1 2 3.00 4 5 6 7 8 9 10 11 12 13 14
I SMK3 KONSTRUKSI
1 Papan informasi K.3 - Buah 200,000.00 - 1.00 Buah 200,000.00 200,000.00 1.00 Buah 200,000.00 200,000.00
2 Helm proyek - Buah 75,000.00 - 10.00 Buah 75,000.00 750,000.00 10.00 Buah 75,000.00 750,000.00
3 Sarung tangan (Safety gloves) - Pasang 15,000.00 - 20.00 Pasang 15,000.00 300,000.00 20.00 Pasang 15,000.00 300,000.00
4 Sepatu keselamatan untuk pekerja (Rubber safety shoes) - Pasang 95,000.00 - 5.00 Pasang 95,000.00 475,000.00 5.00 Pasang 95,000.00 475,000.00
5 Rompi keselamatan (Safety vest) - Buah 40,000.00 - 10.00 Buah 40,000.00 400,000.00 10.00 Buah 40,000.00 400,000.00
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) - Set 150,000.00 - 1.00 Set 150,000.00 150,000.00 1.00 Set 150,000.00 150,000.00
7 Rambu Petunjuk - Buah 70,000.00 - 1.00 Buah 70,000.00 70,000.00 1.00 Buah 70,000.00 70,000.00
8 Pelindung pernapasan dan mulut, masker (protokol covid) - Pack 35,000.00 - 4.00 Pack 35,000.00 140,000.00 4.00 Pack 35,000.00 140,000.00
9 Wastafel protokol Covid - Buah 250,000.00 - 1.00 Buah 250,000.00 250,000.00 1.00 Buah 250,000.00 250,000.00
TOTAL SMK3 KONSTRUKSI - - 2,735,000.00 2,735,000.00
-
II PEKERJAAN KONSTRUKSI -
1 Pasir Urug - m3 100,000.00 - 7.15 m3 100,000.00 715,000.00 7.15 m3 100,000.00 715,000.00
2 Pasir Pasang - m3 150,000.00 - 16.00 m3 150,000.00 2,400,000.00 16.00 m3 150,000.00 2,400,000.00
3 Pasir Beton - m3 150,000.00 - 4.00 m3 150,000.00 600,000.00 4.00 m3 150,000.00 600,000.00
4 Pasir Beton (Kg) - m3 150,000.00 - 0.50 m3 150,000.00 75,000.00 0.50 m3 150,000.00 75,000.00
5 Batu Split - m3 340,000.00 - 4.00 m3 340,000.00 1,360,000.00 4.00 m3 340,000.00 1,360,000.00
6 Kerikil (Kg) - m3 340,000.00 - 1.00 m3 340,000.00 340,000.00 1.00 m3 340,000.00 340,000.00
7 Batu Belah 15 - 20 cm - m3 125,000.00 - 21.00 m3 125,000.00 2,625,000.00 21.00 m3 125,000.00 2,625,000.00
8 Semen - Zak 60,000.00 - 150.00 Zak 60,000.00 9,000,000.00 150.00 Zak 60,000.00 9,000,000.00
9 Semen Warna - Kg 56,000.00 - 11.00 Kg 56,000.00 616,000.00 11.00 Kg 56,000.00 616,000.00
10 Batu Bata - Buah 600.00 - 5,830.00 Buah 600.00 3,498,000.00 5,830.00 Buah 600.00 3,498,000.00
11 Besi Beton Polos Ø 12 - Lonjor 117,000.00 - 8.00 Lonjor 117,000.00 936,000.00 8.00 Lonjor 117,000.00 936,000.00
12 Besi Beton Polos Ø 10 - Lonjor 81,000.00 - 86.00 Lonjor 81,000.00 6,966,000.00 86.00 Lonjor 81,000.00 6,966,000.00
13 Besi Beton Polos Ø 8 - Lonjor 52,000.00 - 49.00 Lonjor 52,000.00 2,548,000.00 49.00 Lonjor 52,000.00 2,548,000.00
14 Kawat Beton - Kg 30,000.00 - 14.00 Kg 30,000.00 420,000.00 14.00 Kg 30,000.00 420,000.00
15 Paku - Kg 25,000.00 - 10.00 Kg 25,000.00 250,000.00 10.00 Kg 25,000.00 250,000.00
16 Besi Hollow 20x40x1,8 mm - Lonjor 120,000.00 - Lonjor 120,000.00 - - Lonjor 120,000.00 -
17 Besi Hollow 40x40x1,8 mm - Lonjor 150,000.00 - Lonjor 150,000.00 - - Lonjor 150,000.00 -
18 Besi Hollow 80x40x1,8 mm - Lonjor 300,000.00 - Lonjor 300,000.00 - - Lonjor 300,000.00 -
19 Besi Profil - Kg 14,000.00 - Kg 14,000.00 - - Kg 14,000.00 -
20 Kawat Las - Kg 37,000.00 - Kg 37,000.00 - - Kg 37,000.00 -
21 Baut Dynabolt S-12.75 mm - Buah 4,500.00 - 18.00 Buah 4,500.00 81,000.00 18.00 Buah 4,500.00 81,000.00
22 Angkur D16. 400 mm - Buah 35,000.00 - 4.00 Buah 35,000.00 140,000.00 4.00 Buah 35,000.00 140,000.00
23 Kaso 5/7 - m3 2,500,000.00 - 1.10 m3 2,500,000.00 2,750,000.00 1.10 m3 2,500,000.00 2,750,000.00
24 Multiplek Tebal 0,9 cm - Lembar 120,000.00 - 22.00 Lembar 120,000.00 2,640,000.00 22.00 Lembar 120,000.00 2,640,000.00
25 Bambu Cerucuk Ø 15 Cm Panjang 600 Cm - Batang 15,000.00 - 85.00 Batang 15,000.00 1,275,000.00 85.00 Batang 15,000.00 1,275,000.00
26 Atap Spandek Berpasir tb. 0,3 mm - m2 67,500.00 - m2 67,500.00 - - m2 67,500.00 -
27 Screw Cteks 10 x 16 - 16 - Buah 800.00 - Buah 800.00 - - Buah 800.00 -
28 GRC plank tebal 8 mm lebar 20 cm - Lembar 20,000.00 - Lembar 20,000.00 - - Lembar 20,000.00 -
29 Baut SDS 4 mm Kepala Obeng - Buah 350.00 - Buah 350.00 - - Buah 350.00 -
30 Pintu PVC Kamar Mandi - Buah 300,000.00 - Buah 300,000.00 - - Buah 300,000.00 -
31 Keramik Ukuran 25 x 25 Cm - Kotak 90,000.00 - Kotak 90,000.00 - - Kotak 90,000.00 -
32 Keramik Dinding Ukuran 25 x 40 - Kotak 90,000.00 - Kotak 90,000.00 - - Kotak 90,000.00 -
