
1.0 %
64 NC01-D36-150NF
NC02-D20-200
NC04-D20
2 2
Ls
1500
NF15-D18-150 NF13-D18-150 77 NF10-D38-150
NC02-D20-100
Skin Skin 77 NF11-D38-150 NF08-D16-750
Clear cover for Pilecap : 75mm
NF14-D18-150
1500
D38 D36
NF11-D18-150
NF16-D18-600
D43 D36
77 NF06-D43-150 77 NF05-D36-150
77 NF04-D43-150
NF01-D16-750
77 NF03-D36-150
274 NF01-D32-150 NOTES:
1 . Ld : development length shall be conformed to 22TCN272-05
2 . Every hooks , lap lengths spacing minimum shall be conformed to
22TCN272-05 and AASHTOLRFD 4th edition with seismic zone 2
3.REBAR SHALL BE ARRANGED TO AVOID INTERFERENCE WITH
ANCHOR BOLT OF TIE-DOWN CABLE.
MATERIALS:
1 . Normal concrete , grade C30
All dimensions are in mm, unless otherwise shown. 2 . Reinforcements shall be conformed to JIS - SD390
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT (BASIC DESIGN)
Ld
24 NK01-D32-168
NK06-D28
NK08-D28
100
Bottom of
150
pile cap
30x75=2250
Bottom of
pile cap
NK03-D16-75
NK03-D16-75 NK04-D16-225
Steel Pipe (STK400 : JIS G 3444)
D out =60.5mm t=2.3mm
1 1 110 1280 110
1500
NK06-D28
86 8
12
5
11x3000=33000
2 2
34000
24 NK01-D28-168
34000
NK05-D16
NK04-D16-225
5 5
Welding Welding
Welding
Ø1 Ø1 Ø1
NK04-D16 10 23 25
NK07-D16 0 6 0
1050
NK05-D16
50 114
3 3
110 1280 110
Ø1500 NOTE:
1 . Ld : development length shall be conformed to 22TCN272-05
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N. H. Nghia DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
Ld
24 NK01-D32-168
NK06-D28
NK08-D28
100
Bottom of
150
pile cap
30x75=2250
Bottom of
pile cap
NK03-D16-75
NK03-D16-75 NK04-D16-225
Steel Pipe (STK400 : JIS G 3444)
D out =60.5mm t=2.3mm
1 1 110 1280 110
1500
35x225=7875
86 8
13x3000=39000
12
5
2 2
41000
24 NK01-D28-168
41000
NK05-D16
5 5 NK04-D16-225
NK04-D16
Welding Welding
Welding
NK07-D16
Ø1 Ø1 Ø1
10 23 25
0 6 0
2050
NK05-D16
50 139
3 3
110 1280 110
Ø1500 NOTE:
1 . Ld : development length shall be conformed to 22TCN272-05
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
N. H. Nghia DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
BaseLine Elevation
+27.910m
+29.410m
2 2 50 +30.160m
586
586
0"
°0'
90
30910
30910
32410
32574
0"
°0'
2910
2910
4410
90
5160
2250
2250
750
189 566
3750700
2
1200
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
5700
30910
30910
2910
4
77
00 AND L-L.
5
THE LOWER SECTIONS IN THE PYLON COLUMN IS
LINEARLY CHANGE FROM SECTIONS M-M , N-N ,
O-O AND P-P.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
3450
450 3000
1500 1500
1500 1500
3000
A-A
A-A
5700
1200 4500
2250 2250
EXTERNAL FORM OF CROSSBEAM:
THE CROSSBEAM AXIS IS DEFINED IN THE LINE
4000
WHICH PASSES POINTS 4 AND 5 .
THE CROSSBEAM SECTIONS ARE DEFINED AT E-E
8000
AND F-F POSITIONS.
THE TOP OF THE CROSSBEAM IS LEVELED.
4000
THE BOTTOM IS A CIRCULAR ARC WHICH PASSES
POINTS a , b AND c .
TOP STRUT
5700
1200 4500
G-G H-H 2250 2250
B-B
4100
2723 2700
C-C
8200
2800
2800
B-B
4100
C-C
7200
7200
20000
20000
10000
10000
C
L
11400
1200 7500 2700
3750 3750
11000
3606
4100
"A"
TOP STRUT DETAILS:
8200
988
THE TOP STRUT SECTION IS DEFINED AT SECTION
H-H. D-D
4100
3606
THE BOTTOM IS DEFINED IN A PARABOLA WHICH D-D
PASSES POINTS d , e AND f .
THE TOP IS DEFINED IN A PARABOLA WHICH
PASSES POINTS g , h AND i .
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
3-3 Ventilation
150
VP75
629 800
545
700
1269
500
"A"
Manhole
SEE C-4-033 Lighting Arrester
150
1350
@500
VP75
150
2-2 Stair
100
100
15 0
1 8 00
2650
90 0
60 0
1 621
"A"
VP50
1 49 0
2 3 3 100
1-1
250 250
VP75
500
1601
"A"
100
1
1 "A"
100
10 30
30
10
50
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
38213
2506 2000 2150 6x4150=24900 2150 2000 2506
NON-SHRINKAGE MORTAR
14200 800 14200
C
L
t2 t1
ACCESS HATCH 800 500 Z + 30 MM
S1 S2
30
C1 C2 C3 C4 C5 C6 C7 C8 C9
t3
Level
800
3200
300 300
300
300
300
300
H
h1
300 300 d
4500
4500
"a"
300
300
800
300 300
300 300
t1 t2 t3 d
300
300
P12,P16 72 170 900 180
ACCESS OPENING
R106635
P13,P15 57 70 1200 210
P14 59 70 1200 210
DRAIN PIPE Ø25 DRAIN PIPE Ø25
PLAN S=1/200
38213
720
2506 2000 2150 6x4150=24900 2150 2000 2506
WEST 14200 800 14200 EAST
2600
3500
620
S1 C1 C2 C3 C4 C5 C6 C7 C8 C9 S2
720
800
300
300
300
300
ACCESS HATCH
300 300 300 300
ACCESS OPENING
END BULKHEAD
4400
6000
800
INTERMEDIATE BULKHEAD 2120
800 2900
300 300 300 300 3700
300
300
300
300
800
30
30
P14 29.660 800 800
1.0 % 1.0 % 1.0 % 1.0 % 1.0 % 1.0 % Z 200 400 200 100 600 100
800
800
P15 28.910
800
P16 27.410
ACCESS OPENING
200
100
300
300
300
300
300
300
3200
1600
H
3200
4500
1000
h1
600
800
600
H h1
2900
300 300
H
S1 4500 2900
4500
300
300
100
C1 4204 2604
800
200
300 300
C2 3929 2329
300
300
300 300
800
C3 3524 1924
C4 3281 1681 NOTES:
300
300
800
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
N13
N12
NC01-LONGITUDINAL REBAR
N2 NC03-CROSS TIE
E1
NOT
NC02-HOOPS
MAX@360
N14
N5
NOTES:
SEE
N3
N4
N6
1.LONGITUDINAL REBAR SHALL BE
ARRANGED TO MAINTAIN REQUIRED
N15 N16 COVER MEASURED VERTICAL FROM
WALL SURFACE.
REINFORCEMENT FROM BASE OF STEM TO CROSSBEAM TOP 3.ALL SPLICES OF VERTICAL REBAR SHALL
BE MECHANICAL JOINT WITH STAGGERED
NUMBER OF LONGITUDINAL REBARS
LOCATIONS.
P12,16 ELEV. P13,15 ELEV. P14 ELEV. REBAR DIAM. N1 N2 N3 N4 N5 N6
NC05-D51-300
HAUNCH REBARS -3.00 - -0.09 -3.00 - 1.41 -3.00 - 2.16 D51 51 46 19 16 19 16
-0.09 - 2.41 1.41 - 3.91 2.16 - 4.66 D51 49 45
4.REBAR SHALL BE ARRANGED TO AVOID
2.41 - 4.91 3.91 - 6.41 4.66 - 7.16 D51 47 43 INTERFERENCE WITH PRESTRESSING
4.91 - 7.41 6.41 - 8.91 7.16 - 9.66 D51 45 41 TENDONS.
NC02-HOOPS 7.41 - 9.91 8.91 - 11.41 9.66 - 12.16 D51 43 39
9.91 - 12.41 11.41 - 13.91 12.16 - 14.66 D51 41 37 5.CONNECTION REBAR SHALL BE
12.41 - 14.91 13.91 - 16.41 14.66 - 17.16 D51 40 36 ARRANGED TO AVOID INTERFERENCE
14.91 - 17.41 16.41 - 18.91 17.16 - 19.66 D51 39 35 WITH TOP SLAB REBAR.
17.41 - 19.91 18.91 - 21.41 19.66 - 22.16 D51 37 33 NO. OF THE REBAR SHALL BE THE SAME
19.91 - 22.91 21.41 - 24.41 22.16 - 25.16 D51 35 31 AS THOSE FOR PYLON STEM AND
22.91 - 25.81 24.41 - 27.31 25.16 - 28.06 D51 33 29 EXTENDED ON TO TOP LAYER OF
MECHANICAL 25.81 - 27.91 27.31 - 29.41 28.06 - 30.16 D51 31 27
SPLICES BOTTOM REBAR OF TOP SLAB.
NUMBER OF HORIZONTAL REBARS
VERTICAL HOOPS CROSS TIE
6.CONNECTION REBAR SHALL BE
P12,16 ELEV. P13,15 ELEV. P14 ELEV. ARRANGED TO CLOSER TO THE
SPACING N11 - N16 N21
-3.00 - 9.91 -3.00 - 11.41 -3.00 - 12.16 100 D22 D22 MAX@360 ADJACENT PYLON REBAR.
9.91 - 27.91 11.41 - 29.41 12.16 - 30.16 100 D28 D28
7.Ld:DEVELOPMENT LENGTH SHALL BE
CONFORMED TO 22TCN272-05.
NC01-LONGITUDINAL REBARS
N1 - N6, SEE TABLE
NC04-CONNECTION REBARS
SEE NOTE 5,6
Ld
-3.00
2 2
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
32 NR03-D22
NC08-HOOPS
N11 N21 ALL CORNERS
NC07-LONGITUDINAL REBAR
N1
16 NR02-D22
NC09-CROSS TIE OTHER SIDES
MAX@360
NC11-D18-300 N14
N3
N5
NC10-D51-300
N4
N6
16 NR01-D22
Ld
HAUNCH REBARS NR04-D18-300 OTHER SIDES
ALL OTHER SIDES
N15 N16
"b" "b"
OBSTACLE LIGHT OBSTACLE LIGHT
OPENING OPENING
NC08-HOOPS
REINFORCEMENT FROM TOP OF CROSSBEAM TO ANCHOR BOX BOTTOM
NUMBER OF LONGITUDINAL REBARS DETAIL "b" S=1/50
P12,16 ELEV. P13,15 ELEV. P14 ELEV. REBAR DIAM. N1 N2 N3 N4 N5 N6
OBSTACLE LIGHT OPENING
1 27.91 - 29.91 29.41 - 31.41 30.16 - 32.16 D51 29 24 18 15 18 15
29.91 - 40.06 31.41 - 41.56 32.16 - 42.31 D51 29 24 18 15 18 15
1 MECHANICAL
40.06 - 50.21 41.56 - 51.71 42.31 - 52.46
50.21 - 60.36 51.71 - 61.86 52.46 - 62.61
D51
D51
27
25
22
20
17
15
14
12
17
15
14
12 16 NR07-D22
SPLICES
60.36 - 70.51 61.86 - 72.01 62.61 - 72.76 D51 25 20 14 11 14 11 ALL CORNERS
70.51 - 73.51 72.01 - 75.01 72.76 - 75.76 D51 23 18 11 8 11 8
8 NR06-D22
NOTES:
NC07-LONGITUDINAL REBARS
1.LONGITUDINAL REBAR SHALL BE
N1 - N6, SEE TABLE
ARRANGED TO MAINTAIN REQUIRED
COVER MEASURED VERTICAL FROM WALL
SURFACE.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
PBL NC13-HOOPS
N11 N1 N2
E1
N21
NOT
N12 N13
SEE
N6
NC12-LONGITUDINAL REBAR
N3
N4
N5
NC14-CROSS TIE
MAX@360
N14
STUD
MECHANICAL
SPLICES
NOTES:
1.LONGITUDINAL REBAR SHALL BE
ARRANGED TO MAINTAIN REQUIRED
ANCHOR BOX COVER MEASURED VERTICAL FROM
WALL SURFACE.
1
2.LONGITUDINAL REBAR SHALL BE
1 ARRANGED TO MAINTAIN REQUIRED
NC14-D18-100 NC12-LONGITUDINAL REBARS COVER MEASURED VERTICAL FROM WALL
N1 - N6, SEE TABLE
SURFACE.
SEE DWG. C-4-032 SEE DWG. C-4-032 4.ALL SPLICES OF VERTICAL REBAR SHALL
BE MECHANICAL JOINT WITH STAGGERED
CONCRETE JOINT CONCRETE JOINT CONCRETE JOINT
LOCATIONS.
TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
R=10000
9°
400 200
5 5
1400
800
2 6 6
1 800
800
7 7
3200
4500
6000
1600
2
800
1 33200
800
1400
200 400
9°
R=10000
SECTION 4 - 4 S=1/100
SECTION 1 - 1 S=1/100 SECTION 2 - 2 S=1/100
R=10000
8200
6000 6000
2@800=1600 2@800=1600 9°
400 200
600 1600 600 1400 800 1600 800 1400
650 650 200 800 800 200
800
400 400
700
200
3 3
100
200
900
5@700=3500
200
4400
6000
4@500=2000
3200
4500
4 4
300
1800
200 400
800
R=1000
9°
0
All dimensions are in mm,unless otherwise shown
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
R=10000
4°
R=10000
200
5°
900
R=10000
4°
700
400
4@700=2800
R=10000
4°
4@500=2000.0
R=10000
R=10000
3°
2°
200
SECTION 7 - 7 S=1/100
15°
NOTES:
R=10000
R=10000
2@700=1400
=400 200
10° 3. PRESTRESSING TENDON IS TENSIONED FROM ONE END ALTERNATELY.
4. INITIAL STRESSING SHALL BE EQUIVALENT TO 1300N/mm2 PER STRAND.
2@200
5. THE TENDON SHALL BE SMOOTH PARABOLIC CURVES BETWEEN
THE SPECIFIED CONTROL POINTS AS SPECIFIED IN THE PLAN.
6. STRAIGHT LENGTH ACCORDING TO SYSTEM REQUIREMENTS
BY THE MANUFACTURER SHALL BE PROVIDED.
7. EACH TENDON SHALL BE ANCHORED IN A BLOCKOUT.
8. THE SIZE SHALL BE THE MIN. REQUIRED BY ANCHORAGE AND JACK.
9. THE BLOCKOUT SHALL BE FILLED WITH NON-SHRINK CONCRETE C40 WITH SAME COLOR AS
THE PYLON CONCRETE.
10. THE CONTRACTOR SHALL DESIGN AND DETAIL THE ANCHORAGE REINFORCEMENT TO BE
COMPATIBLE WITH THE PRESTRESSING SYSTEM PROVIDED.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
6000 6000
31 NB05-D32-T(NO. OF REBAR AT TOP LAYER OF TOP SLAB) 31 NB06-D25-T(NO. OF REBAR AT TOP LAYER OF TOP SLAB)
27 NB05-D32-B(NO. OF REBAR AT BOTTOM LAYER OF TOP SLAB) 27 NB06-D25-B(NO. OF REBAR AT BOTTOM LAYER OF TOP SLAB)
30
NB23-D16 BOTH SIDES BOTH SIDES
30
NB24-D16
1.0 % 1.0 % 1.0 % 1.0 %
800
200
800
200
300 200
300
300
300
300
NB02-D18-300-B
3200
500
1600
300 300 300 300
NB06-D25-200
BOTH SIDES
NB01-D22-150-B
3200
500
4500
300
2900
300
NB05-D32-200
BOTH SIDES
NB02-D18-300-T
500
4500
300
300
NB04-D18-300
800
BOTH SIDES
500
300
300 300
NB03-D22-150
NB01-D22-150-T BOTH SIDES
300
300
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
H. Ikeda
REINFORCEMENT OF
in association with PYLON CROSSBEAM 1
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3a-011
SHEET No. :
Sheet of PACKAGE:
SECTION 1 - 1 S=1/100
C
L
38213
4506 14200 800
TRANSVERSE REIN. 7106 2100 9900
LONGITUDINAL REIN. 7106 12000
Access Hatch
800
Access Opening
DETAIL "a" S=1/50
1 NB24-D16 ACCESS HATCH REINFORCEMENT
4400
6000
800
25 NB22-D16
800
16 NB25-D18,ALL CORNERS
NB05-D32 NB06-D25
16 NB26-D18,ALL CORNERS
23 NB23-D16
SECTION 2 - 2 S=1/100
C
L
38213
TRANSVERSE REIN. 7106 2100 9900
LONGITUDINAL REIN. 7106 12000
NB05-D32-200 NB06-D25-200
NB22-D16 NB23-D16
180 NB03-D22-150 56 NB04-D18-150 130 NB04-D18-300
NB24-D16 Level Access Hatch
Reinforcement For Access Opening 2
1 1
800
3200
1600
4500
12 NB10-D22
2
800
R106635
Access Opening
NOTES:
1. ALL REINFORCEMENT IS SYMMETRICAL ABOUT CROSSBEAM CENTERLINE.
2. THE LONGITUDINAL REBAR SHALL BE EXTENDED BEYOND THE N.A. OF
THE STEM SECTION WITH THE REQUIRED DEVELOPMENT LENGTH.
3. NUMBER OF REBAR SHOWN IS PER PYLON.
B1 C1 C2 C3 C4 C5 C6 C7 C8 C9 B2
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
H. Ikeda
REINFORCEMENT OF
in association with PYLON CROSSBEAM 2
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C-3a-012
SHEET No. :
Sheet of PACKAGE:
END BULKHEAD S=1/50
SECTION 1 - 1 SECTION 2 - 2
2
6000 1
890 4220 890 2506 2000
800
NB12-D22
46 NB12-D22
46 NB11-D22
4204.2
4553.3
4500
2900
NB14-D22
NB14-D22
64 NB15-D16
800
2 1
INTERMEDIATE BULKHEAD S=1/50
SECTION 3 - 3 SECTION 4 - 4
4 ACCESS OPENING
3
6000
900 4200 900 ACCESS OPENING REINFORCEMENT
800
800
76 NB18-D16
NB16-D18
14 NB28-D16,ALL CORNERS
8 NB20-D18,OTHER SIDES
8 NB19-D18,OTHER SIDES
3200
3200
1600
1600
19 NB16-D18
16 NB21-D18,ALL CONERS
800
800
NOTE:
1. NUMBER OF REBAR SHOWN IS PER PYLON.
NB17-D18
24 NB17-D18
All dimensions are in mm,unless otherwise shown
4
3
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
REINFORCEMENT OF
H. Ikeda
in association with PYLON CROSSBEAM 3
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3a-013
SHEET No. :
Sheet of PACKAGE:
TRANSVERSE ELEVATION S=1/200 LONGITUDINAL ELEVATION S=1/200
4-4 5-5
5 ALL CORNERS WITH STEEL
1 4
NS08-D18-300
ANCHOR BOX AND CONCRETE
SHALL BE SEALED BY
2700
SILYCONE SEALANT. TRANSVERSE ELEVATION S=1/100
850 1000 850 NT08-D18-300 NT04-D18-300
HOOPS
NT06-D18-300
@ 30
Ld
NT02-D18-300
3100
NS01-D32-150 NT07-D18-300 NT05-D18-300
0
3 3
7200
NT03-D18-300
2 2
2500
@ 30
Ld
NS05-D20-150
0
NS04-D32-150
1600
NS06-D20-150
Ld
NS02-D32-150
ANCHOR BOX
Ld
CROSS BEAM OF ANCHOR BOX
NS09-D20-300 SEE DWG. C-3a-024 FOR DETAIL.
1 "a" 4 NT09-D18-300
NT10-D18-300
HOOPS
NS10-D32-300 5 HOOPS
NS07-D18-300
NT04-D18-300
ANCHOR BOX 800
NT05-D18-300
700
NT10-D18-300
HOOPS
NS02-D32-150
NS08-D18-300
SECTION 2-2 S=1/100 DETAIL "a" S=1/30
NT06-D18-300
PBL
NS01-D32-146 NS03-D32-146
PBL
CONCRETE FILL
STUD
NS04-D32-150
NS01-D32-146
NS01-D32-146
NOTES:
NS03-D32-146
NS03-D32-146
TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Akiba.TIF
Rev. No.
2979.5
"a"
2017
500 3500 500
2842
BLK1 600 600
3477
3507
1000
3 47 7
CJP
3 5 07
R1
450
450
U22
2568.5
U1
2250
10
500 3500 500
10
U1 U22
1800
BLK2
4000
° 600 600
62
.5 1 29
2139
2139
8
300
300
09 2.9
2 13 9
2 1 39
° 6
1650
1650
2 BLK3 21
11
11
2 21
R2 °
61 25
2155
2153
.2 3 8
1.6
2 15 5
2 1 53
07 6
°
2250
BLK4 20
3
11
12
4200
59 2 °
2181
2180
.77 68
2 18 0
2 1 81
80 .1
° 60
2250
BLK5
12
4 19
13
R3
57 6°
LOCATION
2213
2
2213
.9 5
.3 5 S=1/500
2 21 3
2 2 13
76 58
°
2250
13
18 Flange t=34
14
5 BLK6
4500
7057
Flange t=34 °
55 68
2257
2257
.76 .14
2 25 7
3 06 1
2 2 57
7
44 56
3 0 61
° 1 8 00
2250
15
7
15
6 BLK7 17
Web t=40 R4 Web t=40
30617
3000
°
53 03
2327
2327
2 32 7
2 3 27
.1 2 8
20° 5 3 .4
2400
17
17
7 BLK8 16
4700
49. 8°
2 43 6
2436
2436
2 4 36
828 155
7° 50.
2250
20
19
8 BLK9 15
R5
0°
2 62 6
2 6 27
4 5.
2626
2627
707 995
8° 4 5.
3 06 1
2550
23
23
BLK10
4
29800
1.000
9 14
1 .027
5000
7
300
3 01 0
3 0 09
1500
3010
04 5
3009
40.4 BLK11
54 2
° 40.7 0.2357
30
30
10 R6
1500
BLK12 13
3000
3 3.6
3 96 3
3 9 64
2250
645° 364° BLK13
3963
3964
3 3.8
R7
43
43
7024
1950
L11 BLK14 L12
3200
1 83 4
1 8 05
450
1834
1805
925
BLK15
3 x 44 0
24 0 0 24.8 4 2° 3 x 44 40
= 1 32 8 7° 4.9 47 0 2
0 24 0
2 = 1 32
1 8 00 24 0
1 8 00 NOTES:
1) Steel grade : SM490YB
A B 2) This position is P12.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
2979.5
"a" L5 <L20> 2213 2213 2213 5 < 18> 55.7644 55.7514 55.9169
2017
6 < 17>
2842
BLK1 L6 <L19> 2257 2257 2256 53.1220 53.1220 53.2826
1000
L24
L1
L7 <L18> 2327 2327 2327 7 < 16> 49.8287 49.8306 49.9694
R1
L2 4
L1
L8 <L17> 2436 2436 2436 8 < 15> 45.7078 45.7060 45.8340
450
U1 U22
L9 <L16> 2627 2626 2625 9 < 14> 40.4542 40.4678 40.5763
L2 5
L4 6
<U1>
2568.5
<U22>
1800
BLK2 L10 <L15> 3009 3010 3010 10 < 13> 33.6645 33.6647 33.7453
4000
L11 <L14> 3964 3964 3963 11 < 12> 24.8487 24.8485 24.8955
22
300
L23
1
L2
L2 3
2 21 L12 <L13> 1805 1805 1819 12 < 11> 24.9472 24.9450 24.8955
L2
1650
L4 5
L2 6
<21> BLK3 <2> L13 <L12> 1834 1833 1819 13 < 10> 33.8364 33.8315 33.7453
R2 L14 <L11> 3963 3963 3963 14 < 9> 40.7045 40.6944 40.5763
21 15 < 8>
L22
2 L15 <L10> 3010 3010 3010 45.9950 45.9790 45.8340
L3
L2 2
L3
3 20 16 < 7>
2250
BLK4 L16 <L9> 2626 2625 2625 50.1558 50.1386 49.9694
L4 4
L2 7
<20> <3>
L17 <L8> 2436 2435 2436 17 < 6> 53.4803 53.4561 53.2826
4200
L18 <L7> 2327 2326 2327 18 < 5> 56.1468 56.1045 55.9169
20
L21
3
L4
19 < 4>
L2 1
L19 <L6> 2257 2256 2256 58.3526 58.3218 58.1229
L4
4 19
2250
L4 3
L2 8
<19> BLK5 <4> L20 <L5> 2213 2213 2213 20 < 3> 60.1682 60.1460 59.9263
R3 L21 <L4> 2180 2180 2180 21 < 2> 61.6825 61.6362 61.4084
L22 <L3> 2155 2154 2154 22 < 1> 62.9829 62.9257 62.7007
19
L20
4
L5
L2 0
L5
L4 2
L2 9
2250
<18> BLK6 <5> Flange t=34 L24 <L1> 3477 3480 3495
4500
L19
3 06 1
7
L26 <L45> 11 11 11
L1 9
L6
5
3 0 61
L6
6 17 L27 <L44> 12 12 12
L3 0
L4 1
2250
7
<17> BLK7 <6>
L28 <L43> 13 13 12
Web t=40 R4 Web t=40
30617
L29 <L42> 14 14 14
17
L18
L1 8
L7
6 L30 <L41> 15 15 15
L7
7 16
L4 0
L3 1
L31 <L40> 17 17 17
2400
<16> BLK8 <7>
4700
L32 <L39> 20 20 19
L33 <L38> 23 23 23
L1 7
L17
7 16
L8
L8
L34 <L37> 30 30 30
15
L3 2
L3 9
8
2250
L35 <L36> 43 43 43
<15> BLK9 <8>
R5 L36 <L35> 43 43 43
L37 <L34> 30 30 30
L1 6
15
L16
L38 <L33> 23 23 23
L9
L9
2550
L3 8
L3 3
9 14 L39 <L32> 19 19 19
BLK10 <9>
<14> L40 <L31> 17 17 17
5000
300
L41 <L30> 15 15 15
L42 <L29> 13 13 14
1500
L1 5
L1 0
14
L15
L10
L3 7
L3 4
10 13 L44 <L27> 11 11 12
<13> R6 BLK12
1500 <10> L45 <L26> 11 11 11
L46 <L25> 10 10 10
3000
10
2250
L1 4
L1 1
13 BLK13
L11
L14
R7
L3 6
L3 5
L11 L12
1950
L1 3
L1 2
450
L13
L12
925
BLK15
3 x 44 0
24 0 0 11 3 x 44 40
= 1 32 12 0 2
0 24 0 = 1 32
1 8 00 24 0
1 8 00 NOTE:
1) Steel grade : SM490YB
A B
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
R1 R5
5700 5700 5700 5700
1600 1250 1250 1600 "b" 1600 1250 1250 1600
Cable Cable Cable Cable "a"
34 500 12 12 500 34
34 500 12 12 500 34
1040
1040
1040
1040
1800
1800
1800
1800
U1 U22 7 16
88 87
.4 °
760
760
760
760
80 .2 65
6°
4 8
23
0° 97 .3
87
.6
°
88
Flange 120 x 12 Web 500 x 9 Flange 120 x 12 Web 500 x 9
5700 5700
R2 R6
5700 5700
1600 1250 1250 1600 1600 1250 1250 1600
34 500 12 12 500 34
34 500 12 12 500 34
1040
1040
1040
1040
1800
1800
2 21 8 15
86 °
1800
1800
88
52
760
760
760
760
.7
1°
.3 1 5
21
80 73 .8
86
.5
1° 88 °
5700 5700 Flange 120 x 12 Web 500 x 9 Flange 120 x 12 Web 500 x 9
"c"
R3 R7
5700 5700
1600 1250 1250 1600 1600 1250 1250 1600
1040
1040
1040
1040
1800
1800
34 500 12 12 500 34
34 500 12 12 500 34
3 20 9 14
88 85 °
760
760
760
760
.2 .9 85
°
00
93
7 35 04
8° .
