You are on page 1of 60

CONTRACT CHANGE ORDER (CCO-01)

PEKERJAAN : SUPERVISI PENINGKATAN KEAMANAN BENDUNGAN BINALATUNG KOTA TARAKAN


NO. KONTRAK INDUK : HK.02.03/SATKER-OP-SDA-K.III/OP-SDA-IV/262.11/XII/2019
TGL.KONTRAK : 16 Desember 2019
WAKTU PELAKSANAAN : 360 HARI KALENDER
SUMBER DANA : DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT II ( DOISP 2 )
TAHUN ANGGARAN : 2019-2020
KONTRAKTOR : PT. WIRA KARSA KONSTRUKSI
KONSULTAN SUPERVISI : PT. ANTUSIAS RAYA

KONTRAK CONTRACT CHANGE ORDER - 01


NOMOR PEKERJAAN BERTAMBAH PEKERJAAN BERKURANG CCO-01
URAIAN KETERANGAN
MATA SATUAN JANGKA HARGA SATUAN VOLUME JUMLAH HARGA
KUANTITAS BOBOT % JANGKA JUMLAH HARGA
PEMBAYARAN WAKTU KUANTITAS JANGKA WAKTU KUANTITAS JANGKA WAKTU KUANTITAS VOLUME BOBOT %
WAKTU
(Rp) (Rp) (Rp)

I. BIAYA LANGSUNG PERSONIL


1. TENAGA AHLI (PROFESIONAL STAF)
1.1 Ketua Tim (Team Leader) OB 1.00 12.00 24,000,000.00 12.00 288,000,000.00 25.185 - - - - 1.00 12.00 12.00 288,000,000.00 25.185 TETAP
1.2 Ahli Jalan OB 1.00 4.00 18,500,000.00 4.00 74,000,000.00 6.471 - - - - 1.00 4.00 4.00 74,000,000.00 6.471 TETAP
1.3 Ahli Jembatan OB 1.00 5.00 18,500,000.00 5.00 92,500,000.00 8.089 - - - - 1.00 5.00 5.00 92,500,000.00 8.089 TETAP
1.4 Ahli Bangunan OB 1.00 7.00 18,500,000.00 7.00 129,500,000.00 11.324 - - - - 1.00 7.00 7.00 129,500,000.00 11.324 TETAP
1.5 Ahli Geoteknik OB 1.00 4.00 18,500,000.00 4.00 74,000,000.00 6.471 - - - - 1.00 4.00 4.00 74,000,000.00 6.471 TETAP
SUB TOTAL A.1 (Rp.) = 658,000,000.00 57.54 658,000,000.00 57.54
2. TENAGA SUB AHLI (SUB PROFESIONAL STAFF)
2.1 Inspector OB 1.00 12.00 8,500,000.00 12.00 102,000,000.00 8.920 - - - - 1.00 12.00 12.00 102,000,000.00 8.920 TETAP
2.2 Inspector OB 1.00 12.00 8,500,000.00 12.00 102,000,000.00 8.920 - - - - 1.00 12.00 12.00 102,000,000.00 8.920 TETAP
SUB TOTAL A.2 (Rp.) = 204,000,000.00 17.839 204,000,000.00 17.839
3. TENAGA PENDUKUNG
3.1 Operator Komputer OB 1.00 12.00 4,000,000.00 12.00 48,000,000.00 4.197 - - - - 1.00 12.00 12.00 48,000,000.00 4.197 TETAP
SUB TOTAL A.3 (Rp.) = 48,000,000.00 4.197 48,000,000.00 4.197
I. JUMLAH BIAYA LANGSUNG PERSONIL A1 + A2 + A3 (Rp.) 910,000,000.00 79.577 910,000,000.00 79.577

II. RINCIAN BIAYA LANGSUNG NON PERSONIL

1. PERJALANAN
1.1 Samarinda - Job Site Orang/Bulan 5.00 12.00 1,800,000.00 60.00 108,000,000.00 9.444 - - - - 5.00 12.00 60.00 108,000,000.00 9.444 TETAP
SUB TOTAL B.1 (Rp.) = 108,000,000.00 9.444 108,000,000.00 9.444
2. KENDARAAN DAN OPERASIONAL
2.1 Kendaraan Roda Empat Unit 1.00 12.00 4,500,000.00 12.00 54,000,000.00 4.722 - - - - 1.00 12.00 12.00 54,000,000.00 4.722 TETAP
2.2 Kendaraan Roda Dua Unit 2.00 12.00 700,000.00 24.00 16,800,000.00 1.469 - - - - 2.00 12.00 24.00 16,800,000.00 1.469 TETAP
SUB TOTAL B.2 (Rp.) = 70,800,000.00 6.191 70,800,000.00 6.191
3. Transportasi
3.1 Sewa Basecamp Unit/bln 1.00 12.00 1,500,000.00 12.00 18,000,000.00 1.574 - - - 1.00 12.00 12.00 18,000,000.00 1.574 TETAP
3.2 Sewa Komputer Unit/bln 1.00 12.00 500,000.00 12.00 6,000,000.00 0.525 - - - 1.00 12.00 12.00 6,000,000.00 0.525 TETAP
3.3 Sewa Printer Unit/bln 1.00 12.00 200,000.00 12.00 2,400,000.00 0.210 - - - 1.00 12.00 12.00 2,400,000.00 0.210 TETAP
3.4 Sewa GPS Unit/bln 1.00 12.00 150,000.00 12.00 1,800,000.00 0.157 - - - 1.00 12.00 12.00 1,800,000.00 0.157 TETAP
3.5 Biaya Komunikasi (Telepon, Fax, Internet) Ls 1.00 1.00 3,000,000.00 1.00 3,000,000.00 0.262 - - - 1.00 1.00 1.00 3,000,000.00 0.262 TETAP
3.6 ATK (Alat Tulis Kantor) Bulan 1.00 12.00 500,000.00 12.00 6,000,000.00 0.525 - - - 1.00 12.00 12.00 6,000,000.00 0.525 TETAP
3.7 Biaya Foto Copy Rim/Bln 1.00 12.00 500,000.00 12.00 6,000,000.00 0.525 - - - 1.00 12.00 12.00 6,000,000.00 0.525 TETAP
3.8 Hardisk 1 TB Buah 1.00 1.00 1,000,000.00 1.00 1,000,000.00 0.087 - - - 1.00 1.00 1.00 1,000,000.00 0.087 TETAP
SUB TOTAL B.3 (Rp.) = 44,200,000.00 3.87 44,200,000.00 3.87
4. Laporan - laporan
4.1 Laporan Pendahuluan Buah 5.00 1.00 80,000.00 5.00 400,000.00 0.035 - - - 5.00 1.00 5.00 400,000.00 0.035 TETAP
4.2 Laporan PMKK Buah 5.00 1.00 80,000.00 5.00 400,000.00 0.035 - - - 5.00 1.00 5.00 400,000.00 0.035 TETAP
4.3 Laporan Bulanan Buah 5.00 1.00 80,000.00 5.00 400,000.00 0.035 11.00 - - 5.00 12.00 60.00 4,800,000.00 0.420 PEK. TAMBAH
4.4 Laporan Akhir Buah 5.00 1.00 80,000.00 5.00 400,000.00 0.035 - - - 5.00 1.00 5.00 400,000.00 0.035 TETAP
4.5 Laporan Operasional & Pemeliharaan Buah 5.00 1.00 80,000.00 5.00 400,000.00 0.035 - - - 5.00 1.00 5.00 400,000.00 0.035 TETAP
4.6 Album Dokumentasi Kegiatan Supervisi Buah 3.00 1.00 150,000.00 3.00 450,000.00 0.039 - - - 3.00 1.00 3.00 450,000.00 0.039 TETAP
4.7 Presentasi Kali 3.00 1.00 1,000,000.00 3.00 3,000,000.00 0.262 - 3.00 - 0.00 1.00 0.00 - - HILANG
4.8 Leaflet Buah 50.00 1.00 20,000.00 50.00 1,000,000.00 0.087 - 10.00 - 40.00 1.00 40.00 800,000.00 0.070 PEK. KURANG
4.9 Roll Banner Buah 2.00 1.00 1,200,000.00 2.00 2,400,000.00 0.210 - 1.00 - 1.00 1.00 1.00 1,200,000.00 0.105 PEK. KURANG
4.10 Album Gambar
- Gambar A3 (Asli) Set 1.00 1.00 500,000.00 1.00 500,000.00 0.044 - - - 1.00 1.00 1.00 500,000.00 0.044 TETAP
4.11 - Gambar A3 (Copy) Set 1.00
0.00 3.00 400,000.00 3.00 1,200,000.00 0.105 - - - 1.00 3.00 3.00 1,200,000.00 0.105 TETAP
SUB TOTAL B.4 (Rp.) = 10,550,000.00 0.92 10,550,000.00 0.92
II. JUMLAH BIAYA LANGSUNG NON PERSONIL B1 + B2 + B3 + B4 (Rp.) 233,550,000.00 20.423 233,550,000.00 20.423

A JUMLAH TOTAL (I + II) 1,143,550,000.00 100.00 1,143,550,000.00 100.00


D DIBULATKAN ( RONDDOWN ) 1,143,550,000.00 1,143,550,000.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE 01

Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Timur


Kegiatan : Perencanaan SID/DED Saluran Drainase Jl. H.M. Ardans dan Sekitarnya Kec. Sangatta Selatan
No. Kontrak : 610/511.02/KTRK/PRC.SID.DRAIN.HM.ARDANS/DPU-KT/SDA/V/2020
Tgl. Kontrak : 26 Mei 2020 Minggu : Ke-01 (Satu)
Nilai Kontrak : Rp. 440.000.000,- Periode : 27 Oktober 2023 s/d 02 November 2023
Sumber Dana : APBD Kabupaten Kutai Timur, Tahun Anggaran 2020 Tahun : 2020

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %

A. BIAYA LANGSUNG PERSONIL


1 SURVEY PENDAHULUAN
1.1 TENAGA AHLI
1 Team Leader OB 1.00 0.50 13,500,000.00 6,750,000.00 1.38 - - - - -
2 Ahli Geodesi/Topografi OB 1.00 0.50 9,500,000.00 4,750,000.00 0.97 - - - - -
3 Ahli Hidrologi OB 1.00 0.50 9,500,000.00 4,750,000.00 0.97 - - - - -
4 Ahli Hidrologi OB 2.00 1.50 9,500,001.00 28,500,003.00 5.81 1.00 0.00 - 1.00 0.00
5 Ahli Hidrologi OB 3.00 2.50 9,500,002.00 71,250,015.00 14.53 2.00 0.00 - 2.00 0.00
1.2 TENAGA TEKNIKAL -
1 Surveyor OB 1.00 0.50 3,000,000.00 1,500,000.00 0.31 - - - - -
1.3 TENAGA PENUNJANG -
1 Labour OB 1.00 0.50 1,500,000.00 750,000.00 0.15 - - - - -
SUB TOTAL A.1 = (1.1+1.2+1.3) 118,250,018.00 24.12 3.00 0.00 - - 3.00 0.00
2 SURVEY TOPOGRAFI
2.1 TENAGA AHLI
1 Ahli Geodesi/Topografi OB 1.00 2.50 9,500,000.00 23,750,000.00 4.84 - - - - -
2.2 TENAGA TEKNIKAL
1 Surveyor OB 1.00 2.50 3,000,000.00 7,500,000.00 1.53 - - - - -
2.3 TENAGA PENUNJANG
1 Labour OB 1.00 2.50 1,500,000.00 3,750,000.00 0.76 - - - - -
SUB TOTAL A.2 = (2.1+2.2+.2.3) 35,000,000.00 7.14 - - - - - -
3 SURVEY HIDROLOGI/HIDROLIKA
3.1 TENAGA AHLI
1 Ahli Hidrologi OB 1.00 2.50 9,500,000.00 23,750,000.00 4.84 - - - - -
3.2 TENAGA PENUNJANG
1 Labour OB 1.00 2.50 1,500,000.00 3,750,000.00 0.76 - - - - -
SUB TOTAL A.3 = (3.1+3.2) 27,500,000.00 5.61 - - - - - -
4 SURVEY PENYELIDIKAN TANAH
4.1 TENAGA AHLI
1 Ahli Hidrologi OB 1.00 2.50 9,500,000.00 23,750,000.00 4.84 - - - - -
4.2 TENAGA PENUNJANG
1 Labour OB 1.00 2.50 1,500,000.00 3,750,000.00 0.76 - - - - -
SUB TOTAL A.4 = (4.1+4.2) 27,500,000.00 5.61 - - - - - -
5 PERENCANAAN TEKNIS
5.1 TENAGA AHLI
1 Team Leader OB 1.00 4.50 13,500,000.00 60,750,000.00 12.39 - - - - -
2 Ahli Geodesi/Topografi OB 1.00 2.00 9,500,000.00 19,000,000.00 3.88 - - - - -
3 Ahli Hidrologi OB 1.00 2.00 9,500,000.00 19,000,000.00 3.88 - - - - -
4 Ahli Geoteknik OB 1.00 2.00 9,500,000.00 19,000,000.00 3.88 - - - - -
5 Ahli Teknik Sipil OB 1.00 2.00 9,500,000.00 19,000,000.00 3.88 - - - - -
5.2 TENAGA PENUNJANG
1 Juru Gambar CAD OB 1.00 2.00 2,500,000.00 5,000,000.00 1.02 - - - - -
2 Operator Komputer/ Administrasi OB 1.00 4.50 2,000,000.00 9,000,000.00 1.84 - - - - -
3 Pelayan Kantor OB 1.00 4.50 1,500,000.00 6,750,000.00 1.38 - - - - -
SUB TOTAL A.5 = (5.1+5.2) 157,500,000.00 32.13 - - - - - -
SUB TOTAL BIAYA LANGSUNG PERSONIL 365,750,018.00 74.60 0.00 - - 3.00 0.00
s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %

B. BIAYA LANGSUNG NON PERSONIL


1 SURVEY PENDAHULUAN
1.1 TRANSPORT
1 Sewa Kendaraan Roda Empat Unit/Bulan 1.00 0.50 5,500,000.00 2,750,000.00 0.56 - - 2,750,000.00 0.56 2,750,000.00 0.56
1 Sewa Kendaraan Roda Dua Unit/Bulan 2.00 0.50 1,000,000.00 1,000,000.00 0.20 - - 1,000,000.00 0.20 1,000,000.00 0.20
1.2 PENGADAAN DATA
1 Data Hidrologi, Klimatologi dan Sosial Ekonomi Ls 1.00 - 2,500,000.00 2,500,000.00 0.51 - - - - -
1.3 LAPORAN
1 Laporan Survey Pendahuluan Buku 5.00 - 150,000.00 750,000.00 0.15 - - - - -
Sub Total SURVEY PENDAHULUAN 7,000,000.00 1.43 - - 3,750,000.00 0.76 3,750,000.00 0.76
2 SURVEY TOPOGRAFI
2.1 TRANSPORT
1 Sewa Kendaraan Roda Dua Unit/Bulan 2.00 2.50 1,000,000.00 5,000,000.00 1.02 - - - - -
2.2 BAHAN DAN PERALATAN
1 Mobilisasi/Demobilisasi Ls 1.00 - 1,000,000.00 1,000,000.00 0.20 - - - - -
2 Drone cam Unit/Hari 1.00 20.00 650,000.00 13,000,000.00 2.65 - - - - -
3 Total Station Unit/Bulan 1.00 2.50 3,000,000.00 7,500,000.00 1.53 - - - - -
4 GPS Unit/Bulan 1.00 2.50 250,000.00 625,000.00 0.13 - - - - -
5 Patok Bench Mark (BM) Bh 5.00 - 300,000.00 1,500,000.00 0.31 - - - - -
6 Control Point (CP) Bh 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
7 Perlengkapan & bahan Pengukuran Ls 1.00 - 1,500,000.00 1,500,000.00 0.31 - - - - -
2.3 LAPORAN
1 Laporan Survey Topografi Buku 5.00 - 150,000.00 750,000.00 0.15 - - - - -
Sub Total SURVEY TOPOGRAFI 32,125,000.00 6.55 - - - - - -
3 SURVEY HIDROLOGI/HIDROLIKA
3.1 TRANSPORT
1 Sewa Kendaraan Roda Dua Unit/Bulan 2.00 2.50 1,000,000.00 5,000,000.00 1.02 - - - - -
3.2 BAHAN DAN PERALATAN
1 Mobilisasi/Demobilisasi Ls 1.00 - 450,000.00 450,000.00 0.09 - - - - -
2 Current Meter Unit/Bulan 1.00 2.50 2,500,000.00 6,250,000.00 1.27 - - - - -
3 Perlengkapan Ls 1.00 - 1,500,000.00 1,500,000.00 0.31 - - - - -
3.3 LAPORAN
1 Laporan Survey Hidrologi Buku 5.00 - 150,000.00 750,000.00 0.15 - - - - -
Sub Total SURVEY HIDROLOGI/HIDROLIKA 13,950,000.00 2.85 - - - - - -
4 PERENCANAAN TEKNIS
4.1 BAHAN/PERALATAN/MATERIAL
1 Sewa Kantor Unit/Bulan 1.00 5.00 2,000,000.00 10,000,000.00 2.04 - - 2,000,000.00 0.41 2,000,000.00 0.41
2 Sewa Printer Unit/Bulan 1.00 4.50 850,000.00 3,825,000.00 0.78 - - - - -
3 Biaya Komunikasi Ls 1.00 - 3,000,000.00 3,000,000.00 0.61 - - 3,000,000.00 0.61 3,000,000.00 0.61
4 Sewa Komputer Unit/Bulan 1.00 4.50 1,500,000.00 6,750,000.00 1.38 - - - - -
5 Operasional & Material Komputer/Printer Ls 1.00 - 3,500,000.00 3,500,000.00 0.71 - - 3,500,000.00 0.71 3,500,000.00 0.71
6 Operasional Alat Tulis Kantor/Gambar Ls 1.00 - 3,000,000.00 3,000,000.00 0.61 - - 3,000,000.00 0.61 3,000,000.00 0.61
Sub Total PERENCANAAN TEKNIS 30,075,000.00 6.13 - - 11,500,000.00 2.35 11,500,000.00 2.35
s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %

5 PELAPORAN DAN GAMBAR PERENCANAAN


1 Laporan Pendahuluan Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
2 Laporan Deskripsi BM Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
3 Laporan Antara Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
4 Laporan Bulanan Buku/Bulan 5.00 5.00 300,000.00 7,500,000.00 1.53 - - - - -
5 Laporan Nota Perhitungan Desain Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
6 Laporan Engineer Estimate (EE): Volume Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
Pekerjaan (BOQ) dan Analisa harga Satuan
Pekerjaan (AHSP) di sertai Metode Pelaksanaan
7 Laporan Perhitungan Struktur Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
8 Spesifikasi Teknis Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
9 Laporan Pedoman Operasional dan Pemeliharaan Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
10 Laporan Akhir Buku 5.00 - 250,000.00 1,250,000.00 0.25 - - - - -
11 Album Gambar Desain :
Kertas Gambar (A3) Set 3.00 - 1,000,000.00 3,000,000.00 0.61 - - - - -
12 Dokumentasi Foto kegiatan Album 3.00 - 1,000,000.00 3,000,000.00 0.61 - - - - -
13 Portable SSD 1000 GB (Back Up Laporan) Unit 1.00 - 3,100,000.00 3,100,000.00 0.63 - - - - -
Sub Total PELAPORAN DAN GAMBAR PERENCANAAN 27,850,000.00 5.68 - - - - -

6 BIAYA PRESENTASI
1 Presentasi Laporan Pendahuluan Ls 1.00 1.00 3,500,000.00 3,500,000.00 0.71 - - - - -
2 Presentasi Laporan Antara Ls 1.00 1.00 5,000,000.00 5,000,000.00 1.02 - - - - -
3 Presentasi Laporan Akhir Ls 1.00 1.00 5,000,000.00 5,000,000.00 1.02 - - - - -
Sub Total BIAYA PRESENTASI 13,500,000.00 2.75 - - - - -
SUB TOTAL BIAYA LANGSUNG NON PERSONIL 124,500,000.00 25.40 - - 15,250,000.00 3.11 15,250,000.00 3.11

III JUMLAH TOTAL (A+B) = 490,250,018.00 100.00 - 0.00 15,250,000.00 3.11 15,250,003.00 3.11

III PPN 10% = 49,025,001.80 - 1,525,000.00 1,525,000.30

III JUMLAH TOTAL = 539,275,019.80 - 16,775,000.00 16,775,003.30


LAPORAN KEMAJUAN PEKERJAAN BULAN KE-01 (ADD-01)
Program : Pengelolaan Sumber Daya Air
Kegiatan : Supervisi Peningkatan Kantor UPB BWS Kalimantan III Kota Samarinda
Lokasi : Kec. Palarang, Kota Samarinda.
Sumber Dana : DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT II ( DOISP 2 ) Bulan : Ke-01 (Satu)
Tahun Anggaran : 2019 - 2020 Periode : 22 AGUSTUS - 20 SEPTEMBER
Waktu Pelaksanaan : 180 (Seratus Delapan Puluh) Hari Kalender Tahun : 2019
Nilai Kontrak : Rp. 465.755.000,-

s/d Bulan Lalu Bulan Ini s/d Bulan Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %

A. BIAYA LANGSUNG PERSONIL


A.1 TENAGA AHLI (PROFESIONAL STAF)
1 Ketua Tim (Team Leader) OB 1.00 6.00 24,000,000.00 144,000,000.00 35.01 - 0.00 24,000,000.00 5.83 24,000,000.00 5.83
2 Ahli Geoteknik OB 1.00 4.00 18,000,000.00 72,000,000.00 17.50 - 0.00 18,000,000.00 4.38 18,000,000.00 4.38
3 Ahli Konstruksi OB 1.00 6.00 18,000,000.00 108,000,000.00 26.26 - 0.00 18,000,000.00 4.38 18,000,000.00 4.38

Sub Total A-1.1 324,000,000.00 78.77 - 14.59 14.59


A.2 TENAGA TEKNIS (SUB PROFESIONAL STAFF)
1 Inspector OB 1.00 6.00 2,500,000.00 15,000,000.00 3.65 - 0.00 2,500,000.00 0.61 2,500,000.00 0.61

Sub Total A-2.1 15,000,000.00 3.65 - 0.61 0.61


A.3 TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi OB 1.00 6.00 2,000,000.00 12,000,000.00 2.92 - 0.00 2,000,000.00 0.49 2,000,000.00 0.49

Sub Total A-3.1 12,000,000.00 2.92 - 0.49 0.49

SUB TOTAL A = (A-1.1+ A-2.1+A-3.1) 351,000,000.00 85.33 0.00 15.68 15.68


LAPORAN KEMAJUAN PEKERJAAN BULAN KE-01 (ADD-01)
Program : Pengelolaan Sumber Daya Air
Kegiatan : Supervisi Peningkatan Kantor UPB BWS Kalimantan III Kota Samarinda
Lokasi : Kec. Palarang, Kota Samarinda.
Sumber Dana : DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT II ( DOISP 2 ) Bulan : Ke-01 (Satu)
Tahun Anggaran : 2019 - 2020 Periode : 22 AGUSTUS - 20 SEPTEMBER
Waktu Pelaksanaan : 180 (Seratus Delapan Puluh) Hari Kalender Tahun : 2019
Nilai Kontrak : Rp. 465.755.000,-

s/d Bulan Lalu Bulan Ini s/d Bulan Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %

B. BIAYA LANGSUNG NON PERSONIL


B.1 KENDARAAN DAN OPERASIONAL
1 Kendaraan Roda Empat Unit 1.00 6.00 2,000,000.00 12,000,000.00 2.92 - 0.00 2,000,000.00 0.49 2,000,000.00 0.49
2 Kendaraan Roda Dua Unit 1.00 6.00 500,000.00 3,000,000.00 0.73 - 0.00 500,000.00 0.12 500,000.00 0.12

Sub Total B-1.1 15,000,000.00 3.65 - 0.61 0.61

B.2 BIAYA KANTOR


1 Basecamp Unit/Bln 1.00 6.00 1,500,000.00 9,000,000.00 2.19 - 0.00 1,500,000.00 0.36 1,500,000.00 0.36
2 Laptop Unit/Bln 1.00 6.00 500,000.00 3,000,000.00 0.73 - 0.00 500,000.00 0.12 500,000.00 0.12
3 Printer Unit/Bln 1.00 6.00 200,000.00 1,200,000.00 0.29 - 0.00 200,000.00 0.05 200,000.00 0.05
4 GPS Unit/Bln 1.00 6.00 300,000.00 1,800,000.00 0.44 - 0.00 300,000.00 0.07 300,000.00 0.07
5 Biaya Operasional Kantor Bulan 1.00 6.00 3,000,000.00 18,000,000.00 4.38 - 0.00 3,000,000.00 0.73 3,000,000.00 0.73

Sub Total B-2.1 33,000,000.00 8.02 - 1.34 1.34

B.3 PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan Buku 3.00 1.00 80,000.00 240,000.00 0.06 - 0.00 #REF! #REF! #REF! #REF!
2 Laporan PMKK Buku 3.00 1.00 80,000.00 240,000.00 0.06 - 0.00 #REF! #REF! #REF! #REF!
3 Laporan Bulanan Buku/Bln 3.00 6.00 80,000.00 1,440,000.00 0.35 - 0.00 #REF! #REF! #REF! #REF!
4 Laporan Akhir (Final Report) Buku 3.00 1.00 80,000.00 240,000.00 0.06 - 0.00 #REF! #REF! #REF! #REF!
5 Back Up Data Gambar Supervisi Set 3.00 1.00 400,000.00 1,200,000.00 0.29 - 0.00 #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi Set 3.00 1.00 600,000.00 1,800,000.00 0.44 - 0.00 #REF! #REF! #REF! #REF!
7 Pengarsipan ( Hardisk 2 Terabyte ) Kali 1.00 1.00 1,200,000.00 1,200,000.00 0.29 - 0.00 #REF! #REF! #REF! #REF!
8 Presentasi Kali 2.00 1.00 2,500,000.00 5,000,000.00 1.22 - 0.00 #REF! #REF! #REF! #REF!
9 Leaflet Lembar 65.00 1.00 15,000.00 975,000.00 0.24 - 0.00 #REF! #REF! #REF! #REF!

Sub Total B-3.1 12,335,000.00 3.00 0.00 #REF! #REF!


SUB TOTAL B = (B-1.1 + B-2.1 + B-3.1) 60,335,000.00 14.67 - #REF! #REF!

III JUMLAH TOTAL (A+B) = 411,335,000.00 100.00 0.00 #REF! #REF!