33 Cat Menie (Minyak) - Kg 35,000.00 - Kg 35,000.00 - - Kg 35,000.00 -
34 Kuas - Buah 9,000.00 - Buah 9,000.00 - - Buah 9,000.00 -
35 Cat Dasar / Alkali Resistance - Kg 40,000.00 - Kg 40,000.00 - - Kg 40,000.00 -
36 Cat Penutup (Tembok dan Plafond) - Kg 38,000.00 - Kg 38,000.00 - - Kg 38,000.00 -
37 Plamur - Kg 35,000.00 - Kg 35,000.00 - - Kg 35,000.00 -
38 Politur jadi - Kg 85,000.00 - Kg 85,000.00 - - Kg 85,000.00 -
39 Amplas - m2 10,000.00 - m2 10,000.00 - - m2 10,000.00 -
40 Kloset Jongkok - Buah 500,000.00 - Buah 500,000.00 - - Buah 500,000.00 -
41 Kran 1/2" - Buah 20,000.00 - Buah 20,000.00 - - Buah 20,000.00 -
42 Sealtape - Buah 15,000.00 - Buah 15,000.00 - - Buah 15,000.00 -
43 Head shower tanam Lengkap dengan kran ganda - Buah 300,000.00 - Buah 300,000.00 - - Buah 300,000.00 -
44 Saringan Floordrain - Buah 55,000.00 - Buah 55,000.00 - - Buah 55,000.00 -
45 Tempat sabun - Buah 60,000.00 - Buah 60,000.00 - - Buah 60,000.00 -
46 Pipa PVC tipe AW Ø 4" - Lonjor 400,000.00 - Lonjor 400,000.00 - - Lonjor 400,000.00 -
47 Lem Pipa PVC - Buah 25,000.00 - Buah 25,000.00 - - Buah 25,000.00 -
48 Fitting Pipa PVC 4" - Buah 40,000.00 - Buah 40,000.00 - - Buah 40,000.00 -
49 MCB 6A - Buah 40,000.00 - Buah 40,000.00 - - Buah 40,000.00 -
50 Box MCB 4 Group Inbow - Buah 70,000.00 - Buah 70,000.00 - - Buah 70,000.00 -
51 Pipa Listrik 5/8" - Lonjor 15,000.00 - Lonjor 15,000.00 - - Lonjor 15,000.00 -
52 Kabel NYM 3x2,5 mm2 - m' 17,000.00 - m' 17,000.00 - - m' 17,000.00 -
53 Tee Doos - Buah 10,000.00 - Buah 10,000.00 - - Buah 10,000.00 -
54 L.Bow - Buah 5,000.00 - Buah 5,000.00 - - Buah 5,000.00 -
55 Las Dop - Buah 10,000.00 - Buah 10,000.00 - - Buah 10,000.00 -
56 Klem Pipa Listrik - Buah 3,000.00 - Buah 3,000.00 - - Buah 3,000.00 -
57 Mangkok (Listrik) - Buah 10,000.00 - Buah 10,000.00 - - Buah 10,000.00 -
58 Lampu tempel plafond fitting plc + bohlam - Buah 75,000.00 - Buah 75,000.00 - - Buah 75,000.00 -
59 Saklar (standar) - Gracio Broco - Buah 15,000.00 - Buah 15,000.00 - - Buah 15,000.00 -
60 Line Power Kabel NYM 3 x 2,5 mm2 - m' 17,000.00 - m' 17,000.00 - - m' 17,000.00 -
61 Peralatan - Set 63,000.00 - Set 63,000.00 - - Set 63,000.00 -
62 Sewa Alat Las Listrik - Jam 8,750.00 - Jam 8,750.00 - - Jam 8,750.00 -
63 Daya Listrik - kWh 1,444.70 - kWh 1,444.70 - - kWh 1,444.70 -
64 Pengencer/Minyak Cat Biasa - Liter 30,000.00 - Liter 30,000.00 - - Liter 30,000.00 -
65 Tangki Air 1000 liter fiberglas - Buah 1,940,000.00 - Buah 1,940,000.00 - - Buah 1,940,000.00 -
66 Material pendukung - Ls 9,450.00 - Ls 9,450.00 - - Ls 9,450.00 -
67 Pek. Instalasi Water Level Control (WLC) - Buah 405,000.00 - Buah 405,000.00 - - Buah 405,000.00 -
68 Pipa 1" dari tangki air ke jaringan - m' 21,865.00 - m' 21,865.00 - - m' 21,865.00 -
69 Pipa 1" inch dari sumber air ke Tangki - m' 21,865.00 - m' 21,865.00 - - m' 21,865.00 -
70 Pek. Stopkran - Buah 50,000.00 - Buah 50,000.00 - - Buah 50,000.00 -
71 Logo PU Stainless Steel - Buah 390,000.00 - Buah 390,000.00 - - Buah 390,000.00 -
72 Nomen Klatur "Indonesia Maju" - Buah 1,600,000.00 - Buah 1,600,000.00 - - Buah 1,600,000.00 -
73 Material pendukung (Fischer dll) - Ls 58,500.00 - Ls 58,500.00 - - Ls 58,500.00 -
74 Solar - Liter 9,400.00 - - Liter 9,400.00 - - Liter 9,400.00 -
75 Minyak Pelumas - Liter 42,000.00 - - Liter 42,000.00 - - Liter 42,000.00 -
76 Papan kayu Kelas III m3 2,500,000.00 - - m3 2,500,000.00 - - m3 2,500,000.00 -
77 Dewatering Jam 90,000.00 - - Jam 90,000.00 - - Jam 90,000.00 -
78 Minyak bekisting Liter 10,000.00 - - Liter 10,000.00 - - Liter 10,000.00 -
79 Kayu Kelas II m3 7,000,000.00 - - m3 7,000,000.00 - - m3 7,000,000.00 -
80 Penjaga Jarak Bekisting /Spacer Set 3,000.00 - - Set 3,000.00 - - Set 3,000.00 -
81 Waterproofing Cementitious m2 3,200.00 - - m2 3,200.00 - - m2 3,200.00 -
82 Pipa PVC tipe AW Ø 1" Lonjor 13,750.00 - - Lonjor 13,750.00 - - Lonjor 13,750.00 -
83 Tali Tis (Panjang 20 cm) m' 1,200.00 - - m' 1,200.00 - - m' 1,200.00 -
84 Waterstop lebar 200 mm m' 135,000.00 - - m' 135,000.00 - - m' 135,000.00 -
85 Media Filter Sarang tawon 0.2 mm Unit 2,000,000.00 - - Unit 2,000,000.00 - - Unit 2,000,000.00 -
86 Kayu Kelas III m3 2,300,000.00 - - m3 2,300,000.00 - - m3 2,300,000.00 -