9
86
1800
1800
.3
°
88
5700 5700
R4
1040
1040
1040
1040
5700
1800
1800
34 500 12 12 500 34
760
760
760
760
.1 1 .4 3
0 85 4 92 .6
° .2 4° 84
88
1800
5700 5700
1040
1040
1040
1800
1800
5 18 L11 L12
87 ° 81
760
760
760
0° 760
.8 09 .4
9 3 39
56
° 88
.0 92
5° 8 1 .6
DETAIL "a" S=1/30 DETAIL "b" S=1/30 DETAIL "c" S=1/30
5700 100 Flange Flange Flange
200 34
5
5
310
R3
R3
TYP. TYP. Web
1040
1040
R3 TYP. Web
1800
6 17 5
5
L.RIB 310 x 30 NOTES:
R2
87 6° 1) Steel grade
760
760
.6 2
2 66 76 t=9-16 SM490YA
° 8 7. 20 300
t=17-40 SM490YB
2) This position is P12.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.
5700 5700
1040
1040
1040
1040
U1 U22 7 16 1 < 22> 88.4800 88.4783 88.5379
1800
1800
<U22> <U1> <16> <7>
2 < 21> 88.3801 88.3803 88.4357
760
760
760
760
3 < 20> 88.2735 88.2680 88.3215
1 7 16
22
4 < 19> 88.1085 88.1060 88.1641
5 < 18> 87.8956 87.8910 87.9497
5700 5700 6 < 17> 87.6266 87.6266 87.6877
7 < 16> 87.2497 87.2505 87.3096
8 < 15> 86.7173 86.7164 86.7781
9 < 14> 85.9008 85.9086 85.9729
10 < 13> 84.4924 84.4926 84.5592
1040
1040
1040
1040
2 21 8 15 11 < 12> 81.4925 81.4922 81.5623
1800
1800
<21> <2> <15> <8>
12 < 11> 81.6390 81.6357 81.5623
760
760
760
760
13 < 10> 84.6343 84.6302 84.5592
8 15
21
2
14 < 9> 86.0485 86.0426 85.9729
15 < 8> 86.8552 86.8476 86.7781
5700 5700 16 < 7> 87.3865 87.3794 87.3096
17 < 6> 87.7626 87.7534 87.6877
18 < 5> 88.0309 88.0161 87.9497
19 < 4> 88.2411 88.2308 88.1641
20 < 3> 88.3993 88.3921 88.3215
1040
1040
1040
1040
3 20 9 14 21 < 2> 88.5211 88.5067 88.4357
1800
1800
<20> <3> <14> <9>
22 < 1> 88.6236 88.6063 88.5379
760
760
760
760
3 9 14
20
5700 5700
1040
1040
1040
1040
4 19 10 13
1800
1800
<19> <4> <13> <10>
760
760
760
760
4 19 10 13
5700 5700
1040
1040
1040
1040
5 18 L11 L12
1800
1800
760
760
760
5 18 11 12
5700
1040
1040
6 17
1800
<17> <6>
760
760
6 17
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.
1040 760 L1
300 L2
P12,P16 35 230 35
Anchor Pipe
Cable No. a1 a2 a3 b1 b2 b3 (deg) CJP
(SCW490-CF)
U1 1155 635 585 1090 570 520 2.9195
Stiffening Plate
t
t=40 2 1077 597 547 1010 530 480 2.9486
3 1086 606 556 1010 530 480 2.9621
TYP.
D1
D3
D2
4 1021 581 521 940 500 440 3.0203
Anchor Box Web
5 1035 595 535 940 500 440 3.0908
6 975 575 505 870 470 400 3.1622
t
7 1001 601 531 870 470 400 3.2568
a3
8 1050 650 570 880 480 400 3.3647
a2
a1
Taper Pipe
9 1159 749 649 920 510 410 3.4970 (SCW550)
10 1052 732 602 770 450 320 3.6745
L11 1573 1173 993 980 580 400 3.9627
Cable No. L1 L2 D1 D2 D3 t
L12 1569 1169 989 980 580 400 3.9112
U1 1700 1400 600 500 700 50
b3 13 1039 719 599 760 440 320 3.6028
2 1700 1400 550 460 660 45
b2 14 1155 745 645 920 510 410 3.4008
3 1600 1300 550 460 660 45
15 1047 647 567 880 480 400 3.2557
b1 4 1600 1300 500 420 620 40
16 999 599 529 870 470 400 3.1309
5 1600 1300 500 420 620 40
17 963 563 503 860 460 400 3.0203
6 1600 1300 450 380 580 35
18 1033 593 533 940 500 440 2.9340
7 1600 1300 450 380 580 35
19 1008 568 518 930 490 440 2.8523
8 1600 1300 450 380 580 35
20 1083 603 553 1010 530 480 2.7899
9 1600 1300 450 390 590 30
21 1074 594 544 1010 530 480 2.7431
10 1600 1300 350 300 500 25
U22 1152 632 582 1090 570 520 2.6979
L11 1600 1300 450 380 580 35
L12 1600 1300 450 380 580 35
13 1600 1300 350 300 500 25
14 1600 1300 450 390 590 30
15 1600 1300 450 380 580 35
16 1600 1300 450 380 580 35
17 1600 1300 450 380 580 35
18 1600 1300 500 420 620 40
19 1600 1300 500 420 620 40
20 1600 1300 550 460 660 45
1-1 P12,P16
Cable No. L1 L2 L3 L4 L5 L6 L7 L8 t1 t2 t3 h1 h2 (deg)
Socket 200 L5 L6 200 U1 1500 1300 950 250 472 260 494 238 40 40 40 240 220 1.3485
150 2 1500 1300 950 250 495 287 519 263 38 38 40 200 200 1.4201
3 1400 1200 850 260 496 286 518 264 38 38 40 190 190 1.4920
Bearing Plate 4 1400 1200 850 260 518 314 542 290 32 28 40 190 190 1.6035
h1
15
5 1399 1199 849 290 514 318 540 292 32 28 40 190 190 1.7400
t3
6 1399 1199 849 290 535 347 563 319 25 16 40 180 160 1.8989
h1
R 7 1399 1199 849 320 529 353 560 322 22 16 40 180 160 2.1022
10
0 8 1399 1199 849 400 519 363 554 328 22 16 40 180 160 2.3510
100
9 1399 1199 849 600 502 380 542 340 22 16 35 180 160 2.6624
1 1
150
t1
10 1398 1198 848 1200 508 474 554 428 11 11 35 110 110 3.0596
CJP
Anchor Pipe
CJP
2-2 L11
L12
1398
1398
1198
1198
848
848
1800
1800
399
402
483
480
452
454
430
428
25
25
16
16
40
40
180
180
160
160
3.5968
3.5472
13 1398 1198 848 1200 511 471 555 427 11 11 35 110 110 2.9938
L3
L1
L2
200 L7 L8 200
14 1399 1199 849 600 505 377 543 339 22 16 35 180 160 2.5793
15 1399 1199 849 400 522 360 555 327 22 16 40 180 160 2.2631
2 2 16 1399 1199 849 320 531 351 561 321 22 16 40 180 160 2.0072
200
t2
17 1399 1199 849 290 537 345 564 318 25 16 40 180 160 1.7984
100
h2 h2
18 1400 1200 850 290 516 316 541 291 32 28 40 190 190 1.6354
t3
19 1400 1200 850 260 520 312 543 289 32 28 40 190 190 1.4975
20 1400 1200 850 260 498 284 519 263 38 38 40 190 190 1.3887
L4
21 1500 1300 950 250 498 284 520 262 38 38 40 200 200 1.3020
CJP U22 1500 1300 950 250 475 257 495 237 40 40 40 240 220 1.2263
1040 760
1800 NOTE:
1) Steel grade
Stiffening Plates : SM490YB
Anchor Plates : t=11-16 SM490YA
t=17-40 SM490YB
Others : Shown
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.
P14 P14
Cable No. a1 a2 a3 b1 b2 b3 (deg) Cable No. L1 L2 L3 L4 L5 L6 L7 L8 t1 t2 t3 h1 h2 (deg)
U1 1153 633 583 1090 570 520 2.8312 U1 1500 1300 950 250 473 259 495 237 40 40 40 240 220 1.2994
2 1076 596 546 1010 530 480 2.8685 2 1500 1300 950 250 496 286 519 263 38 38 40 200 200 1.3737
3 1085 605 555 1010 530 480 2.8971 3 1400 1200 850 260 497 285 518 264 38 38 40 190 190 1.4527
4 1010 570 520 930 490 440 2.9505 4 1400 1200 850 260 519 313 542 290 32 28 40 190 190 1.5591
5 1034 594 534 940 500 440 3.0286 5 1399 1199 849 290 515 317 540 292 32 28 40 190 190 1.6983
6 964 564 504 860 460 400 3.0989 6 1399 1199 849 290 536 346 564 318 25 16 40 180 160 1.8539
7 1000 600 530 870 470 400 3.2019 7 1399 1199 849 320 530 352 560 322 22 16 40 180 160 2.0607
8 1049 649 569 880 480 400 3.3169 8 1399 1199 849 400 520 362 555 327 22 16 40 180 160 2.3123
9 1157 747 647 920 510 410 3.4503 9 1399 1199 849 600 503 379 542 340 22 16 35 180 160 2.6220
10 1041 721 601 760 440 320 3.6408 10 1398 1198 848 1200 509 473 554 428 11 11 35 110 110 3.0287
L11 1571 1171 991 980 580 400 3.9382 L11 1398 1198 848 1800 400 482 453 429 25 16 40 180 160 3.5733
L12 1571 1171 991 980 580 400 3.9382 L12 1398 1198 848 1800 400 482 453 429 25 16 40 180 160 3.5733
13 1041 721 601 760 440 320 3.6408 13 1398 1198 848 1200 509 473 554 428 11 11 35 110 110 3.0287
14 1157 747 647 920 510 410 3.4503 14 1399 1199 849 600 503 379 542 340 22 16 35 180 160 2.6220
15 1049 649 569 880 480 400 3.3169 15 1399 1199 849 400 520 362 555 327 22 16 40 180 160 2.3123
16 1000 600 530 870 470 400 3.2019 16 1399 1199 849 320 530 352 560 322 22 16 40 180 160 2.0607
17 964 564 504 860 460 400 3.0989 17 1399 1199 849 290 536 346 564 318 25 16 40 180 160 1.8539
18 1034 594 534 940 500 440 3.0286 18 1399 1199 849 290 515 317 540 292 32 28 40 190 190 1.6983
19 1010 570 520 930 490 440 2.9505 19 1400 1200 850 260 519 313 542 290 32 28 40 190 190 1.5591
20 1085 605 555 1010 530 480 2.8971 20 1400 1200 850 260 497 285 518 264 38 38 40 190 190 1.4527
21 1076 596 546 1010 530 480 2.8685 21 1500 1300 950 250 496 286 519 263 38 38 40 200 200 1.3737
U22 1153 633 583 1090 570 520 2.8312 U22 1500 1300 950 250 473 259 495 237 40 40 40 240 220 1.2994
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.
32x150=4800
Stud Ø22 x 200 209 166 15x150=2250 166 209
OUTSIDE INSIDE
4800
158 158 158
209 11x150=1650
300
5700 5700 209 12x150=1800
158
300 300
209 c150 209 209 c150 209
158 158 158 158
217
PBL
32x150=4800
2767.3
3191.6
2767.3
c150
3191.6
PBL
4800
"b"
2842
BLK1
1000
S=1/30 PBL
450
450
300
2 5 00
CJP
2568.5
2568.5
1800
BLK2
300
300
158
300
209 12x150=1800
1650
BLK3
300
100 4x150
=600
80
150 150
209 13x150=1950
700
Ø 209 175 17x150=2550 175 209
158
2250
PBL PBL
2250
BLK6 5700
3000 700 2000
outside inside
South side Manhole North side
2250
202x150=30300
BLK7
LOCATION
30617
1100
1800
7057
2400
BLK8
600
R
1 8 00
10
0
100
2250
BLK9
3000
150 596 3x600=1800 546 100
1254 3191 1254
2550
BLK10
300
BLK11
BLK1 286 286 572
BLK2 250 222 472
1500
3 06 1
BLK12 "a" BLK3 260 240 500
4
29800
1.000
1 .027
7
BLK4 300 284 584
BLK5 300 300 600
2250
BLK13
BLK6 330 330 660
0.2357
BLK7 330 330 660
BLK8 380 380 760
1950
BLK14
BLK9 360 360 720
450
450
NOTE:
Steel grade
Stud : JIS B 1198
Others : Shown
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
22 88100
CJP
22
22
CJP
R4
25
25
0
15
1085
150
75 25 25 75
450
TYP. 350
1000
1000
TYP.
3005
925
88 22
75
75
0
R4
60
60
22
22
19x75=1425
450 450 550 4x700=2800 550 450 450
1600
40 5620 40
Ø9
860 3900 860
100
WASHER S=1/30
PLAN S=1/60 (SS400)
20
5700 Ø2
304 5092 304
2046 1000 2046 Ø
11
B-B
3
S=1/30
764
Manhole 450
914
40 370 40 34 1732
Ø 13
A B E CJP
34
0
R1
206
00
450
22
4391
R1
00
25
A B E CJP CJP
R4
=1320
3x440
1800
1732
850
C C
25
25
D D
1000
500
TYP.
206
700
700
34
675
675
CJP CJP
0
0
914
R4
R4
60
60
60
22
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Asano.tif
Rev. No.
30
of Anchor Box
. =. 25
0m
m
125
15
30 15
125
A
Elastomer Shealing
(Polybutadiene)
Fixed by Web of Anchor Box
elastomer shealing
t=9mm(SM400)
A
30
Bolt M10
Ø
135
15
25
0
99
30
30
Welding of connection
e
ra n c pieses to Steel Pipe
C le a inimum
5 m mm
2
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
1000
700 5175 700
25 950 25 1240
2 97 9
2900
.5
1588 2000 1588
2 9 79
125 300 150 300 125 300 20 600 20 300
.5
487.5 7x600=4200 487.5 Cross Beam Flange
120 120 Stud Ø22 x 200
80
3x85 3x85 3x85 3x85
=255 =255 =255 =255
20
R3
R
10
A
5
700
840
0
2x85 105
=170 105
400 "a"
B B
45
20
=170
2x85
1533
1 5 75
2 56 8
.5
2500
2 5 68
80
5x450=2250
.5
19x100
=1900
=1900
2450
2450
CJP Manhole
2450
2500
1100
967
Stiffening Plate
99 4
1061 t=25
105 =170
=170
2x85
105 2x85
ts_w=10
C C
A
1289 5175 1289
700
125
25
B-B S=1/100
Diaphram t=9 (SM400A)
1849 6575 1849
399 800 650 700 5175 700 650 800 399
1588 2000 1588
487.5
3287.5
7x600=4200
3287.5
487.5
LOCATION S=1/500
120 120
3x85 3x85 3x85 3x85 7057
2350
3000
2 97 9
10
250 500 250
R1 PL 100 x 10 (SM400A) 20 20
2500 2900
00
5700
=765
1000
1000
9x85
1000
.5 2 5
00
R1
6 8.5
Concrete Fill up Hole Ø300 00
R1
2350
PL 90 x 10 (SM400A)
3 06 1
29800
1.000
7
C-C S=1/100 0.236
1849 7753 1849 D-D S=1/100
399 800 650 1289 5175 1289 650 800 399
1588 2000 1588
487.5 7x600=4200 487.5
1 8 00
120 120
3x85 3x85 3x85 3x85 97 4
82 7
=255 =255 =255 =255
10 10
7024
2350
ts_b=11
Manhole
117.5 9x85 117.5
117.5 =765 117.5
1339
CJP 0
1533
60
250 500 250
Ø
R1
00
2500
5700
=765
1000
1000
9x85
1000
00
R1
NOTES:
1) Steel grade
1161
967
Plates : t=10-16 SM490YA
t=17-40 SM490YB
D D Others Shown
Socket Drawing in Hole Stud : JIS B 1198
2350
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Asano DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
32.310
31.560
3000 0.500%
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
=120000
PLAN S=1/1000
1.0
25 0)
1 + 7 5 1.
( 2+ 1500000
600 900 148500 300000
Floorbeam 4500 36 x 4000 = 144000 75 x 4000 = 300000
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
1200
S1
W1
1200
W2
1150
WEG
W3
15200
35600
33200
33200
W4
500
L
C
E4
15200
E3
1150
1200
EEG
E2
1200
E1 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
=120000
W3
E3
E2
W1
W4
E1
E4
PH PH 1500000
As Pave. t=75mm 150000 300000 300000 300000 300000 150000
1000
250 750
Waterproofing
260
1100
150
2% 2%
2700
1250
2000
3000
R=364013
WEG EEG
3280 4x3330=13320 4x3330=13320 3280 All dimensions are in mm, unless otherwise shown.
800 800
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
1500000
300000 300000
Cable 10x12000= 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10x12000=
Floorbeam 120000 75 x 4000 = 300000 75 x 4000 = 300000 120000
33.810
0.500%
Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000
VCL=600m VCR=60000m
PLAN S=1/1000
1500000
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000 = 300000
FB100
FB101
FB102
FB103
FB104
FB105
FB106
FB107
FB108
FB109
FB110
FB111
FB112
FB113
FB114
FB115
FB116
FB117
FB118
FB119
FB120
FB121
FB122
FB123
FB124
FB125
FB126
FB127
FB128
FB129
FB130
FB131
FB132
FB133
FB134
FB135
FB136
FB137
FB138
FB139
FB140
FB141
FB142
FB143
FB144
FB145
FB146
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB80
FB81
FB82
FB83
FB84
FB85
FB86
FB87
FB88
FB89
FB90
FB91
FB92
FB93
FB94
FB95
FB96
FB97
FB98
FB99
1200
W1
1200
W2
1150
WEG
W3
15200
35600
33200
33200
W4
500
L
C
E4
15200
E3
1150
1200
EEG
E2
1200
E1 J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-39 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54
Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000
CL 20 150 980
1.5%
150
1500000
250
250
265
75 350 75
150000 300000 300000 300000 300000 150000
75
PH PH
2.0% Level 2.0% 2.0%
2.0%
73.5
75
284
260
260
75
260
30 x 30 75 75
Chloroprene Rubber(TYP.)
30
30 x 30
Floorbeam T.Flg Chloroprene Rubber(TYP.) 570 (TYP.)
Floorbeam T.Flg 30 x 30
Chloroprene Rubber(TYP.) Edge Girder T.Flg
30 x 30
Support Strut Chloroprene Rubber(TYP.)
500 All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\takada.tif ..\..\..\..\..\..\NT100/成果\01_図面\国内組\00 SIGN\DATE-03.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000, 20 DRAWING No. : C - 3b - 002
SHEET No. :
Sheet of PACKAGE:
LONGITUDINAL ELEVATION S=1/1000
Symmetry
1500000
300000 300000
Cable 10x12000= 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10x12000=
120000 75 x 4000 = 300000 75 x 4000 = 300000 120000
Floorbeam
SUBSTATIONS
34.560
Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 5000 5000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000
VCL=600m VCR=60000m
PLAN S=1/1000
1500000
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000 = 300000
SUBSTATIONS
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB155
FB156
FB157
FB158
FB159
FB160
FB161
FB162
FB163
FB164
FB165
FB166
FB167
FB168
FB169
FB170
FB171
FB172
FB173
FB174
FB175
FB176
FB177
FB178
FB179
FB180
FB181
FB182
FB183
FB184
FB185
FB186
FB187
FB188
FB187
FB186
FB185
FB184
FB183
FB182
FB181
FB180
FB179
FB178
FB177
FB176
FB175
FB174
FB173
FB172
FB171
FB170
FB169
FB168
FB167
FB166
FB165
FB164
FB163
FB162
FB161
FB160
FB159
FB158
FB157
FB156
FB155
FB154
FB153
FB152
FB151
FB150
FB149
FB148
FB147
1200
W1
1200
W2
1150
WEG
W3
15200
35600
33200
33200
W4
500
L
C
E4
15200
E3
1150
1200
EEG
E2
1200
E1 J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65 J-65 J-64 J-63 J-62 J-61 J-60 J-59 J-58 J-57 J-56 J-55 J-54 J-53 J-52 J-51
Joint 10x12000= 6000 10 x 12000 = 120000 12000 10000 5000 5000 10000 12000 10 x 12000 = 120000 6000 10x12000=
120000 120000
1500000
150000 300000 300000 300000 300000 150000
SUBSTATIONS
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
15
15
66
66
30 31 30 31 30 31 30 31
21
21
21
21
18 18 18 18 18 18 18 18
31 31 31 31
66
66
15
15
30 30 30 30
33200
S1 S1
X=2332870.5349 X=2334248.3034
Y= 507078.9880 Y= 507672.0763
x= 0.0000 x= 1500.0000
X
y= 0.0000 y= 0.0000
Elevation of Top of Fulcrum x
P11(S1) P12 P13 P14 P15 P16 P17(S1)
WEG,EEG WEG,EEG WEG,EEG WEG,EEG WEG,EEG WEG,EEG WEG,EEG
T1
Elevation of Roadway Z1 31.166 31.908 33.408 34.158 33.408 31.908 31.166 P12 P13 Y P14 P15 P16
Z1
Thickness of Deck + Haunch Depth T1(mm) 469 284 284 284 284 284 469
Z2
Elevation of Top of Top Flange Z2 30.697 31.624 33.124 33.874 33.124 31.624 30.697
Girder Depth H1(mm) 2815 3000 3000 3000 3000 3000 2815
Coordinate at intersection with Direction angle of Intersection angle with
Sole Plate Thickness T2(mm) 61 38 58 56 58 38 61 Station centerline of roadway Grobal Coordinate centerline of roadway
H1
Bearing Height H2(mm) 550 904 999 999 999 904 550 X Y θ α
Elevation of Bearing Bottom Z3 27.271 27.682 29.067 29.819 29.067 27.682 27.271 P11 1+251.0000 2332870.5349 507078.9880 23°17'25.58 90°00'00
Thickness of Mortar T3(mm) 71 72 57 59 57 72 71 P12 1+401.0000 2333008.3117 507138.2968 23°17'25.58 90°00'00
Height of Pedestal H3(mm) 0 200 100 100 100 200 0 P13 1+701.0000 2333283.8654 507256.9145 23°17'25.58 90°00'00
Sum Up Σ(mm) 3966 4498 4498 4498 4498 4498 3966
T2
P14 2+ 1.0000 2333559.4192 507375.5322 23°17'25.58 90°00'00
Elevation of End Pier and Pylon Top Z4 27.200 27.410 28.910 29.660 28.910 27.410 27.200 P15 2+301.0000 2333834.9729 507494.1498 23°17'25.58 90°00'00
H2
P16 2+601.0000 2334110.5266 507612.7675 23°17'25.58 90°00'00
T3
P17 2+751.0000 2334248.3034 507672.0763 23°17'25.58 90°00'00
Z3
H3
NOTES:
1. T3 and H3 of P11 shall be as specified on dwg.C-2b-001 and -002
Z4 2. T3 and H3 of P12,P13,P14,P15 and P16 shall be as specified on dwg.C-3a-002
3. T3 and H3 of P17 shall be as specified on dwg.C-2b-003
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
1.0
25 0)
1 + 7 5 1.
( 2+ 1500000
600 900 148500 300000
Floorbeam 4500 36 x 4000 = 144000 75 x 4000
= 300000
(300)
1200
WEG
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
35600
33200
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
L
C
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
EEG
1200
300
1500
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350
1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
1500000
148500 300000
Floorbeam 36 x 4000 75 x 4000 = 300000
= 144000
1200
WEG
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
35600
33200
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
L
C
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
EEG
1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350
1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000
= 300000
1200
WEG
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
35600
33200
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
L
C
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
EEG
1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350
1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
1500000
148500 300000
Floorbeam 36 x 4000 75 x 4000 = 300000
= 144000
1200
WEG
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
35600
33200
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
L
C
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
350
A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B
EEG
1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350
1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
1500000
300000 300000
Floorbeam 75 x 4000 = 300000 75 x 4000
= 300000
1200
WEG
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
35600
33200
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
L
C
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
350
B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A
EEG
1200
3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350
1500000
150000 300000 300000 300000 300000 150000
LEGEND: NOTE:
Precast Deck Panel 1. DECORATIVE LIGHTING IS TO INDICATE THE LOCATION ONLY.
A : Reinforced concrete
B : Prestressed concrete
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
1200
35600
33200
L
C
1200
"a" "b"
1 2 3
Transverse
400
560
1 1
2
NOTES:
1. TOTAL NUMBER OF TENDON IS 38 PAR GROUP, AND EACH WITH 1S28.6.
1-1 S=1/50 2-2 S=1/50 2. PRESTRESSING TENDONS SHALL BE LOW-RELAXATION TYPE.