LAPORAN BULAN KE-I (SATU)
PERIODE (22 Agustus 2019 s/d 20 September 2019)

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Supervisi Peningkatan Kantor UPB BWS Kalimantan III Kota Samarinda
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Kantor UPB BWS Kalimantan III Kota Samarinda
Indikator Kinerja Kegiatan : Pengawasan Konstruksi Bangunan Gedung

PERHITUNGAN BOBOT (%)


KONTRAK RENCANA KEMAJUAN BOBOT (%)
PRESTASI
DESKRIPSI PEKERJAAN BOBOT BOBOT
NO S/D BULAN S/D BULAN TERHADAP
BULAN INI
LALU INI PROGRESS (%)
(%) (%)
a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! Err:509 0.00 5.83 5.83 #REF!
2 Ahli Geoteknik #REF! Err:508 0.00 4.38 4.38 #REF!
3 Ahli Konstruksi #REF! Err:508 0.00 4.38 4.38 #REF!

B TENAGA TEKNIS
1 Inspector #REF! Err:508 0.00 0.61 0.61 #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi #REF! Err:509 0.00 0.49 0.49 #REF!

II BIAYA LANGSUNG NON PERSONIL


A KENDARAAN DAN OPERASIONAL
1 Sewa Kendaraan Roda empat #REF! 0.00 0.00 0.49 0.49 #REF!
2 Sewa Kendaraan Roda 2 #REF! Err:508 0.00 0.12 0.12 #REF!

B BIAYA KANTOR
1 Sewa Base camp #REF! Err:508 0.00 0.36 0.36 #REF!
2 Sewa Laptop #REF! Err:508 0.00 0.12 0.12 #REF!
3 Sewa Printer #REF! Err:508 0.00 0.05 0.05 #REF!
4 Sewa GPS #REF! Err:509 0.00 0.07 0.07 #REF!
5 Operasional Kantor #REF! 0.00 0.00 0.73 0.73 #REF!

C PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan #REF! Err:508 0.00 #REF! #REF! #REF!
2 Laporan PMKK #REF! Err:509 0.00 #REF! #REF! #REF!
3 Laporan Bulanan #REF! Err:508 0.00 #REF! #REF! #REF!
4 Laporan Akhir #REF! Err:508 0.00 #REF! #REF! #REF!
5 Back Up Data Gambar Supervisi #REF! Err:509 0.00 #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi #REF! Err:508 0.00 #REF! #REF! #REF!
7 Pengarsipan ( Hardisk 2 Terabyte ) #REF! 0.00 0.00 #REF! #REF! #REF!
8 Presentasi #REF! Err:509 0.00 #REF! #REF! #REF!
9 Leaflet #REF! Err:508 0.00 #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI Err:508
JUMLAH BOBOT s/d BULAN LALU 0.00
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Satker Operasi dan Pemeliharaan SDA III KONSULTAN SUPERVISI
Kordinator Lapangan CV. KARYA PRATAMA MANDIRI

ELYZABETH DARONGKE., ST. ANDI DANUR PANGILEGAU, ST.


NIP . 19751214 201410 2 002 Team Leader
LAPORAN BULAN KE-I (SATU)
PERIODE (18 Desember 2019 s/d 16 Januari 2020)

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D BULAN
BULAN INI S/D BULAN INI PROGRESS (%)
(%) LALU
(%)

a b c d e f g=e+f h = g/c x 100

A I.
### Err:509
A. TENAGA AHLI
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
2 BIAYA LANGSUNG NON PERSONIL
### TENAGA AHLI
1 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
1 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
### Err:509
### TENAGA AHLI
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
### Err:509
1 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
### TENAGA AHLI
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
### Err:509
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
### Err:509
### TENAGA AHLI
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
2 Err:509 Err:509 0.00 0.00 0.00 Err:509
3 Err:509 Err:509 0.00 0.00 0.00 Err:509
4 Err:509 Err:509 0.00 0.00 0.00 Err:509
5 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
2 Err:509 Err:509 0.00 0.00 0.00 Err:509
3 Err:509 Err:509 0.00 0.00 0.00 Err:509
B BIAYA LANGSUNG NON PERSONIL
### Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 0.00 Err:509
2 Err:509 0.25 0.13 0.00 0.00 0.00
### Err:509
1 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
1 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
### Err:509
2 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
1 Err:509 0.00 0.00 0.00 0.00 #DIV/0!
2 Err:509 Err:509 0.00 0.00 0.00 Err:509
3 Err:509 Err:509 0.00 0.00 0.00 Err:509
4 Err:509 Err:509 0.00 0.00 0.00 Err:509
5 Err:509 Err:509 0.00 0.00 0.00 Err:509
6 Err:509 Err:509 0.00 0.00 0.00 Err:509
7 Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
1 Err:509 Err:509 0.00 0.00 0.00 Err:509
PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D BULAN
BULAN INI S/D BULAN INI PROGRESS (%)
(%) LALU
(%)

a b c d e f g=e+f h = g/c x 100

### Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509
### Err:509
1 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509
### Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
Err:509
Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509
Err:509 Err:509 0.00 0.00 0.00 Err:509
### Err:509 Err:509 0.00 1.00 -1.00 Err:509
### Err:509 Err:509 0.00 2.00 -2.00 Err:509
### Err:509
1 Err:509 Err:509 0.00 0.00 0.00 0.00 Err:509
2 Err:509 Err:509 0.00 0.00 0.00 0.00 Err:509
3 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509
JUMLAH BOBOT KONTRAK Err:509
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI Err:509
JUMLAH BOBOT s/d BULAN LALU 3.00
JUMLAH BOBOT BULAN INI Err:509
JUMLAH BOBOT s/d BULAN INI Err:509
DEVIASI Err:509

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
TIME SCHEDULE
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 01 (satu)
Nilai Kontrak : Rp. 95.293.500,- 07 Oktober 2021 - 05 November 2021
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023
NILAI DURASI PELAKSANAAN PEKERJAAN 90 HARI KALENDER
KONTRAK BOBOT BULAN - I BULAN - III
No. URAIAN PEKERJAAN KET.
07 Oktober 2021 - 05 November 2021
06 Desember 2021 - 31 Desember 2021
(Rp) (%) M.1 M.2 M.3 M.4 M.9 M.10 M.11 M.12

I. Err:509
A. TENAGA AHLI
1 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
II. BIAYA LANGSUNG NON PERSONIL
### Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
2 Err:509
2.1 Err:509
1 Err:509
2.2 Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509
2.3 Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509
2.4 Err:509
1 Err:509 Err:509 Err:509 Err:509
2.5 Err:509
1 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509
3 Err:509 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509 Err:509
2.6 Err:509
1 Err:509 Err:509 Err:509 Err:509
### Err:509
### Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509
### Err:509
### Err:509
1 Err:509 Err:509 Err:509 Err:509
1 Err:509 Err:509 Err:509 Err:509
1 Err:509 Err:509 Err:509 Err:509
1 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509

A JUMLAH BOBOT RENCANA 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
B BOBOT RENCANA KUMULATIF 0.0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
C JUMLAH BOBOT REALISASI 0.0 #REF! #REF! #REF! #REF!
D BOBOT REALISASI KUMULATIF 0.0 #REF! #REF! #REF! #REF!
E DEVIASI (+) / (-) 0.0 #REF! #REF! #REF! #REF!

Dibuat Oleh
Konsultan
Perencana
CV. KARYA
PRATAMA
CONSULTANT

.Ahmad Rofi’i, ST
Team Leader
RINCIAN KOMPONEN REMUNERASI PERSONIL

Pengalaman Tunjangan Biaya Langsung


No. Nama Personil/Jabatan/Posisi Posisi Sertifikat Keahlian Gaji Dasar Biaya Beban Sosial Biaya Beban Umum Keuntungan Dibulatkan
Profesional Penugasan Personil

(a) (b) (c) (d) (e) (f) (g)=(0.3-0.4)f (h)=(0.5-1.3)f (i)=(0.1-0.3)f (j)=0.1(f+g+h) (k)=(f+g+h+i+j)
TENGA AHLI

Supervision Ahli Teknik Jalan -


1 Rio, ST 2 Rp 8,366,900.00 Rp 2,928,415.00 Rp 6,275,175.00 Rp 1,673,380.00 Rp 1,757,049.00 Rp 21,000,919.00 Rp 21,000,000.00
Engineer Muda

TENAGA TEKNIS DAN PENDUKUNG

Inspector/Material
1 Ir. Amos Datuan - 5 Rp 2,789,000.00 Rp 976,150.00 Rp 2,091,750.00 Rp 557,800.00 Rp 585,690.00 Rp 7,000,390.00 Rp 7,000,000.00
Teknisi

2 Wawan Supriadi Operator Komputer - - Rp 2,191,500.00 Rp 767,025.00 Rp 1,643,625.00 Rp 438,300.00 Rp 460,215.00 Rp 5,500,665.00 Rp 5,500,000.00

Ahli K3 Konstruksi -
3 Mujainah, ST Petugas K3 2 Rp 2,191,500.00 Rp 767,025.00 Rp 1,643,625.00 Rp 438,300.00 Rp 460,215.00 Rp 5,500,665.00 Rp 5,500,000.00
Muda
REKAPITULASI
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Lokasi : Kec. Tenggarong Kab. Kutai Kartanegara
Sumber Dana : APBD Kab. Kutai Kartanegara
Tahun Anggaran : 2023

TOTAL HARGA
No. URAIAN KEGIATAN
(Rp)

