Phase 3: Livening

of Steam Distribution 818-


U091 HVAC Steam (DH3) Distribution

818-U080VH104
A
818-U080VH106

C
E

D
818-U080VH109

818-U080VH103 818-U080VH101 818-U080VH102

Livening Flowpaths
Hand Valve Condensate Return
D8 Steam (8bar)

to be open
MKWP return
MKWP Supply
Instrument Air
Feedwater

Waste Water
DH3 Steam (3bar)
Phase 3: Livening of Steam Distribution
Livening Flowpaths
818-U091 HVAC Steam (DH3) Distribution
Condensate Return

Hand Valve is
Opened

818-U116VH113

E
Hand Valve to
be Open

818-U233VH266 818-U233VH267

C D

Livening Flowpaths
Phase 3 : Livening of Steam Distribution MKWP Supply
818-U091 HVAC Steam (DH3) Distribution MKWP Return
Phase 3 : Livening of Steam Distribution Livening Flowpaths
Valve to be
818-U091 HVAC Steam (DH3) Distribution opened D8 Steam (8BAR)

818-U101VH105

B
Phase 3: Livening of Steam Distribution 818- Livening Flowpath
U091 HVAC Steam (DH3) Distribution Instrument Air

Valve is open and air can be livened LEGEND:

to Electrical Panel 12 way compressed air manifold.

8 way compressed air manifold.

Instrument Air (LS) Distribution


020
LV1-105323
U020
818-LS-U020-105
LH023 40
FACADE Future phase Project Bacthera
Project Bacthera
818-LS-U020-107 LH023 40 U020

VH224

Reserve BU ROOM U020 U020


818-LS-U020-108 LH023 40
E0010
VH217 25 /40 VH223

25 /40
818-LS-U020-121
LH023 25
U020 U020 25 /15
818-LS-U020-110 LH023 25 818-LS-U020-110 818-LS-U020-106 LH023 40
Future

818-LS-U020-120 LH023 25
VH228
LH023 25

VH230
U020

U020
40 /25 VH234 VH227

VH233 Compressed air VH232


818-LS-U020-116

U020
VH225

VH226
U020

U020

818-LS-U020-118 LH023 25
LH023 25

818-LS-U020-115
VH231 Compressed air

818-LS-U020-119
VH229 Compressed air
Future

Future

LH023 25

LH023 25
manifold

manifold
manifold

VH216

818-LS-U020-106

818-LS-U020-111
U020
VH201

VH202

VH203

VH235

VH204

VH205

VH206

VH207

VH220

VH208

VH219

VH209

VH213

VH214

VH218
U020

U020

U020

U020

U020

U020

U020

U020

U020

U020

U020

U020

U020

U020

U020
U020

LH023 25
U174
818-LS-U020-130

818-LS-U020-129

818-LS-U020-128

818-LS-U020-131

818-LS-U020-127

818-LS-U020-126

818-LS-U020-125

818-LS-U020-124

818-LS-U020-123

818-LS-U020-113

818-LS-U020-122

818-LS-U020-106
U020

U020

U020
LH023 25

LH023 25

LH023 25

LH023 15

LH023 25

LH023 25

LH023 25

LH023 25

LH023 25

LH023 25

LH023 25

LH023 25
VH215

VH211
Reserve CU ROOM
U020

U020
U020

VH221
VH222
E0009

U020
U020
U020

VH212
U080

U020
VH210
U020
U170

WAInf Collection Tank

WP Pretreatment 1
WBU Generation 1

Firewater Sprinkler
WP Generator 2.0

WS System 2.0
DH3 Generation

LV1-105323
LV0-105323

LV1-105323
Chiller Cabinet

FUTURE
WAInf Bio-Kill

LV1-105323
LV1-105324

FUTURE

E0010
E0007

U170
CIOC 001

CIOC 002

CIOC 003

CIOC 004

CIOC 011

CIOC 009

CIOC 007

CIOC 006

CIOC 005

CIOC 008
E0009

U174

U080
E0009
Future
E0010

E0010

E0010

E0010

U190

E0010

E0009

E0010
U191
Future

Future

XXX

171

170
174

080
XXX

175
190
XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX
191

+0,00

Status D IC/IV/IQ-Test-Plan Anlage / RI-Fliessbild-Kontrolle IC/IV/IQ-Test-Bericht