87 T-PVC AW 4" Buah 30,000.00 - - Buah 30,000.00 - - Buah 30,000.00 -
88 Pipa PVC tipe AW Ø 2" m' 30,000.00 - - m' 30,000.00 - - m' 30,000.00 -
89 Pemasangan vent pipa Galvanish dia. 1" Buah 170,000.00 - - Buah 170,000.00 - - Buah 170,000.00 -
90 Floating Clorin feeder (pengumpan klorin apung) Buah 250,000.00 - - Buah 250,000.00 - - Buah 250,000.00 -
91 Khlorin Tablet Buah 70,000.00 - - Buah 70,000.00 - - Buah 70,000.00 -
92 Uji Aliran Bak IPL Ls 250,000.00 - - Ls 250,000.00 - - Ls 250,000.00 -
93 Uji Kebocoran Bak IPL Ls 250,000.00 - - Ls 250,000.00 - - Ls 250,000.00 -
-
TOTAL PEKERJAAN KONSTRUKSI - - 39,235,000.00 39,235,000.00
-
III UPAH KERJA -
Tukang Batu - Orang/Hari 100,000.00 - 24.00 Orang/Hari 100,000.00 2,400,000.00 24.00 Orang/Hari 100,000.00 2,400,000.00
Tukang Kayu - Orang/Hari 100,000.00 - 10.00 Orang/Hari 100,000.00 1,000,000.00 10.00 Orang/Hari 100,000.00 1,000,000.00
Tukang Besi - Orang/Hari 115,000.00 - 11.00 Orang/Hari 115,000.00 1,265,000.00 11.00 Orang/Hari 115,000.00 1,265,000.00
Tukang Allumunium - Orang/Hari 120,000.00 - - Orang/Hari 120,000.00 - - Orang/Hari 120,000.00 -
Tukang Pipa - Orang/Hari 100,000.00 - Orang/Hari 100,000.00 - - Orang/Hari 100,000.00 -
Tukang Las - Orang/Hari 120,000.00 - Orang/Hari 120,000.00 - - Orang/Hari 120,000.00 -
Tukang Cat - Orang/Hari 120,000.00 - Orang/Hari 120,000.00 - - Orang/Hari 120,000.00 -
Tukang Listrik - Orang/Hari 120,000.00 - - Orang/Hari 120,000.00 - - Orang/Hari 120,000.00 -
Pekerja - Orang/Hari 100,000.00 - 20.00 Orang/Hari 100,000.00 2,000,000.00 20.00 Orang/Hari 100,000.00 2,000,000.00
TOTAL UPAH KERJA - - 6,665,000.00 6,665,000.00
-
IV. OPERASIONAL -
A Biaya Transportasi LS/BOP 2,450,000.00 0.39 LS/BOP 2,450,000.00 950,000.00 0.39 LS/BOP 2,450,000.00 950,000.00
B Alat Bantu Media - LS/BOP 900,000.00 - 0.33 LS/BOP 900,000.00 300,000.00 0.33 LS/BOP 900,000.00 300,000.00
C Biaya ATK - LS/BOP 3,755,500.00 - 0.03 LS/BOP 3,755,500.00 115,000.00 0.03 LS/BOP 3,755,500.00 115,000.00
D Biaya Dokumentasi - LS/BOP 540,000.00 - - LS/BOP 540,000.00 - - LS/BOP 540,000.00 -
E Biaya Asbuild Drawing LS/BOP 955,000.00 - - LS/BOP 955,000.00 - - LS/BOP 955,000.00 -
F Evaluasi dan Peningkatan Kapasitas - LS/BOP 500,000.00 - - LS/BOP 500,000.00 - - LS/BOP 500,000.00 -
TOTAL OPERASIONAL - 1,365,000.00 1,365,000.00
JUMLAH TOTAL - 50,000,000.00 50,000,000.00
DIBULATKAN - 50,000,000.00 50,000,000.00
LALU WIRA HARIYADI, ST.MT M. BAIDHOWI MAHFUDZ, ST M FARUQI ABDULLAH,ST Ir Husni Wardi,MBA,M.Pd Zakiah Darajat
NIP. 19790421 200911 1 001
RENCANA PENARIKAN DANA BANK (RPDB) TERMIN 1 (SATU)
KEGIATAN PENYEDIAAN SARANA PRASARANA SANITASI DI LEMBAGA PENDIDIKAN KEAGAMAAN
TIM PELAKSANA YPP DARUL MAHMUDIEN
1 2 3.00 4 5 6 7 8 9 10 11 12 13 14
I SMK3 KONSTRUKSI
1 Papan informasi K.3 1.00 Buah 200,000.00 200,000.00 - Buah 200,000.00 - 1.00 Buah 200,000.00 200,000.00
2 Helm proyek 10.00 Buah 75,000.00 750,000.00 - Buah 75,000.00 - 10.00 Buah 75,000.00 750,000.00
3 Sarung tangan (Safety gloves) 20.00 Pasang 15,000.00 300,000.00 - Pasang 15,000.00 - 20.00 Pasang 15,000.00 300,000.00
4 Sepatu keselamatan untuk pekerja (Rubber safety shoes) 5.00 Pasang 95,000.00 475,000.00 - Pasang 95,000.00 - 5.00 Pasang 95,000.00 475,000.00
5 Rompi keselamatan (Safety vest) 10.00 Buah 40,000.00 400,000.00 - Buah 40,000.00 - 10.00 Buah 40,000.00 400,000.00
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) 1.00 Set 150,000.00 150,000.00 - Set 150,000.00 - 1.00 Set 150,000.00 150,000.00
7 Rambu Petunjuk 1.00 Buah 70,000.00 70,000.00 - Buah 70,000.00 - 1.00 Buah 70,000.00 70,000.00
8 Pelindung pernapasan dan mulut, masker (protokol covid) 4.00 Pack 35,000.00 140,000.00 - Pack 35,000.00 - 4.00 Pack 35,000.00 140,000.00
9 Wastafel protokol Covid 1.00 Buah 250,000.00 250,000.00 - Buah 250,000.00 - 1.00 Buah 250,000.00 250,000.00
TOTAL SMK3 KONSTRUKSI 2,735,000.00 2,735,000.00
II PEKERJAAN KONSTRUKSI
1 Pasir Urug 7.15 m3 100,000.00 715,000.00 - m3 100,000.00 - 7.15 m3 100,000.00 715,000.00
2 Pasir Pasang 16.00 m3 150,000.00 2,400,000.00 - m3 150,000.00 - 16.00 m3 150,000.00 2,400,000.00
3 Pasir Beton 4.00 m3 150,000.00 600,000.00 - m3 150,000.00 - 4.00 m3 150,000.00 600,000.00
4 Pasir Beton (Kg) 0.50 m3 150,000.00 75,000.00 - m3 150,000.00 - 0.50 m3 150,000.00 75,000.00