3. INITIAL STRESSING FORCE SHALL BE EQUIVALENT TO 1200N/mm2 PER STRAND.
3650 4. STRESSING SEQUENCES:
STAGE1-INSTALL ALL PRECAST DECK PANELS.
STAGE2-#1TENDON GROUP SHALL BE TENSIONED.
STAGE3-CAST CIP CONCRETE DECK.
250 260
150 100
5. TIE-DOWN CABLE AND EXPANSION JOINT SHOULD BE INSTALLED AFTER ALL
PRESTRESSING IS FINISHED.
6. THE ANCHORAGE SHALL BE FILLED WITH NON-SHRINK MORTAR.
58 300 1000
80 400 80 All dimensions are in mm,unless otherwise shown
802 1358 1490
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
1500000
300000
Cable 10 x 12000 = 120000 12000 10 x 12000 = 120000
Floorbeam 75 x 4000 = 300000
1200
35600
33200
L
C
1200
4 5 6 7 8
1500000 NOTES:
150000 300000 300000 300000 300000 150000 1. TOTAL NUMBER OF TENDON IS 38 PAR GROUP, AND EACH WITH 1S28.6.
2. PRESTRESSING TENDONS SHALL BE LOW-RELAXATION TYPE.
3. INITIAL STRESSING FORCE SHALL BE EQUIVALENT TO 1200N/mm2 PER STRAND.
4. STRESSING SEQUENCES:
STAGE1-INSTALL PRECAST DECK PANELS EXCEPT THE CENTER 3 PANELS.
STAGE2-#1TENDON GROUP SHALL BE TENSIONED.
STAGE3-INSTALL THE CENTER 3 PANELS FOR DECK CLOSURE.
STAGE4-#2TENDON GROUP SHALL BE TENSIONED.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
T.Takada
in association with LAYOUT OF PRESTRESSING TENDON 2
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 500 DRAWING No. : C-3b-011
SHEET No. :
Sheet of PACKAGE:
SECTION 1 - 1 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH
PH
260
#2 TENDON GROUP
250
2%
150
2700
1250
2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
SECTION 2 - 2 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH
PH
260
#1 TENDON GROUP #2 TENDON GROUP
250
2%
150
2700
1250
2000
NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
PH
260
#1 TENDON GROUP #2 TENDON GROUP
250
2%
150
2700
1250
2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
SECTION 4 - 4 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH
PH
260
#1 TENDON GROUP
250
2%
150
2700
1250
2000
NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
PH
260
#1 TENDON GROUP
250
2%
150
2700
2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
SECTION 6 - 6 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH
PH
260
#1 TENDON GROUP #2 TENDON GROUP
250
2%
150
2700
1250
2000
NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
PH
260
#2 TENDON GROUP
#1 TENDON GROUP
250
2%
150
2700
1250
2000
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
SECTION 8 - 8 S=1/100
35600
1200 33200
400 750 3300 150 3 x 3750=11250 500 500 500 3 x 3750
=11250
PH
PH
260
#1 TENDON GROUP
250
2%
150
2700
1250
2000
NOTE:
1. PRESTRESSING CABLES SHALL BE ALIGNED NOT TO INTERFERE
WITH HEADED STUD ON THE FLOORBEAMS.
210 2895 350 2980 350 2980 350 2980 350 2980 350 2980
3280 4x3330=13320 4x3330=13320
800 33200
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
260
Apply Foam Release Agent
30
REBAR
125
Support Strut
Chloroprene Rubber
75 75
500
25 ND02-D16
260
350
S=1/30
STUD
CIP Concrete
Precast Deck Panel Precast Deck Panel
260
D16
SECTION 2 - 2
Longitudinal
17 x 200 = 3400 (Top Reinforcement)
30
1 1
3650
3650
REBAR
25 ND02-D16
75 75
500
Top
Longitudinal
18 ND01-D16-200
2
D16 AT ALL CORNERS
100100100
180°HOOK TOP & BOTTOM BAR
LAP SPLICES
300
2895
100100100
300
8-RB Ø6 x 300 (SR235) All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
T.Takada
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C-3b-016
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/30
Transverse
2980
18 ND03-D16-200
2
125
25 ND04-D16
25 ND04-D16
Bottom
17 x 200 = 3400 (Bottom Reinforcement)
260
S=1/30
Longitudinal
17 x 200 = 3400 (Top Reinforcement)
SECTION 2 - 2
1 1
3650
3650
Top
25 ND04-D16
125
18 ND03-D16-200
2
2980
2980
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
T.Takada
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C-3b-017
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/30
S=1/30
6 NF03-D20-125
6 NF04-D20-125
SECTION 2 - 2
2 NF01-D16-100
8 NF05-D14-200
2 NF08-D14-200
Transverse
7 NF06-D14
80
1 1
400
560
80
8 NF05-D14-200
4 NF02-D16-125
2 NF01-D16-100
7 NF06-D14 4 NF02-D16-125
2 NF08-D14-100
2 NF07-D14-100
2
Longitudinal
SECTION 1 - 1 S=1/30
3650
2 NF07-D14-200 NOTES:
2 NF08-D14-200 1. SEE LAYOUT OF PRESTRESSING TENDON FOR LOCATION OF RIB ANCHORAGE AND TENDON.
2. WHERE PRESTRESSING STRANDS ARE INTERFERED WITH REBAR FOR THE PRECAST DECK, REARRANGE THEM.
6 NF03-D20-125 4 NF02-D16-125 8 NF05-D14-200 3. SIDE SURFACES OF PRECAST DECK PANEL SHALL BE ROUGHENED TO BE INTEGRATED WITH CIP CONCRETE.
4. WHEN ANCHORAGE RIB LOCATES NEAR THE END OF PRECAST DECK PANEL, REBAR DESIGNATED AS NF06 AND
NF08 SHALL BE FIXED BY HOOK.
5. ANCHORAGE PORTION SHALL BE FILLED BY NON-SHRINK MORTAR.
260
150 100
13°
R 500
250
6 NF04-D20-125
0
5 NF06-D14-200
2 NF01-D16-100
2 NF06-D14-100
58 300 1000
802 1358 1490
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
T.Takada REINFORCEMENT OF
in association with PRESTRESSING CABLE ANCHORAGE
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C-3b-018
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/20
35600
1410 2895 350 2980
14504 ND05-D16(Top)
ND05-D16 14504 ND06-D16(Bottom)
ND06-D16
3
CIP Concrete Deck
17@200=3400
17@200=3400
42 ND07-D16(Top)
42 ND08-D16(Bottom)
ND07-D16
ND08-D16
S=1/20
ND09-D32
1472 ND09-D32
125
125
SECTION 2 - 2
SECTION 3 - 3
1 1
350
350
CIP Concrete
125
125
ND07-D16
ND08-D16
17@200=3400
17@200=3400
ND10-D20
42 ND07-D16(Top)
42 ND08-D16(Bottom)
54 ND10-D20
2
3
SECTION 1 - 1 S=1/20
1.5% ND09-D32
ND07-D16
150
ND05-D16
2.0%
260
ND09-D32
CIP Concrete Deck NOTE:
ND06-D16 1. SET UP CUTWATER IN THE PLACE WHERE WIND FAIRING DOESN'T CLING.
100 Edge Girder ND08-D16
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
4
260
75 30
PRECAST DECK PANEL PRECAST DECK PANEL
S=1/50
1925
250 ND12-D16
(PER PIER)
185
150000
5575
300000
1850
CATCH PIT
OPENING
LOCATION
300000
2 ND20-D16
(PER CATCH PIT)
1500000
300
300000
19 ND11-D16
2400
(PER PIER)
CIP* 1360
1500
1500
300000
EXPANSION JOINT 10 NE01-D16 INSPECTION LADOER
(PER PIER) (P11:EAST SIDE ONLY)
(P17:WEST SIDE ONLY)
8 ND18-D16 4 ND19-D16
(PER CATCH PIT) (PER CATCH PIT)
150000
300
4
600
2550 550
35600
1
2
SECTION 3 - 3 S=1/50
35600
1200
1150
290 75
150
NOTES:
1. REFER REINFORCEMENT OF CIP CONCRETE SLAB 1 FOR REBAR
SHOWN IN BROKEN LINES.
2. CIP* ; CIP CONCRETE AFTER INSTALLATION AT EXPANSION.
3330 3280
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
4
260
75 30
PRECAST DECK PANEL PRECAST DECK PANEL
S=1/50
1925
250 ND14-D16
(PER PIER)
185
150000
5575
300000
1850
CATCH PIT
OPENING
LOCATION
300000
1500000
300
300000
37 ND13-D16
2400
(PER PIER)
CIP*
1500
1500
300000
EXPANSION JOINT 18 NE02-D16 INSPECTION LADOER
(PER PIER) (P11:EAST SIDE ONLY)
(P17:WEST SIDE ONLY)
150000
300
4
600
2550 550
35600
1
2
SECTION 3 - 3 S=1/50
35600
1200
1150
290 75
150
NOTES:
1. REFER REINFORCEMENT OF CIP CONCRETE SLAB 1 FOR REBAR
SHOWN IN BROKEN LINES.
2. CIP* ; CIP CONCRETE AFTER INSTALLATION AT EXPANSION.
3330 3280
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
4
250 ND17-D16
(PER PYLON)
4175
3 3
150000
S=1/50
300000
(CIP Concrete Deck) 8350
SECTION 4 - 4
LOCATION
300000
1500000
300000
300000
4175
150000
PRECAST DECK PANEL PRECAST DECK PANEL 26030
290
40 ND15-D16 (TOP)
40 ND16-D16 (BOTTOM)
(PER PYLON)
SECTION 3 - 3 S=1/50 1
35600
1200
2
1150
290 75
150
NOTE:
1. REFER REINFORCEMENT OF CIP CONCRETE SLAB 1 FOR REBAR
SHOWN IN BROKEN LINES.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
8 NW05-D14 4 NC04-D14
1 1 2 2
3650
3650
Precast Deck Panel Precast Deck Panel Precast Deck Panel
3 3 4 4
@200
@200
350
350
CIP Concrete CIP Concrete CIP Concrete
3650
3650
NW02-D14-200 NW01-D14-200 NW03-D14-200 NC03-D14-200 NC01-D14-200
NW04-D14-200 NC02-D14-200
980 150 20
4 NC05-D20(PER POST)
4 NW06-D20(PER POST) NC02-D14-200 C NC01-D14-200
Anchor Re-bar L
NW01-D14-200 Curb Level
1.5% CIP Expansive Concrete
265
250
150
231
Mortar
NW02-D14-200 2.0% 2.0%
Anchor Re-bar
75
2.0% 2.0% 2.0%
260
260
Level
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
REINFORCEMENT OF
T. Takada
in association with SIDEWALK AND MEDIAN 1
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C-3b-023
SHEET No. :
Sheet of PACKAGE:
CIP Concrete Deck
SECTION 3 - 3 SECTION 4 - 4
1200 400 750 500
980 150 20
CL
4 NW06-D20(PER POST) 4 NC05-D20(PER POST) NC03-D14-200
NW04-D14-200 Curb Level
1.5%
250
150
265
231
Mortar
2.0% 2.0%
75
2.0% 2.0% 2.0%
260
260
Level
Edge Girder
1410 2895
Curb Level
1.5%
ELASTOMER
250
150
265
231
6 6
980 (500)
5 5 2.0% 2.0%
75
Mortar
ELASTOMER
NOTES:
1. LONGITUDINAL RELIEF JOINT SHALL BE PROVIDED FOR SIDEWALK AND
MEDIAN CURB WITH 10M SPACING (TYPICAL), AND FILLED BY ELASTOMER.
2. ARRANGE CONNECTION REINFORCEMENT BETWEEN CURB AND SIDEWALK.
3. REBAR NW06 AND NC05 IS REINFORCEMENT FOR TRAFFIC BARRIER ANCHOR.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
REINFORCEMENT OF
T.Takada
in association with SIDEWALK AND MEDIAN 2
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 20 DRAWING No. : C-3b-024
SHEET No. :
Sheet of PACKAGE:
PLAN S=1/20
1150 1200
500 700
250 250
250
1 1
500
250
8 NL01-D14 3 NL02-D14
SECTION 1 - 1 S=1/20
1150 1200
500 700
FB 50 x t 3.0
8 NL01-D14
1.5% Level
150
SIDEWALK
265
275
75
2.0%
2.0%
260
260
NOTES:
Level
1. NUMBER OF REBAR AND ANCHOR BOLT SHOWN IS PER ONE LOCATION.
2. REFER LAYOUT OF PRECAST DECK PANEL FOR THE LOCATION.
Floorbeam U-Flg 3 NL02-D14
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y. Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
1200
NS01-D16
1 1
NS05-D16
1213
4 NS02-D16
5 NS01-D16
NS03-D16
NS01-D16
4 NS03-D16
NS02-D16 2 NS06-D16
260
NS05-D16
8 NS04-D16
NS04-D16
8 NS05-D16
1250
2
3000
1750
NOTES:
1) The plan shown in the drawing is for
U7 locating between P11 and P12.
2) Refer Technical Specifications for
damper installation.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
Y.Harada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Harada.tif
Rev. No.
T. Takada REINFORCEMENT OF
in association with STAY CABLE BOOT SUPPORT BASE
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50 DRAWING No. : C-3b-026
SHEET No. :
Sheet of PACKAGE:
Section Length 7500 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T.Flg 1200 6300 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
570 x 24 570 x 24 570 x 24 570 x 26 570 x 26 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 825 x 47
SM490Y SM570 SM570 SM570 SM570 SM570
T.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Stud Interval Type A B C C C D D D D D D D E F
Cable No. U1 2 3 4 5 6 7 8 9 10 L11
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
2815 185
S1
3000
J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
T-Stiffener Type a b a e a d a d a c a c a f
L-Stiffener Type 4-2 4-5 4-2 3-5 5-5 3-3 5-5 3-3 5-5 3-1 4-3 3-1 4-3 4-1 4-2 5-2 4-2 5-2 4-3 5-4 4-3 5-4 4-5
Web 1300 6200 6000 5300 6700 5300 6700 5200 6800 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 10000 10000
2936x19 2921x31 2912x28 2912x28 2924x25 2929x25 2938x19 2938x19 2938x19 2938x19 2932x19
2791x19 2928x19 2921x19 2912x19 2912x19 2924x19 2929x19 2938x19 2938x19 2938x19 2938x19 2932x19 2929x19 2875x24
SM570 SM570 SM570 SM570 SM570 SM570
Web Material SM490Y SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
B.Flg 1200 6300 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
910x40 910x48 910 x 55 910 x 62 910 x 62 910 x 52 910 x 47 910 x 38 910 x 38 910 x 38 910 x 38 910 x 44 910 x 47 1500 x 78
SM490Y SM570 SM570 SM570 SM570 SM570
B.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Joint 7500 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
1950
T-Stiffener 800 1750 72 x 2000 = 144000 150x2000=300000
Floorbeam 4500 36 x 4000 = 144000 75x4000=300000
Cable 4500 10 x 12000 = 120000 24000 24000
Span Length 148500 300000
Stud Arrangement - Transverse Direction Stud Interval Types - Longitudinal Direction T-Stiffener Types L-Stiffener Types
570 SM400 3 L-Stiffeners 4 L-Stiffeners 5 L-Stiffeners
105 4x90 105 Type Interval Type Interval Type Interval Type Sizes Type Material Sizes Type Material Sizes Type Material Sizes Type Material Sizes
=360 1 960 1 410 1 410
Stud Ø22 x 200 a 230x15 1 SM400 200x18 1 SM400 170x13 1 SM400 170x13 1 SM400 170x13
2 350 2 390 2 590
3 390 3 400 3 3x600=1800 b 260x17 3-1 2 SM400 200x18 2 SM400 170x13 2 SM400 170x13 2 SM400 170x13
4-1
4 310 4 7x600=4200 G 4 400 5-1 3 SM400 5-5 3 SM400
A c 270x17 3 SM490Y 200x20 3 SM400 170x13 170x13 170x13
5 8x400=3200 D 5 400 5 3x600=1800
6 190 6 5x600=3000 6 590 d 290x19 1 SM400 200x18 4 SM400 170x13 4 SM400 170x13 4 SM490Y 170x15
7 6x400=2400 7 400 7 410 e 310x21 3-2 2 SM490Y 200x20 1 SM400 170x13 5 SM400 170x13 5 SM570 170x17
8 200 8 3x600=1800 1 410
f 375x24 3 SM490Y 200x20 2 SM400 170x13 1 SM400 170x13 1 SM400 170x13
3000
1 3 4 5 6 7 8 10
2 9
3 L-Stiffeners Interval 4 L-Stiffeners Interval 5 L-Stiffeners Interval
500 550
1 NOTE:
575 625
2
3000
3000
3000
2 The girder depth shown in the drawing is the destance between
600
2 3 the top of the top flange and the bottom of the bottom flange.
3
4
3 4 5
525
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 3b - 027
SHEET No. :
Sheet of PACKAGE:
Section Length 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 6600 5400 6500 5500 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 26 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 825 x 47
SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
T.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Stud Interval Type E D' D' D' D' D' D' D' D' D' D' D' G D D D D D D D D D D D E F
FB100
FB101
FB102
FB103
FB104
FB105
FB106
FB107
FB108
FB109
FB110
FB111
FB112
FB113
FB114
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB80
FB81
FB82
FB83
FB84
FB85
FB86
FB87
FB88
FB89
FB90
FB91
FB92
FB93
FB94
FB95
FB96
FB97
FB98
FB99
3000
J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-39 J-40
T-Stiffener Type a c a c a e a e a e a d a c a f
L-Stiffener Type 5-4 5-3 4-3 5-4 4-3 5-4 4-3 5-4 4-3 5-3 4-3 5-1 4-1 4-2 4-3 3-1 4-3 3-1 4-2 4-1 3-6 5-6 3-5 5-5 3-5 5-5 3-4 5-6 3-1 4-3 5-3 4-3 5-4 4-3 5-3 4-3 5-4 4-3 5-4 5-4 4-5
Web 10000 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6800 5200 6700 5300 6700 5300 6600 5400 6000 5400 6600 5300 6700 5300 6700 5200 6800 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 10000 10000
2933x19 2938x19 2938x19 2936x19 2936x19 2927x19 2924x19 2926x19 2928x19 2921x19 2930x19 2932x19 2925x19 2922x19 2913x19 2921x19 2928x19 2931x19 2936x19 2938x19 2938x19 2938x19 2933x19
2928x19 2933x19 2938x19 2938x19 2936x19 2936x19 2927x19 2924x19 2926x25 2928x25 2921x19 2930x19 2925x31 2922x31 2913x31 2921x28 2928x25 2931x19 2936x19 2938x19 2938x19 2938x19 2933x19 2928x19 2875x24
SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
Web Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
B.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 6600 5400 6500 5500 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
910 x 48 910 x 43 910 x 38 910 x 38 910 x 40 910 x 40 910 x 49 910 x 52 910 x 50 910 x 48 910 x 55 910 x 46 910 x 44 910 x 51 910 x 54 910 x 61 910 x 55 910 x 48 910 x 45 910 x 40 910 x 38 910 x 38 910 x 38 910 x 43 910 x 48 1500 x 78
SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
B.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Joint 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T-Stiffener 150 x 2000 = 300000 150x2000=300000
Floorbeam 75 x 4000 = 300000 75x4000=300000
Cable 24000 10 x 12000 = 120000 12000 10 x 12000 = 120000 24000 24000
Span Length 300000 300000
Section Length 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 570 x 24 825 x 47
SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
T.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Stud Interval Type E D' D' D' D' D' D' D' D' D' D' D' G D D D D D D D D D D D E F
J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65 P14 J-65
T-Stiffener Type a c a c a c a d a d a e a e a e a e a d a c a f
L-Stiffener Type 5-4 5-4 4-3 5-4 4-3 5-3 4-3 5-4 4-3 5-3 4-3 3-2 4-3 3-2 4-3 3-1 4-3 3-3 4-3 3-3 4-3 3-5 4-1 3-6 4-3 3-6 4-3 3-5 5-3 3-4 5-6 3-1 4-3 5-3 4-3 5-3 4-3 5-3 4-3 5-3 4-3 5-4 4-3 5-4 5-4 4-5
Web 10000 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6800 5200 6700 5300 6700 5300 6600 5400 6000 5400 6600 5300 6700 5300 6700 5200 6800 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 5100 6900 10000 10000
2933x19 2938x19 2938x19 2936x19 2936x19 2931x19 2931x19 2928x19 2926x19 2930x19 2932x19 2930x19 2927x19 2925x19 2920x19 2924x19 2930x19 2933x19 2938x19 2938x19 2938x19 2938x19 2933x19
2927 x 19 2933x19 2938x19 2938x19 2936x19 2936x19 2931x25 2931x25 2928x25 2926x28 2930x28 2932x28 2927x31 2925x31 2920x31 2924x28 2930x25 2933x19 2938x19 2938x19 2938x19 2938x19 2933x19 2928x19 2875x24
SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
Web Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
B.Flg 10000 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 5200 6800 10000 10000
910 x 49 910 x 43 910 x 38 910 x 38 910 x 40 910 x 40 910 x 45 910 x 45 910 x 48 910 x 50 910 x 46 910 x 44 910 x 46 910 x 49 910 x 51 910 x 56 910 x 52 910 x 46 910 x 43 910 x 38 910 x 38 910 x 38 910 x 38 910 x 43 910 x 48 1500 x 78
SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM570 SM570 SM570 SM570
B.Flg Material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM490Y SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570
Joint 10000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 6000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 10000 10000
T-Stiffener 150 x 2000 = 300000 150x2000=300000
Floorbeam 75 x 4000 = 300000 75x4000=300000
Cable 24000 10 x 12000 = 120000 12000 10 x 12000 = 120000 24000 24000
Span Length 300000 300000
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 1000 DRAWING No. : C - 3b - 028
SHEET No. :
Sheet of PACKAGE:
CABLE ANCHORAGE DETAILS S=1/100 ANCHOR PIPE S=1/30
L1
Cable U1 ~ 5 Cable 6 ~ 8 A-A S=1/50
300 L2
(18 ~ U22) (15 ~ 17) 35 230 35 Mill to grind
Anchor Pipe
Anchor Pipe CJP
Cable (SCW490-CF)
Cable B
1250
1250
t
Cable
A
D1
D3
D2
A
15
Ground and Smooth R1
800
TYP.
00
15
50
00
t
Ground and Smooth
1750
139 22 22 139
1750
L3
R
TYP.
15
<155> <123>
t2
Taper Pipe
L5
(SCW550)
L5
250
Edge Girder
Web
A B
A 700 L2 500 L1 L2 D1 D2 D3 t
L4
L1 U1 2100 1800 600 470 670 65
2 2000 1700 550 420 620 65
t3 3 2000 1700 550 440 640 55
4 1900 1600 500 390 590 55
26
Cable 9, 10 Cable L11 500
5 1900 1600 500 390 590 55
(13, 14) (L12) < > : L11 (L12) dimension
6 1800 1500 500 400 600 50
7 1800 1500 450 350 550 50
Cable 8 1800 1500 450 350 550 50
Cable
9 1700 1400 450 360 560 45
1250
1250
150 B-B S=1/50 L11 1800 1500 450 350 550 50
A
15 0 Ground Smooth (TYP.)