Genehmigt für Qualifizierung Geprüft: Name: Datum: Visum: Tester: Datum: Visum:

Armaturen: Identifikation Betriebsverantw.: In-Albon Dieter See approvals in Kneat Betriebsverantw.: See approvals in Kneat
Version: D TPL-Mechanik: Markus Gomer See approvals in Kneat TPL-Mechanik: See approvals in Kneat
Vom: 18. Apr 2023 Betr.-Ing.: n/a See approvals in Kneat Betr.-Ing.: See approvals in Kneat
Zeichner: M.Rados TPL-EMR: n/a See approvals in Kneat TPL-EMR: See approvals in Kneat
Qualif.-Leiter: Giannone Sabrina See approvals in Kneat Qualif.-Leiter: See approvals in Kneat
QA: n/a See approvals in Kneat QA: See approvals in Kneat

Bereich: Ko. St.: Bau: Anlage: Invest. Nr: Pos. Nr Datum Name:
%
10 Mai 2022 MRADOS Massstab:
J08 818 U020
Für diese Zeichnung behalten wir uns alle Rechte vor
Instrument Air (LS) Distribution

U020

RI Fliessbild (Identifikation) Lonza AG Walliser Werke

PID - 818-U020-CQL-002 LV1-105324 Blatt 020


Roof +35,52m

Phase 3:Livening of Steam Distribution Handvalve closed but not


818-U091 HVAC Steam (DH3) Distribution
BACK FLOW PREVENTION FOR U081
locked 1
2 VALVE CLOSED, SECURED WITH A LOCK, WITH BLIND FLANGE/SCREW

3 GENERAL NOTE: ALL BALL VALVES TO BE INSTALLED WITH RELEVANT


Handvalve to be open 4
SPINDLE EXTENSION
CONNECTION FOR FUTURE DISTRIBUTION EXTENSION

5 SYSTEM BOUNDARY BALL VALVE TO BE HIGH POINT IN ORDER TO PREVENT


BACK FLOW OF CONDENSATE INTO U081 SYSTEM.

Handvalve to be Locked 6 SPARE VALVE FOR DISTRIBUTION TO CU ROOM USERS.

Closed 7 GENERAL NOTE FOR FUTURE EXTENSION:


DRAIN POINTS TO BE ADDED EVERY 30 METERS AS PER PIPE ROUTING.

LV6 +28,5m

LV5 +24m

LV4 +19,5m

LV3 +15m

LV2 +10,5m

818-U081VH108

LV1 +6m

818-U081VH105 1 5

Livened Flowpaths
080
LV1-105323
U080
818-DH3-U080-101
U081

VR102
U081

VH108
B N

FV105
818-DH3-U081-101
LH011 100
W23-80 LV1-105323
U091 091
F
W23-80

LH088 100 HVAC STEAM (DH3) DISTRIBUTION


DH3 Generation
U081 LH088

U091 LH011

A DH3 Steam (3Bar)


FV101
B N

-1/+5bar 2 6
VH102 VR101 VH101
U081

U081
2 4 2 4 PI PI101
602HB 602HB
602HB
601HB Condensate Return
U081

40 /25 VH105KV146

U081FV104

601HB 601HB
VH107

818-U081VH107
40 /25 VH106B N

U081
BN
FV102

FV103
N

U081
VH103 B

VH104 B
U081

U081

U081

818-DH3-U081-102 LH088 100 W23-80

818-U081VH110
50 /100
25 /50

W23-30 U081 SYSTEM LOW


KV147

POINTSAMPLE POINT
VH110B N
VH109
U081

818-U081VH109
15 /25
AK101
U081

U081 LH088

818-U081VH101 U116 LH011

LV1-105323

G
818-DKH-U081-107 LH011 15 W23-40
U091 091 Status D IC/IV/IQ-Test-Plan Anlage / RI-Fliessbild-Kontrolle IC/IV/IQ-Test-Bericht