I BIAYA LANGSUNG PERSONIL

1.1 TENAGA AHLI 81,000,000.00


Sub Total I (Personil) 81,000,000.00

II BIAYA LANGSUNG NON PERSONIL

2.2 BAIAYA KANTOR 2,300,000.00


2.2 PEMBUATAN LAPORAN 2,550,000.00
Sub Total II (Non Personil) 4,850,000.00

A Jumlah ( I + II ) 85,850,000.00
B PPN 11% 9,443,500.00
C Jumlah + PPN 10% (A+B) 95,293,500.00

TERBILANG : / / Sembilan Puluh Delapan Juta Enam Ratus Tujuh Puluh Tiga Ribu Empat Ratus Lima Puluh Rupiah/ / /

Samarinda, 28 Juli 2023


CV. CV. ARORI TEKNIKA

AMBO RIO, ST
Direktur
KUANTITAS DAN HARGA
I. BIAYA LANGSUNG PERSONIL
Harga Satuan Jumlah Harga
No. Posisi Sat Kuantitas Waktu Volume
(Rp) (Rp)

1.1 TENAGA AHLI


1 Site Engineer OB 1.00 2.00 2.00 21,000,000.00 42,000,000.00
2 Ahli K3 Konstruksi OB 1.00 2.00 2.00 19,500,000.00 39,000,000.00
Sub Total 1.1 81,000,000.00
Jumlah Biaya Langsung Personil 81,000,000.00
II. BIAYA LANGSUNG NON PERSONIL
Harga Satuan Jumlah Harga
No. Uraian Kegiatan Sat Kuantitas Waktu Volume
(Rp) (Rp)

2.2 BAIAYA KANTOR


1 Biaya ATK Ls 1.00 1.00 1.00 2,300,000.00 2,300,000.00
Sub Total 2.2 2,300,000.00
2.3 BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 10.00 95,000.00 950,000.00
2 Laporan Akhir Buku 5.00 1.00 5.00 90,000.00 450,000.00
3 Back Up Invoice Buku 5.00 1.00 5.00 90,000.00 450,000.00
4 FlashDisk 64 GB Buah 1.00 1.00 1.00 250,000.00 250,000.00
5 Foto Dokumentasi Album 5.00 1.00 5.00 90,000.00 450,000.00
Sub Total 2.3 2,550,000.00
Jumlah Biaya Langsung Non Personil 4,850,000.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-01
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-01 (Satu)
Nilai Kontrak : Rp. 95.293.500,- Periode : 27 Oktober 2023 s/d 02 November 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL 27 Oktober 2023 s/d 25 November 2023
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 - - 5,250,000.00 0.25 6.12 5,250,000.00 0.25 6.12
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 - - 4,875,000.00 0.25 5.68 4,875,000.00 0.25 5.68
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 - - 10,125,000.00 11.79 10,125,000.00 11.79
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 - - 10,125,000.00 11.79 10,125,000.00 11.79
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 - - 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 - - 2,300,000.00 2.68 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 - - - - - - - -
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 - - - - - -
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 - - 2,300,000.00 2.68 2,300,000.00 2.68
TOTAL I + II 85,850,000.00 100.00 - - 12,425,000.00 14.47 12,425,000.00 14.47
IV PPN 11% 9,443,500.00 - 1,366,750.00 1,366,750.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 - 13,791,750.00 13,791,750.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-02
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-02 (Dua)
Nilai Kontrak : Rp. 95.293.500,- Periode : 03 November 2023 s/d 10 November 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL 27 Oktober 2023 s/d 25 November 2023
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 5,250,000.00 0.25 6.12 5,250,000.00 0.25 6.12 10,500,000.00 0.50 12.23
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 4,875,000.00 0.25 5.68 4,875,000.00 0.25 5.68 9,750,000.00 0.50 11.36
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 10,125,000.00 11.79 10,125,000.00 11.79 20,250,000.00 23.59
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 10,125,000.00 11.79 10,125,000.00 11.79 20,250,000.00 23.59
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 - - - - - - - - -
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 - - - - - -
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,300,000.00 2.68 - - 2,300,000.00 2.68
TOTAL I + II 85,850,000.00 100.00 12,425,000.00 14.47 10,125,000.00 11.79 22,550,000.00 26.27
IV PPN 11% 9,443,500.00 1,366,750.00 1,113,750.00 2,480,500.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 13,791,750.00 11,238,750.00 25,030,500.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-03
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-03 (Tiga)
Nilai Kontrak : Rp. 95.293.500,- Periode : 11 November 2023 s/d 17 November 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL 27 Oktober 2023 s/d 25 November 2023
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 10,500,000.00 0.50 12.23 5,250,000.00 0.25 6.12 15,750,000.00 0.75 18.35
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 9,750,000.00 0.50 11.36 4,875,000.00 0.25 5.68 14,625,000.00 0.75 17.04
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 20,250,000.00 23.59 10,125,000.00 11.79 30,375,000.00 35.38
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 20,250,000.00 23.59 10,125,000.00 11.79 30,375,000.00 35.38
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 - - - - - - - - -
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 - - - - - -
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,300,000.00 2.68 - - 2,300,000.00 2.68
TOTAL I + II 85,850,000.00 100.00 22,550,000.00 26.27 10,125,000.00 11.79 32,675,000.00 38.06
IV PPN 11% 9,443,500.00 2,480,500.00 1,113,750.00 3,594,250.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 25,030,500.00 11,238,750.00 36,269,250.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-04
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-04 (Empat)
Nilai Kontrak : Rp. 95.293.500,- Periode : 18 November 2023 s/d 25 November 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL 27 Oktober 2023 s/d 25 November 2023
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 15,750,000.00 0.75 18.35 5,250,000.00 0.25 6.12 21,000,000.00 1.00 24.46
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 14,625,000.00 0.75 17.04 4,875,000.00 0.25 5.68 19,500,000.00 1.00 22.71
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 30,375,000.00 35.38 10,125,000.00 11.79 40,500,000.00 47.18
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 30,375,000.00 35.38 10,125,000.00 11.79 40,500,000.00 47.18
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 - - - 475,000.00 5.00 0.55 475,000.00 5.00 0.55
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 - - 475,000.00 0.55 475,000.00 0.55
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,300,000.00 2.68 475,000.00 0.55 2,775,000.00 3.23
TOTAL I + II 85,850,000.00 100.00 32,675,000.00 38.06 10,600,000.00 12.35 43,275,000.00 50.41
IV PPN 11% 9,443,500.00 3,594,250.00 1,166,000.00 4,760,250.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 36,269,250.00 11,766,000.00 48,035,250.00
LAPORAN KEMAJUAN PEKERJAAN BULAN KE-01
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-01 (Satu)
Nilai Kontrak : Rp. 95.293.500,- Periode : 27 Oktober 2023 s/d 25 November 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Bulan Lalu Bulan Ini s/d Bulan Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL 27 Oktober 2023 s/d 25 November 2023
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 - - 21,000,000.00 1.00 24.46 21,000,000.00 1.00 24.46
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 - - 19,500,000.00 1.00 22.71 19,500,000.00 1.00 22.71
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 - - 40,500,000.00 47.18 40,500,000.00 47.18
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 - - 40,500,000.00 47.18 40,500,000.00 47.18
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 - - 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 - - 2,300,000.00 2.68 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 - - 475,000.00 5.00 0.55 475,000.00 5.00 0.55
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 - - 475,000.00 0.55 475,000.00 0.55
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 - - 2,775,000.00 3.23 2,775,000.00 3.23
TOTAL I + II 85,850,000.00 100.00 - - 43,275,000.00 50.41 43,275,000.00 50.41
IV PPN 11% 9,443,500.00 - 4,760,250.00 4,760,250.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 - 48,035,250.00 48,035,250.00
REKAP SERTIFIKAT BULANAN 01

Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Lokasi : Kabupaten Kutai Kartanegara
Sumber Dana : APBD-P Kutai Kartanegara
Tahun Anggaran : 2023
Konsultan Pengawas : CV. ADHITAMA CITRA MANDIRI
No Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tanggal Kontrak : 27 Oktober 2023
Nilai Kontrak : Rp. 95.293.500,-
Waktu Pelaksanaan : 60 (Enam Puluh ) Hari Kalender 27 Oktober 2023 s/d 25 November 2023
Bulan Ke : 01 (satu)
Periode : 27 Oktober 2023 s/d 25 November 2023

REALISASI KONTRAK
KONTRAK AWAL
BULAN LALU BULAN INI SAMPAI BULAN INI

NO JENIS PEKERJAAN
BOBOT JUMLAH BOBOT JUMLAH BOBOT JUMLAH BOBOT JUMLAH
(%) (Rp) (%) (Rp) (%) (Rp) (%) (Rp)

I BIAYA LANGSUNG PERSONIL 94.35 81,000,000.00 - - 47.18 40,500,000.00 47.18 40,500,000.00


II BIAYA LANGSUNG NON PERSONIL 5.65 4,850,000.00 - - 3.23 2,775,000.00 3.23 2,775,000.00

III TOTAL 100.00 85,850,000.00 - - 50.41 43,275,000.00 50.41 43,275,000.00


IV PPN 11 % 9,443,500.00 - 4,760,250.00 4,760,250.00
JUMLAH IV + V 95,293,500.00 - 48,035,250.00 48,035,250.00
A JUMLAH HARGA PEKERJAAN SAMPAI SAAT INI 48,035,250.00
B PEMBAYARAN SERTIFIKAT S/D BULAN LALU -
C JUMLAH KOTOR SERTIFIKAT BULAN INI (A - B) 48,035,250.00
D POTONGAN-POTONGAN : -
E JUMLAH BERSIH SERTIFIKAT BULAN INI (C - D) 48,035,250.00
F DIBULATKAN 48,035,250.00

Terbilang : EMPAT PULUH DELAPAN JUTA TIGA PULUH LIMA RIBU DUA RATUS LIMA PULUH RUPIAH

0.00
PERSENTASE PEMBAYARAN (%) 50.41
50.41

Tenggarong, 25 November 2023


Diperiksa / Disetujui Oleh, Dibuat Oleh,
DINAS PEKERJAAN UMUM Konsultan Pengawas
KABUPATEN KUTAI KARTANEGARA CV. ADHITAMA CITRA MANDIRI
PEJABAT PEMBUAT KOMITMEN

EDDY HARUSSWANTO, ST. I Nyoman Murda, ST.


