PLUMBING NOTES:

1. GRADES OF HORIZONTAL PIPING


RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND AT A FORM
GRADE OF NOT LESS THAN TWO PERCENT (2%).

2. CHANGE IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF
FORTY FIVE DEGREES (45°) WYES, LONGSWEEP QUARTER BEND, SIX-EIGHT
OR SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL
TO VERTICAL, 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS
AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE. TEE AND
CROSSES MAYBE USED IN VENT PIPES.

3. PROHIBITED FITTINGS 13 FHC (SEE MECHANICAL PLAN)


NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL WASTE CISTERN TANK
LINES. THE DRILLINGS AND TAPPINGS OF HOUSE DRAIN, WASTE OR VENT CAP = ±60,000 LITERS
PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED. (±15,852 GALLONS)
MH
4. SLEEVES 12 2
PROVIDE PIPE SLEEVES AT WALLS, COLUMNS OR SLABS ONE SIZE BIGGER 32 mm Ø PPRC CWL GV WP P1
(PERFORATED PIPE) HB
THAN THE ACTUAL SIZE PASSING THROUGH THE WALLS, COLUMNS OR UNDER HB W 32 mm Ø PPRC CWL
WC HB
SLAB TO PROTECT PIPE FROM BREAKAGE. FHC
32 mm Ø PPRC CWL GV
HB
HB
5. PIPE CLEAN-OUTS 11 HB
HB
HB MH
HB HB
PIPE CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS: GV HB GV HB
HB HB
a. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY-TWO
AND ONE-HALF DEGREES (22 1/2°).
WC HE ING
LAV
D ND
b. ONE AND ONE-HALF METERS (1.50 m) INSIDE THE PROPERTY LINE BEFORE 10 . 40 PW LA FDC
THE HOUSE DRAINAGE CONNECTION. SCH
P IPE UP
c. EVERY FIFTEEN METERS (15.00 m) IN HORIZONTAL RUN OF PIPES.
G.I ST
O. UP
d. AT THE END OF ANY HORIZONTAL PIPE LINES. mØ
5m
E
AS
DB
9 6 OA
R

OM
KB C
BLA
6. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED. O
SSR
A
7. NOT LESS THAN 300 mm OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF CL 1:
12
5 E
THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB. OP
8 SL
UP
8. NO SEPTIC VAULT MUST BE CONSTRUCTED UNDER THE BUILDING.
40 MP
H. RA
SC
9. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER PIPE E
O
R
G.I
AS

ID
B

AND A LICENSED PLUMBING CONTRACTOR. 7 Ø M


RD
OA
CK
B
R
mm OO
A
BL
R
65 S R O
AS C
CL
4
6

E
AS
DB
5 AR

OM
O
KB

. 40
AC
BL

CH O
ES SR
I P AS
.I P CL
ØG 3
mm
4 65
R
O
ID UP
R
R
O
E
AS
DB
3 A BO
AR C
RE
K
AC

OM
BL
A
RE O V E
CT
U
I CR UP PY A
BO
LE OM
N NO
2 E CO OF
CA
ME
1 E
H O LIN

A
1 RE
LIV ING
A
R
1 ISOMETRIC DIAGRAM (WATER AND FIRE LINE LAYOUT)
SCALE NTS.
KS R P-1f
EA O
G AR ID
R
D DININ R
PW C
O

E
SH

O.
CO
NC
ST
M PU
P LEGEND:
C
RE
TE RA
FLA 12 REVISION OF DRAWING DETAILS (1/23/2018)
1:
TF
OR HA

M
ND
WA
SH UP OP
E R
ING
SL - ADDITIONAL ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT)

UP

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
PLUMBING NOTES
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1b
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV

You might also like