818-U081VH102 818-U081VH103, HVAC STEAM (DH3) DISTRIBUTION Genehmigt für Qualifizierung

Armaturen: Identifikation
Geprüft: Name:

Betriebsverantw.: In-Albon Dieter


Datum: Visum:
See approvals in Kneat
Tester:

Betriebsverantw.:
Datum: Visum:

See approvals in Kneat

818-U081VH104, Version:
Vom:
Zeichner:
D
05. Sep 2023
M. Pocedulic
TPL-Mechanik:
Betr.-Ing.:
TPL-EMR:
Manuel Deuringer
n/a
n/a
See approvals in Kneat
See approvals in Kneat
See approvals in Kneat
TPL-Mechanik:
Betr.-Ing.:
TPL-EMR:
See approvals in Kneat
See approvals in Kneat
See approvals in Kneat

818-U081VH106 Qualif.-Leiter:
QA:
Giannone Sabrina
n/a
See approvals in Kneat
See approvals in Kneat
Qualif.-Leiter:
QA:
See approvals in Kneat
See approvals in Kneat

Bereich: Ko. St.: Bau: Anlage: Invest. Nr: Pos. Nr Datum Name:
%
21 Mrz 2022 MRADOS Massstab:
J08 818 U081
Für diese Zeichnung behalten wir uns alle Rechte vor
DH3 Distribution
819-G07E0009
CLEAN UTILITIES GENERATION
U081
Ebene 0+-0.0m
RI-Fliessbild (Identifikation) Lonza AG Walliser Werke

PID - 818-U081-CQL-001 LV1-105323 Blatt 081


Phase 3 : Livening of Steam Distribution 818-U091 HVAC Steam (DH3) Handvalves to be locked
Distribution
Closed

Handvalves to be open
Handvalves to be closed
not locked

818-U091VH110

Livened Flowpaths
818-U091VH111
Condensate Return
DH3 Steam (3bar)
818-U091VH109
818-U091VH106

818-U091VH105
818-U091VH118

818-U091VH117

818-U091VH102
H
818-U091VH103
818-U091VH112 F
818-U091VH113
G 818-U091VH101

818-U091VH112
818-U091VH116
818-U091VH116
818-U091VH115
H

Hot water (MHWS) Generation

Hot water (MHWS) Generation

HVAC STEAM (DH3) DISTRIBUTION


225

Steam Condensate (DK) Collection


225

STEAM D12/D8 GENERATION


110

100
116

091
Phase 3 : Livening Steam Distribution

D12/D3 Generation
LV2-105323

LV2-105323

LV1-105323
U225

LV1-105323

LV1-105323
LV2-105323
U225

U110

U100
U116

U091
818-U091 HVAC Steam (DH3)

MC4a
Facade

Distribution

W60-32
W60-32
2
W23-30

818-MHWS/S-U225-103
818-MHWS/R-U225-112
LH001 50

LH001 50
2

818-AB-U115-112 LH011 50 W23-50


N.C.
U115
N.C.
U115
Livening Flow Path
Condensate Return
VH112 VH107

U115

VH108
U115

TI
U115

TI
TI106 TI105
U115

Supplier
0/100 °C 0/100 °C

Lonza
VH113
U115

LH011 50
LH011 20
VH106

40 /50
Lonza
U115W3 C3
Supplier C2

LH011 200
DN40

LH011 200

818-DK-U100-108
818-DK-U110-110
TT
U115W2TI1730

818-DK-U115-109
Lonza C1
C4 Supplier C5 DN40
W23-80 Supplier
Lonza DN50

VH114
U115
818-DK-U115-111

Supplier
Lonza
TV

VH109
U115
U115TC2630
U115

W23-50
TI102
0/120 °C

VH102
U115
TI
LV1-105323 T60-13
818-MKWP/R-U231-117 LH001 100 818-MKWT/R-U115-106
233 U233 100 /80 80 /100
80 LH001 100
MKWP PROCESS COOLING WATER DISTRIBUTION
VH105
U115