5 Batu Split 4.00 m3 340,000.00 1,360,000.00 - m3 340,000.00 - 4.00 m3 340,000.00 1,360,000.00
6 Kerikil (Kg) 1.00 m3 340,000.00 340,000.00 - m3 340,000.00 - 1.00 m3 340,000.00 340,000.00
7 Batu Belah 15 - 20 cm 21.00 m3 125,000.00 2,625,000.00 - m3 125,000.00 - 21.00 m3 125,000.00 2,625,000.00
8 Semen 150.00 Zak 60,000.00 9,000,000.00 2.00 Zak 60,000.00 120,000.00 152.00 Zak 60,000.00 9,120,000.00
9 Semen Warna 11.00 Kg 56,000.00 616,000.00 - Kg 56,000.00 - 11.00 Kg 56,000.00 616,000.00
10 Batu Bata 5,830.00 Buah 600.00 3,498,000.00 170.00 Buah 600.00 102,000.00 6,000.00 Buah 600.00 3,600,000.00
11 Besi Beton Polos Ø 12 8.00 Lonjor 117,000.00 936,000.00 - Lonjor 117,000.00 - 8.00 Lonjor 117,000.00 936,000.00
12 Besi Beton Polos Ø 10 86.00 Lonjor 81,000.00 6,966,000.00 - Lonjor 81,000.00 - 86.00 Lonjor 81,000.00 6,966,000.00
13 Besi Beton Polos Ø 8 49.00 Lonjor 52,000.00 2,548,000.00 - Lonjor 52,000.00 - 49.00 Lonjor 52,000.00 2,548,000.00
14 Kawat Beton 14.00 Kg 30,000.00 420,000.00 - Kg 30,000.00 - 14.00 Kg 30,000.00 420,000.00
15 Paku 10.00 Kg 25,000.00 250,000.00 11.67 Kg 25,000.00 291,700.00 21.67 Kg 25,000.00 541,700.00
16 Besi Hollow 20x40x1,8 mm - Lonjor 120,000.00 - 10.00 Lonjor 120,000.00 1,200,000.00 10.00 Lonjor 120,000.00 1,200,000.00
17 Besi Hollow 40x40x1,8 mm - Lonjor 150,000.00 - 25.00 Lonjor 150,000.00 3,750,000.00 25.00 Lonjor 150,000.00 3,750,000.00
18 Besi Hollow 80x40x1,8 mm - Lonjor 300,000.00 - 12.00 Lonjor 300,000.00 3,600,000.00 12.00 Lonjor 300,000.00 3,600,000.00
19 Besi Profil - Kg 14,000.00 - 269.00 Kg 14,000.00 3,766,000.00 269.00 Kg 14,000.00 3,766,000.00
20 Kawat Las - Kg 37,000.00 - 66.00 Kg 37,000.00 2,442,000.00 66.00 Kg 37,000.00 2,442,000.00
21 Baut Dynabolt S-12.75 mm 18.00 Buah 4,500.00 81,000.00 - Buah 4,500.00 - 18.00 Buah 4,500.00 81,000.00
22 Angkur D16. 400 mm 4.00 Buah 35,000.00 140,000.00 - Buah 35,000.00 - 4.00 Buah 35,000.00 140,000.00
23 Kaso 5/7 1.10 m3 2,500,000.00 2,750,000.00 - m3 2,500,000.00 - 1.10 m3 2,500,000.00 2,750,000.00
24 Multiplek Tebal 0,9 cm 22.00 Lembar 120,000.00 2,640,000.00 - Lembar 120,000.00 - 22.00 Lembar 120,000.00 2,640,000.00
25 Bambu Cerucuk Ø 15 Cm Panjang 600 Cm 85.00 Batang 15,000.00 1,275,000.00 - Batang 15,000.00 - 85.00 Batang 15,000.00 1,275,000.00
26 Atap Spandek Berpasir tb. 0,3 mm - m2 67,500.00 - m2 67,500.00 - - m2 67,500.00 -
27 Screw Cteks 10 x 16 - 16 - Buah 800.00 - 348.00 Buah 800.00 278,400.00 348.00 Buah 800.00 278,400.00
28 GRC plank tebal 8 mm lebar 20 cm - Lembar 20,000.00 - 32.00 Lembar 20,000.00 640,000.00 32.00 Lembar 20,000.00 640,000.00
29 Baut SDS 4 mm Kepala Obeng - Buah 350.00 - 120.00 Buah 350.00 42,000.00 120.00 Buah 350.00 42,000.00
30 Pintu PVC Kamar Mandi - Buah 300,000.00 - 8.00 Buah 300,000.00 2,400,000.00 8.00 Buah 300,000.00 2,400,000.00
31 Keramik Ukuran 25 x 25 Cm - Kotak 90,000.00 - 46.00 Kotak 90,000.00 4,140,000.00 46.00 Kotak 90,000.00 4,140,000.00
32 Keramik Dinding Ukuran 25 x 40 - Kotak 90,000.00 - 84.00 Kotak 90,000.00 7,560,000.00 84.00 Kotak 90,000.00 7,560,000.00
33 Cat Menie (Minyak) - Kg 35,000.00 - 6.00 Kg 35,000.00 210,000.00 6.00 Kg 35,000.00 210,000.00
34 Kuas - Buah 9,000.00 - 6.00 Buah 9,000.00 54,000.00 6.00 Buah 9,000.00 54,000.00
35 Cat Dasar / Alkali Resistance - Kg 40,000.00 - 6.00 Kg 40,000.00 240,000.00 6.00 Kg 40,000.00 240,000.00
36 Cat Penutup (Tembok dan Plafond) - Kg 38,000.00 - 15.00 Kg 38,000.00 570,000.00 15.00 Kg 38,000.00 570,000.00
37 Plamur - Kg 35,000.00 - 6.00 Kg 35,000.00 210,000.00 6.00 Kg 35,000.00 210,000.00
38 Politur jadi - Kg 85,000.00 - 1.00 Kg 85,000.00 85,000.00 1.00 Kg 85,000.00 85,000.00
39 Amplas - m2 10,000.00 - 1.00 m2 10,000.00 10,000.00 1.00 m2 10,000.00 10,000.00
40 Kloset Jongkok - Buah 500,000.00 - 4.00 Buah 500,000.00 2,000,000.00 4.00 Buah 500,000.00 2,000,000.00
41 Kran 1/2" - Buah 20,000.00 - 14.00 Buah 20,000.00 280,000.00 14.00 Buah 20,000.00 280,000.00
42 Sealtape - Buah 15,000.00 - 2.00 Buah 15,000.00 30,000.00 2.00 Buah 15,000.00 30,000.00
43 Head shower tanam Lengkap dengan kran ganda - Buah 300,000.00 - 4.00 Buah 300,000.00 1,200,000.00 4.00 Buah 300,000.00 1,200,000.00
44 Saringan Floordrain - Buah 55,000.00 - 16.00 Buah 55,000.00 880,000.00 16.00 Buah 55,000.00 880,000.00