00 250 L12 1800 1500 450 350 550 50
A
1750
20
3 0° 16 1800 1500 450 350 550 50
L5
L5 17 1800 1500 500 400 600 50
18 1900 1600 500 390 590 55
1400
t1
19 1900 1600 500 390 590 55
20 2000 1700 550 440 640 55
A
t=22
250
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
45 140 45
=170 =170
2x85 2x85
n 2 2 3 3 3 3
45 45
ts_to 11 11 11 11 11 12
ts_ti 12 12 12 12 12 13
tf 0 0 0 2.3 23 0
ts_to : Thickness of outside splice plate L1 170 170 255 255 255 255
ts_ti : Thickness of inside splice plate Spl PL material SM490Y SM570 SM570 SM570 SM570 SM570
tf : Thickness of filler plate
45 100 45
Web Type
nx85 nx85 Type W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18
=L1 =L1 n 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
85 L2
ts_w 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11
tf 0 0 0 0 0 0 0 0 0 0 0 0 4.5 0 6 6 0 0
45
L1 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170
ts_w L2 134 134 134 134 134 134 134 134 134 134 134 139 139 139 139 139 139 139
L3 148 150 153 154 155 155 156 157 157 158 159 161 161 163 164 166 167 170
L4 2548 2546 2543 2542 2541 2541 2540 2539 2539 2538 2537 2530 2530 2528 2527 2525 2524 2521
28 x L5 = L4
L5 91.0 90.9 90.8 90.8 90.8 90.8 90.7 90.7 90.7 90.6 90.6 90.4 90.4 90.3 90.3 90.2 90.1 90.0
Spl PL material SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM490Y SM570 SM490Y SM490Y SM490Y SM490Y SM570 SM490Y SM490Y SM490Y SM490Y
Type W-19 W-20 W-21 W-22 W-23 W-24 W-25 W-26 W-27 W-28 W-29 W-30 W-31 W-32 W-33 W-34 W-35 W-36 W-37 W-38 W-39 W-40
n 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4
ts_w 10 10 10 10 10 10 10 10 10 10 11 11 11 11 11 11 11 11 11 11 11 12
tf 3.2 4.5 3.2 3.2 4.5 6 3.2 3.2 3.2 6 0 6 0 6 4.5 4.5 6 3.2 4.5 4.5 2.3 2.3
L1 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 340
L2 139 139 139 139 139 139 139 139 144 144 134 139 144 144 144 146 146 146 146 151 162 162
L3 85
L3 160 161 163 165 165 166 167 170 175 176 158 170 172 174 176 181 181 182 182 187 193 193
L4 2531 2530 2528 2526 2526 2525 2524 2521 2511 2510 2538 2521 2514 2512 2510 2503 2503 2502 2502 2492 2475 2475
45
L5 90.4 90.4 90.3 90.2 90.2 90.2 90.1 90.0 89.7 89.6 90.6 90.0 89.8 89.7 89.6 89.4 89.4 89.4 89.4 89.0 88.4 88.4
Spl PL material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570
tf : Thickness of filler plate
100
Bottom Flange Type
45 nx85 nx85 45 Type BF-1 BF-2 BF-3 BF-4 BF-5 BF-6 BF-7 BF-8 BF-9 BF-10 BF-11 BF-12 BF-13 BF-14 BF-15 BF-16 BF-17 BF-18 BF-19 BF-20 BF-21 BF-22
=L1 =L1 n 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6
45
ts_bo 19 20 20 20 24 19 20 20 20 21 22 22 22 22 23 23 25 26 26 23 24 25
=340
4x85
ts_bi 20 21 21 22 27 20 21 21 22 23 23 23 23 23 24 25 27 28 28 24 25 27
45 45
140
tf 0 0 2.3 4.5 2.3 9 9 4.5 6 8 3.2 3.2 4.5 6 3.2 3.2 7 2.3 3.2 2.3 3.2 9
=340
4x85
L1 340 340 340 340 340 425 425 425 425 425 425 425 425 425 425 425 425 425 425 510 510 510
Spl PL material SM490Y SM490Y SM490Y SM490Y SM490Y SM570 SM490Y SM570 SM490Y SM570 SM490Y SM570 SM490Y SM490Y SM570 SM490Y SM490Y SM490Y SM490Y SM570 SM570 SM490Y
45
Type BF-23 BF-24 BF-25 BF-26 BF-27 BF-28 BF-29 BF-30 BF-31 BF-32 BF-33 BF-34 BF-35 BF-36 BF-37 BF-38 BF-39 BF-40 BF-41 BF-42
ts_bo : Thickness of outside splice plate
n 7 7 7 7 7 7 7 7 8 8 8 8 9 9 9 10 10 10 10 10
ts_bi : Thickness of inside splice plate
ts_bo 24 24 24 24 26 26 28 30 25 26 28 28 28 29 30 25 26 26 30 34
tf : Thickness of filler plate
ts_bi 25 25 26 26 27 28 30 32 26 27 29 30 30 31 32 26 27 28 32 36
tf 0 3.2 4.5 6 2.3 2.3 2.3 7 4.5 7 3.2 4.5 10 7 6 31 30 29 7 0
L1 595 595 595 595 595 595 595 595 680 680 680 680 765 765 765 850 850 850 850 850
Spl PL material SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM490Y SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570 SM570
Joint Type
Joint No J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33
T. Flg TF-2 TF-3 TF-4 TF-6 TF-4 TF-3 TF-2 TF-1 TF-1 TF-1 TF-1 TF-1 TF-5 TF-5 TF-1 TF-1 TF-1 TF-1 TF-1 TF-1 TF-1 TF-3 TF-3 TF-1 TF-1 TF-1 TF-1 TF-3 TF-4 TF-4 TF-3 TF-2 TF-1
Web W-29 W-30 W-37 W-38 W-36 W-25 W-9 W-1 W-1 W-1 W-4 W-8 W-39 W-40 W-10 W-3 W-1 W-2 W-2 W-11 W-17 W-31 W-22 W-27 W-18 W-12 W-16 W-32 W-35 W-34 W-26 W-14 W-5
B. Flg BF-10 BF-32 BF-41 BF-42 BF-35 BF-31 BF-6 BF-1 BF-1 BF-1 BF-9 BF-11 BF-38 BF-39 BF-13 BF-4 BF-1 BF-3 BF-2 BF-7 BF-16 BF-29 BF-27 BF-30 BF-22 BF-5 BF-17 BF-33 BF-36 BF-37 BF-32 BF-15 BF-4
Joint No J-34 J-35 J-36 J-37 J-38 J-39 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65
T. Flg TF-1 TF-1 TF-1 TF-1 TF-1 TF-5 TF-5 TF-1 TF-1 TF-1 TF-1 TF-1 TF-2 TF-3 TF-3 TF-3 TF-3 TF-3 TF-1 TF-1 TF-3 TF-3 TF-3 TF-3 TF-2 TF-1 TF-1 TF-1 TF-1 TF-1 TF-1 TF-5
Web W-2 W-1 W-1 W-3 W-10 W-40 W-40 W-11 W-3 W-1 W-2 W-2 W-6 W-19 W-21 W-22 W-23 W-20 W-13 W-15 W-24 W-28 W-33 W-25 W-7 W-3 W-1 W-1 W-1 W-3 W-10 W-40
B. Flg BF-3 BF-1 BF-1 BF-4 BF-13 BF-39 BF-40 BF-14 BF-4 BF-1 BF-3 BF-2 BF-8 BF-23 BF-24 BF-27 BF-25 BF-20 BF-18 BF-19 BF-28 BF-34 BF-34 BF-26 BF-12 BF-4 BF-1 BF-1 BF-1 BF-4 BF-13 BF-39
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64
J-2 J-15 J-27 J-39 J-53 J-65
7500 6000 10x12000=120000 10000 10000 10000 11x12000=132000 6000 11x12000=132000 10000 10000 10000 11x12000=132000 6000 11x12000=132000 10000 10000
148500 300000 300000
NOTES:
1 Bolt material : S10T(F10T)
2 Bolt diameter : M24
3 Filler plate material : The same material as basic material
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif
Rev. No.1
45 140 45
19 1200 26 19 1200 26
50 470 50
=170 =170
2x85 2x85
K.L.
K.L.
105 4x90 105
570 =360 20 20
Stud
19
19
Ø22 x 200
500
24
20
1048
CJP
35
CJP
20
1668
TYP.
750
500
2100 6300
20
35
1500
20
Section 8400
2186
C
20
800
750
1357
3252
1600
Stud 960 350 390 310 8x400=3200 190 6x400=2400 200 400
3252
2936
3000
35
1800 1850 4750
9°
.24
800
2204
J-1 19 64
243
0
21
R3
35
1584
TYP.
147
1066
00 45 100 45 350
13 3x85 3x85
CJP
Cable(No.U1) Floorbeam
1250
197 81
=255 =255 TYP. B.Flg CJP
85 134
B
K.L.
0.500%
10.5% A
40
185
K.L.
0.500% T.Stiff
0 250 20 250 20
10
50 2 0C 910
675
48
TYP.
0
50
15
28 x 90.6 = 2538
C
2 5 .7 5
00
625
CJP
16
1°
1750
68
2515
2815
2791
00
2815
28
600
22
16
04
00
0
C-C D-D
32
R3
52
575
Anchor pipe
12 TYP. CJP 1800
158 85
CJP
15
28 Anchor pipe
84
525
28 D 3 0°
300
5.344°
65 Ø470 65
65 Ø470 65
Ø600
A B
Ø600
1400
S1 FB2
40
TYP.
800
R1
50
R1
139 1278 139
50
22 22
60 840 890 1450
19
250
2200 6200 Edge Girder
Web D
T.Stiff 100 800 800 1950 1750 2000 2000
700 1300 500
1200
Floorbeam 900 4500 4000
2500
Section 8400
28
26
500
1300
1730
125 7x205=1435 170
240 3x150 300 3x150 290
=450 =450 45 5x85 100 5x85 45
=425 =425 Cable No. U1 2 3 4 5 6 7 8 9 10 L11
20-Ø45 CJP
65
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
185 200 185
=340
4x85
3x240=720
140 140
2 J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
40
910
850
140
J-2
19
19
Ø
=340
4x85
45
65
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
45 140 45
=170 =170
2x85 2x85
105 4x90 105 500
570
=360
19
19
Stud
Ø22 x 200 CJP 250 250
CJP
35
1172
1977
457
20
24
CJP 500
750
TYP.
20
5200 6800
1500
20
C
35
Section 12000
2772
1043
1000
20
750
1415
3577
35
1600
1800
20
7°
.7 8
2938
3000
TYP. 50 217
Stud 410 390 400 7x600=4200 400 5x600=3000 400 3x600=1800 590 410 T.Stiff R 30 CJP
800
267
19
385
20
55
J-7 J-8
240
35
1600
25
Cable(No.7)
21
350 410
45 100 45 250 800
00
958
500
10 2x85 2x85 CJP
85 134
1250
=170 =170 TYP.
0.500% 20
A B
25
38
11
675
Floorbeam
72
39.
C
15
148
50
00
28 x 91 = 2548
2000
625
2000
‹
16
1750
3000
19
00
77
00
600
25
TYP. 22
18
00
C-C D-D
35
575
77
30
1000
R
1000
C 22 B
148 85
Anchor pipe
CJP
525
16
1500 CJP
00
D Anchor pipe
30 ‹
8.358 ‹
A
50
50 Ø350 50
FB21 FB22
50 Ø350
Ø450
Ø450
1400
32
800
R1
FB20
50
100
R1
139 978 139
5100 1000
50
22 22
19
T.Stiff 2000 2000 2000 2000 2000 2000 2000
250
Edge Girder
Floorbeam 4000 4000 4000 4000 Web D
Section 12000 700 1000 500
1200
2200
22
26
500
1000
100
45 4x85 4x85 45
CJP =340 =340
45
=340
4x85
910
140
19
19
=340
4x85
Cable No. U1 2 3 4 5 6 7 8 9 10 L11
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
J-2
5200 6800
Joint 7500 6000 10x12000=120000 10000 10000
Section 12000
Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
Span 148500 300000
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
45 140 45
=170 =170
2x85 2x85
19 1100 26 19 1100 26
=360 Stud
570
Ø22 x 200
19
19
800
20
24
25
CJP 20 CJP
TYP.
CJP 500
1600
500
1341
5200 6800 Floorbeam
35
Web
20
20
Section 12000
35
750
20
800
1500
2941
2938
3000
1550
3200
750
Floorbeam
19 Web
Stud 410 390 400 7x600=4200 400 5x600=3000 400 3x600=1800 590 410
750
35
1600
20
J-9 J-10
35
1600
45 100 45 CJP
Cable(No.9)
2x85 2x85 TYP. 20
85 134
=170 =170 CJP
1250
0.500%
25
38
13 20
0
41
B
90
25
675
600
20C CJP Floorbeam
250 800
B.Flg
0
48.
50
15
C
A
00
760
550
28 x 91 = 2548
2000
°
625
2000
TYP. 16
00
0
50
3000
1750
2x500=1000
00
24
16
600
00
22
15
50
575
32
1000
450
00
1000
TYP.
22
C-C D-D
148 85
16
C
00
525
400
Anchor pipe
A
CJP
1400 CJP
D Anchor pipe
11.270°
3 0°
FB26 FB27 FB28
45 Ø360 45
45 60
Ø450
1400
Ø450
100
28
4 5 Ø3
800
R1
50
5100 1000
R1
2000 2000 2000 2000 2000 2000 2000 139 878 139
T.Stiff
50
22 22
19
Floorbeam 4000 4000 4000 4000
250
12000 Edge Girder
Section
Web D
1100
700 900 500
2100
22
26
500
900
100
45 4x85 4x85 45
=340 =340
CJP
45
=340
4x85
910
140
19
19
=340
4x85
Cable No. U1 2 3 4 5 6 7 8 9 10 L11
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
J-2
5200 6800
Joint 7500 6000 10x12000=120000 10000 10000
Section 12000
Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
Span 148500 300000
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
45 140 45
=170 =170
2x85 2x85
105 4x90 105 800 800
=360 Stud
570
19
19
Ø22 x 200
25
25
20 20
24
CJP CJP CJP
1600
TYP. 500
1600
500
20
5200 6800
35
35
Section 12000 20 20 Floorbeam
900
Web
750
1500
3200
3200
1700
2932
3000
750
800
410 390 400 7x600=4200 400 5x600=3000 400 3x600=1800 590 410 19 Floorbeam 21
Stud Web 0
R3
258
35
35
J-11 J-12
1600
20
Cable(No.L11)
1600
189
45 100 45 6°
CJP 25.3 4 CJP
2x85 2x85
TYP. 20
85 134
=170 =170
1250
20
160 0.500%
0
25
25
44
B
600
675
20 C CJP
C
64
150
00
.7 2
0
500
10
160
4‹
0
550
28 x 90.7 = 2539
2000
625
2000
A
TYP.
3000
1750
2x500=1000
00
500
25
600
22
160
0
170
575
C-C D-D
0
R3
450
1000
1000
22
TYP.
0
320
0
157 85
160 CJP
A
525
0
C
400
Anchor pipe
150
0
‹
CJP Anchor pipe
19.279
30 ‹
FB32 FB33 FB34
50 Ø350 50
D
50
Ø450
1400
32
35 0
800
R1
100
0
Ø 45
50
50 Ø
5100 1000
R1
155 978 123
250 250
50
250 200
T.Stiff 2000 2000 2000 2000 2000 2000 2000 22 22
19
Floorbeam 4000 4000 4000 4000 Edge Girder
Section 12000 Web
1100
700 1000 500
D
2200
22
26
500
1000
45
=340
4x85
910
140
19
19
=340
4x85
Cable No. U1 2 3 4 5 6 7 8 9 10 L11
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
45
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
J-2
5200 6800
Joint 7500 6000 10x12000=120000 10000 10000
Section 12000
Floor beam 4500 36x4000=144000 75x4000=300000
Cable 4500 10x12000=120000 24000 24000
Span 148500 300000
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.2
45 140 45
=170 =170
2x85 2x85
570
825
24
1:5
Stud 410 590 550 5x600=3000 2x450=900 5x600=3000 550 590 410
85 162
0.500%
47
675
TYP.
28 x 88.4 = 2475
2000
2000
625
3000
2700
2875
600
3000
24
575
1000
1000
193 85
525
TYP.
300
78
FB37 FB38 TYP. FB39
TYP. 1500
P12
1990
220 3x516.7=1550 220
12-Ø51 45 10x85 100 10x85 45
1:5 =850 =850
345 95
45
=340
4x85
02
1500
1390
Ø5
910
510
140
Cable No. U1 2 3 4 5 6 7 8 9 10 L11
24
=340
4x85
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
S1
3000
95 345
45
J-1 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14
1:5 J-2
1475 2510 2030 2510 1475 Floor beam 4500 36x4000=144000 75x4000=300000
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif
Rev. No.1
End floorbeam section Pylon floorbeam section Intermediate Intermediate stiffener section Transverse stiffener position Connected position
floorbeam section
Alternating flexure section 35 t 35 20 20
CJP
15 CJP 15
10
TYP. TYP. Splice Plate
15C back-filling
R3
15C back-filling
45
L-Stiffener L-Stiffener
‹
TYP.
T-Stiffener
CJP
CJP
Floorbeam position
30 30
DETAIL "1" S=1/5
H
H
tw tw
10
TYP. TCB M24(S10T)
B.Flg
45
L-Stiffener
‹
H/2
H/2
B B
) )
15C back-filling tw TYP. tw
5x 0 5x 0 B-B
15C back-filling (=: 10 (=: 10
R R TYP. Floorbeam L.Flg
20
under 100
under 100
CJP CJP CJP Sole Plate
30 30
Ø26.5
Ø50
CJP
A-A SOLE PLATE S=1/30
CJP 1:5
100 P11, P17 P12, P16 P13 ~ P15
CJP
1:5 1730
Transverse
Transverse
direction
direction
125 7x205=1435 170
A A P14 P14
12-Ø51 16-Ø63
Transverse
direction P14
95
95
20-TCB M24(S10T) 20-Ø45
345
345
65
1390
1390
850
850
510
510
BOLT TIGHTENING DIRECTION S=1/20
65
345
345
Outside Inside 240
3x150
=450 150 150
3x150
=450 290
95
95
1730
33.6
42.4
56.8
65.4
38
61
t3
t2
t1
12
12
12
12
840 890 100 1790 100 100 1790 100
1730
Steel grade : SM490C Steel grade : SM490C
t1 t2 t3
Steel grade : SM400C
P13,15 53.6 58 62.4
P14 56.0 56 56.0
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\NT100 /成果\01_ 図面国
\ 内組\00 SIGN\takada.tif ..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 50,30,5 DRAWING No. : C - 3b - 036
SHEET No. :
Sheet of PACKAGE:
ELEVATION S=1/100
TYPICAL FLOORBEAM
33200
1630 9420 11100 9420 1630
570 16065 500 16065 570
3000 IF-1 IF-2 IF-3 3000
K.L
K.L
2.0 % 2.0 %
560
420
420
2000
2000
2700
2098
2098
2552
2552
1580
1580
2140
R = 364013
WEG EEG
33200
1630 9420 11100 9420 1630
570 16065 500 16065 570
3000 IF-1 IF-2 IF-3 3000
K.L
K.L
2.0 % 2.0 %
560
420
420
2000
2000
2700
2098
2098
2552
2552
1580
1580
2140
R = 364013
WEG EEG
NOTE:
The Contractor shall provide proper bracing for the 1st typical floorbeams
away from pylons against lateral buckling during construction as necessary.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Tokuhashi.tif
Rev. No.
Stud 45
4x110
=440
110
125 375 375 8x125 110 180 10x125=1250 152.5 10x125=1250 165 180 10x125=1250 152.5 10x125=1250 155 125 375
SECTION S=1/60 SUPPORT STRUT S=1/20
2x125 =1000 165 180 152.5 180 152.5 165 3x110 125
=250 =330 500 500
500
CJP 45 120 45 A 45 120 45
4x55 4x55 4x55 4x55 0.5 %
16
=220 =220 =220 =220
65 45
65 45
166
TYP. TYP.
65
65
150
150
65
65
65
65
1-PL 500 x 16 x 3461(SM400A)
1- 300 x 150 x 8 x 13 x 3667(SS400)
45
45
2000~2552
2000~2552
A
1-T.Flg PL 700 x 21 x 1340(SM490YB) 1-Spl PL 500 x 10 x 650(SM490YA) 1-T.Flg PL 500 x 21 x 9412(SM490YB) 1-Spl PL 500 x 10 x 650(SM490YA)
A-A S=1/20
36-Stud Ø22 x 200 2-Spl PL 220 x 11 x 650(SM490YA) 268-Stud Ø22 x 200 2-Spl PL 220 x 11 x 650(SM490YA)
32-TCB M24 x 85(S10T) 32-TCB M24 x 85(S10T) 20
4-Stud Ø22 x 200 4-Stud Ø22 x 200 45 85 45 100 160 45 85 45
10 83 83 10
50
20 0.5 % 20
570 1345 9420 500
20 505046
46
(520) P14
166
50
20
166
R2
R
0
20 50
1-Web PL 2056(2055) x 18 x 1610~1616(SM490YB) 2-Spl PL 530 x 11 x 1932(1927)(SM490YA) 1-Web PL 2505(2500) x 13 x 9410(SM490YA) 2-Spl PL 530 x 11 x 2373(2370)(SM490YA)
2-Fill PL 260 x 2.3 x 1932(1927)(SM490YA) 144-TCB M24 x 75(S10T)
126-TCB M24 x 80(S10T)
1-L.Stiff PL 150 x 11 x 570(SM400A) TYP. 140 TYP.
1-L.Stiff PL 150 1-L.Stiff PL 150
x 11 x 588(SM400A) x 11 x 588(SM400A) 100
85 85 85 85
100 1-PL 100 x 9 x 295(SM400A)
85 85 85 85 1-L.Stiff PL 150 x 11 x 786(SM400A) 10
Detail "1" 1-PL 100 x 9 x 335(SM400A)
10
95.7 110
4-TCB M24 x 60(S10T)
21
95.7
515.1
x 2032(2031)(SM400A)
1-L.Stiff PL 150
DETAIL "1" DETAIL "2"
1-T.Stiff PL 140 x 10
20
=180
2x90
250 35 35
2502.7(2499.7)
19x100=1900
TYP.
x 2137(2132)(SM400A)
Base Point
x 2240(2235)(SM400A)
2000
2551.7
16x91.9=1470.6
x 2333(2328)(SM400A)
TYP.
1-T.Stiff PL 140 x 10
x 2414(2409)(SM400A)
900
1-T.Stiff PL 140 x 10
TYP.
1-T.Stiff PL 140 x 10
1580
1-T.Stiff PL 140 x 10
2036.6
R3
00
35
t 450 450 5
R1
3000
CJP
678.9
50
523.2
474
110 95.7
=180
2x90
35
(107) 95.7
110
Detail "3"
700
500
18
1-PL 140 x 10 x 2113(2108)(SM400A)
28(31)
1000
65 45
65 65
65
65 65
700
150
65
65
45
45
8 8
8 8
1-Spl PL 500(520) x 14(17) x 850(SM490YA) TYP.
100
100
1-B.Flg PL 700(720) x 21(22) x 1612~1618(SM490YB) 1-Spl PL 500(520) x 10(11) x 630(SM490YA) 1-B.Flg PL 500(520) x 26(31) x 9414(SM490YB) 2-Spl PL 220(230) x 16(20) x 850(SM490YA(B))
TYP.
2-Spl PL 220(230) x 11(12) x 630(SM490YA) 2(0)-Fill PL 220(230) x 2.3 x 420(SM490YA)
(235)
(222)
240
227
2-Fill PL 220(230) x 4.5(9) x 310(SM490YA) 44-TCB M24 x 100(S10T)
32-TCB M24 x 90(S10T)
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
Stud 375 215 5x250=1250 165 220 4x250=1000 215 5x250=1250 165 5x250=1250 215 4x250=1000 220 165 5x250=1250 215 375
CIP CONCRETE FILL S=1/20
215 265 215 165 215 265 215
75 350 75
Stud Ø22 x 200
500
260
1-T.Flg PL 500 x 21 x 11092(SM490YB)
180-Stud Ø22 x 200 30 x 30 Chloroprene Rubber
11100
SECTION S=1/60
21
x 11 x 785(SM400A) 1-L.Stiff PL 150 x 11 x 785(SM400A)
560
21
21
TYP.
1-L.Stiff PL 150
A A
867
1-L.Stiff PL 150 1-L.Stiff PL 150 1-L.Stiff PL 150
x 11 x 2140(SM400A) x 11 x 1815(SM400A) x 11 x 1815(SM400A) x 11 x 2140(SM400A)
2552~2700
2552~2700
TYP.
2700
20 20 140
2651
2700
600
x 2490(2487)(SM400A)
900
2140
50 1-T.Stiff PL 140 x 10
2502.7
2502.7
2551.7
2551.7
x 2490(2487)(SM400A)
TYP.
x 2555(2552)(SM400A)
x 2555(2552)(SM400A)
1-T.Stiff PL 140 x 10
1-T.Stiff PL 140 x 10
1-T.Stiff PL 140 x 10
100
912 TYP.
50
28
500
(520) P14
28
28
P14
Detail "5"
10
20
0
R5
20 10
8 8
8 8
100
100
270
270
270
270
TYP.
500
NOTES:
1) ( ) is Floorbeam at Electric Platform.
2) The girder depth shown in the drawing is the destance between
the top of the top flange and the bottom of the bottom flange.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
825 825
11050 11100 11050
33200
ELEVATION S=1/100
K.L
K.L
3000 3000
K.L
K.L
2.0 % 2.0 %
660
560
47
2700
3200
1580
3000
3074
3074
2760
2760
1880
3000
560
660
78
R = 771102
D D D D D D
WEG EEG
1500 1500
T.Stiff 2000 1985 1985 1985 1985 6x2220=13320 1985 1985 1985 1985 2000
Dia 5970 3970 3x4440=13320 3970 5970
Support Strut 3280 8x3330=26640 3280
12-Ø51 16-Ø63
1500 1500
P12,P16 P13~P15
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\..\..\..\N T 100 /成果\01_ 図面\国内組\00 SIG N \DATE-03.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 100 DRAWING No. : C - 3b - 040
SHEET No. :
Sheet of PACKAGE:
PF-1,PF-3 S=1/60
1630
550
DETAIL "3" S=1/20 LONGITUDINAL STIFFENER
2x110 110
Stud 137.5 =220 125 265 375
2x125 110
8x125
=1000
110 180
165 180
10x125=1250 152.5
152.5
10x125=1250 165 180
180
10x125=1250 152.5
152.5
10x125=1250 155 125 375
165 3x110 125 9
18
18
CONNECTION DETAIL S=1/20
=250 =330
45 120 45 45 120 45 TYP.
CJP 85 85 85 85 6-19Ø
J
75 30
Spl PL
30
55
=450
600
1-Rib PL 150 x 14
340Ø
230Ø
120Ø
45 105
x 1193(SM490YA) 1-Rib PL 150 x 14 x 9390(SM490YA)
150
150
1200
=450
=450
TYP.
600
55
Rib PL
30 75
30
PF-R
30
Nut Weld
K.L
45 85 85 120 85 85 45
2-PL 90 x 10 x 550(SM490YA)
1-T.Flg PL 1260 x 14 x 1213(SM490YA) 1-Spl PL 1140 x 10 x 380(SM490YA) 1-T.Flg PL 1260 x 14 x 9412(SM490YA) 1-Spl PL 1140 x 10 x 380(SM490YA) 6-TCB M24 x 70(S10T)
100 40-Stud Ø22 x 200 2-Spl PL 540 x 10 x 380(SM490YA) 335-Stud Ø22 x 200 2-Spl PL 540 x 10 x 380(SM490YA)
48-TCB M24 x 75(S10T) 48-TCB M24 x 75(S10T)
5-Stud Ø22 x 200 5-Stud Ø22 x 200
SCALLOP S=1/20 STUD S=1/60
825 1217.5 9420
3280 3330 3330 3330 80 1200
137.5 100 2-L.Stiff PL 150 x 11 x 786(SM400A) 100
85 85 85 85 85 85 85 85 100 400 400 100
K.L
105.5 110
150
CJP
110
14
105.5
104.1
47
628
0
R2
100 2-L.Stiff PL 150
560
20
SECTION
30 1200 30 1260
24x100=2400
CJP TYP. TYP.
WEG Only
300 600 300 30 1200 30
1779.7
3042
3074
2700
1580
24 450 450
3000
0.5 %
1300~1674
1270~1644
1300~1674
560
18
Detail "2"
110
666.3
15C back-filling
105.5
105.5
TYP.
300
18
2-L.Stiff PL 150 x 11 x 786(SM400A) 1110
110
78
2700~3074
2700~3074
2700~3074
CJP CJP 2000 TYP.
1985 1985 1985 1985 2220
20 10
2-B.Stiff PL 664 x 26 x 2875(SM570)
10
20
2-B.Stiff PL 414 x 38 x 1422(SM570) 5970 3970 4440 R5
0
2-B.Stiff PL 683 x 26 x 222(SM570) 1630 9420
900
900
940
960
900
11050 10
20 20
1500
10 20
20
10
500
2-Web PL 2728 x 26 x 1613(SM490YB) 4-Spl PL 530 x 10 x 2598(SM490YA) 2-Web PL 3042 x 13 x 9410(SM490YA) 4-Spl PL 530 x 10 x 2912(SM490YA)
500
470
2-Fill PL 260 x 13 x 2598(SM490YA) 348-TCB M24 x 75(S10T)
312-TCB M24 x 90(S10T)
0.5 %
inside outside
1390
12-Ø51 1-Dia PL 1188 x 9 x 2887~3011(SM400A)
100 100 2-PL 100 x 10 x 700(SM400A)
45 85 85 45 45 85 85 45 2-PL 90 x 10 x 940(SM400A)
85 85 30 200 85 85 tw-7 7
Drain Hole Ø24.5
tw
75 30
30
=450
P12,P16
600
TYP.