U115

Supplier
Lonza
TI101 U115W2
0/100 °C Lonza C3 Lonza
C4
VH103
U115

Supplier DN200 Supplier


TI
LV1-105323 T60-13
C1
DN100
818-MKWP/S-U231-109 LH001 100
233 U233
C2
MKWP PROCESS COOLING WATER DISTRIBUTION DN100
C5 Supplier
Supplier
Lonza

65 /50
Lonza W23-80
DN50 U115
TI103
VH104

TI 0/100 °C
U115

W23-50 U115
LV1-105323

Supplier
818-DK-U115-103
U115 U250 250

Lonza
TI104 Lonza
U115W1 Lonza VR103 LH011 50
C3 River water MKWR
VH116

C4
U115

Supplier DN200 DN200 Supplier


0/100 °C TI
C1
DN65
LV YV
C2 U115LV6000 U115YS6020
DN65
VH115

Supplier
U115

C5
Supplier
Lonza

VH145

VH147
U115

U115
DN50 Lonza
W60-38

W60-38

U115 U115 U115 U115 U115


LV1-105323
U220 220

W23-80

W23-60
VH146 VH148 VR102 50 /65 65 65 /50 VH150 50 /65 65 65 /50 VR101
MHW Erzeugung
U115

LH011 50
FUTURE CONNECTION
VH149

W23-60

LH011 150

818-DKH-U116-113 LH011 80

818-DK-U115-103
818-DK-U116-205
LV1-105323
818-MHW/R-U220-104 LH001 65
220 U115
MHW Erzeugung

W23-50
LH011 50

LH011 50
LH011 50

818-SIV-U115-117 LH032 100

W23-80
LV1-105323
818-MHW/S-U220-103 LH001 65
818-DK-U115-123

818-DK-U115-121
818-DK-U115-115

220 U220
MHW Erzeugung

LH032
LH011

VH124
U115
U115VS101
LV1-105323 80 2.0 bar
818-DK-U220-104 LH011 32
220 U220 100 /80
DN 50
MHW Erzeugung TT
U115TI6030
W23-50

W23-50

W23-50

LV1-105323

LH011 20
DN 25
818-DK-U220-117 LH011 25 W23-50 LV1-105323
220 U220 818-DK-U115-102 LH011 50
Lonza
U220 220

LH011 50
MHW Erzeugung MHW Erzeugung
N2
LV1-105323 U115
Supplier
818-DK-U220-119 LH011 32
220 U220
W23-40 VH119
VH120

MHW Erzeugung
U115

VH121
U115

VH144
U115
VH140
U115
YV

VH125

VH126
LV2-105323

U115

U115
U115 U115
818-DK-U225-105 LH011 25 PT PI U115YS6200

200 mm
225 U225 PI102 PI PI103
U115PI0020 0-6bar 0/6bar
LS

65

65
Hot water (MHWS) Generation

VH139
U115

VH143
U115
U115LA0018
50 /25

VH123

Hand Valve is Open


U115

Lonza
YV

Supplier
LT

Lonza
Supplier N22 U115YS6300
N13 N14 N01 N02 N03 N04 N05 N07 N08 N09 N10 N11 N12 50 DN 100 U115LC0010
50 32 65 100 15 100 50 200 100 150 50 80 50