45 Tempat sabun - Buah 60,000.00 - 14.00 Buah 60,000.00 840,000.00 14.00 Buah 60,000.00 840,000.00
46 Pipa PVC tipe AW Ø 4" - Lonjor 400,000.00 - 10.00 Lonjor 400,000.00 4,000,000.00 10.00 Lonjor 400,000.00 4,000,000.00
47 Lem Pipa PVC - Buah 25,000.00 - 3.00 Buah 25,000.00 75,000.00 3.00 Buah 25,000.00 75,000.00
48 Fitting Pipa PVC 4" - Buah 40,000.00 - 19.00 Buah 40,000.00 760,000.00 19.00 Buah 40,000.00 760,000.00
49 MCB 6A - Buah 40,000.00 - 1.00 Buah 40,000.00 40,000.00 1.00 Buah 40,000.00 40,000.00
50 Box MCB 4 Group Inbow - Buah 70,000.00 - 1.00 Buah 70,000.00 70,000.00 1.00 Buah 70,000.00 70,000.00
51 Pipa Listrik 5/8" - Lonjor 15,000.00 - 16.00 Lonjor 15,000.00 240,000.00 16.00 Lonjor 15,000.00 240,000.00
52 Kabel NYM 3x2,5 mm2 - m' 17,000.00 - 96.00 m' 17,000.00 1,632,000.00 96.00 m' 17,000.00 1,632,000.00
53 Tee Doos - Buah 10,000.00 - 16.00 Buah 10,000.00 160,000.00 16.00 Buah 10,000.00 160,000.00
54 L.Bow - Buah 5,000.00 - 32.00 Buah 5,000.00 160,000.00 32.00 Buah 5,000.00 160,000.00
55 Las Dop - Buah 10,000.00 - 48.00 Buah 10,000.00 480,000.00 48.00 Buah 10,000.00 480,000.00
56 Klem Pipa Listrik - Buah 3,000.00 - 192.00 Buah 3,000.00 576,000.00 192.00 Buah 3,000.00 576,000.00
57 Mangkok (Listrik) - Buah 10,000.00 - 16.00 Buah 10,000.00 160,000.00 16.00 Buah 10,000.00 160,000.00
58 Lampu tempel plafond fitting plc + bohlam - Buah 75,000.00 - 16.00 Buah 75,000.00 1,200,000.00 16.00 Buah 75,000.00 1,200,000.00
59 Saklar (standar) - Gracio Broco - Buah 15,000.00 - 12.00 Buah 15,000.00 180,000.00 12.00 Buah 15,000.00 180,000.00
60 Line Power Kabel NYM 3 x 2,5 mm2 - m' 17,000.00 - 20.00 m' 17,000.00 340,000.00 20.00 m' 17,000.00 340,000.00
61 Peralatan - Set 63,000.00 - 2.00 Set 63,000.00 126,000.00 2.00 Set 63,000.00 126,000.00
62 Sewa Alat Las Listrik - Jam 8,750.00 - - Jam 8,750.00 - - Jam 8,750.00 -
63 Daya Listrik - kWh 1,444.70 - - kWh 1,444.70 - - kWh 1,444.70 -
64 Pengencer/Minyak Cat Biasa - Liter 30,000.00 - 1.00 Liter 30,000.00 30,000.00 1.00 Liter 30,000.00 30,000.00
65 Tangki Air 1000 liter fiberglas - Buah 1,940,000.00 - - Buah 1,940,000.00 - - Buah 1,940,000.00 -
66 Material pendukung - Ls 9,450.00 - 22.00 Ls 9,450.00 207,900.00 22.00 Ls 9,450.00 207,900.00
67 Pek. Instalasi Water Level Control (WLC) - Buah 405,000.00 - 1.00 Buah 405,000.00 405,000.00 1.00 Buah 405,000.00 405,000.00
68 Pipa 1" dari tangki air ke jaringan - m' 21,865.00 - - m' 21,865.00 - - m' 21,865.00 -
69 Pipa 1" inch dari sumber air ke Tangki - m' 21,865.00 - - m' 21,865.00 - - m' 21,865.00 -
70 Pek. Stopkran - Buah 50,000.00 - 2.00 Buah 50,000.00 100,000.00 2.00 Buah 50,000.00 100,000.00
71 Logo PU Stainless Steel - Buah 390,000.00 - - Buah 390,000.00 - - Buah 390,000.00 -
72 Nomen Klatur "Indonesia Maju" - Buah 1,600,000.00 - - Buah 1,600,000.00 - - Buah 1,600,000.00 -
73 Material pendukung (Fischer dll) - Ls 58,500.00 - 2.00 Ls 58,500.00 117,000.00 2.00 Ls 58,500.00 117,000.00
74 Solar - Liter 9,400.00 - - Liter 9,400.00 - - Liter 9,400.00 -
75 Minyak Pelumas - Liter 42,000.00 - - Liter 42,000.00 - - Liter 42,000.00 -
76 Papan kayu Kelas III - m3 2,500,000.00 - - m3 2,500,000.00 - - m3 2,500,000.00 -
77 Dewatering - Jam 90,000.00 - - Jam 90,000.00 - - Jam 90,000.00 -
78 Minyak bekisting - Liter 10,000.00 - - Liter 10,000.00 - - Liter 10,000.00 -
79 Kayu Kelas II - m3 7,000,000.00 - - m3 7,000,000.00 - - m3 7,000,000.00 -
80 Penjaga Jarak Bekisting /Spacer - Set 3,000.00 - - Set 3,000.00 - - Set 3,000.00 -
81 Waterproofing Cementitious - m2 3,200.00 - - m2 3,200.00 - - m2 3,200.00 -
82 Pipa PVC tipe AW Ø 1" - Lonjor 13,750.00 - - Lonjor 13,750.00 - - Lonjor 13,750.00 -
83 Tali Tis (Panjang 20 cm) - m' 1,200.00 - - m' 1,200.00 - - m' 1,200.00 -
84 Waterstop lebar 200 mm - m' 135,000.00 - - m' 135,000.00 - - m' 135,000.00 -
85 Media Filter Sarang tawon 0.2 mm - Unit 2,000,000.00 - - Unit 2,000,000.00 - - Unit 2,000,000.00 -
86 Kayu Kelas III - m3 2,300,000.00 - - m3 2,300,000.00 - - m3 2,300,000.00 -
87 T-PVC AW 4" - Buah 30,000.00 - - Buah 30,000.00 - - Buah 30,000.00 -
88 Pipa PVC tipe AW Ø 2" - m' 30,000.00 - - m' 30,000.00 - - m' 30,000.00 -
89 Pemasangan vent pipa Galvanish dia. 1" - Buah 170,000.00 - - Buah 170,000.00 - - Buah 170,000.00 -