S=1/20 S=1/20
1-Rib PL 150 x 14 x 9390(SM490YA)
1990
1200
100 80
=450
=450
377.5 35 35
600
10
30 75
Ø
PF-R
30
K.L
35
R3
170 8 8
1-Rib PL 150 x 14 x 1593(SM490YA) 1-Spl PL 1140 x 10 x 530(SM490YA) 1-B.Flg PL 1260 x 18 x 9411(SM490YB) 1-Spl PL 1140 x 10 x 530(SM490YA)
50
1500 1-B.Flg PL 1260 x 18 x 1610(SM490YB) 2-Spl PL 540 x 10 x 530(SM490YA) 2-Spl PL 540 x 10 x 530(SM490YA)
16-Ø63 72-TCB M24 x 80(S10T) 72-TCB M24 x 80(S10T) 50
170
170
2-PL 100 x 9 x 599(SM400A) NOTES:
HANDHOLE COVER 1) ( ) is P12,P16. Other is P13~P15.
P12,P16 P13~P15 2) The girder depth shown in the drawing is the destance between 25 532 25
the top of the top flange and the bottom of the bottom flange. 170
2 - COV PL 340 x 9 x 340(SS400) 2 - COV PL 340 x 9 x 536(SS400) 582
2 - Doubling PL 340 x 18 x 340(SM490YB) 2 - Doubling PL 340 x 18 x 550(SM490YB)
12 - BN M16 x 80(SS400) 12 - BN M16 x 80(SS400) 1-PL 173 x 8 x 582(SM400A)
All dimensions are in mm, unless otherwise shown.
2-PL 163 x 8 x 170(SM400A)
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
Stud 375 215 5x250=1250 165 220 4x250=1000 215 5x250=1250 165 5x250=1250 215 4x250=1000 220 165 5x250=1250 215 375 SECTION S=1/60
215 265 215 165 215 265 215
1260
30 1200 30 1260
PF-L 30 300 600 300 30 1200 30
600
0.5 %
1-Rib PL 150 x 14 x 11070(SM490YA)
1200
TYP.
600
TYP.
1674~1800
PF-R
30
1644~1770
1674~1800
TYP.
1-T.Flg PL 1260 x 14 x 11092(SM490YA)
225-Stud Ø22 x 200
3074~3200
3074~3200
3074~3200
TYP.
20 10
10
20
R5
0
11100
900
PF-L PF-R
900
940
960
900
3330 3330 3330 3330 10
20 20
2-L.Stiff PL 150 x 11 x 784(SM400A) CL 2-L.Stiff PL 150 x 11 x 784(SM400A)
10 20
14
20
10
500
500
470
660
14
14
0.5 %
628
628
2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150 inside outside
2-L.Stiff PL 150
x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A)
3168
2-PL 90 x 10 x 940(SM400A)
1880
TYP. tw
1779.7
1779.7
3042
3042
3074
3074
2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150 2-L.Stiff PL 150
x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A) x 11 x 2140(SM400A)
660
666.3
666.3
18
18
18
2-L.Stiff PL 150 x 11 x 784(SM400A) 2-L.Stiff PL 150 x 11 x 784(SM400A)
1110 1110
2220 2220 2220 2220 2220 2220
4440 4440 4440
11100
200 30
Drain Hole Ø24.5
30
PF-L
600
TYP.
1-Rib PL 150 x 14 x 11070(SM490YA)
1200
600
PF-R
30
30 200 NOTE:
The girder depth shown in the drawing is the destance between
1-B.Flg PL 1260 x 18 x 11090(SM490YB) the top of the top flange and the bottom of the bottom flange.
4-PL 100 x 9 x 599(SM400A)
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
ELEVATION S=1/100
(P11)
11050 11100 11050
EF-R
570 16065 500 16065
K.L
K.L
3000 3000
2.0 % 2.0 %
610
510
2815
2515
3015
2889
2889
1495
2575
2575
2815
1795
510
610
R = 771102
D D D D D D
T.Stiff 2000 1985 1985 1985 1985 6x2220=13320 1985 1985 1985 1985 2000
Dia 5970 3970 3x4440=13320 3970 5970
Support Strut 3280 8x3330=26640 3280
ELEVATION S=1/100
(P17)
11050 11100 11050
EF-L
570 16065 500 16065
K.L
K.L
3000
2.0 % 2.0 %
610
510
2815
2515
3015
2889
2889
1495
2575
2575
2815
1795
510
610
R = 771102
D D D D D D
T.Stiff 2000 1985 1985 1985 1985 6x2220=13320 1985 1985 1985 1985 2000
Dia 5970 3970 3x4440=13320 3970 5970
Support Strut 3280 8x3330=26640 3280
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\..\00 SIGN\Tokuhashi.tif
Rev. No.
75 30
45 105
30
150
150
=650
=650
800 1-Rib PL 150 x 14 Ø 30
0 30
Rib PL
400
x 1320(SM490YA) 45 85 85 120 85 85 45
1600
=650
800
7x92.9
=220 =220 =220 =220 =220 =220 =220 =220 =220 110
=650
50 50
TYP.
SCALLOP S=1/20 STUD S=1/60
100 75
100
100
175
175
EF-R
100
80 1600
25×52 Long Hole 30Ø Air Hole
100 5x100 850
1-T.Flg PL 1730 x 14 x 1340(SM490YA) 1-Spl PL 1540 x 10 x 380(SM490YA) 1-T.Flg PL 1730 x 14 x 9412(SM490YA) 1-Spl PL 1540 x 10 x 380(SM490YA) 150 =500
150
27-Stud Ø22 x 200 2-Spl PL 740 x 10 x 380(SM490YA) 223-Stud Ø22 x 200 2-Spl PL 740 x 10 x 380(SM490YA)
64-TCB M24 x 75(S10T) 64-TCB M24 x 75(S10T) Stud Ø22 x 200
1-Stud Ø22 x 200 1-Stud Ø22 x 200
0
R2
570 1345 9420
3280 3330 3330 3330
100
85 85 85 85
2-L.Stiff PL 160 x 12 x 592(SM400A) 2-L.Stiff PL 160 x 12 x 786(SM400A) 100
85 85 85 85 SECTION S=1/60
1730
10 2-L.Stiff PL 160 10
3x87.9 110
85.3 110
500 600 500 30 1600 100
14
=263.6
85.3
0.5 %
578
2-L.Stiff PL 160 2-L.Stiff PL 160
510
415
2-L.Stiff PL 160
x 12 x 1904(SM400A) x 12 x 1904(SM400A) x 12 x 1904(SM400A)
2-T.Stiff PL 200 x 13 x 2562(SM400A)
TYP.
x 13 x 2637(SM400A)
CJP
1115~1489
600 20
18x100=1800
2547.3
x 13 x 2771(SM400A)
2-T.Stiff PL 200
900
WEG Only
23x100=2300
TYP. TYP. TYP.
1694.7
2-T.Stiff PL 200
19
2861
2889
450 450
2515
1495
2815
2515~2889
2515~2889
Close Up
CJP 2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160
1312.8
=263.6
110 3x87.9
900
1144.7
14
510
200
616.3
85.3
Detail "2"
85.3
300
14
500
110
2-L.Stiff PL 160 x 12 x 577(SM400A)
658 658 Concrete Fill up 2-L.Stiff PL 160 x 12 x 786(SM400A)
2-Web PL 2507 x 38 x 616(SM490YB) 2-Web PL 2547 x 20 x 1000(SM490YB) 2-PL 200 x 13 x 2588(SM400A) 2-Web PL 2861 x 15 x 9410(SM490YA) 4-Spl PL 530 x 10 x 2861(SM490YA)
3-B.Stiff PL 416 x 38 x 2751(SM490YB)
3-B.Stiff PL 416 x 38 x 260(SM490YB)
4-Spl PL 530 x 10 x 2417(SM490YA)
2-Fill PL 260 x 4.5 x 2417(SM490YA)
2-PL 200 x 13 x 2613(SM400A)
4-PL 100 x 10 x 637(SM400A)
336-TCB M24 x 75(S10T) DETAIL "1" S=1/20 DETAIL "2" S=1/20
1-B.Stiff PL 416 x 38 x 2486(SM490YB) 300-TCB M24 x 80(S10T) 4(2)-PL 220 x 10 x 570(SM400A)
250 35 35 100 80
45 100 45 45 100 45
Base Point 10
85 85 85 85
Ø45 30 200
Drain Hole Ø24.5
35
75 30
R
30
35
170 8 8
50
=650
=650
800
TYP. 50
170
1-Rib PL 150 x 14
170
x 1180(SM490YA) 1-Rib PL 150 x 14 x 9390(SM490YA)
1600
25 532 25
2 170
40 582
=650
=650
Ø
800
30 75
NOTES: 2-PL 163 x 8 x 170(SM400A)
EF-R
30
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
Stud 375 215 5x250=1250 165 220 4x250=1000 215 5x250=1250 165 5x250=1250 215 4x250=1000 220 165 5x250=1250 215 375 SECTION S=1/60
215 265 215 165 215 265 215 1730
30 1600 100 1730
Concrete Fill up Hole 500 600 500 30 1600 100
EF-L 30
Ø 30 Ø 30 Ø 30
800 0 0 0 0.5 %
400
1600
TYP.
1489~1615
1-Rib PL 150 x 14 x 11070(SM490YA) 125
125 TYP.
745 2x110 890 2x110 890 2x110 935 2x110 865 2x110 2x110 865 2x110 935 2x110 890 2x110 890 2x110 745
800
=220 =220 =220 50 =220 =220 =220 =220 50 =220 =220 =220 TYP.
100
100
EF-R
100
2889~3015
2889~3015
25×52 Long Hole 30Ø Air Hole
900
231-Stud Ø22 x 200
11100
500
EF-L EF-R
3330 3330 3330 3330
2-L.Stiff PL 160 x 12 x 784(SM400A) CL 2-L.Stiff PL 160 x 12 x 784(SM400A)
0.5 %
inside outside
14
610
1-Dia PL 1584 x 9 x 2944(SM400A)
14
14
2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160
578
578
2-L.Stiff PL 160 tw-7 7
x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A)
tw
2-T.Stiff PL 200 x 13 x 2891(SM400A)
3015
1795
TYP. TYP.
2987
1694.7
1694.7
2861
2861
2889
2889
2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160 2-L.Stiff PL 160
x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A) x 12 x 2139(SM400A)
610
616.3
616.3
14
14
14
Concrete Fill up
2-L.Stiff PL 160 x 12 x 784(SM400A) 2-L.Stiff PL 160 x 12 x 784(SM400A)
1110 1110
2220 2220 2220 2220 2220 2220
4440 4440 4440
11100
EF-L
800
TYP.
1-Rib PL 150 x 14 x 11070(SM490YA)
1600
800
EF-R
30
30 200
NOTES:
1-B.Flg PL 1660 x 14 x 11090(SM490YA) 1) Unit weight of counterweight shall not be less than 23.5N/mm3.
4-PL 100 x 9 x 801(SM400A) 2) Opening at end diaphram shall be closed and watertight before filling concrete.
3) Stud avoids and arranges Expansion.
4) The girder depth shown in the drawing is the destance between
the top of the top flange and the bottom of the bottom flange.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
1250
P11 Division Line
B
K.L.
0.500% F Ø1
( P17 ) 10.5% Convex 40 F
300
185
0.500% Socket (Fixed End)(SCM440H)
K.L.
Bearing
(S45CN)
371
E E
40 90
Bearing PL
(S45CN)
22 60
E-E
2 5 .7 5
70
C C
0
Ø220
1°
R30
1750
400
3000
50
R5
2815
2815
90
22 Ø68
S45CN
22
Ø240 F-F
6000
R3
50 350 50
450
3
R
A A
C-C Bearing PL(Concave Bearing) S=1/20
6000
FB2
CJP
B
250 19
27.200 D
22
60
100 1600 1950 1750 2000 2000 TYP.
550
5
R7 Division Line
900 4500 4000
22
H H
380
150
0
Ø22
350
(S45CN)
1500 1350
225
20 19
2850 G G
60
TYP. 75 60 75 D - D
50 350 50 210
450 380
D
P11 Convex 150 200 150
( P17 ) Bearing 10 Ø180 10
G-G Cut L 50x50x6
900 4500
B-B 6
50
15 15 20 30
R300
70 40 50
775 100 300
10 150
160
570
40 90
4
40 30
155 1800
30
70
250 250
19
50 6
395
5.344°
2x 12 Hole
24
65 470 65
85 210 85 4
600
1223(1215.5)
380
CJP
550
800
H-H
910
R3
R3
19
550
22 400 22
444
2841
2905
R5
1682(1689.5)
20
1238(1245.5)
225 550 550 225
A-A
6000
NOTES :
1 No of wires 7Ø x 55
2 Semi-pararell-wire strand contained
40
Ø6 within an HDPE tube (high density polyethylene tube).
8
910 3 Ultimate strength : fu = 1770 N/mm 2 fa = 1770 / 2.5 = 708 N/mm 2
550
550
from the reference temperature (24 deg.) for the Engineer's Approval.
The clearance of tie-down cables and end pier front face shall be checked
61
Steel grade
Bracket Plates : SM490YB
Others : Shown
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T.Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No. 1
2050(1300)
( P17 )
2850 F-F C-C
1500 1350
B 400(775) 1100(725) C
L
1625 (1250)
20 1605 (1230)
27.200 930
225 1400 (1025)
95 170 285 285 95
30 350
550 380
8-Anchor bolt
C F
1500
D65
(1729)
1999
Cable Boot Cover
(EPDM Rubber)
95
95
2318
Steel Pipe(STK400)
22 278
6000
Ø267.4
100
6000
35 65
2.0%
2968
2968
D D
650
550 550
22
Ø240
CJP
G-G
1300
1110
1110
1300
700
700
95
Drain Hole G
A A
90 40
R5
Ø220 2.0%
650
1300
1110
22
E E
22
70
200
78 189
278
175 175
Ø68
95
95
Bearing PL
G (S45CN)
371
95
C Convex
Bearing
200 350
1860 1300 (975) (S45CN) 550 22
3000 1400 (1025) Ø180
380
Socket (Movable End)
(SCM440H)
F
A-A Convex Bearing S=1/20 Bearing PL(Concave Bearing) S=1/20 E-E ANCHOR BOLT DETAILS S=1/30
(S35CN + SR235)
C
H L 930
300 M64
60
95 170 285 285 95
125(120)
Washer M64
5 (SS400)
Division Line R7 Division Line CJP
J Ø1 L
40 J L
300
380
150
1440 (1110)
I-I
(19x45=855)
26x45=1170
Ø6
3000 75 60 75
1400(1025)
S45CN
500 2000 500 210
R5
D-D
1625(1250)
90
70 1860 70 380
50
H 22
930 930
R30
22
85 210 85
75
50 6 2x 12 Hole 0 0
Ø22 Ø24
350
4 Ø65
33.8 40
R3
30 20 15 15
150 10
225
62.4
90 40
1625(1250)
(1025)
4
70
50 40 70
1400
160
TYP. Steel Pipe(STK400)
R300
6
50
Cut L 50x50x6 50 350 50
10 Ø180 10
Convex
M-M 450
225
M R3 Others : Shown
R3
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R. Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No. 1
A A
No. of Cable
74000
A-A
U1 U22 P (Base Point)
2 21
3 20
4 19
5 18
6 17 1W 22E
7 16
8 15
9 14 2W 21E
10 13
L11 L12
Z STA. 1+251.0
(STA. 2+751.0) 3W 20E
4W 19E
5W 18E
6W 17E
X 7W 16E
8W 15E
9W 14E
Y XY-PLANE S=1/1500
10W 13E
1250
No. X Y Z X Y Z LG-P at Girder at Pylon
3000
W, E W E W, E W, E W E W, E W E G P
U 1 6.0000 17.4000 -17.4000 29.6537 150.0000 3.9303 -3.9303 101.3100 161.3978 161.3978 25.653 27.036
B
2 18.0000 17.4000 -17.4000 29.7137 150.0000 4.4070 -4.4070 99.3100 149.7802 149.7802 27.058 28.294 800 33200 800
3 30.0000 17.4000 -17.4000 29.7737 150.0000 4.8842 -4.8842 97.3100 138.2605 138.2605 28.742 29.718 Gy = 17400 Gy = 17400
4 42.0000 17.4000 -17.4000 29.8337 150.0000 5.3641 -5.3641 95.3100 126.8638 126.8638 30.617 31.508
5 54.0000 17.4000 -17.4000 29.8937 150.0000 5.8465 -5.8465 93.3100 115.6273 115.6273 32.839 33.663
Y
6 66.0000 17.4000 -17.4000 29.9537 150.0000 6.3317 -6.3317 91.3100 104.6036 104.6036 35.552 36.256 B-B
7 78.0000 17.4000 -17.4000 30.0137 150.0000 6.8224 -6.8224 89.3100 93.8662 93.8662 38.849 39.484 G (Base Point)
8 90.0000 17.4000 -17.4000 30.0737 150.0000 7.3211 -7.3211 87.3100 83.5263 83.5263 42.976 43.514
9 102.0000 17.4000 -17.4000 30.1337 150.0000 7.8344 -7.8344 85.3100 73.7507 73.7507 48.206 48.633
10 114.0000 17.4000 -17.4000 30.1937 150.0000 8.3786 -8.3786 83.3100 64.7930 64.7930 54.900 55.204
L 11 126.0000 17.4000 -17.4000 30.2537 150.0000 9.0052 -9.0052 81.3100 57.0326 57.0326 63.424 63.621
L 12 174.0000 17.4000 -17.4000 30.4937 150.0000 8.9975 -8.9975 81.3100 56.8190 56.8190 63.313 63.511
13 186.0000 17.4000 -17.4000 30.5537 150.0000 8.3713 -8.3713 83.3100 64.4992 64.4992 54.714 55.020
14 198.0000 17.4000 -17.4000 30.6137 150.0000 7.8271 -7.8271 85.3100 73.3937 73.3937 47.972 48.369
15 210.0000 17.4000 -17.4000 30.6737 150.0000 7.3140 -7.3140 87.3100 83.1172 83.1172 42.672 43.214
16 222.0000 17.4000 -17.4000 30.7337 150.0000 6.8154 -6.8154 89.3100 93.4139 93.4139 38.504 39.144
17 234.0000 17.4000 -17.4000 30.7937 150.0000 6.3248 -6.3248 91.3100 104.1139 104.1139 35.174 35.884
18 246.0000 17.4000 -17.4000 30.8537 150.0000 5.8396 -5.8396 93.3100 115.1043 115.1043 32.436 33.267
19 258.0000 17.4000 -17.4000 30.9137 150.0000 5.3573 -5.3573 95.3100 126.3104 126.3104 30.186 31.099 NOTES :
1 G and P are cable anchorage base points on Girder and Pylon respectively
20 270.0000 17.4000 -17.4000 30.9737 150.0000 4.8776 -4.8776 97.3100 137.6786 137.6786 28.273 29.315
2 L stands for the chord length between G and P
21 282.0000 17.4000 -17.4000 31.0337 150.0000 4.3999 -4.3999 99.3100 149.1725 149.1725 26.628 27.827 3 W and E stand for West side plane and East side plane
U 22 294.0000 17.4000 -17.4000 31.0937 150.0000 3.9232 -3.9232 101.3100 160.7648 160.7648 25.222 26.548 4 G and P stand for angle formed by the anchor pipe and the horizontal plane
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
NOTES :
1 G and P are cable anchorage base points on Girder and Pylon respectively
2 L stands for the chord length between G and P
3 W and E stand for West side plane and East side plane
4 G and P stand for angle formed by the anchor pipe and the horizontal plane
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
74000
74000
74000
Cable No. of Casing Duct Casing Duct Middle Portion
Dc
No. Wires D Lm Do Inner Dia. Outer Dia. Thickness Inner Dia. Outer Dia. Thickness D Lf Do D' Lf ' Inner Dia. Outer Dia. Thickness
U 1 313 155 395 775 189 249 570 155 249 435 100 425 430 189 325 260 375 600 125
Z
2 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110 U22 U1
U1 U22 U1
3 223 136 340 645 170 230 540 145 230 380 100 370 365 170 285 210 335 560 110
4 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 2 3 4 5 6 7 8 9 10 L11 L12 13 14 15 16 17 18 19 20 21 2 3 4 5 6 7 8 9 10 L11 L12 13 14 15 16 17 18 19 20 21 2 3 4 5 6 7 8 9 10 L11
5 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135
1 6 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 X
7 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125
8 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 Cable No.
9 163 115 290 560 145 205 460 115 205 330 90 290 505 145 - - 205 490 125
10 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95
L 11 187 121 310 545 151 211 450 115 211 350 90 310 545 151 - - 211 480 125
L 12 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125
13 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95
14 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125
15 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125
16 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 Stay Cable Layout (P12) (m)
2 17 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 Cable Anchorage Coordinate Elastic Cable
Chord Length
18 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 Cable at Grider at Pylon by Sag Elongation
19 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo
20 241 139 350 675 173 233 540 145 233 390 100 380 380 173 290 225 350 560 110 W, E W E W, E W, E W E W, E W, E W, E W, E W, E
21 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110 U 1 4.7018 17.5214 -17.5214 29.0275 149.0013 4.0237 -4.0237 100.8132 161.733 0.004 0.396 161.342
U 22 295 151 380 750 185 245 570 155 245 420 100 410 420 185 315 250 365 600 125 2 16.7794 17.5201 -17.5201 29.0872 148.9655 4.5088 -4.5088 98.7647 149.991 0.003 0.377 149.617
U 1 313 155 395 775 189 249 570 155 249 435 100 425 430 189 325 260 375 600 125 3 28.7892 17.5263 -17.5263 29.1061 148.8598 5.0031 -5.0031 96.6684 138.342 0.002 0.403 137.941
2 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110 4 40.8720 17.5257 -17.5257 29.1620 148.8484 5.4925 -5.4925 94.6119 126.836 0.001 0.363 126.474
3 253 142 355 695 176 236 540 145 236 395 100 390 390 176 300 230 350 560 110 5 52.8999 17.5324 -17.5324 29.1786 148.8313 5.9871 -5.9871 92.5381 115.545 0.001 0.318 115.228
4 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 6 64.9721 17.5354 -17.5354 29.2127 148.7681 6.4941 -6.4941 90.4103 104.350 0.001 0.289 104.061
5 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 7 77.0297 17.5426 -17.5426 29.2238 148.7186 7.0106 -7.0106 88.2549 93.461 0.000 0.246 93.215
3 6 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 8 89.0913 17.5526 -17.5526 29.2152 148.6765 7.5434 -7.5434 86.0476 82.949 0.000 0.214 82.735
7 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 9 101.2157 17.5563 -17.5563 29.2392 148.6632 8.1008 -8.1008 83.7735 72.902 0.000 0.190 72.712
8 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 10 113.3360 17.5664 -17.5664 29.2198 148.7585 8.6897 -8.6897 81.4784 63.754 0.000 0.176 63.578
9 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125 L 11 125.4719 17.5847 -17.5847 29.1353 148.6334 9.4832 -9.4832 78.4030 55.040 0.000 0.154 54.886
10 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95 L 12 174.5301 17.5856 -17.5856 29.3764 151.3611 9.4741 -9.4741 78.4284 54.852 0.000 0.153 54.698
L 11 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125 13 186.6670 17.5673 -17.5673 29.5820 151.2342 8.6808 -8.6808 81.5016 63.483 0.000 0.174 63.309
L 12 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125 14 198.7881 17.5572 -17.5572 29.7221 151.3294 8.0922 -8.0922 83.7953 72.566 0.000 0.203 72.363
13 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95 15 210.9132 17.5535 -17.5535 29.8201 151.3160 7.5352 -7.5352 86.0679 82.559 0.000 0.212 82.347
14 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125 16 222.9750 17.5433 -17.5433 29.9497 151.2738 7.0026 -7.0026 88.2739 93.026 0.001 0.243 92.784
15 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 17 235.0327 17.5362 -17.5362 30.0596 151.2243 6.4862 -6.4862 90.4281 103.876 0.001 0.286 103.591
16 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 18 247.1051 17.5331 -17.5331 30.1464 151.1611 5.9794 -5.9794 92.5547 115.037 0.001 0.314 114.724
4 17 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 19 259.1329 17.5263 -17.5263 30.2506 151.1442 5.4849 -5.4849 94.6279 126.297 0.001 0.353 125.946
18 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 20 271.2159 17.5269 -17.5269 30.3162 151.1330 4.9958 -4.9958 96.6838 137.774 0.002 0.374 137.401
19 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 21 283.2256 17.5207 -17.5207 30.4163 151.0271 4.5011 -4.5011 98.7788 149.397 0.003 0.387 149.012
20 241 139 350 675 173 233 540 145 233 390 100 380 380 173 290 225 350 560 110 U 22 295.3033 17.5220 -17.5220 30.4771 150.9914 4.0160 -4.0160 100.8267 161.113 0.004 0.412 160.705
21 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110
U 22 295 151 380 750 185 245 570 155 245 420 100 410 420 185 315 250 365 600 125
U 1 295 151 380 750 185 245 570 155 245 420 100 410 420 185 315 250 365 600 125
2 283 149 375 735 183 243 520 135 243 415 100 405 410 183 310 245 360 560 110
CURVED CABLE LENGTH
3 241 139 350 675 173 233 540 145 233 390 100 380 380 173 290 225 350 560 110
4 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135 PF
5 223 136 340 645 170 230 490 125 230 380 100 340 575 170 - - 230 520 135
th
5 6 199 124 315 625 154 214 500 130 214 355 100 315 560 154 - - 214 480 125 ng Base Point at Pylon
Le
7 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 ble
8 187 121 310 605 151 211 450 115 211 350 100 310 545 151 - - 211 480 125 Ca Top of
ed Edge Girder
9 151 110 280 540 140 200 460 115 200 320 90 280 490 140 - - 200 490 125 rv
Cu
10 121 101 250 480 131 191 430 105 191 290 90 250 435 131 - - 191 400 95 NOTES :
Pylon Center 1 Coordinate system is tentative because road profile is not determined.