VH142

VH151
U115

U115
N23 U115
Supplier

W23-50
Lonza

25 VH127

818-DK-U115-122
U115B1 EV;SS;XS EV;SS;XS

32 /65

32 /65
DN600

LH011 100
ML
U115EU0260 U115EU0360
TT 3500 L DN 50
N18 LS

U115P1

U115P2
U115TI0030 25
N24 U115LA0015

U115
25 U115

VH128
DN 100 M M
818-DK-U115-120 N19 DN50

25/100
LH011 50
N16

W23-50 VH118 100 N25


80

80 /50

80 /50
N15 DN25
Supplier
VH117
U115

Lonza

VH129
U115
Supplier

VH137 FS101

VH141 FS102
Lonza
W11-100

U115

U115
U115
U115
Supplier

Lonza

SG101

PI
U115

VH130 PI101

U115

U115
0/10bar

VH134
U115
VH131
U115

Supplier

VH136
U115
3
1 N1
Rout to the floor
U115 W23-60 U115 Lonza
818-DK-U115-113 LH011 80
50 /80
VH132 VH133

LEVEL 0

Status D IC/IV/IQ-Test-Plan Anlage / RI-Fliessbild-Kontrolle IC/IV/IQ-Test-Bericht


Genehmigt für Qualifizierung Geprüft: Name: Datum: Visum: Tester: Datum: Visum:

Armaturen: Identifikation Betriebsverantw.: In-Albon Dieter See approvals in Kneat Betriebsverantw.: See approvals in Kneat
NOTES: GENERAL NOTES: Version: D2 TPL-Mechanik: Markus Gomer TPL-Mechanik:
See approvals in Kneat See approvals in Kneat
1 BLIND FLANGE WITH BORE DN50. 1. PROVIDE NON RETURN VALVES DOWNSTREAM OF ANY TRAP WHER THE CONDENSATE LINE IS RISING UP TO A DRAVITY RETURN LINE. Vom: 05. Jul 2023 Betr.-Ing.: n/a See approvals in Kneat Betr.-Ing.: See approvals in Kneat
2. DELETED. Zeichner: M. Pocedulic TPL-EMR: n/a See approvals in Kneat TPL-EMR: See approvals in Kneat
2 45 DEG CUT 3. GRADE ALL STEAM LINES AT A UNIFORM SLOPE OF 1:250 AND CONDENSATE LINES AT A UNIFORM SLOPE OF 1:250 Qualif.-Leiter: Giannone Sabrina See approvals in Kneat Qualif.-Leiter: See approvals in Kneat
QA: n/a See approvals in Kneat QA: See approvals in Kneat
4. PROVIDE HIGH POINT VENTS AND LOW POINT DRAINS AS REQUIRED ON ALL PIPING.
3 DISCHARGE TO FLOOR GULLY IN VISIBLE LOCATION.
5. LOCATE INSTRUMENT IN ACESSIBLE LOCATION.
6. ALL HORIZONTAL REDUCERS ON STEAM AND CONDENSATE LINES SHALL BE ECCENTRIC WITH FLAT BOTTOM. Bereich: Ko. St.: Bau: Anlage: Invest. Nr: Pos. Nr Datum Name:
%
8. STEAM BRANCH TAKE OFFS SHALL BE TAKEN FROM TOP OF THE LINE. . Massstab:
9. ALL IN-LINE INSTRUMENTS, REGULATORS, CONTROL VALVES AND SAFETY VALVES SHALL BE REMOVED FROM PIPELINES PRIOR TO TESTING, FLUSHING AND PASSIVATION AND SHALL NOT BE FITTED UNTIL LINES ARE CLEAN. J08 818 U115
Für diese Zeichnung behalten wir uns alle Rechte vor
10. STRAINERS IN STEAM LINES SHALL BE INSTALLED ON THEIR SIDE SO DRAIN PORT IS IN THE HORIZONTAL POSITION.
STEAM CONDESATE (DK) COLLECTION TANK

U115

RI-Fliessbild (Identifikation) Lonza AG Walliser Werke

PID - 818-U115-CQL-001 LV1-105323 Blatt 115