90 Floating Clorin feeder (pengumpan klorin apung) - Buah 250,000.00 - - Buah 250,000.00 - - Buah 250,000.00 -
91 Khlorin Tablet - Buah 70,000.00 - - Buah 70,000.00 - - Buah 70,000.00 -
92 Uji Aliran Bak IPL - Ls 250,000.00 - - Ls 250,000.00 - - Ls 250,000.00 -
93 Uji Kebocoran Bak IPL - Ls 250,000.00 - - Ls 250,000.00 - - Ls 250,000.00 -
IV. OPERASIONAL
A Biaya Transportasi 0.39 LS/BOP 2,450,000.00 950,000.00 - LS/BOP 2,450,000.00 - 0.39 LS/BOP 2,450,000.00 950,000.00
B Alat Bantu Media 0.33 LS/BOP 900,000.00 300,000.00 - LS/BOP 900,000.00 - 0.33 LS/BOP 900,000.00 300,000.00
C Biaya ATK 0.03 LS/BOP 3,755,500.00 115,000.00 - LS/BOP 3,755,500.00 - 0.03 LS/BOP 3,755,500.00 115,000.00
D Biaya Dokumentasi - LS/BOP 540,000.00 - - LS/BOP 540,000.00 - - LS/BOP 540,000.00 -
E Biaya Asbuild Drawing - LS/BOP 955,000.00 - - LS/BOP 955,000.00 - - LS/BOP 955,000.00 -
F Evaluasi dan Peningkatan Kapasitas - LS/BOP 500,000.00 - - LS/BOP 500,000.00 - - LS/BOP 500,000.00 -
TOTAL OPERASIONAL 1,365,000.00 1,365,000.00
JUMLAH TOTAL 50,000,000.00 70,000,000.00 120,000,000.00
DIBULATKAN 50,000,000.00 70,000,000.00 120,000,000.00
LALU WIRA HARIYADI, ST.MT M. BAIDHOWI MAHFUDZ, ST M FARUQI ABDULLAH,ST Ir Husni Wardi,MBA,M.Pd Zakiah Darajat
NIP. 19790421 200911 1 001
RENCANA PENARIKAN DANA BANK (RPDB) TERMIN 3 (TIGA)
KEGIATAN PENYEDIAAN SARANA PRASARANA SANITASI DI LEMBAGA PENDIDIKAN KEAGAMAAN
TIM PELAKSANA YPP DARUL MAHMUDIEN
1 2 3.00 4 5 6 7 8 9 10 11 12 13 14
I SMK3 KONSTRUKSI
1 Papan informasi K.3 1.00 Buah 200,000.00 200,000.00 - Buah 200,000.00 - 1.00 Buah 200,000.00 200,000.00
2 Helm proyek 10.00 Buah 75,000.00 750,000.00 - Buah 75,000.00 - 10.00 Buah 75,000.00 750,000.00
3 Sarung tangan (Safety gloves) 20.00 Pasang 15,000.00 300,000.00 - Pasang 15,000.00 - 20.00 Pasang 15,000.00 300,000.00
4 Sepatu keselamatan untuk pekerja (Rubber safety shoes) 5.00 Pasang 95,000.00 475,000.00 - Pasang 95,000.00 - 5.00 Pasang 95,000.00 475,000.00
5 Rompi keselamatan (Safety vest) 10.00 Buah 40,000.00 400,000.00 - Buah 40,000.00 - 10.00 Buah 40,000.00 400,000.00
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) 1.00 Set 150,000.00 150,000.00 - Set 150,000.00 - 1.00 Set 150,000.00 150,000.00
7 Rambu Petunjuk 1.00 Buah 70,000.00 70,000.00 - Buah 70,000.00 - 1.00 Buah 70,000.00 70,000.00
8 Pelindung pernapasan dan mulut, masker (protokol covid) 4.00 Pack 35,000.00 140,000.00 - Pack 35,000.00 - 4.00 Pack 35,000.00 140,000.00
9 Wastafel protokol Covid 1.00 Buah 250,000.00 250,000.00 - Buah 250,000.00 - 1.00 Buah 250,000.00 250,000.00
TOTAL SMK3 KONSTRUKSI 2,735,000.00 2,735,000.00
II PEKERJAAN KONSTRUKSI
1 Pasir Urug 7.15 m3 100,000.00 715,000.00 - m3 100,000.00 - 7.15 m3 100,000.00 715,000.00
2 Pasir Pasang 16.00 m3 150,000.00 2,400,000.00 - m3 150,000.00 - 16.00 m3 150,000.00 2,400,000.00
3 Pasir Beton 4.00 m3 150,000.00 600,000.00 - m3 150,000.00 - 4.00 m3 150,000.00 600,000.00
4 Pasir Beton (Kg) 0.50 m3 150,000.00 75,000.00 - m3 150,000.00 - 0.50 m3 150,000.00 75,000.00
5 Batu Split 4.00 m3 340,000.00 1,360,000.00 - m3 340,000.00 - 4.00 m3 340,000.00 1,360,000.00
6 Kerikil (Kg) 1.00 m3 340,000.00 340,000.00 - m3 340,000.00 - 1.00 m3 340,000.00 340,000.00
7 Batu Belah 15 - 20 cm 21.00 m3 125,000.00 2,625,000.00 - m3 125,000.00 - 21.00 m3 125,000.00 2,625,000.00
8 Semen 152.00 Zak 60,000.00 9,120,000.00 - Zak 60,000.00 - 152.00 Zak 60,000.00 9,120,000.00
9 Semen Warna 11.00 Kg 56,000.00 616,000.00 - Kg 56,000.00 - 11.00 Kg 56,000.00 616,000.00
10 Batu Bata 6,000.00 Buah 600.00 3,600,000.00 - Buah 600.00 - 6,000.00 Buah 600.00 3,600,000.00
11 Besi Beton Polos Ø 12 8.00 Lonjor 117,000.00 936,000.00 - Lonjor 117,000.00 - 8.00 Lonjor 117,000.00 936,000.00
12 Besi Beton Polos Ø 10 86.00 Lonjor 81,000.00 6,966,000.00 - Lonjor 81,000.00 - 86.00 Lonjor 81,000.00 6,966,000.00
13 Besi Beton Polos Ø 8 49.00 Lonjor 52,000.00 2,548,000.00 - Lonjor 52,000.00 - 49.00 Lonjor 52,000.00 2,548,000.00
14 Kawat Beton 14.00 Kg 30,000.00 420,000.00 - Kg 30,000.00 - 14.00 Kg 30,000.00 420,000.00
15 Paku 21.67 Kg 25,000.00 541,700.00 3.42 Kg 25,000.00 85,500.00 25.09 Kg 25,000.00 627,200.00
16 Besi Hollow 20x40x1,8 mm 10.00 Lonjor 120,000.00 1,200,000.00 - Lonjor 120,000.00 - 10.00 Lonjor 120,000.00 1,200,000.00
