Septic tank Design:
The septic tank will serve a household of 50 people who produce 90 lpcd of
wastewater. The tank is to be desludged every three years.
P=50; q= 90 lpcd; N= 5 yrs; T = 33 °C
Sedimentation Zone:
th = minimum mean hydraulic retention time, days = 1.5 – 0.3log (Pq) = 0.4
days often it is taken as 1 day but should not be less than 0.2 days.
Vh = 10-3 Pqth = 10-3 x 50 x 90 x 0.4 = 1.81 m3
Sludge digestion zone
Vd = 0.5*10-3Ptd
= 0.803 m3
td depends on temperature,
td =30(1.035)35-33
= 32.1367 days
Digested sludge storage zone:
Vsl = C X P X N = 0.06 x 50 x 5 = 15 m3
C = 0.06 m3 /person/yr for N
Scum storage zone
Vsc = 0.4 Vsl