Nip: 19700411 199803 1 007 Site Engineer
BALAI WILAYAH SUNGAI KALIMANTAN III
SATKER OPERASI DAN PEMELIHARAAN SDA III

TIME SCHEDULE ADD -01


PROGRAM : #REF!
KEGIATAN : #REF!
LOKASI : #REF! Bulan Ke 0: 4 (empat)
SUMBER DANA : #REF! Periode : 17 Maret s/d 16 April
TAHUN ANGGAR : #REF! Tahun : 2020
NILAI DURASI PELAKSANAAN PEKERJAAN 360 HARI KALENDER
KONTRAK BOBOT BULAN - I BULAN - II BULAN - III BULAN - IV BULAN - V BULAN - VI BULAN - VII BULAN - VIII BULAN - IX BULAN - X BULAN - XI BULAN - XII
No. URAIAN PEKERJAAN KET.
18 Des 2019 - 16 Jan 2020 17 Jan 2020 - 15 Feb 2020 16 Feb 2020 - 16 Mar 2020 17 Mar 2020 - 15 Apr 2020 16 Apr 2020 - 15 Mei 2020 16 Mei 2020 - 14 Juni 2020 15 Jun 2020 - 14 Juli 2020 15 Jul 2020 - 13 Agt 2020 14 Agt 2020 - 12 Sep 2020 13 Sep 2020 - 12 Okt 2020 13 Okt 2020 - 11 Nov 2020 12 Nov 2020 - 11 Des 2020
(Rp) (%) M.1 M.2 M.3 M.4 M.5 M.6 M.7 M.8 M.9 M.10 M.11 M.12 M.13 M.14 M.15 M.16 M.17 M.18 M.19 M.20 M.21 M.22 M.23 M.24 M.25 M.26 M.27 M.28 M.29 M.30 M.31 M.32 M.33 M.34 M.35 M.36 M.37 M.38 M.39 M.40 M.41 M.42 M.43 M.44 M.45 M.46 M.47 M.48

### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449 0.449
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! 54,000,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF! RENCANA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
8 #REF! #REF! #REF! #REF!
### #REF!
0.0
1 #REF! #REF! #REF! #REF!
0.0
2 Laporan PMKK #REF! #REF! #REF!
3 #REF! 4,800,000.00 #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF!
7 #REF! 0.00 #REF! #REF!
8 #REF! 1,200,000.00 #REF! #REF!
9 #REF! - #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

A JUMLAH BOBOT RENCANA 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
B BOBOT RENCANA KUMULATIF 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
C JUMLAH BOBOT REALISASI 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
D BOBOT REALISASI KUMULATIF 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
E DEVIASI (+) / (-) 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Diperiksa / Disetujui Oleh Dibuat Oleh


PPK Operasi Dan Pemeliharaan SDA IV Konsultan Supervisi
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

.Ariyadi, ST .Pileo Tandi Allo, ST


NIP . 19760606 200812 1 003 Team Leader
JADWAL WAKTU PELAKSANAAN / TIME SCHEDULE
KURVA S
Kegiatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Nomor Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tanggal Kontrak : 27 Oktober 2023
Tahun Anggaran : 2023
Prop / Kab / Kodya : Kabupaten Kutai Kartanegara
Konsultan Pengawas : CV. ADHITAMA CITRA MANDIRI

DURASI PELAKSANAAN PEKERJAAN 60 HARI KALENDER

27 Oktober 2023 s/d 25 November 2023 26 November 2023 s/d 25 Desember 2023
No. Mata
JENIS PEKERJAAN NILAI BOBOT
Pmbyrn KETERANGAN
Minggu ke 1 Minggu Ke 2 Minggu ke 3 Minggu Ke 4 Minggu ke 5 Minggu Ke 6 Minggu ke 7 Minggu Ke 8
KONTRAK (%)
1 2 3 4 5 6 7 8

I. DBIAYA LANGSUNG PERSONIL

A. ###TENAGA AHLI

1 - Site Engineer 42,000,000.00 48.92 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 100

2 - Ahli K3 Konstruksi 39,000,000.00 45.43 5.68 5.68 5.68 5.68 5.68 5.68 5.68 5.68 90

II. BIAYA LANGSUNG NON PERSONIL


80
B. BAIAYA KANTOR
70
1 - Biaya ATK 2,300,000.00 2.68 2.68
60
BIAYA PELAPORAN
50
1 - Laporan Bulanan 950,000.00 1.11 50.41 0.55 0.55
40
2 - Laporan Akhir 450,000.00 0.52 0.52
38.06
3 - Back Up Invoice 450,000.00 0.52 0.52 30

4 - FlashDisk 64 GB 250,000.00 0.29 26.27 0.29 20

5 - Foto Dokumentasi 450,000.00 0.52 0.52 10


14.47

0
85,850,000.00 100.00 0 0 0 0

RENCANA PROGRESS MINGGUAN (%) 14.47 11.79 11.79 12.35 11.79 11.79 11.79 14.21
SCHEDULE RENCANA
KOMULATIF PROGRESS MINGGUAN (%) 14.47 26.27 38.06 50.41 62.20 74.00 85.79 100.00

PROGRESS MINGGUAN (%) 14.47 11.79 11.79 12.35


REALISASI FISIK
KOMULATIF PROGRES MINGGUAN (%) 14.47 26.27 38.06 50.41
DEVIASI DEVIASI (%) - - - -

Dibuat Oleh :
Konsultan Pengawas
CV. ADHITAMA CITRA MANDIRI

I Nyoman Murda, ST.


Site Engineer
Copy Sheet ini Ke File Anda
48,035,250 EMPAT PULUH DELAPAN JUTA TIGA PULUH LIMA RIBU DUA RATUS LIMA
Sesuaikan sel yang berwarna merah dengan Sel PULUH RUPIAH
yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9
et anda

48035250 48035250
SATU LIMA PULUH
DUA DUA RATUS 480 MILYARAN
TIGA LIMA RIBU 48 JUTAAN
EMPAT TIGA PULUH 035 RIBUAN
LIMA 250 RATUSAN
ENAM DELAPAN JUTA
TUJUH EMPAT PULUH
DELAPAN EMPAT RATUS
SEMBILAN MILYAR
DELAPAN PULUH
EMPAT Ratus
DAFTAR HADIR
Konsultan Pengawas : CV. ADHITAMA CITRA MANDIRI
Kegiatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Lokasi : Kabupaten Kutai Kartanegara
Tahun Anggaran : 2023 27 Oktober 2023 s/d 25 November 2023 Bulan : Ke-01
Periode : 27 Oktober 2023 s/d 25 November 2023

2023
OKTOBER-NOVEMBER Total Hari
No. Nama Posisi Dalam Bulan
27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

1 I Nyoman Murda, ST. Site Engineer

30

2 David Andera Putra, ST. Ahli K3 Konstruksi

Keterangan :
ST : Sakit C : Cuti : Hari Libur Resmi : Belum Mobiliasasi
I : Ijin TL : Tugas Luar (Survei) : Hari Minggu
Konsultan Pengawas
CV. ARORI TEKNIKA