17 Besi Hollow 40x40x1,8 mm 25.00 Lonjor 150,000.00 3,750,000.00 - Lonjor 150,000.00 - 25.00 Lonjor 150,000.00 3,750,000.00
18 Besi Hollow 80x40x1,8 mm 12.00 Lonjor 300,000.00 3,600,000.00 - Lonjor 300,000.00 - 12.00 Lonjor 300,000.00 3,600,000.00
19 Besi Profil 269.00 Kg 14,000.00 3,766,000.00 - Kg 14,000.00 - 269.00 Kg 14,000.00 3,766,000.00
20 Kawat Las 66.00 Kg 37,000.00 2,442,000.00 1.00 Kg 37,000.00 37,000.00 67.00 Kg 37,000.00 2,479,000.00
21 Baut Dynabolt S-12.75 mm 18.00 Buah 4,500.00 81,000.00 - Buah 4,500.00 - 18.00 Buah 4,500.00 81,000.00
22 Angkur D16. 400 mm 4.00 Buah 35,000.00 140,000.00 - Buah 35,000.00 - 4.00 Buah 35,000.00 140,000.00
23 Kaso 5/7 1.10 m3 2,500,000.00 2,750,000.00 - m3 2,500,000.00 - 1.10 m3 2,500,000.00 2,750,000.00
24 Multiplek Tebal 0,9 cm 22.00 Lembar 120,000.00 2,640,000.00 - Lembar 120,000.00 - 22.00 Lembar 120,000.00 2,640,000.00
25 Bambu Cerucuk Ø 15 Cm Panjang 600 Cm 85.00 Batang 15,000.00 1,275,000.00 - Batang 15,000.00 - 85.00 Batang 15,000.00 1,275,000.00
26 Atap Spandek Berpasir tb. 0,3 mm - m2 67,500.00 - 61.00 m2 67,500.00 4,117,500.00 61.00 m2 67,500.00 4,117,500.00
27 Screw Cteks 10 x 16 - 16 348.00 Buah 800.00 278,400.00 - Buah 800.00 - 348.00 Buah 800.00 278,400.00
28 GRC plank tebal 8 mm lebar 20 cm 32.00 Lembar 20,000.00 640,000.00 - Lembar 20,000.00 - 32.00 Lembar 20,000.00 640,000.00
29 Baut SDS 4 mm Kepala Obeng 120.00 Buah 350.00 42,000.00 - Buah 350.00 - 120.00 Buah 350.00 42,000.00
30 Pintu PVC Kamar Mandi 8.00 Buah 300,000.00 2,400,000.00 - Buah 300,000.00 - 8.00 Buah 300,000.00 2,400,000.00
31 Keramik Ukuran 25 x 25 Cm 46.00 Kotak 90,000.00 4,140,000.00 - Kotak 90,000.00 - 46.00 Kotak 90,000.00 4,140,000.00
32 Keramik Dinding Ukuran 25 x 40 84.00 Kotak 90,000.00 7,560,000.00 - Kotak 90,000.00 - 84.00 Kotak 90,000.00 7,560,000.00
33 Cat Menie (Minyak) 6.00 Kg 35,000.00 210,000.00 - Kg 35,000.00 - 6.00 Kg 35,000.00 210,000.00
34 Kuas 6.00 Buah 9,000.00 54,000.00 - Buah 9,000.00 - 6.00 Buah 9,000.00 54,000.00
35 Cat Dasar / Alkali Resistance 6.00 Kg 40,000.00 240,000.00 - Kg 40,000.00 - 6.00 Kg 40,000.00 240,000.00
36 Cat Penutup (Tembok dan Plafond) 15.00 Kg 38,000.00 570,000.00 - Kg 38,000.00 - 15.00 Kg 38,000.00 570,000.00
37 Plamur 6.00 Kg 35,000.00 210,000.00 - Kg 35,000.00 - 6.00 Kg 35,000.00 210,000.00
38 Politur jadi 1.00 Kg 85,000.00 85,000.00 - Kg 85,000.00 - 1.00 Kg 85,000.00 85,000.00
39 Amplas 1.00 m2 10,000.00 10,000.00 - m2 10,000.00 - 1.00 m2 10,000.00 10,000.00
40 Kloset Jongkok 4.00 Buah 500,000.00 2,000,000.00 - Buah 500,000.00 - 4.00 Buah 500,000.00 2,000,000.00
41 Kran 1/2" 14.00 Buah 20,000.00 280,000.00 - Buah 20,000.00 - 14.00 Buah 20,000.00 280,000.00
42 Sealtape 2.00 Buah 15,000.00 30,000.00 - Buah 15,000.00 - 2.00 Buah 15,000.00 30,000.00
43 Head shower tanam Lengkap dengan kran ganda 4.00 Buah 300,000.00 1,200,000.00 - Buah 300,000.00 - 4.00 Buah 300,000.00 1,200,000.00
44 Saringan Floordrain 16.00 Buah 55,000.00 880,000.00 - Buah 55,000.00 - 16.00 Buah 55,000.00 880,000.00
45 Tempat sabun 14.00 Buah 60,000.00 840,000.00 - Buah 60,000.00 - 14.00 Buah 60,000.00 840,000.00
46 Pipa PVC tipe AW Ø 4" 10.00 Lonjor 400,000.00 4,000,000.00 - Lonjor 400,000.00 - 10.00 Lonjor 400,000.00 4,000,000.00
47 Lem Pipa PVC 3.00 Buah 25,000.00 75,000.00 - Buah 25,000.00 - 3.00 Buah 25,000.00 75,000.00
48 Fitting Pipa PVC 4" 19.00 Buah 40,000.00 760,000.00 - Buah 40,000.00 - 19.00 Buah 40,000.00 760,000.00
49 MCB 6A 1.00 Buah 40,000.00 40,000.00 - Buah 40,000.00 - 1.00 Buah 40,000.00 40,000.00
50 Box MCB 4 Group Inbow 1.00 Buah 70,000.00 70,000.00 - Buah 70,000.00 - 1.00 Buah 70,000.00 70,000.00
51 Pipa Listrik 5/8" 16.00 Lonjor 15,000.00 240,000.00 - Lonjor 15,000.00 - 16.00 Lonjor 15,000.00 240,000.00
52 Kabel NYM 3x2,5 mm2 96.00 m' 17,000.00 1,632,000.00 - m' 17,000.00 - 96.00 m' 17,000.00 1,632,000.00
53 Tee Doos 16.00 Buah 10,000.00 160,000.00 - Buah 10,000.00 - 16.00 Buah 10,000.00 160,000.00
54 L.Bow 32.00 Buah 5,000.00 160,000.00 - Buah 5,000.00 - 32.00 Buah 5,000.00 160,000.00
55 Las Dop 48.00 Buah 10,000.00 480,000.00 - Buah 10,000.00 - 48.00 Buah 10,000.00 480,000.00
56 Klem Pipa Listrik 192.00 Buah 3,000.00 576,000.00 - Buah 3,000.00 - 192.00 Buah 3,000.00 576,000.00
