Project Plan in CSS 9

MELCS: Obtain correct specifications from relevant source. (TLE_IACSS9-12PMC-IIa-b-10)

I. Project Proponents
(Name of Group
Members)

II. Project Title

III. Project Objectives At the end of this project, the group will be able to create an
enhanced projection of smartphone offerings by infusing detailed
specifications and establishing appropriate pricing strategies.

Key Deliverables:
a. Comprehensive smartphone specifications
- Hardware features, software capabilities and user
experience enhancements
b. Competitive pricing
- Pricing trends, competitiveness, and profitability

IV. Working Drawing Per


Product with Detailed
Specification (Sketch)

V. Bill of Materials

Quantity Unit Description Unit Price Total Cost


Example: 2 pieces 8 GB RAM P 2,200.00 P 4,400.00

VI. Materials Needed

VII. Sample Picture of Each


Product with Price
Rubrics in Rating the Project Plan

Performance Excellent Good Fair Score


Criteria 5 3 1

Completeness of 7 parts of the 4-5 parts of the 3 and below parts


Parts project plan were project plan were of the project
used used plan were used

Content The content of The content of The content of


each part of the each part of the each part of the
project plan is project plan lacks project plan lacks
complete, clear, 1-2 needed 3-5 needed
and information or information or
comprehensive. data. data.

Technical Thoroughly Technical Technical


Requirements details technical requirements are requirements are
requirements for mentioned but unclear or
smartphone lack detail or irrelevant.
enhancement of specificity.
each product.

Price Justifies price per Provides a basic Price justification


Justification product through a justification but is unclear and
clear breakdown lacks clarity or inadequate.
of costs completeness.