AMBO RIO, ST
Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-05
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-05 (Lima)
Nilai Kontrak : Rp. 95.293.500,- Periode : 26 November 2023 s/d 02 Desember 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 21,000,000.00 1.00 24.46 5,250,000.00 0.25 6.12 26,250,000.00 1.25 30.58
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 19,500,000.00 1.00 22.71 4,875,000.00 0.25 5.68 24,375,000.00 1.25 28.39
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 40,500,000.00 47.18 10,125,000.00 11.79 50,625,000.00 58.97
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 40,500,000.00 47.18 10,125,000.00 11.79 50,625,000.00 58.97
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 475,000.00 5.00 0.55 - - - 475,000.00 5.00 0.55
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 475,000.00 0.55 - - 475,000.00 0.55
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,775,000.00 3.23 - - 2,775,000.00 3.23
TOTAL I + II 85,850,000.00 100.00 43,275,000.00 50.41 10,125,000.00 11.79 53,400,000.00 62.20
IV PPN 11% 9,443,500.00 4,760,250.00 1,113,750.00 5,874,000.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 48,035,250.00 11,238,750.00 59,274,000.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-06
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-06 (Enam)
Nilai Kontrak : Rp. 95.293.500,- Periode : 03 Desember 2023 s/d 10 Desember 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 26,250,000.00 1.25 30.58 5,250,000.00 0.25 6.12 31,500,000.00 1.50 36.69
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 24,375,000.00 1.25 28.39 4,875,000.00 0.25 5.68 29,250,000.00 1.50 34.07
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 50,625,000.00 58.97 10,125,000.00 11.79 60,750,000.00 70.76
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 50,625,000.00 58.97 10,125,000.00 11.79 60,750,000.00 70.76
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 475,000.00 5.00 0.55 - - - 475,000.00 5.00 0.55
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 475,000.00 0.55 - - 475,000.00 0.55
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,775,000.00 3.23 - - 2,775,000.00 3.23
TOTAL I + II 85,850,000.00 100.00 53,400,000.00 62.20 10,125,000.00 11.79 63,525,000.00 74.00
IV PPN 11% 9,443,500.00 5,874,000.00 1,113,750.00 6,987,750.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 59,274,000.00 11,238,750.00 70,512,750.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-07
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-07 (Tujuh)
Nilai Kontrak : Rp. 95.293.500,- Periode : 11 Desember 2023 s/d 17 Desember 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 31,500,000.00 1.50 36.69 5,250,000.00 0.25 6.12 36,750,000.00 1.75 42.81
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 29,250,000.00 1.50 34.07 4,875,000.00 0.25 5.68 34,125,000.00 1.75 39.75
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 60,750,000.00 70.76 10,125,000.00 11.79 70,875,000.00 82.56
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 60,750,000.00 70.76 10,125,000.00 11.79 70,875,000.00 82.56
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 475,000.00 5.00 0.55 - - - 475,000.00 5.00 0.55
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - - - - - - -
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - - - - - - -
C = LAPORAN-LAPORAN 2,550,000.00 2.97 475,000.00 0.55 - - 475,000.00 0.55
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,775,000.00 3.23 - - 2,775,000.00 3.23
TOTAL I + II 85,850,000.00 100.00 63,525,000.00 74.00 10,125,000.00 11.79 73,650,000.00 85.79
IV PPN 11% 9,443,500.00 6,987,750.00 1,113,750.00 8,101,500.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 70,512,750.00 11,238,750.00 81,751,500.00
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE-08
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-08 (Delapan)
Nilai Kontrak : Rp. 95.293.500,- Periode : 18 Desember 2023 s/d 22 Desember 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Minggu Lalu Minggu Ini s/d Minggu Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 36,750,000.00 1.75 42.81 5,250,000.00 0.25 6.12 42,000,000.00 2.00 48.92
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 34,125,000.00 1.75 39.75 4,875,000.00 0.25 5.68 39,000,000.00 2.00 45.43
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 70,875,000.00 82.56 10,125,000.00 11.79 81,000,000.00 94.35
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 70,875,000.00 82.56 10,125,000.00 11.79 81,000,000.00 94.35
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 475,000.00 5.00 0.55 475,000.00 5.00 0.55 950,000.00 10.00 1.11
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - 450,000.00 5.00 0.52 450,000.00 5.00 0.52
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - 450,000.00 5.00 0.52 450,000.00 5.00 0.52
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - 250,000.00 1.00 0.29 250,000.00 1.00 0.29
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - 450,000.00 5.00 0.52 450,000.00 5.00 0.52
C = LAPORAN-LAPORAN 2,550,000.00 2.97 475,000.00 0.55 2,075,000.00 2.42 2,550,000.00 2.97
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,775,000.00 3.23 2,075,000.00 2.42 4,850,000.00 5.65
TOTAL I + II 85,850,000.00 100.00 73,650,000.00 85.79 12,200,000.00 14.21 85,850,000.00 100.00
IV PPN 11% 9,443,500.00 8,101,500.00 1,342,000.00 9,443,500.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 81,751,500.00 13,542,000.00 95,293,500.00
LAPORAN KEMAJUAN PEKERJAAN BULAN KE-02
Satuan Kerja : Dinas Pekerjaan Umum Kabupaten Kutai Kartanegara
Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
No. Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tgl. Kontrak : 27 Oktober 2023 Bulan : Ke-01 (Satu)
Nilai Kontrak : Rp. 95.293.500,- Periode : 26 November 2023 s/d 22 Desember 2023
Sumber Dana : APBD-P Kabupaten Kutai Kartanegara, Tahun Anggaran 2023 Tahun : 2023

s/d Bulan Lalu Bulan Ini s/d Bulan Ini

Bobot Bobot Bobot Bobot


Jangka Biling Rate Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
No Posisi Satuan Kuantitas Volume Volume Volume Volume
Waktu (Rp) (Rp) (Rp) (Rp) (Rp)
% % % %
I. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI
1 Site Engineer OB 1.00 2.00 21,000,000.00 42,000,000.00 2.00 48.92 21,000,000.00 1.00 24.46 21,000,000.00 1.00 24.46 42,000,000.00 2.00 48.92
2 Ahli K3 Konstruksi OB 1.00 2.00 19,500,000.00 39,000,000.00 2.00 45.43 19,500,000.00 1.00 22.71 19,500,000.00 1.00 22.71 39,000,000.00 2.00 45.43
A = BIAYA TENAGA AHLI 81,000,000.00 94.35 40,500,000.00 47.18 40,500,000.00 47.18 81,000,000.00 94.35
BIAYA LANGSUNG PERSONIL 81,000,000.00 94.35 40,500,000.00 47.18 40,500,000.00 47.18 81,000,000.00 94.35
II. BIAYA LANGSUNG NON PERSONIL
B. BAIAYA KANTOR
1 Biaya ATK Ls 1.00 1.00 2,300,000.00 2,300,000.00 1.00 2.68 2,300,000.00 1.00 2.68 - - - 2,300,000.00 1.00 2.68
B = BIAYA PERALATAN KERJA DAN KENDARAAN 2,300,000.00 2.68 2,300,000.00 2.68 - - 2,300,000.00 2.68
C. BIAYA PELAPORAN
1 Laporan Bulanan Buku 5.00 2.00 95,000.00 950,000.00 10.00 1.11 475,000.00 5.00 0.55 475,000.00 5.00 0.55 950,000.00 10.00 1.11
2 Laporan Akhir Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - 450,000.00 5.00 0.52 450,000.00 5.00 0.52
3 Back Up Invoice Buku 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - 450,000.00 5.00 0.52 450,000.00 5.00 0.52
4 FlashDisk 64 GB Buah 1.00 1.00 250,000.00 250,000.00 1.00 0.29 - - - 250,000.00 1.00 0.29 250,000.00 1.00 0.29
5 Foto Dokumentasi Album 5.00 1.00 90,000.00 450,000.00 5.00 0.52 - - - 450,000.00 5.00 0.52 450,000.00 5.00 0.52
C = LAPORAN-LAPORAN 2,550,000.00 2.97 475,000.00 0.55 2,075,000.00 2.42 2,550,000.00 2.97
BIAYA LANGSUNG NON PERSONIL 4,850,000.00 5.65 2,775,000.00 3.23 2,075,000.00 2.42 4,850,000.00 5.65
TOTAL I + II 85,850,000.00 100.00 43,275,000.00 50.41 42,575,000.00 49.59 85,850,000.00 100.00
IV PPN 11% 9,443,500.00 4,760,250.00 4,683,250.00 9,443,500.00
V TOTAL JUMLAH (III+IV) 95,293,500.00 48,035,250.00 47,258,250.00 95,293,500.00
REKAP SERTIFIKAT BULANAN 02

Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Lokasi : Kabupaten Kutai Kartanegara
Sumber Dana : APBD-P Kutai Kartanegara
Tahun Anggaran : 2023
Konsultan Pengawas : CV. ADHITAMA CITRA MANDIRI
No Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tanggal Kontrak : 27 Oktober 2023
Nilai Kontrak : Rp. 95.293.500,-
Waktu Pelaksanaan : 60 (Enam Puluh ) Hari Kalender
Bulan Ke : 02 (dua)
Periode : 26 November 2023 s/d 22 Desember 2023

REALISASI KONTRAK
KONTRAK AWAL
BULAN LALU BULAN INI SAMPAI BULAN INI

NO JENIS PEKERJAAN
BOBOT JUMLAH BOBOT JUMLAH BOBOT JUMLAH BOBOT JUMLAH
(%) (Rp) (%) (Rp) (%) (Rp) (%) (Rp)

I BIAYA LANGSUNG PERSONIL 94.35 81,000,000.00 47.18 40,500,000.00 47.18 40,500,000.00 94.35 81,000,000.00
II BIAYA LANGSUNG NON PERSONIL 5.65 4,850,000.00 3.23 2,775,000.00 2.42 2,075,000.00 5.65 4,850,000.00

III TOTAL 100.00 85,850,000.00 50.41 43,275,000.00 49.59 42,575,000.00 100.00 85,850,000.00
IV PPN 11 % 9,443,500.00 4,760,250.00 4,683,250.00 9,443,500.00
JUMLAH IV + V 95,293,500.00 48,035,250.00 47,258,250.00 95,293,500.00
A JUMLAH HARGA PEKERJAAN SAMPAI SAAT INI 95,293,500.00
B PEMBAYARAN SERTIFIKAT S/D BULAN LALU 48,035,250.00
C JUMLAH KOTOR SERTIFIKAT BULAN INI (A - B) 47,258,250.00
D POTONGAN-POTONGAN : -
E JUMLAH BERSIH SERTIFIKAT BULAN INI (C - D) 47,258,250.00
F DIBULATKAN 47,258,250.00

Terbilang : EMPAT PULUH DELAPAN JUTA TIGA PULUH LIMA RIBU DUA RATUS LIMA PULUH RUPIAH

50.41
PERSENTASE PEMBAYARAN (%) 49.59
100.00

Tenggarong, 22 Desember 2023


Diperiksa / Disetujui Oleh, Dibuat Oleh,
DINAS PEKERJAAN UMUM Konsultan Pengawas
KABUPATEN KUTAI KARTANEGARA CV. ADHITAMA CITRA MANDIRI
PEJABAT PEMBUAT KOMITMEN

EDDY HARUSSWANTO, ST. I Nyoman Murda, ST.