L 11 187 121 310 605 151 211 450 115 211 350 90 310 545 151 - - 211 480 125
2 GF is the location of forehead of socket at girder
1250
3 PF is the location of forehead of socket at pylon
4 Chord length Lc is the distance between GF and PF
Catenary Curve 5 Ls is the length increased by cable sag
6 Le is the elastic elongation by cable stress
7 Lo is unstressed length of cable expressed as
Lo = Lc + Ls - Le
8 Semi-pararell-wire-strand contained within an HDPE tube (high density polyethylene tube).
Base Point at Girder 9 Ultimate strength : fu = 1770N / mm2
fa = 1770 / 2.5 = 708 N / mm2
GF
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
Stay Cable Layout (P14) (m) Stay Cable Layout (P16) (m)
Cable Anchorage Coordinate Elastic Cable Cable Anchorage Coordinate Elastic Cable
Chord Length Chord Length
Cable at Grider at Pylon by Sag Elongation Cable at Grider at Pylon by Sag Elongation
No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo No. GF-X GF-Y GF-Z PF-X PF-Y PF-Z Lc Ls Le Lo
W, E W E W, E W, E W E W, E W, E W, E W, E W, E W, E W E W, E W, E W E W, E W, E W, E W, E W, E
U 1 604.6999 17.5216 -17.5216 31.8280 749.0041 4.0207 -4.0207 103.0683 161.497 0.004 0.409 161.091 U 1 1204.6967 17.5220 -17.5220 30.4771 1349.0086 4.0160 -4.0160 100.8267 161.113 0.004 0.412 160.705
2 616.7775 17.5204 -17.5204 31.8555 748.9684 4.5058 -4.5058 101.0202 149.758 0.003 0.382 149.379 2 1216.7744 17.5207 -17.5207 30.4163 1348.9729 4.5011 -4.5011 98.7788 149.397 0.003 0.387 149.012
3 628.7872 17.5265 -17.5265 31.8403 748.8627 5.0003 -5.0003 98.9246 138.114 0.002 0.384 137.731 3 1228.7841 17.5269 -17.5269 30.3162 1348.8670 4.9958 -4.9958 96.6838 137.774 0.002 0.374 137.401
4 640.8700 17.5260 -17.5260 31.8582 748.8514 5.4893 -5.4893 96.8685 126.614 0.001 0.362 126.253 4 1240.8671 17.5263 -17.5263 30.2506 1348.8558 5.4849 -5.4849 94.6279 126.297 0.001 0.353 125.946
5 652.8978 17.5327 -17.5327 31.8352 748.8345 5.9840 -5.9840 94.7951 115.331 0.001 0.310 115.022 5 1252.8949 17.5331 -17.5331 30.1464 1348.8389 5.9794 -5.9794 92.5547 115.037 0.001 0.314 114.724
6 664.9700 17.5357 -17.5357 31.8266 748.7714 6.4906 -6.4906 92.6680 104.146 0.001 0.294 103.852 6 1264.9673 17.5362 -17.5362 30.0596 1348.7757 6.4862 -6.4862 90.4281 103.876 0.001 0.286 103.591
7 677.0276 17.5429 -17.5429 31.7933 748.7220 7.0062 -7.0062 90.5132 93.269 0.001 0.243 93.027 7 1277.0250 17.5433 -17.5433 29.9497 1348.7262 7.0026 -7.0026 88.2739 93.026 0.001 0.243 92.784
8 689.0893 17.5530 -17.5530 31.7375 748.6798 7.5397 -7.5397 88.3068 82.773 0.000 0.211 82.562 8 1289.0868 17.5535 -17.5535 29.8201 1348.6840 7.5352 -7.5352 86.0679 82.559 0.000 0.212 82.347
9 701.2140 17.5567 -17.5567 31.7111 748.6666 8.0968 -8.0968 86.0335 72.747 0.000 0.204 72.543 9 1301.2119 17.5572 -17.5572 29.7221 1348.6706 8.0922 -8.0922 83.7953 72.566 0.000 0.203 72.363
10 713.3346 17.5668 -17.5668 31.6400 748.7619 8.6855 -8.6855 83.7393 63.626 0.000 0.175 63.451 10 1313.3330 17.5673 -17.5673 29.5820 1348.7658 8.6808 -8.6808 81.5016 63.483 0.000 0.174 63.309
L 11 725.4709 17.5851 -17.5851 31.5010 748.6360 9.4788 -9.4788 80.6652 54.950 0.000 0.153 54.797 L 11 1325.4699 17.5856 -17.5856 29.3764 1348.6389 9.4741 -9.4741 78.4284 54.852 0.000 0.153 54.698
L 12 774.5291 17.5851 -17.5851 31.5010 751.3640 9.4788 -9.4788 80.6652 54.950 0.000 0.153 54.797 L 12 1374.5281 17.5847 -17.5847 29.1353 1351.3666 9.4832 -9.4832 78.4030 55.040 0.000 0.154 54.886
13 786.6654 17.5668 -17.5668 31.6400 751.2381 8.6855 -8.6855 83.7393 63.626 0.000 0.175 63.451 13 1386.6640 17.5664 -17.5664 29.2198 1351.2415 8.6897 -8.6897 81.4784 63.754 0.000 0.176 63.578
14 798.7860 17.5567 -17.5567 31.7111 751.3334 8.0968 -8.0968 86.0335 72.747 0.000 0.204 72.543 14 1398.7843 17.5563 -17.5563 29.2392 1351.3368 8.1008 -8.1008 83.7735 72.902 0.000 0.190 72.712
15 810.9107 17.5530 -17.5530 31.7375 751.3202 7.5397 -7.5397 88.3068 82.773 0.000 0.211 82.562 15 1410.9087 17.5526 -17.5526 29.2152 1351.3235 7.5434 -7.5434 86.0476 82.949 0.000 0.214 82.735
16 822.9724 17.5429 -17.5429 31.7933 751.2780 7.0062 -7.0062 90.5132 93.269 0.001 0.243 93.027 16 1422.9703 17.5426 -17.5426 29.2238 1351.2814 7.0106 -7.0106 88.2549 93.461 0.000 0.246 93.215
17 835.0300 17.5357 -17.5357 31.8266 751.2286 6.4906 -6.4906 92.6680 104.146 0.001 0.294 103.852 17 1435.0279 17.5354 -17.5354 29.2127 1351.2319 6.4941 -6.4941 90.4103 104.350 0.001 0.289 104.061
18 847.1022 17.5327 -17.5327 31.8352 751.1655 5.9840 -5.9840 94.7951 115.331 0.001 0.310 115.022 18 1447.1001 17.5324 -17.5324 29.1786 1351.1687 5.9871 -5.9871 92.5381 115.545 0.001 0.318 115.228
19 859.1300 17.5260 -17.5260 31.8582 751.1486 5.4893 -5.4893 96.8685 126.614 0.001 0.362 126.253 19 1459.1280 17.5257 -17.5257 29.1620 1351.1516 5.4925 -5.4925 94.6119 126.836 0.001 0.363 126.474
20 871.2128 17.5265 -17.5265 31.8403 751.1373 5.0003 -5.0003 98.9246 138.114 0.002 0.384 137.731 20 1471.2108 17.5263 -17.5263 29.1061 1351.1402 5.0031 -5.0031 96.6684 138.342 0.002 0.403 137.941
21 883.2225 17.5204 -17.5204 31.8555 751.0316 4.5058 -4.5058 101.0202 149.758 0.003 0.382 149.379 21 1483.2206 17.5201 -17.5201 29.0872 1351.0345 4.5088 -4.5088 98.7647 149.991 0.003 0.377 149.617
U 22 895.3001 17.5216 -17.5216 31.8280 750.9959 4.0207 -4.0207 103.0683 161.497 0.004 0.409 161.091 U 22 1495.2982 17.5214 -17.5214 29.0275 1350.9987 4.0237 -4.0237 100.8132 161.733 0.004 0.396 161.342
NOTES :
1 Coordinate system is tentative because road profile is not determined.
2 GF is the location of forehead of socket at girder
3 PF is the location of forehead of socket at pylon
4 Chord length Lc is the distance between GF and PF
5 Ls is the length increased by cable sag
6 Le is the elastic elongation by cable stress
7 Lo is unstressed length of cable expressed as
Lo = Lc + Ls - Le
8 Semi-pararell-wire-strand contained within an HDPE tube (high density polyethylene tube).
9 Ultimate strength : fu = 1770N / mm2
fa = 1770 / 2.5 = 708 N / mm2
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
HDPE
HDPE HDPE (Colored as specified)
HDPE HDPE (Colored as specified)
HDPE (Colored as specified)
(Colored as specified) (Colored as specified) HDPE
(Colored as specified) HDPE
HDPE HDPE Filament Tape
HDPE HDPE Filament Tape Filament Tape
Filament Tape
Filament Tape Filament Tape
Galvanized Galvanized Galvanized Galvanized Galvanized Galvanized
Steel Wires Steel Wires Steel Wires Steel Wires Steel Wires Steel Wires
Cross Section
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 6 6 4
8 Ø85 8 8 Ø94 8 8 Ø99 8 8 Ø105 8 8 Ø108 8 10 Ø116 10
Ø101 Ø110 Ø115 Ø121 Ø124 Ø136
1 -10 , 2 -13 , 3 -13 , 4 -10 , 5 -10 2 -14 , 3 -9 , 4 -14 , 5 -9 1 -9 1 -7,8 , 2 -15,16 , 3 -7,8 , 4 -15,16 , 5 -7,8 1 -6 , 2 -17 , 3 -6 , 4 -17 , 5 -6 1 -3,4,5 , 2 -18,19 , 3 -4,5
Cable No. 1 -L11 , 2 -L11 , 3 -L11 , 4 -L11 , 5 -L11 4 -18,19 , 5 -4,5
195
HDPE HDPE
HDPE HDPE HDPE (Colored as specified) (Colored as specified)
(Colored as specified) (Colored as specified) (Colored as specified)
HDPE HDPE
HDPE HDPE HDPE
Filament Tape Filament Tape
Filament Tape Filament Tape Filament Tape Galvanized Galvanized
Galvanized Galvanized Galvanized Steel Wires Steel Wires
Steel Wires Steel Wires Steel Wires
Cross Section
4 6 6 4 4 6 6 4 4 6 6 4 4 6 6 4 4 6 6 4
10 Ø119 10 10 Ø122 10 10 Ø129 10 10 Ø131 10 10 Ø135 10
Ø139 Ø142 Ø149 Ø151 Ø155
195
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
TrDs xp
TrDs xp
ØDo
ØDa
ØDo
ØD
ØD
Movable End Live End
Ls
Lo Lm 56 ØD Lo L Lf 56 ØDa
Heat-shrinkage polyethylene
Chloroprene Rubber
400 ~ 500 mm Galvanized wire
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
D5 Outer Dia.
M20 x 30 M20 x 30
Top
Top
SS400
S45CN
D4
Outer Dia.
D4
D5
2
C2
C2
ia.
rD
ne
2
C2 I n
C2
Bottom 4-Ø19
Bottom
Upper Surface
D5
Bottom Surface
Ø6 mm Outer Dia.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
Ø1
21
Damping Facility Using 1200 200
High Damping Rubber
Stay Cable
Elastic Buffer(Polybutadiene)
Steel Pipe(STK400) Damper
262.3
Cover (Rubber)
Cable Boot Cover
(EPDM Rubber)
284.3
284.3 262.3
260
C
1250
Back Up Material High Damping Elastomeric Damper
(Polyethylene)
Ø4
1250
50
Casing
00
15 C
Elastic Seal(Polybutadiene) .7
89
57
3000
RC Slab
C-C
1750
0 Plate fixed to stay cable
75
0
30 A
00 5
1 11
B
Plate fixed to deck slab
800
A-A B-B
Plate fixed to stay cable
Rib
Spl PL(SS400)
Ø450
Rib PL(SM400A)
1200
Steel Pipe(STK400)
NOTES:
1) The plan shown in the drawing is for
U7 locating between P11 and P12.
2) Anchor Plate assembly is hot-dip
galvanized.
3) Drawing for damper and the attachment to the stay cable
12-M16 and fixture to the deck is for reference only.
Anchor Bolt When it is required to install the damper, the Contractor
Nut to be welded to Steel Pipe shall propose and design the damper to meet the
requirements as specified in these Technical
Specifications and with instruction by the Engineer.
Elastic buffer and back-up material at the mouth of the
30 3 0
15 60
steel pipe may be removed when damper is required to be
Ø4
installed.
135
135
15
06
3 0 30
.7
60
Welding of connection All dimensions are in mm, unless otherwise shown.
pieses to Steel Pipe
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
Fill-in after Installation 345 510 345 3 x 516.7 = 1550 Longitudinal Reaction due to EQ Rh1e 2152 kN
Transverse Reaction due to EQ Rh2e 5650 kN
Ø500
Uplift due to EQ V 1587 kN
30
Displacement
8
Displacement on Service Loading UB +240mm, -285mm
11 6 Displacement on Service Loading
UB +272mm, -317mm
plus Assumed Allowance (±5°C)
904
Rubber Bearing
3 5
Shear Modulus of Elasticity Ge 1.0 N/mm 2
9 1 Fracture Strain γu 600 %
Component Material
2120 720 620 720
No. Component Material Nos Weight (kg) Note
2560 2380 1 Bottom Plate SM490A 1 8544.8 JIS B 3106
2 Top Plate SM490A 1 1304.2 JIS B 3106
1 SM490A 3 Rubber Bearing
+SS400 1 3351.2
720
28 10.6
13 Bolt and Washer 28 16.8 JIS B 1180
3x130
=390
Total Weight 18391.0 (kg)
7 x 200 = 1400
1720
7 x 260 = 1820
Hot Dip
Deposit is not less than 550 g/m 2 for general,
Galvanizing
2380
Detail A S=1:6
400
620
and not less than 350g/m 2 for bolts and washers.
3x130
=390
of rubber , shear key and contact surface between shear key and plate.
2. Black oxide film treatment should be applied to Hex socket head screw cap,
2
45
720
and after bearing fabrication, high concentrated zinc powder should be painted.
7 x 150 = 1050 3. Bolt of strength class 10.9 should be painted by high concentrated zinc powder.
46
1220 4. The longitudinal position of bearing is at its center at 10 years after the bridge
completion when the reference temperature is 24 deg. The Contractor shall set the
6
25 28-M27Screw
Rubber Thickness Te = 46mm x 10Layers (HDR-S) 2560 setting plan and method and means with analysis results for the Engineer's Approval.
Depth 45
Reinforcing Plate t = 6mm x 9 (SS400)
Layout
Top & Bottom Plate t = 45mm x 2 (SM490A)
E E E E E
604
180
25
25
Ø500
P11 P12 P13 P14 P15 P16 P17
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 001
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
25 25 25
2 ( ) SM490A 10 ( ) SM490A 4 ( ) SCW480N
Detail B S=1:6
235
2x130
=260
25 50
3
C
22
65
3 x 516.7 = 1550
7 x 200 = 1400
300
7 x 260 = 1820
7 x 200 = 1400
1770
290 2-M64Screw
90
Depth100
1910
105
R1
719
0
25
230
25
7 x 150 = 1050 1310 560
1390
7 x 150 = 1050
28-Dia29 Drilling
1410
Ø500 Ø43 Spot Facing Depth 29
25
Ø500
Note :
45
25
75
25
25 The rubber material of elastomeric bearing shall satisfy the characteristics hereafter.
1. Equivalent Shear Stiffness
Ø490 KB = G ( ) x Ae / te
28-Dia29Drilling
G ( ) = a 0 + a1 + a2 2 + a3 3... + a i
i
Ø43 Spot Facing Depth29
KB : Equivalent Stiffness of Elastomeric Bearing ( N/mm )
Ae : Effective Area ( mm2 )
G( ) : Equivalent Shear Modulus at a Shear Strain ( N/mm2 )
ai : Coefficient dependent on G( ). See Table 1.
: Design Shear Strain
7 S35CN Table 1 Coefficient ai
Ge a0 a1 a2 a3 a4 a5
65
(Washer) 2. Equivalent Damping Factor
00 00
Ø5
2 3
Ø5 hB ( ) = b 0+ b 1 + b 2 +b3
3
6 Hexagon Head Bolt (JIS) M48 x 195 8.8 hB( ) : Equivalent Damping Factor at Shear Strain
12 x 55 = 660
bi : Coefficient dependent on hB( ). See Table 2.
(Washer)
865
: Shear Strain
Table 2 Coefficient bi
11 Hexagon Holed Bolt M27 x 70 10.9
b0 b1 b2 b3
12 Hexagon Holed Bolt M27 x 40 10.9
C C Ge = 1.0 0.2091 0.01611 -0.02704 0.003519
2 2
55
13 Hexagon Head Bolt (JIS) M27 x 90 10.9 Ø80
130
(Washer)
2
49
C
2
C
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 002
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
Transverse Direction Longitudinal Direction
Design Conditions
15 1390 15 1770
Reaction
Fill-in after Installation 345 510 345 5 x 310 = 1550 Total Reaction R 8735 kN
Ø500 Dead Load Reaction Rd 5289 kN
2145 kN
50
Longitudinal Reaction due to EQ Rh1e
Transverse Reaction due to EQ Rh2e 10203 kN
8
Uplift due to EQ V 1587 kN
11 6
Displacement
4 2 Displacement on Service Loading UB +153mm, -173mm
Displacement on Service Loading
UB +169mm, -189mm
999
plus Assumed Allowance (±5°C)
3 5
Displacement on Earthquake UBe ± 185 mm
9 1
Rubber Bearing
13 7 Shear Modulus of Elasticity Ge 1.0 N/mm 2
Fracture Strain γu 600 %
10
Test Displacement ∆L ± 185 mm
12 Equivalent Stiffness KB 9.815 kN/mm
85
Equivalent Damping Factor hB 21.1 %
Rotation Checking Load R1 8735 kN
1100
Component Material
No. Component Material Nos Weight (kg) Note
2120 720 620 720
1 Bottom Plate SCW480N 1 12687.8 JIS G 5102*
2680 2380 2 1549.4 JIS B 3106
Top Plate SM490A 1
25 3 Rubber Bearing 1 3351.2
1 ( ) SCW480N +SS400
4 Side Block SCW480N 2 6266.2 JIS G 5102*
25
3 ( ) HDR-S+SM490A+SS400 2x170=340 1590 2x170=340
5 Bolt and Washer 48 327.4 JIS B 1180
48-M56 Screw 8-M110 Screw
Depth 95 7 x 190 = 1330
Depth 95 (Back Side) 6 Bolt and Washer 16 99.7 JIS B 1180
2 x 28 - M27 Screw
Depth 28 7 Anchor Bolt S35CN 8 710.2 JIS G 4051*
1200
8 Shear Key SM490A 1 254.3 JIS B 3106
9 Shear Key SM490A 1
4 75.5 JIS B 3106
2-Air Vent 10 Mid Plate SM490A 1 889.8 JIS B 3106
11 28 15.9 JIS B 1176
720
12 28 10.6 JIS B 1176
3x170
=510
13 Bolt and Washer 28 16.8 JIS B 1180
Total Weight 26254.8 (kg)
7 x 200 = 1400
1720
7 x 260 = 1820
Hot Dip
Deposit is not less than 550 g/m 2 for general,
2380
Detail A S=1:6 Galvanizing
620
540
and not less than 350g/m 2 for bolts and washers.
of rubber , shear key and contact surface between shear key and plate.
3x170
=510
2. Black oxide film treatment should be applied to Hex socket head screw cap,
2
45
720
and after bearing fabrication, high concentrated zinc powder should be painted.
7 x 150 = 1050 3. Bolt of strength class 10.9 should be painted by high concentrated zinc powder.
46
1220 4. The longitudinal position of bearing is at its center at 10 years after the bridge
completion when the reference temperature is 24 deg. The Contractor shall set the
6
25 28-M27Screw
Rubber Thickness Te = 46mm x 10Layers (HDR-S) 2680 setting plan and method and means with analysis results for the Engineer's Approval.
Depth 45
Reinforcing Plate t = 6mm x 9 (SS400) Layout
Top & Bottom Plate t = 45mm x 2 (SM490A) E E E E E
604
25
260
25
25
Ø500
P11 P12 P13 P14 P15 P16 P17
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 003
SHEET No. : 1
Sheet 1 of 2 PACKAGE:
25 25 25
2 ( ) SM490A 10 ( ) SM490A 4 ( ) SCW480N
Detail B S=1:6
195
2x170
=340
25 50
3
C
22
5 x 310 = 1550
7 x 200 = 1400
7 x 260 = 1820
7 x 200 = 1400
85
300
1770
1910
25
400 2-M64Screw
90 Depth100
105
R1
0
25
734
320
7 x 150 = 1050
25
1730 620
1390 7 x 150 = 1050
1410
28-Dia29 Drilling
Ø500 Ø43 Spot Facing Depth 29
25
Ø500
Note :
45
25
25
90
25 The rubber material of elastomeric bearing shall satisfy the characteristics hereafter.
1. Equivalent Shear Stiffness
Ø490 KB = G ( ) x Ae / te
28-Dia29 Drilling
G ( ) = a 0 + a1 + a2 2 + a3 3... + a i
i
Ø43 Spot Facing Depth29
KB : Equivalent Stiffness of Elastomeric Bearing ( N/mm )
Ae : Effective Area ( mm2 )
G( ) : Equivalent Shear Modulus at a Shear Strain ( N/mm2 )
ai : Coefficient dependent on G( ). See Table 1.
: Design Shear Strain
7 S35CN Table 1 Coefficient ai
Ge a0 a1 a2 a3 a4 a5
90
5
Washer 2. Equivalent Damping Factor
00 00
Ø5
2 3
Ø5 hB ( ) = b 0+ b 1 + b 2 +b3
6 Hexagon Head Bolt (JIS) M60 x 200 8.8 4 hB( ) : Equivalent Damping Factor at Shear Strain
bi : Coefficient dependent on hB( ). See Table 2.
(Washer) : Shear Strain
12 x 75 = 900
Table 2 Coefficient bi
1190
11 Hexagon Holed Bolt M27 x 85 10.9
b0 b1 b2 b3
12 Hexagon Holed Bolt M27 x 40 10.9
C C Ge = 1.0 0.2091 0.01611 -0.02704 0.003519
2 2
13 Hexagon Head Bolt (JIS) M27 x 90 10.9
(Washer)
165
75
2
49
C
2 Ø110
C
Ø9 Spiral Wound Round Bar
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 30 DRAWING No. : C - 4 - 004
SHEET No. : 2
Sheet 2 of 2 PACKAGE:
Transverse Direction Longitudinal Direction 25 6.3 1.6
2 ( ) SCW480
850 1730
3x240=720
3x240=720 9 890 840
20-M42
17 170 7x205=1435 125
ScrewDepth 55
2 Design Conditions
2
10
170
Reactions
Total Reaction R 8252 kN
15
7
Dead Load Reaction Rd 1388 kN
10
890
8 R H1f 825 kN
550
25
18
7x205=1435
5 Uplift due to EQ V 139 kN
1710
1730
1 Displacement
750
00 Total Movable Distance e -509, +564 mm
1170 Ø4
3
Friction Coefficient
Design Friction Coefficient f 0.10
10
840
4 3.2
( 25
) SM490A Allowable Bearing Stress
1400
125
0
10
62
Ø
930
2
C
750 1 Bottom Plate SCW480N 1 2119.6 JIS G 5102*
54
M12 Screw Depth 25
1170
Install before shipping 2 Top Plate SCW480N 1 3111.9 JIS G 5102*
318
264
47
3 Sliding Plate PTFE 1 2.7
Ø670
50
3
4 Middle Plate SM490A 1 171.1 JIS B 3106
R0
2.8
940 5 Rubber 1 21.7
.5
25 3.2
1 ( ) SCW480N
63.8
7.5
15
Bond to Middle Plate 6 Seal Ring 1 1.0
11 SUS316
.5
R0
1170 7 Side Block SS400 2 171.8 JIS B 3106
210 750 210 9.5
Surface Lubrication 8 Hex. Bolts 10.7 JIS B 1180
Ø679 8
R33
4-Ø147Hole S 25 9 Hex. Bolts, Washers 20 48.2
7 SS400
R585
4-Ø235Seat
10 Anchor Bolts, Nuts S35CN 4 862.4 JIS B 1181
11 Stainless Plate SUS316 1 38.1
123
90
210
R 4-39Drill
R3
55 50
(with Compressive Seal Ring) Exterior Surface Corrosion Protection
200
R3
B Components with are to be coated.
Hot Dip
3x120=360 173 75 Deposit is not less than 550 g/m 2 for general,
Galvanizing
1170
A
750
2
0 470 248
C Ø67
D
* "-N" indicates the steel is normalized and heat treated.
Detail "a" S=1:10
Notes :
210
R1
0 10 S35CN 1. Organic zinc rich paint shall be applied to the top and bottom surface
of rubber , shear key and contact surface between shear key and plate.
5
2. Black oxide film treatment should be applied to Hex socket head screw cap,
4 225 M140x6 and after bearing fabrication, high concentrated zinc powder should be painted.
Ø680 Ø2
Compressive RIng 3. Bolt of strength class 10.9 should be painted by high concentrated zinc powder.
Ø3
2 4. The longitudinal position of bearing is at its center at 10 years after the bridge
112
175
completion when the reference temperature is 24 deg.
250
46
1650
12x100=1200
8 Hex. Bolt (JIS) M36 x 120 4.6 Layout
55
155
1400
175 86
346
261
115 5
100
1150 510 70 510 P11 P12 P13 P14 P15 P16 P17
30 30
All dimensions are in mm, unless otherwise shown.