57 Mangkok (Listrik) 16.00 Buah 10,000.00 160,000.00 - Buah 10,000.00 - 16.00 Buah 10,000.00 160,000.00
58 Lampu tempel plafond fitting plc + bohlam 16.00 Buah 75,000.00 1,200,000.00 - Buah 75,000.00 - 16.00 Buah 75,000.00 1,200,000.00
59 Saklar (standar) - Gracio Broco 12.00 Buah 15,000.00 180,000.00 - Buah 15,000.00 - 12.00 Buah 15,000.00 180,000.00
60 Line Power Kabel NYM 3 x 2,5 mm2 20.00 m' 17,000.00 340,000.00 - m' 17,000.00 - 20.00 m' 17,000.00 340,000.00
61 Peralatan 2.00 Set 63,000.00 126,000.00 - Set 63,000.00 - 2.00 Set 63,000.00 126,000.00
62 Sewa Alat Las Listrik - Jam 8,750.00 - - Jam 8,750.00 - - Jam 8,750.00 -
63 Daya Listrik - kWh 1,444.70 - - kWh 1,444.70 - - kWh 1,444.70 -
64 Pengencer/Minyak Cat Biasa 1.00 Liter 30,000.00 30,000.00 - Liter 30,000.00 - 1.00 Liter 30,000.00 30,000.00
65 Tangki Air 1000 liter fiberglas - Buah 1,940,000.00 - - Buah 1,940,000.00 - - Buah 1,940,000.00 -
66 Material pendukung 22.00 Ls 9,450.00 207,900.00 - Ls 9,450.00 - 22.00 Ls 9,450.00 207,900.00
67 Pek. Instalasi Water Level Control (WLC) 1.00 Buah 405,000.00 405,000.00 - Buah 405,000.00 - 1.00 Buah 405,000.00 405,000.00
68 Pipa 1" dari tangki air ke jaringan - m' 21,865.00 - - m' 21,865.00 - - m' 21,865.00 -
69 Pipa 1" inch dari sumber air ke Tangki - m' 21,865.00 - - m' 21,865.00 - - m' 21,865.00 -
70 Pek. Stopkran 2.00 Buah 50,000.00 100,000.00 - Buah 50,000.00 - 2.00 Buah 50,000.00 100,000.00
71 Logo PU Stainless Steel - Buah 390,000.00 - - Buah 390,000.00 - - Buah 390,000.00 -
72 Nomen Klatur "Indonesia Maju" - Buah 1,600,000.00 - - Buah 1,600,000.00 - - Buah 1,600,000.00 -
73 Material pendukung (Fischer dll) 2.00 Ls 58,500.00 117,000.00 - Ls 58,500.00 - 2.00 Ls 58,500.00 117,000.00
74 Solar - Liter 9,400.00 - - Liter 9,400.00 - - Liter 9,400.00 -
75 Minyak Pelumas - Liter 42,000.00 - - Liter 42,000.00 - - Liter 42,000.00 -
76 Papan kayu Kelas III - m3 2,500,000.00 - - m3 2,500,000.00 - - m3 2,500,000.00 -
77 Dewatering - Jam 90,000.00 - - Jam 90,000.00 - - Jam 90,000.00 -
78 Minyak bekisting - Liter 10,000.00 - - Liter 10,000.00 - - Liter 10,000.00 -
79 Kayu Kelas II - m3 7,000,000.00 - - m3 7,000,000.00 - - m3 7,000,000.00 -
80 Penjaga Jarak Bekisting /Spacer - Set 3,000.00 - - Set 3,000.00 - - Set 3,000.00 -
81 Waterproofing Cementitious - m2 3,200.00 - - m2 3,200.00 - - m2 3,200.00 -
82 Pipa PVC tipe AW Ø 1" - Lonjor 13,750.00 - - Lonjor 13,750.00 - - Lonjor 13,750.00 -
83 Tali Tis (Panjang 20 cm) - m' 1,200.00 - - m' 1,200.00 - - m' 1,200.00 -
84 Waterstop lebar 200 mm - m' 135,000.00 - - m' 135,000.00 - - m' 135,000.00 -
85 Media Filter Sarang tawon 0.2 mm - Unit 2,000,000.00 - - Unit 2,000,000.00 - - Unit 2,000,000.00 -
86 Kayu Kelas III - m3 2,300,000.00 - - m3 2,300,000.00 - - m3 2,300,000.00 -
87 T-PVC AW 4" - Buah 30,000.00 - - Buah 30,000.00 - - Buah 30,000.00 -
88 Pipa PVC tipe AW Ø 2" - m' 30,000.00 - - m' 30,000.00 - - m' 30,000.00 -
89 Pemasangan vent pipa Galvanish dia. 1" - Buah 170,000.00 - - Buah 170,000.00 - - Buah 170,000.00 -
90 Floating Clorin feeder (pengumpan klorin apung) - Buah 250,000.00 - - Buah 250,000.00 - - Buah 250,000.00 -
91 Khlorin Tablet - Buah 70,000.00 - - Buah 70,000.00 - - Buah 70,000.00 -
92 Uji Aliran Bak IPL - Ls 250,000.00 - - Ls 250,000.00 - - Ls 250,000.00 -
93 Uji Kebocoran Bak IPL - Ls 250,000.00 - - Ls 250,000.00 - - Ls 250,000.00 -
IV. OPERASIONAL
A Biaya Transportasi 0.39 LS/BOP 2,450,000.00 950,000.00 - LS/BOP 2,450,000.00 - 0.39 LS/BOP 2,450,000.00 950,000.00
B Alat Bantu Media 0.33 LS/BOP 900,000.00 300,000.00 - LS/BOP 900,000.00 - 0.33 LS/BOP 900,000.00 300,000.00
C Biaya ATK 0.03 LS/BOP 3,755,500.00 115,000.00 - LS/BOP 3,755,500.00 - 0.03 LS/BOP 3,755,500.00 115,000.00
D Biaya Dokumentasi - LS/BOP 540,000.00 - - LS/BOP 540,000.00 - - LS/BOP 540,000.00 -
E Biaya Asbuild Drawing - LS/BOP 955,000.00 - - LS/BOP 955,000.00 - - LS/BOP 955,000.00 -
F Evaluasi dan Peningkatan Kapasitas - LS/BOP 500,000.00 - - LS/BOP 500,000.00 - - LS/BOP 500,000.00 -
TOTAL OPERASIONAL 1,365,000.00 - 1,365,000.00
JUMLAH TOTAL 120,000,000.00 20,000,000.00 140,000,000.00
DIBULATKAN 120,000,000.00 20,000,000.00 140,000,000.00
LALU WIRA HARIYADI, ST.MT M. BAIDHOWI MAHFUDZ, ST M FARUQI ABDULLAH,ST Ir Husni Wardi,MBA,M.Pd Zakiah Darajat