Section A-B-C-D Ø140
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
1200 33200
550 15860
600 6805 8395 60 380 60
Support box pitch 940 1200 995 990 995 990 995 300 300 995 990 4x1110=4440 1200 530
Control box pitch 1655 940 1985 1985 840 1765 2085 1110 1110 1155 1230 TABLE OF INSTALLATION CLEARANCE
It is ventilation hole 50 (PER ONE CELL)
of the size of Ø25. C
L
F C D E
EJ-2
80
70
52
1100
60
"a"
80
"a"(mm)
50
30.8mm
(24℃)
2235
40
1944
750
30
500
20
10
0
EJ-1 200 250 -10 0 10 20 30 40 50
F C D E Temperature( C)
Shifting amount by a change of
Control box pitch 20 1455 2135 1985 1830 755 1985 1310 1110 1110 1155 1030 20 temperature per 1 °C (per one cell) = 0.755mm
1200 33200
EJ-2 550 15860
1150 15200 500
600 6805 8395 60 380 60
18 535 250 5
C
L
Joint
18 535 167.9
17.3
535 255
265.3
1.0%
150
304
535
A 2.0% A
15
445
1.5%
15
15
24
18
LOCATION
B B
30
P11 P17
30
K.L
706
EJ-1
EJ-2
3x165 130 187.5 60 160 200 150 150 190 190
Stud interval 115 =495 80 130 60 187.5 60 160 60 80 200 80 60 190 60 60 200 60 140 140
EJ-3
EJ-4
1730 20 690 500 260 440 500 495 550 440 500 495 550 440 500 495 550 550 495 500 440 550 610 500 560 550 610 500 560 550 700 500 280 170
1200 2000 4x1985=7940 3x2220=6660 20
33200
EJ-1 550 15860
1150 15200 500
600 6805 8395 60 380 60
470 250 5
C
L
Joint
470 167.9
17.3
470 255
1.0%
150
304
470
A 2.0% A
1.5%
NOTES
1. The Drawing shows a condition with 10-year creep and shrinkage
B B with reference temperature of 24 deg. The Contractor shall set the
expansion joints in a position by considering elastic shortening,
effect of 10-year creep and shrinkage and difference of setting
641
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
33200 900
15860 550
60 380 60 8395 6805 600
530 1200 4x1110=4440 990 995 300 300 995 990 995 990 995 1200 940 Support box pitch
1230 1155 1110 1110 2085 1765 840 1985 1985 940 1655 Control box pitch
50 It is ventilation hole
C
L of the size of Ø25.
E D C F
EJ-4
52
1100
"a"
80
2235
1944
750
500
250 200
EJ-3
E D C F
20 1030 1155 1110 1110 1310 1985 755 1830 1985 2135 1455 20 Control box pitch
33200 900
15860 550 EJ-4
500 15200 1150
60 380 60 8395 6805 600
535 250 5
C
18 535 255
Joint
168
17
1.0%
150
265
304
18 535
2.0%
18 535
A A
15
24 445
1.5%
15
15
LOCATION
B B
30
P11 P17
30
K.L
5060 100 400 100 K.L
706
50 350 50 855
EJ-1
EJ-2
190 190 150 150 200 160 60 187.5 130 3x165
140 140 60 200 60 60 190 60 80 200 80 60 160 60 187.5 60 130 80 =495 115 Stud interval
EJ-3
EJ-4
170 280 500 700 550 560 500 610 550 560 500 610 550 440 500 495 550 550 495 500 440 550 495 500 440 550 495 500 440 260 500 690 20 1430
20 3x2220=6660 4x1985=7940 2000 900
33200
15860 550 EJ-3
500 15200 1150
60 380 60 8395 6805 600
470 250 5
C
470 255
L
Joint
168
17
1.0%
150
304
470
470
A 2.0% A
1.5%
NOTE
1. The Drawing shows a condition with 10-year creep and shrinkage
B B with reference temperature of 24 deg. The Contractor shall set the
expansion joints in a position by considering elastic shortening,
effect of 10-year creep and shrinkage and difference of setting
641
temperature from the reference temperature. The Contractor shall
submit the plan and method and means with analysis results for the
140 190 190 150 150 185 60 187.5 60 3x165 Engineer's Approval.
140 60 200 60 60 190 60 60 185 60 187.5 105 105 80 =495 115 Stud interval
280 500 700 500 610 500 610 500 610 500 610 500 490 500 495 550 550 495 500 490 500 495 500 490 500 495 500 210 490 500 690
170 20 8455 7405 20 530
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
EJ-2 C
L
65 110 45
220
10
12
575
575
1920
1900
750
750
575
150 720
12
10
80
EJ-1
Reinforcement 3x170 4x192.5 3x188.3 3x186.7 3x188.3 3x186.7 3x188.3 170 3x188.3 3x186.7 4x170 4x170 4x170 4x170 4x192.5 170
steel rod pitch 215 =510 430 =770 430 =565 430 =560 430 =565 430 =560 430 =565 430 430 =565 430 =560 430 =680 430 =680 430 =680 430 =680 430 =770 430 145
1200 33200
C
L
EJ-4
65 110 45
220
10
12
575
575
1900
1920
750
750
LOCATION
575
150 720
P11 P17
12
10
80
EJ-3
EJ-1
EJ-2
170 4x192.5 4x170 4x170 4x170 4x170 3x186.7 3x188.3 170 3x188.3 3x186.7 3x188.3 3x186.7 3x188.3 4x192.5 3x170 Reinforcement
EJ-3
EJ-4
145 430 =770 430 =680 430 =680 430 =680 430 =680 430 =560 430 =565 430 430 =565 430 =560 430 =565 430 =560 430 =565 430 =770 430 =510 215 steel rod pitch
33200 900
65 110 45
65 110 45
220
220
220
NOTE
1. The Drawing shows a condition with 10-year creep and shrinkage
with reference temperature of 24 deg. The Contractor shall set the
expansion joints in a position by considering elastic shortening,
effect of 10-year creep and shrinkage and difference of setting
15
15
15
temperature from the reference temperature. The Contractor shall
submit the plan and method and means with analysis results for the
Engineer's Approval.
1-Fill Pl 220 x 15 x 300 1-Fill Pl 220 x 15 x 250 1-Fill Pl 220 x 15 x 400
4-HTB M24 x 90 (F10T) 4-HTB M24 x 90 (F10T) 4-HTB M24 x 90 (F10T)
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80,20 DRAWING No. : C - 4 - 008
SHEET No. :
Sheet of PACKAGE:
Section C - C S=1/30 Section D - D S=1/30
EJ-1 3428 EJ-2 EJ-1 2118 EJ-2
EJ-3 742 1944 742 EJ-4 EJ-3 87 1944 87 EJ-4
12 1920 12 12 1920 12
Bearing(Frame)(Polyamide)
80 "a" 52 80 "a" 52
Middle Beam(SM490YB) <0~80> <0~80>
Edge Beam(SM400A) Rubber Packing(CR) Spring(Box)(NR+PTFE) Rubberfit Plate(Box)(SM400A) Rubberfit Plate(MB)(SM400A)
Support Beam(S355K2G3)
16 106
16 106
336 12 110
336 12 110
200
200
470
470
b b
500
500
535
535
550
550
320
320
a a
397
397
12
12
30
30
Connection Plate(SM400A)
16
16
15
15
Control Spring(NR)
Bearing(Box)(Polyamide) Shoe(Polyurethene Rubber) Welding Wire Net(SWM-P) Control Box(SM400A)
Spring(Frame)(NR+PTFE)
Support Box(SM400A)
10 10 10 10
80 575 575 220 80 575 575 220
12 1920 12 12 1920 12
1500 750 1500 1500 750 1500
200
Shoe(Polyurethene Rubber)
Support Box(SM400A)
290
Guide(SM400A)
Support Box(SM400A)
200
290
200
500
500
Control Box(SM400A)
Connection Plate(SM400A)
16 106
12 110
NJ02-D16(SD390) Stud(NSD400) 8
120 225 Casting concrete
115 56
57
R3
5
16 106
336 12 110
470
145
535
6
336
397
80
80
D25
D25
50 115
470
500
535
550
50 145
NJ03~06 D16 NJ07-D16(SD390)
397
350
Lower Flange(SM400A)
(SD390) 0
R2
500
60
12
12
30
60
50 80 50
16
16
15
150
Joint(SM400A)
180 12 50 80 50
NJ01-D16(SD390)
Filler Plate(SS400) 12 180
10 10 NOTE
HTB M22(F10T)
150 720 65110 45 1. The Drawing shows a condition with 10-year creep and shrinkage
with reference temperature of 24 deg. The Contractor shall set the
300 300
expansion joints in a position by considering elastic shortening,
80 575 575 220
effect of 10-year creep and shrinkage and difference of setting
158 12 1920 12 188 temperature from the reference temperature. The Contractor shall
1500 750 1500 submit the plan and method and means with analysis results for the
Engineer's Approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1/30,20 DRAWING No. : C - 4 - 009
SHEET No. :
Sheet of PACKAGE:
A-A S=1/80
900 33200
550 15860
600 6805 8395 60 380 60
Support box pitch 1035 1200 995 990 995 990 995 205 205 995 990 3x1110=3330 1200 1200 535
Control box pitch 1540 1190 1985 1985 705 1695 2260 1110 1110 1245 1035 TABLE OF INSTALLATION CLEARANCE
It is ventilation hole 50 (PER ONE CELL)
F C D E C
of the size of Ø25. L
EJ-2
80
70
60
600
"a"(mm)
50
29.1mm
(24℃)
40
2064
800
2355
30
20
80
1100
"a"
10
52
0
EJ-1 -10 0 10 20 30 40 50
F C D E Temperature( C)
200
Shifting amount by a change of
Control box pitch 20 1740 1985 1985 1695 700 1945 3x1110=3330 1245 1235 20 temperature per 1 °C (per one cell) = 0.781mm
33200
EJ-2 550 15860
1150 15200 500
600 6805 8395 60 380 60
470 250 5
C
L
Joint
168
17
470 255
1.0%
150
304
470
470
A 2.0% A
1.5%
LOCATION
45 75
B B
P11 P17
521
K.L
101
177 373 47 5
EJ-1
EJ-2
170 90 202.5 200 180 60 140 60 140
Stud interval 110 170 80 105 105 202.5 90 60 290 60 90 200 90 60 60 140 60 60 425 60 60 380 145
EJ-3
EJ-4
530 300 410 580 210 410 585 410 580 410 585 410 580 410 585 410 410 585 410 580 410 300 400 410 300 400 410 300 400 410 300 400 545 300 400 500 285
530 20 7405 8455 20 170
900 33200
EJ-1 550 15860
1150 15200 500
600 6805 8395 60 380 60
5
C
L
535 250
Joint
168
17
535 255
1.0%
150
265
304
18 535
535
A 2.0% A
15
1.5%
445
15
18
15
NOTES
18
24
K.L
effect of 10-year creep and shrinkage and difference of setting
706
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
33200 1200
15860 550
60 380 60 8395 6805 600
535 1200 1200 3x1110=3330 990 995 205 205 995 990 995 990 995 1200 1035 Support box pitch
1035 1245 1110 1110 2260 1695 705 1985 1985 1190 1540 Control box pitch
F 50 It is ventilation hole
C E D C
L of the size of Ø25.
EJ-4
600
2064
800
2355
80
1100
"a"
52
EJ-3
E D C F
200
20 1235 1245 3x1110=3330 1945 700 1695 1985 1985 1740 20 Control box pitch
33200
15860 550 EJ-4
500 15200 1150
60 380 60 8395 6805 600
470 250 5
C
470 255
Joint
17
168
1.0%
150
304
470
470
A 2.0% A
1.5%
LOCATION
P11 P17
45 75
B B
521
K.L
101
EJ-1
EJ-2
5 47 373 177
EJ-3
EJ-4
145 380 60 60 425 60 60 140 60 60 90 200 90 60 290 60 90 202.5 105 105 80 170 110 Stud interval
285 500 400 300 545 400 300 410 400 300 410 400 300 410 400 300 410 580 410 585 410 410 585 410 580 410 585 410 580 410 585 410 210 580 410 300 530
170 20 8455 7405 20 530
33200 1200
15860 550 EJ-3
500 15200 1150
60 380 60 8395 6805 600
535 250 5
C
18 535 255
L
Joint
17
18 535 168
1.0%
150
265
304
2.0%
18 535
A A
15
445
1.5%
15
15
24
NOTE
1. The Drawing shows a condition with 10-year creep and shrinkage
B B with reference temperature of 24 deg. The Contractor shall set the
30
30
K.L
effect of 10-year creep and shrinkage and difference of setting
706
5060 100 400 100 K.L
temperature from the reference temperature. The Contractor shall
50 350 50 submit the plan and method and means with analysis results for the
140 60 140 60 180 200 90 202 90 170 Engineer's Approval.
145 380 60 60 425 60 60 140 60 60 90 200 60 290 60 90 203 105 105 80 170 110 Stud interval
170 285 500 300 400 545 300 400 410 300 400 410 300 400 410 300 400 410 580 410 585 410 410 585 410 580 410 585 410 580 410 585 410 580 210 410 300 530 20 1730
20 3x2220=6660 4x1985=7940 2000 1200
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
900 33200
Reinforcement
steel rod pitch 185 4x180 300 5x180 300 4x173.8 300 4x172.5 300 4x173.8 300 4x172.5 300 4x173.8 300 300 4x173.8 300 4x172.5 300 5x162 300 5x162 300 5x162 300 5x180 300 5x180 300 155
=720 =900 =695 =690 =695 =690 =695 110 =695 =690 =810 =810 =810 =900 =900 230
EJ-2
150
80
10
12
755
610
2040
2020
800
800
610
610
45 110 65
12
220
10
EJ-1 C
L LOCATION
27×52 Long Hole
100 100 100 50 150 50 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 100 100
(Expansion side) P11 P17
300 250 400 400 400 400 400 400 300
900 550 1450 4x1985=7940 3x2220=6660
EJ-1
EJ-2
33200 1200
Reinforcement
EJ-3
EJ-4
155 300 5x180 300 5x180 300 5x162 300 5x162 300 5x162 300 4x172.5 300 4x173.8 300 300 4x173.8 300 4x172.5 300 300 4x172.5 300 4x173.8 300 5x180 300 4x180 185 steel rod pitch
230 =900 =900 =810 =810 =810 =690 =695 110 =695 =690 =695 =690 =695 =900 =720
EJ-4
150
80
10
12
755
610
2020
2040
800
800
610
610
45 110 65
12
220
10
C
L
EJ-3
100 100 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 100 200 100 50 150 50 100 100 100 27×52 Long Hole
(Expansion side)
300 400 400 400 400 400 400 250 300
3x2220=6660 4x1985=7940 1450 550 1200
45 110 65
45 110 65
NOTE
220
220
220
1. The Drawing shows a condition with 10-year creep and shrinkage
with reference temperature of 24 deg. The Contractor shall set the
45
15
15
submit the plan and method and means with analysis results for the
Engineer's Approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 80,20 DRAWING No. : C - 4 - 012
SHEET No. :
Sheet of PACKAGE:
Section C - C S=1/30 Section D - D S=1/30
EJ-1 3628 EJ-2 EJ-1 2238 EJ-2
742 2064 822 87 2064 87
12 2040 12 12 2040 12
Bearing(Frame)(Polyamide)
80 "a" 52 80 "a" 52
Middle Beam(SM490YB) <0~80> <0~80>
Edge Beam(SM400A) Rubber Packing(CR) Spring(Box)(NR+PTFE) Rubberfit Plate(Box)(SM400A) Rubberfit Plate(MB)(SM400A)
Support Beam(S355K2G3)
397 16 106
16 106
336 12 110
336 12 110
200
200
470
470
b b
500
500
535
535
550
550
320
320
a a
397
12
12
30
30
Connection Plate(SM400A)
16
16
15
15
Control Box(SM400A) Control Spring(NR)
Welding Wire Net(SWM-P)
Shoe(Polyurethene Rubber)
Bearing(Box)(Polyamide)
Spring(Frame)(NR+PTFE)
10 10 10 10
220 610 610 80 220 610 610 80
12 2040 12 12 2040 12
1500 800 1600 1500 800 1600
200
Shoe(Polyurethene Rubber)
220
Guide(SM400A)
200
Support Box(SM400A)
220
Support Box(SM400A)
200
205
205
Control Box(SM400A)
Connection Plate(SM400A)
16 106
12 110
Stud(NSD400) NJ10-D16(SD390) 8
Casting concrete 225 120
57
115 56
5
R3
470
397 16 106
336 12 110
145
535
6
336
397
80
80
D25
D25
50 115
470
500
535
550
50 145
NJ08-D16(SD390) NJ11~14 D16
350
Lower Flange(SM400A) R2
(SD390) 0
500
12
60
12
30
60
50 80 50
16
16
15
150
50 80 50 12 180
Joint(SM400A)
NJ09-D16(SD390) 180
Filler Plate(SS400) 12
NOTE
10 10
HTB M22(F10T)
755 150 1. The Drawing shows a condition with 10-year creep and shrinkage
45 110 65
with reference temperature of 24 deg. The Contractor shall set the
300 300
expansion joints in a position by considering elastic shortening,
220 610 610 80 effect of 10-year creep and shrinkage and difference of setting
188 12 2040 12 158 temperature from the reference temperature. The Contractor shall
1500 800 1600 submit the plan and method and means with analysis results for the
Engineer's Approval.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
..\..\00 SIGN\Tokuhashi.tif ..\..\00 SIGN\DATE.tif
Rev. No.1
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1/30,20 DRAWING No. : C - 4 - 013
SHEET No. :
Sheet of PACKAGE:
SECTION A-A DETAIL "a"
SECTION B-B A B (Scale 1/20) (Scale 1/20)
8 1 8
250 1 1a 1a
37.5
75
7
225
237.5
150
2 100 7 100
50 2 2a 5b 2a
100
9
5 300 8b 1b
9 6b 2b
125 125 5
480
6
380
125
1100
1100
1100
6
3 300 3 10
875
3a
10
100
3b
175
4 11
125
295
11 9b
170
170
7b 4a 4b
1.5%
11.25
4
150
230
Ø225 Ø225
Deck slab
B No
SHOULDER REILING (TYPE 1)
Description Remarks
NOTES:
Center Line of
Center Line of
P11 1- All dimension are in millimeter.
Girder End
Girder End
Floorbeam
Floorbeam
( P17 ) 2- The railing shall satisfy the requirements for the level "L3"
stipulated in Article 13.7.2 of the specification for bridge 22TCN-272-05.
3- Refer to the Technical Specification for the surface finish.
4- The post for the railing shall be spaced typically at every 2 m.
The Contractor shall submit the plan and calculation sheets for the
arrangement of the posts and their anchor and horizontal beams at
the ends with Approach Bridges for the Engineer's approval.
5- Additional post for shoulder railing shall be fabricated and installed
inside expansion joints at Approach Bridge side as shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
T. Takada
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura
SHOWN IN
SCALE: DRAWING DRAWING No. : C - 4 - 014
SHEET No. :
Sheet of PACKAGE:
SECTION A-A DETAIL "a"
SECTION B-B B (Scale 1/20) (Scale 1/20)
(Scale 1/20)
300 300
1a 1 1b
1
100
200 4
350
4
200
2 5
2a 2
750
750
750
100
1000
250 2b
100
300
100
250
3 3
100
230
250
250
Ø225 Ø225
250 250
500
B
MEDIAN REILING
No Description Remarks
A 1 200 x 200 x t8
2 100 x 50 x t3.2 STKR 400 (JIS G3466)
3 100 x 100 x t12
1a 184 x 184 x t10
2a 93.6 x 43.6 x t4 SS 400 (JIS G3101)
Other incidentals
4 M20 x 50 JIS B1051
5 M16 x 40 (Strength class 8.8)
)
1.0
75
( 2+
1+
25
1 .0 MEDIAN RAILING ARRANGEMENT
150(200) 600 (Scale 1/50)
500(600) 750(800) 1100 1000 1300 746x2000=1492000
800(850) 750(800) 800(850)
Detail "a"
1b
2b
NOTES:
Center Line of
Center Line of
P11 1- All dimension are in millimeter.
Girder End
Girder End
Floorbeam
Floorbeam
( P17 ) 2- The railing shall satisfy the requirements for the level "L3"
stipulated in Article 13.7.2 of the specification for bridge 22TCN-272-05.
3- Refer to the Technical Specification for the surface finish.
4- The post for the railing shall be spaced typically at every 2 m.
The Contractor shall submit the plan and calculation sheets for the
arrangement of the posts and their anchor and horizontal beams at
the ends with Approach Bridges for the Engineer's approval.
5- Additional post for shoulder railing shall be fabricated and installed
inside expansion joints at Approach Bridge side as shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
R.Tokuhashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.1
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
400 1200
S1
1200
WEG
750
15200
35600
32400
33200
500
L
C
15200
1200 400
750
1200
EEG
1500 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
4500 4500 33 x 4000 = 132000 12000 72 x 4000 = 288000 =120000
Slab Drain Pipe
Catch Pit 2400 9000 61 x 12000 = 732000
1500000
300000 300000
Cable 10 x 12000 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10 x 12000
= 120000 75 x 4000 = 300000 75 x 4000 = 300000 = 120000
Floorbeam
Spiral mesh drain pipe
FB100
FB101
FB102
FB103
FB104
FB105
FB106
FB107
FB108
FB109
FB110
FB111
FB112
FB113
FB114
FB115
FB116
FB117
FB118
FB119
FB120
FB121
FB122
FB123
FB124
FB125
FB126
FB127
FB128
FB129
FB130
FB131
FB132
FB133
FB134
FB135
FB136
FB137
FB138
FB139
FB140
FB141
FB142
FB143
FB144
FB145
FB146
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB80
FB81
FB82
FB83
FB84
FB85
FB86
FB87
FB88
FB89
FB90
FB91
FB92
FB93
FB94
FB95
FB96
FB97
FB98
FB99
400 1200
1200
WEG
750
15200
35600
32400
33200
500
L
C
15200
1200 400
750
1200
EEG
J-25 J-26 J-27 J-28 J-29 J-30 J-31 J-32 J-33 J-34 J-35 J-36 J-37 J-38 J-39 J-40 J-41 J-42 J-43 J-44 J-45 J-46 J-47 J-48 J-49 J-50 J-51 J-52 J-53 J-54
Joint 10x12000=120000 6000 10 x 12000 = 120000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000=120000
Slab Drain Pipe 72 x 4000 = 288000 12000 72 x 4000 = 288000
Catch Pit 61 x 12000 = 732000
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
1500000
300000 300000
Cable 10 x 12000 12000 10 x 12000 = 120000 24000 24000 10 x 12000 = 120000 12000 10 x 12000
= 120000 75 x 4000 = 300000 75 x 4000 = 300000 = 120000
Floorbeam
Spiral mesh drain pipe
FB147
FB148
FB149
FB150
FB151
FB152
FB153
FB154
FB155
FB156
FB157
FB158
FB159
FB160
FB161
FB162
FB163
FB164
FB165
FB166
FB167
FB168
FB169
FB170
FB171
FB172
FB173
FB174
FB175
FB176
FB177
FB178
FB179
FB180
FB181
FB182
FB183
FB184
FB185
FB186
FB187
FB188
FB187
FB186
FB185
FB184
FB183
FB182
FB181
FB180
FB179
FB178
FB177
FB176
FB175
FB174
FB173
FB172
FB171
FB170
FB169
FB168
FB167
FB166
FB165
FB164
FB163
FB162
FB161
FB160
FB159
FB158
FB157
FB156
FB155
FB154
FB153
FB152
FB151
FB150
FB149
FB148
FB147
400 1200
1200
WEG
750
15200
35600
32400
33200
500
L
C
15200
1200 400
750
1200
EEG
J-51 J-52 J-53 J-54 J-55 J-56 J-57 J-58 J-59 J-60 J-61 J-62 J-63 J-64 J-65 J-65 J-64 J-63 J-62 J-61 J-60 J-59 J-58 J-57 J-56 J-55 J-54 J-53 J-52 J-51
Joint 10x12000=120000 6000 10 x 12000 = 120000 12000 10000 5000 5000 10000 12000 10 x 12000 = 120000 6000 10x12000=120000
Slab Drain Pipe 72 x 4000 = 288000 12000 72 x 4000 = 288000
Catch Pit 61 x 12000 = 732000 6000 6000 61 x 12000 = 732000
W3
E3
E2
400 400
W1
W4
E1
E4
PH PH
97 303 303 97
As Pave. t=75mm
Waterproofing
260
250
150
2% 2%
2700
1250
2000
3000
R=364013
WEG EEG
1247 1247
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
46 20
100 214
370 20
495 20
390
515
550
185
500
500
B1
600
500
B1
00
R6
1183.2
1800
1800
2515
1675
3000
3092
2875
00
2967
R6
Tie down
B1 B1 cable
1216.8
700
700
700
300
EEG
100
100
100
EEG EEG WEG
WEG WEG
1225 1200
1247 1200 1247 1200
1-PIPE 25A x 123 (SGPW) (per1 place)
450
1-VP 200A x 3092 (per1 place) 1-Bent pipe (VP) (per1 place) 550 1150
10
2%
10
467
467
Pavement
0
0
60
60
591.6
591.6
R
Waterproof Membrane
Deck
591.6
591.6
2967
2967
0
0
60
60
R
Longitudinal direction
1316.8
1316.8
A-A A-A
Pavement
1000 1000
1-VP 200A x 3468 (per1 place) 1-VP 200A x 3468 (per1 place) Expansion joint etc Waterproof Membrane
Deck
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
27
1:5 Ø30x60 drain hole .2
55 20
Ø
15 90 19 33
Cap t=6 (SM400) Ø
60
85
(Galvanizing)
35
180
Ø100
100
165
450(575)
6
6
200 Weld
1000
6
Ø10 bolt for chain
21
10
Ø
300 installation 4-M10 tap bolt holes
46
200
(SUS304) Steel pipe Ø25x215
6
(ND SGPW)
40
40
10 Ø174 10 10 Ø174 10
215
6
Ø41.5
Ø194 Ø194
455
8
400 6 71.5 3x100 71.5 6
=300 M12 bolt (SUS304) 1247
50 25
25 50 25
355
100
100
500
Crossbar 8x8
25
25
PL 55x35 Bearing bar 7x4x55 15 15 SLAB DRAIN PIPE INSTALLATION S=1/20
70
25 30 228 30 25
55
70 30 29.5
R1
75
20
4-B.N M16 x 45 (1-W,SW) (SS400)
TAP BOLT M12 Bolt BOLT FOR CHAIN
Deck thick
S=1/4 S=1/4 4-B.N M16 x 50 (2W) (SS400) Slab reinforcing bar
(SUS304) INSTALLATION S=1/4 Steel pipe Deck slab
(SUS304)
21.9
M10
M12
Ø16
7 30 (ND SGPW)
M8
per 1 places
Mark Item name Material quantity Mass (Kg) Remarks column
2
1 Main body FC250 1 66.2 (71.9) Painting area:0.7 (0.8) m
2 Grating SS400 1 13.7 Galvanizing
3 M12 bolt SUS304 4 0.1
4 Chain SS400 1 0.1 Galvanizing
5 Ø10 Bolt for chain installation SUS304 1 0.1
6 Tap bolt SS400 4 0.096 Galvanizing
1 grouping total 80.3 (86.0) kg
( ) is catch pit at near end of girder
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
50
200
50 00
B C D
1
680 612 612 617 580 580 37 1200 200 500
Detail "2"
A
6
200
2.0 %
128 60
60 120 80
60 120 80
260
260
6
156
Wedge Anchors M16
1150
Detail "1" FB 75 x 6
8x150=1200
6
156
1500
1566
B 2
87
72
350
152
1 - L 90 x 90 x 10
50 128
A
1 - CT 95 x 152 x 8
6
B C D 95
2000 2000
4000
1 - PL 3990 x 6 x 1568
1 - PL 3990 x 6 x 214
5 - FB 75 x 6 x 1346
1 - FB 75 x 6 x 604
2 - L 90 x 90 x 10 x 1655
2 - PL 223 x 6 x 140
DETAIL "1" S=1/10 CUP HEAD BOLT DETAIL S=1/5
1 - PL 3990 x 6 x 280 2 - FB 75 x 6 x 574 2 - PL 110 x 6 x 140
1 - CT 95 x 152 x 8 x 1568 1 - FB 75 x 6 x 579 2 - PL 237 x 6 x 210
1 - CT 95 x 152 x 8 x 178 1 - FB 75 x 6 x 529 8 - BN M16 x 35 (Anti-loosen Nuts) 35 6 35
1 - L 90 x 90 x 10 x 1568 1 - FB 75 x 6 x 504
1 - L 90 x 90 x 10 x 178 4 - BN M16 x 35 (Anti-loosen Nuts)
M16
2 - L 90 x 90 x 10 x 1904 85 - BN M16 x 35 (Cup Head Bolt)
2 - L 90 x 90 x 10 x 1814 8 - W.ANC M16 x 125
10
75
6
32Ø 9 35
45°
700
700
200 500
200 500
Silicone Seal
1 - L 90 x 90 x 10
1150
80
210
1500
1500
25
FB 75 x 6 1 - L 90 x 90 x 10
45
42
NOTES:
1 ) Examine details separately about the joint with web of edge girder at cable anchorage
2 ) Refer to LAYOUT OF PRECAST DECK PANEL for arrangement of fairing panel
237 3 ) Nut shall be filet welded to plate. (3 filet-weldings per 1 nut)
350
1 - L 90 x 90 x 10
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
=120000
1.0
25 0)
1 + 7 5 1.
PLAN S=1/1000
( 2+ 1500000
600 900 148500 300000
Floorbeam 3700 35 x 4000 = 140000 3400 3400 73 x 4000 = 292000
Transverse Inspection Way Rack for Electric Cables Longitudinal Inspection Way Ladder Longitudinal Inspection Way Transverse Inspection Way
(Ladder)
FB10
FB11
FB12
FB13
FB14
FB15
FB16
FB17
FB18
FB19
FB20
FB21
FB22
FB23
FB24
FB25
FB26
FB27
FB28
FB29
FB30
FB31
FB32
FB33
FB34
FB35
FB36
FB37
FB38
FB39
FB40
FB41
FB42
FB43
FB44
FB45
FB46
FB47
FB48
FB49
FB50
FB51
FB52
FB53
FB54
FB55
FB56
FB57
FB58
FB59
FB60
FB61
FB62
FB63
FB64
FB65
FB66
FB67
FB68
FB69
FB70
FB71
FB72
FB73
FB74
FB75
FB76
FB77
FB78
FB79
FB2
FB3
FB4
FB5
FB6
FB7
FB8
FB9
1200
S1
W1
1200
W2
1150
WEG
3000
W3
(Ladder)
15200
13600
(Man Hole)
1600 1200
35600
33200
33200
W4
500
L
C
E4
13600
15200
Man Hole
Ladder
3000
E3
1150
1200
EEG
E2
1200
E1 J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 J-19 J-20 J-21 J-22 J-23 J-24 J-25 J-26 J-27 J-28
Joint 8400 6000 9 x 12000 = 108000 12000 10000 10000 10000 12000 10 x 12000 = 120000 6000 10x12000
Ladder Rack for Fiber Optic Cables =120000
W3
E3
E2
W1
W4
E1
E4
PH PH 1500000
As Pave. t=75mm 150000 300000 300000 300000 300000 150000
Waterproofing
260
2% 2%
2700
1800
1901
1800
1250
2000
3000
NOTES:
1) Because electric platform of substation is set up between FB185 and FB186,
Rack for Electric Cables Longitudinal Inspection Way Man Hole Rack for Fiber Optic Cables longitudinal inspection way on west side is not set up.
WEG EEG 2) Inspection access ladder of P11 or P17 is set up respectively only in one side.
3000 13600 13600 3000
3280 4x3330=13320 4x3330=13320 3280 All dimensions are in mm, unless otherwise shown.
800 33200 800
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
2052
20.5
2052
2052
1+251.0
"1" 4900 A
1050 2500 1350
+27.200 600 4500 35x4000=14000
150 900
10001500
1500
C C 550
Access Door
1000
Transverse Inspection Way Longitudinal Inspection Way
1700 352
Tie-Down Cable PC BOX
2052
800 3000 8300 2900 800 800 3000 8300 3000 800
15900 3000 3000 15900
B
SECTION AT P11 S=1/300 C M M C
Rack
A
Transverse Inspection Way
1170 415 Ladder
4500
Man Hole
550
1100 1350
1600
P12
100
4900
1+251.0
P10
1552
352
"1" Super T
500 1200
2052
1700
+27.200
1500
1500
C C Rack
+27.200
C M M C
2500
500 500
Tie-Down Cable
800 3000 8000 3000 8200 3000 8000 3000 800
37800
Tie-Down Cable 575 3000 575
B
SECTION AT P17 S=1/300
1000 3000 A
Rack for Electric Cables CL Rack for Fiber Optic Cables
End Floorbeam
2+751.0
Ladder
P18
2+751.0
4150
13501500
100
P16
1600
4500
550
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
H. Ikeda DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
WEG C EEG
L
600
1200 Pylon Crossbeam Access Ladder 600
1901
1800
1800
4900
Handrail
Access Hatch
800 500
Level
3200
4500
4500
Pylon Crossbeam Access Hatch
Inside Access Ladder
500
800
Access Hatch
Pylon Floorbeam
Access Hatch
4400
6000
800
800
Ladder
800
500
34 x 1100 = 37400
Handrail
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
1901 166
Man Hole
1716 166
1800
1800
1615
2700
1615
100 1700
100 1700
1001515
2000
3015
1001515
2515
3000
2815
1922.3
633
1922.3
1133
Rack for Electric Cables
WEG Detail "c" Rack for Fiber Optic Cables EEG
Rack for Electric Cables Rack for Fiber Optic Cables
WEG 6449 20 6449 6449 20 6449 EEG
1901 166
Man Hole 1716 166
1800
1800
1615
2700
1615
1015
600 1015
100 1700
100 1700
2000
3015
2515
3000
2815
1922.3
633
1922.3
1122
600
Rack for Electric Cables
WEG Rack for Fiber Optic Cables EEG
WEG 6449 20 6449 6449 20 6449 EEG 6449 20 6449 6449 20 6449
3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5 3224.5 3234.5 3234.5 3224.5
582 50 12918 50 582 50 12918 582 582 50 12918 50 582 50 12918 50 582
3000 13600 13600 50 3000 3000 13600 13600 3000
1015
1615
1615
Man Hole
600 600
1515
900
1901
600
900
900
300
100
300
300
1922.3
1922.3
270
322.5
350
322.5
150 150
Rack for Electric Cables
650
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
R
20
0
4
Longitudinal Inspection Way Ø3
300
300
10 284
2
30 30
650
6
60
65 606 65 65
Ring
1100
1100
20
500 35 30 (Horizontal Brace)
1250
C
300
75
42.7Ø
C
56
20
100
150
375
Support Fittings
21.7Ø
(Slab)
34
1200
Ring
RACK DETAIL
4 x 600 = 2400
S=1/20
2700
(Vertical Brace)
1258.2
1100
375
For Electric and Fiber Optic Cables Support Fittings
(Edge Girder)
21.7Ø
550
34
4500
STEP 12 x 300 = 3600
160 10 370 10
350 130 10 350 10
Ch.PL t=3.2 50x3.2
FB 90x9
1200
100
25 100 25
10 50
150
103.2
90
23.7
1010
10
18Ø 760
L 90 x 90 x 10 6
50 50 25 135 25 Roofing board
1200
6 6 582 6 6 185
60 60
6 3.2
1450
6
1150
1024.7
END DETAIL S=1/20 ELEVATION S=1/60
100
20 542 20
15 512 15 4000
200 3600 200
200 1600 1600 200
Ø21.7 Ø21.7 Ø42.7
375
2 - FB 50 x 6 x 192
10 75
25
6 - U.BOLT 32C
103.2
19x40
All dimensions are in mm, unless otherwise shown.
140 282 140
10 562 10
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
6 300 500
100 (800) 50 400 50
50
50
200
105 105
90
1800<1901>
Inspection Man Hole
Handrail
900
600(1100)
1615
400
105 105
500
90
100 50 400 50
100 100 65
2628
Step
50
50
900
160 50
160 50
300
90
90
350
350
12x300=3600
12x300=3600
3700
3700
105 105
2x300=600
2x300=600
90
150
6x300=1800
6x300=1800
1900
1900
150 90
150 90
C
342
342
C
600
1700
800 800
1600 B B
2 - L 50 x 50 x 6 x 3700 2 - L 50 x 50 x 6 x 1900
50
50
6 - FB 90 x 6 x 118 4 - L 50 x 50 x 6 x 1269
1 - FB 90 x 6 x 150 12 - FB 90 x 6 x 83
7 - RB Ø22 x 430
12 - RB Ø22 x 430
50
50
4 - RB Ø16 x 557
1 - RB Ø22 x 780(1380) 900
34Ø
6 17
100 600 100 50 400 50
Access Door
400
100
375
375
800
90 50
50
400
200
105 105
21.7Ø
50
1100
1100
1100
1068
375
375
Access Hatch Ø12 Hole
6x300=1800
6x300=1800
21.7Ø
Access Hatch
2214
2214
2014
350
350
9
150
1100 1100 200
364
364
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
.2
3 0 82
3000
3000
.5
2 0 16
4 0 00
R1
4 2 00
R2
4 5 00
R3
6.5
3 0 61
29800
29800
4 7 00
R4
5 0 00
R5
3 0 00
R6
3 2 00
R7
3000
3000
1632.2
1632.2
"B" "B"
1454.5
1454.5
S1
S2
1750
1750
80500
80500
S3
77500
S4
5x2500=12500
5x2500=12500
S5
S6
S7
1500
S8
L1
"A" "A"
S9
S10
7x3000=21000
7x3000=21000
S11
S12
S13
PH PH = Z1 S14
2.0 % 2.0 %
2000
S15 2000
Z1 Z2 L1 L2 L3
P12 +32.310 +1.330 109310 28810 13000
P13 +33.810 +0.180 110810 30310 12597
P14 +34.560 +11.140 111560 31060 12396
6000
P15 +33.810 -1.200 110810 30310 12597
P16 +32.310 +10.580 109310 28810 13000
MNTK:+13.67
L2
L2
L3
MNNN:+2.33
AT : Z2
0.0
-3.0
A 8200 All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
745
1121
1150 1150 Plan7-7
376
Plan6-6
800
Column-D32 550 1210 750
1100
40 C250 x 90 150 2844 50
6041
3800
6099
C250 x 90 UP
1100
10x250=2500
C250 x 90 150 Handrail-D32
2500
2500
C250 x 90
800
1500
40
376
1121
6 6
745
Handrail-D32
C250 x 90
10x250=2500
BR1 BR2 "C" C250 x 90
150
2500
2500
C250 x 90
7 7 Plan8-8
700
C250 x 90
10x250=2500
C250 x 90 150 Plan7-7
"D"
2500
2500
800
C250 x 90
1500
40
UP
1600
8 8 C250 x 90
4300
Handrail-D32
6200
6259
C250 x 90 Handrail-D32 C250 x 90
12x250=3000
150 2918 50
1100
3000
3000
150 C250 x 90 650 1210 750
2000
800
Column-D32
40
455
1175 1175
9 9
1200
2350
745
C250 x 90 C250 x 90
12x250=3000
3000
3000
C250 x 90 150
2000
SECTIONS 8-8 AND 9-9 S=1/100
CL of 8-8 CL of 9-9
40
2300
Plan9-9
800 35 745
780
1150 1150
Plan8-8
C250 x 90 Handrail-D32 C250 x 90
12x250=3000
3000
3000
150 C250 x 90
750 1210 550
1600
2000 150 2837 50
Column-D32
40
4800
6360
6418
UP
1600
C250 x 90 C250 x 90
Handrail-D32
745 35 800
All dimensions are in mm, unless otherwise shown.
780
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
917
1430
Plan1-1
513
Ladder Type-1 Plan2-2
800 50 800
"E"
1650
1 7 32 10 0
46 6
5360
5415
60 0 Column-D32
46 6
10 0 4
1050 1050
1363
2100
50 0 Ladder Type-2
80 0
4 50 0 C250 x 90 150 2389 50
2280
Ladder Type-3
200
BR3
917
SECTIONS 2-2 AND 3-3 S=1/100
CL of 2-2 CL of 3-3
2400
746
1200 1200
1476
Ladder Type-2 Plan2-2
731
Plan3-3
800
450
5453
5508
Ladder Type-1 800 1160 650
3150
1632
1100
150 2941 50
UP
1 1
746 81 800
1455
1455
826
Handrail-D32
150
2 2
7x250=1750
1750
1750
C250 x 90
Column-D32 C250 x 90
850
2500
C250 x 90
C250 x 90 5700
100
100
C250 x 90
666
Handrail-D32
1332
1532
1800
600
666
Ladder Type-3
100
100
All dimensions are in mm, unless otherwise shown.
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
L8
02 01
L2 L1 L3 L9 L9
<2xL4=L3>
30 740 30
35 670 35
450
450
1070
1070
handrail, D32
620
620
Grating
FB 32 x 3 x 670
250 32
"F"
C250 transverse bar, steel shape transverse bar, steel shape
150 x 9 x 782 150 x 9
10 75
S12 1210 700 900 - 668 868 - 2600 1300 1268
25
S13 1210 700 1000 - 668 968 - 2700 1350 1318 L-75x75x6
40 60 40
S14 1210 700 1100 - 668 1068 - 2800 1400 1368 90 620 90
140
S15 1210 550 1900 950 518 1868 918 2750 1375 1343
9 782 9
81
10 40 40
30
90
75
250
225
8
6.4mm checkered tread
25
10 80
90
50
30 30
10 60
9 432 9
450
19x40 Slotted Hole
200 380 200
2-PL 140 x 9 x 90
175 10 780 10
4-BN M16 x 45(2-W)
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
02 01 R1,R5-7 R3,R4
1332 1332 1332
30 1440 30
666 666 266 800 266 666 666
35 1370 35
450
450
1070
1070
620
620
620
Grating
FB 32 x 3 x 1370
250 32
C250
transverse bar, steel shape transverse bar, steel shape transverse bar, steel shape
150 x 9 150 x 9 150 x 9
550 950
transverse bar, steel shape transverse bar, steel shape supported beam, C250 supported beam, C250 supported beam, C250
150 x 9 x 541 150 x 9 x 932 variable length variable length variable length
02 01 3-D32 x 1086 4-D32 x 1086 3-D32 x 1086
4-D32 x 634 1-D32 x 768 4-D32 x 634
4-D32 x 234
50
120
50
50
120
117
50
120
116
8
8 8
12 0
170
350
8
170
8
170
50
50
50
17 0
351
339
360
350
230
200
200
200
200
36 0
234
223
240
230
150
150
150
130
24 0
140
130
14 0
9
10
100 70
840 37 188
20 800 20
25 750 25
25 1450 25
75 3x200=600 75
130
40 40
117
380
37 80
13
34
80 100
13
230
207
214
10 170
40 40
40 40
80
10
380 1130
75 3x200=600 75
25 750 25
20 800 20
840
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
50
125
300
20 0
10 0
3x300=900
Anchor Box Flange
1300
1175
FB 64 x 10
55 0
1 2 00
FB 64 x 10
Rung D19@300mm
Ring
(Horizontal Brace)
100 Rung D19@300mm
60 0
490
1 2 00
490 Ring
(Vertical Brace)
0 0
0
0 , 61
60 0
12 0
20 0
08 3
00 = 4
00 , 1
1 4 x3
4 5 00
0
L=12
1 2 00
FB 64 x 10
90 0
Rung D19@300mm
490
1 2 00
85 0
126 10 0
60 0
LADDER TYPE-4 S=1/50 DETAIL "a" S=1/10 FIXTURE DETAIL S=1/20 RING S=1/20
160
100 470 100 200 (250) 470
110 18 32 32
40 60 60 40 64
54 10
10 25 50 25 10
32 32
32 32
64
10
125 450 125
375
200 (250)
123 300 100
273 250
10 158 32 32
(208) 0
523
10 75
Ø
17 7
TYP.
222
20 0 (272)
172 10
62 7
10 450 10 166
0
= 2 10
(666) 64
64
60 0
FB 64 x 10
9 x 30
2 3 77
64
490
166 (666)
90 0
Rung D19@300mm
24(524)
110 32 32
10 0
10 25 25 10
50
25 0
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
584 ventilation
10
342 545
147 522
500
225
325
475
Obstacle Light
600
700
1 1
500
Rein. Stiffener
400
10x20x420
20
L25x5 EA
Manhole
(Outward-opening
steel hatch) Handle
450
400
1600
inside outside
1000
400
handle
100 100
20
150
Rein. Stiffener
Stair 10x20x420
450
400
2723 2920 438
Steel Shape
L50x50x5
steel plate
10x80x1400
10 55 90 20
275
ELEVATION S=1/50
175 175
175
15 0
2 Steel Shape
1 8 00
L50x50x5
300 300
90 0 503 166
600
60 0
1 621
1091 1601
145 800 146
SECTION 1 - 1 S=1/20
200
250 250
600 - opening
500
5 590 5
inside
69
100
Shape Steel
Anchor Bar - D10 Anchor bar - D10
L50x50x5
40
123 300
120
75
17 7
518
15x50x1400 10x80x1400
Supported Beam
64x10
outside
Chamfer 50x50
0 2 10
30 0=
60 0
10 0 Access Door
7x
70 0
10 0
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
K. Itabashi DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
166
375
888
600
600
1100
375
600
"a"
1679.7
1811
1912
350
2700
900
129.5
900
per place (6 places)
290
1 - PIPE Ø42.7 x 2.3 x 1200 (STK400)
131.3
311
2 - PIPE Ø21.7 x 1.9 x 1200 (STK400)
367.9
2 - L 65 x 65 x 6 x 1285 (SS400)
B B 1 - PL 90 x 3.2 x 1200 (SS400)
622
2 - PL 215 x 12 x 185 (SM400A)
8 - BN M16 x 45 (2-W) (SS400)
8 - BN M10 x 35 (2-W) (SS400)
1 2 2 2 - U.BOLT ND 32C (SS400)
R = 364013 2 2 2 2 2 4 - U.BOLT ND 15C (SS400)
7221 6941
406 5x1363=6815 20 5x1306=6529 412
WEG 616 660 3x1985=5955 2220 2220 1895 616 DETAIL "a" S=1/30
2709 14182 16309
300
100
SECTION B - B
30 60
90
1 2 2 2 2 2 2 2 C
FB186
180
12 3.2
4x300=1200
1200
D D
20
C
per panel (3 panels) per panel (3 panels)
4x300=1200
1 - Ch.PL 1160 x 4.5 x 7176 (SS400) 1 - Ch.PL 1160 x 4.5 x 6896 (SS400)
2 - CH 125 x 65 x 6 x 8 x 7221 (SS400) 2 - CH 125 x 65 x 6 x 8 x 6941 (SS400)
4000
3640
1200
1 - CH 125 x 65 x 6 x 8 x 1200 (SS400) 1 - CH 125 x 65 x 6 x 8 x 1200 (SS400)
5 - CH 125 x 65 x 6 x 8 x 1188 (SS400) 5 - CH 125 x 65 x 6 x 8 x 1188 (SS400)
1 - L 125 x 75 x 10 x 1188 (SS400) 1 - L 125 x 75 x 10 x 1188 (SS400)
4 - FB 90 x 12 x 1357 (SS400) 4 - FB 90 x 12 x 1300 (SS400)
20
1 - FB 90 x 12 x 1337 (SS400) 1 - FB 90 x 12 x 1286 (SS400)
3 - FB 90 x 12 x 400 (SS400) 3 - FB 90 x 12 x 400 (SS400)
1 - PL 60 x 8 x 1180 (SM400A) 1 - PL 60 x 8 x 1180 (SM400A)
4x300=1200
4 - PL 160 x 8 x 1180 (SM400A) 3 - PL 160 x 8 x 1180 (SM400A)
1200
180
FB185
7221 6941
406 5x1363=6815 20 5x1306=6529 412
616 660 3x1985=5955 2220 2220 1895 616
14182
2 per place
1 - H 200 x 200 x 8 x 12 x 3666 (SS400)
(175)
200
200
(175)
50 100 50
9 10
(175)
200
(37.5)
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
166
2.0 % 2.0 %
888
50
50
600
600
600
1912
1811
1679.7
2700
900
1800
1800
900
1300
1300
A A
131.3
290
367.9
311
622
R = 364013
Electric Platform
836 800 200 800 200 800 1065 2000 1330 2000 1030 800 2030 291
WEG 7221 20 6941
2709 14182 16309
SECTION A - A
14182
7221 20 6941
Electric Platform
FB186
180
1020
1020
1200
1370
1420
20
500 500
700
600
4000
3640
3640
1200
1800
1800
200
100
20
700
600
600
1200
Exhaust Fan Exhaust Fan
820
820
820
770
180
FB185
836 800 200 800 200 800 1065 1000 1000 530 800 1000 1000 1030 800 2321
786 900 100 900 100 900 1015 2000 1330 2000 980 900 2271
CONSULTANTs TITLE NAME SIGNATURE DATE SOCIALIST REPUBLIC OF VIET NAM NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Takada DRAWING TITLE:
CHODAI CO., LTD AND NIPPON ENGINEERING CO., LTD
Rev. No.
K. Itabashi
in association with
H. Ohashi
TRANSPORT ENGINEERING DESIGN INCORPORATED Y. Kajimura SCALE: 1 / 60 DRAWING No. : C - 4 - 035
SHEET No. :
Sheet of PACKAGE:
1.0 .0
25 75
1
1+ 2+
1500000
150000 150000 150000 150000 150000 150000 150000 150000 150000 150000 To DONG ANH
Upstream
Upstream
150000 110000 40000 40000 110000 300000 300000 110000 40000 40000 110000 150000
Downstream
Downstream
P11 P12 P13 P14 P15 P16 P17
Detail "A" Detail "B" Detail "C" Detail "D" Detail "E" Detail "F"
scale 1:50 scale 1:50 scale 1:50 scale 1:100 scale 1:50
scale 1:500
"F" c - 5.2
1800
B - 5.1 black
10@100
12 12 pylon shaft
1000
00 12 00 00 12 00 00 black
yellow
n@100
12 00 0 12 00 12
1 20
yellow
yellow yellow
10@100
1000
1800
90°
90°
90°
90°
1 black 200
C - 1.1.3 2
C - 1.1.4 C - 1.1.3 C - 1.1.4 3
"e" 4 150 1000
red white green green white red
10000
5
6 1150
7
8
9 +13.41: Navigation water (MNTT)
10
11
12
BH140A BH140A BH140A BH140A BH140A BH140A 13
light (red) light (green) yellow flash light light (yellow) light (green) light (red) 14
15
sign :
16
17 c - 1.1.3 : Signal plate ( white - green)
18
19 (allowing to go through between two signal plates)
20 +2.33: Lowest Water (MNTN)
+1.41 21 C - 1.1.4 : Signal plate (red - white)
22
Notations: (forbiding to go through outside two signal plates)
1.- Arrangement of signal lights, signal plates, contrary water gauges are followed C - 5.2 : Contrary water gauge
4.- Contrary water gauges are laid all both up-tream and down-stream on pylon shaft P13, P15
"internal waterway signal rules of Viet Nam, 22tcn 269-2000" (informing direct clearance)
the numbers of contrary water gauge have the height of 600mm and the thickness of 100mm
2.- Positions of signal lights, signal plates are given relatively. the final positions will B - 5.1 : Signal plate (yellow)
5.- Signal lights are used solar energy light type.
be decided in the construction stage, base on ship passage and determining by (Indication of navigable clearance, mechanical and primitive ships can go through)
6.- This drawing are shown the domastic navigation signal system for service stage.
domestic navigation management agency of Nhat Tan bridge area. BH 140A : Signal lights including red, green, yellow and yellow flash
7.- If the main passage are transfered, the signal navigation plates can be placed
3.- Signal plates, signal lights are placed in advantage positions for exploitation,
between P13 - P14 or P14 - P15.
maintainance.
CONSULTANTs Title name signature date Socialist republic of viet nam NHAT TAN BRIDGE CONSTRUCTION PROJECT
P.B. Trong drawing title: Rev. No.
Chodai co., ltd AND Nippon Engineering co., ltd
K. Itabashi Navigation lights arrangement
in association with
H. Ohashi
transport engineering design incorporated Y. Kajimura scale: 1 / 1000 DRAWING No. : C - 4 - 036
SHEET No. :
Sheet of PACKAGE:
erection sequences
Scale 1:5000
10000
- Construct the temporary bridge and
STEP-1
temporary road.
MNTK:+13.67
MNNN:+2.33
- Construct pylons
10000
- Complete pylon construction
STEP-2
- Complete girder erection on bent
erection proceeds
MNTK:+13.67
MNNN:+2.33
80000 80000
- Erect the closure segments
STEP-4
10000
10000
- Erect wind fairing, expansion joints,
tie-down cables...ect.
MNTK:+13.67 MNNN:+2.33
- Deck surfacing
CONSULTANTs Title name signature date Socialist republic of viet nam NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba drawing title: Rev. No.1
Chodai co., ltd AND Nippon Engineering co., ltd
K. Itabashi erection sequence
in association with
H. Ohashi
transport engineering design incorporated Y. Kajimura scale: 1 / 1000 DRAWING No. : C - 5 - 001
SHEET No. :
Sheet of PACKAGE:
this drawing is for information only
CONSULTANTs Title name signature date Socialist republic of viet nam NHAT TAN BRIDGE CONSTRUCTION PROJECT
T. Akiba drawing title: Rev. No.1
Chodai co., ltd AND Nippon Engineering co., ltd
K. Itabashi erection method
in association with
H. Ohashi
transport engineering design incorporated Y. Kajimura scale: 1 / 1000 DRAWING No. : c - 5 - 002
SHEET No. :