Nip: 19700411 199803 1 007 Site Engineer
JADWAL WAKTU PELAKSANAAN / TIME SCHEDULE
KURVA S
Kegiatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Nomor Kontrak : P.1731/DPU/BM/600.1.9.3/10/2023
Tanggal Kontrak : 27 Oktober 2023
Tahun Anggaran : 2023
Prop / Kab / Kodya : Kabupaten Kutai Kartanegara
Konsultan Pengawas : CV. ADHITAMA CITRA MANDIRI

DURASI PELAKSANAAN PEKERJAAN 60 HARI KALENDER

27 Oktober 2023 s/d 25 November 2023 26 November 2023 s/d 25 Desember 2023
No. Mata
JENIS PEKERJAAN NILAI BOBOT
Pmbyrn KETERANGAN
Minggu ke 1 Minggu Ke 2 Minggu ke 3 Minggu Ke 4 Minggu ke 5 Minggu Ke 6 Minggu ke 7 Minggu Ke 8
KONTRAK (%)
1 2 3 4 5 6 7 8

I. DBIAYA LANGSUNG PERSONIL

A. ###TENAGA AHLI

1 - Site Engineer 42,000,000.00 48.92 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 100

2 - Ahli K3 Konstruksi 39,000,000.00 45.43 5.68 5.68 5.68 5.68 5.68 5.68 5.68 5.68 90

II. BIAYA LANGSUNG NON PERSONIL


80
B. BAIAYA KANTOR
70
1 - Biaya ATK 2,300,000.00 2.68 2.68
60
BIAYA PELAPORAN
50
1 - Laporan Bulanan 950,000.00 1.11 50.41 0.55 0.55
40
2 - Laporan Akhir 450,000.00 0.52 0.52
38.06
3 - Back Up Invoice 450,000.00 0.52 0.52 30

4 - FlashDisk 64 GB 250,000.00 0.29 26.27 0.29 20

5 - Foto Dokumentasi 450,000.00 0.52 0.52 10


14.47
0
85,850,000.00 100.00 0 0 0 0

RENCANA PROGRESS MINGGUAN (%) 14.47 11.79 11.79 12.35 11.79 11.79 11.79 14.21
SCHEDULE RENCANA
KOMULATIF PROGRESS MINGGUAN (%) 14.47 26.27 38.06 50.41 62.20 74.00 85.79 100.00

PROGRESS MINGGUAN (%) 14.47 11.79 11.79 12.35 11.79 11.79 11.79 14.21
REALISASI FISIK
KOMULATIF PROGRES MINGGUAN (%) 14.47 26.27 38.06 50.41 62.20 74.00 85.79 100.00
DEVIASI DEVIASI (%) - - - - - - - -

Dibuat Oleh :
Konsultan Pengawas
CV. ADHITAMA CITRA MANDIRI

I Nyoman Murda, ST.


Site Engineer
DAFTAR HADIR
Konsultan Pengawas : CV. ADHITAMA CITRA MANDIRI
Kegiatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Lokasi : Kabupaten Kutai Kartanegara
Tahun Anggaran : 2023 Bulan : Ke-02
Periode : 26 November 2023 s/d 22 Desember 2023

2023
OKTOBER-NOVEMBER Total Hari
No. Nama Posisi Dalam Bulan
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

1 I Nyoman Murda, ST. Site Engineer

30

2 David Andera Putra, ST. Ahli K3 Konstruksi

Keterangan :
ST : Sakit C : Cuti : Hari Libur Resmi : Belum Mobiliasasi
I : Ijin TL : Tugas Luar (Survei) : Hari Minggu
Konsultan Pengawas
CV. ARORI TEKNIKA

AMBO RIO, ST
Direktur
TABEL PENANGGALAN LAP.BUL. Konsultan Supervisi SUPERVISI PENINGKATAN PENGAMANAN BENDUNGAN BINALATUNG KOTA TARAKAN

TAHUN 2019 - 2020


BULAN KE - SATU
27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Kontrak awal
LAP.BUL & INVOICE. 01

BULAN KE - DUA
26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

LAP.BUL & INVOICE. 02


a
n
a
a
n
P
e
m
b
PEKERJAAN a Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
LOKASI n
: Kabupaten Kutai Kartanegara
g
KONSULTAN :u CV. ADHITAMA CITRA MANDIRI
n
a
n DAFTAR FASILITAS KONSULTAN
G
e
d
u
NO URAIAN n KUANTITAS JANGKA WAKTU TANGGAL PENGADAAN PERIODE PEMAKAIAN KETERANGAN
g
U
P
1 Err:509 T 1 ( Satu ) Unit 1.5 Bulan 27 Oktober 2023 27 Oktober 2023 s/d 10 Desember 2023
P
P
P
P Diajukan Oleh :
K CV. ADHITAMA CITRA MANDIRI
e
c
.
L
o
n
g AMBO RIO, ST
M
Direktur
a
s
e
n
g
a
t
STRUKTUR ORGANISASI KONSULTAN PENGAWAS

Pekerjaan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang
Lokasi : KABUPATEN KUTAI KARTANEGARA
Tahun Anggaran : 2023

Site Engineer

I Nyoman Murda, ST.

27 Oktober 2023 s/d 25 November 2023

Ahli K3 Konstruksi

David Andera Putra, ST.


RINCIAN KOMPONEN REMUNERASI PERSONIL

Nama Pengalaman Biaya Beban Biaya Beban Tunjangan Biaya Langsung


No. Posisi Sertifikat Keahlian Gaji Dasar Keuntungan Dibulatkan
Personil/Jabatan/Posisi Profesional Sosial Umum Penugasan Personil
(a) (b) (c) (d) (e) (f) (g)=(0.3-0.4)f (h)=(0.5-1.3)f (i)=(0.1-0.3)f (j)=0.1(f+g+h) (k)=(f+g+h+i+j)
TENGA AHLI

SKA-Ahli Sumber Daya


1 #REF! 3 Rp 8,366,900.00 Rp 2,928,415.00 Rp 6,275,175.00 Rp 1,673,380.00 Rp 1,757,049.00 Rp 21,000,919.00 Rp 21,000,000.00
Air-Madya

SKA-Ahli K3
2 #REF! 1 Rp 7,769,300.00 Rp 2,719,255.00 Rp 5,826,975.00 Rp 1,553,860.00 Rp 1,631,553.00 Rp 19,500,943.00 Rp 19,500,000.00
Konstruksi-Madya

SKA-Ahli Sumber Daya


3 #REF! 3 Rp 4,183,500.00 Rp 1,464,225.00 Rp 3,137,625.00 Rp 836,700.00 Rp 878,535.00 Rp 10,500,585.00 Rp 10,500,000.00
Air-Madya
SLIP GAJI

Nama : I Nyoman Murda, ST.

Jabatan : Site Engineer

Penempatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang

Periode : 27 Oktober 2023 s/d 25 November 2023

Buat Pembayaran : Gaji Bulan ke 1 (Satu)

Upah Pokok Rp. 8,366,900.00


Tunjangan Rp. 2,928,415.00
Beban Biaya Sosial Rp. 6,275,175.00
Beban Biaya Umum Rp. 1,673,380.00
Keuntungan Rp. 1,756,130.00 +
TOTAL Rp. 21,000,000.00

Terbilang : DUA PULUH SATU JUTA RUPIAH

Tenggarong, 25 November 2023


Diterima, Diserahkan,

I Nyoman Murda, ST. ADITYA GAUTAMA, ST


Site Engineer Direktur
SLIP GAJI

Nama : I Nyoman Murda, ST.

Jabatan : Site Engineer

Penempatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang

Periode : 26 November 2023 s/d 22 Desember 2023

Buat Pembayaran : Gaji Bulan ke 2 (Dua)

Upah Pokok Rp. 8,366,900.00


Tunjangan Rp. 2,928,415.00
Beban Biaya Sosial Rp. 6,275,175.00
Beban Biaya Umum Rp. 1,673,380.00
Keuntungan Rp. 1,756,130.00 +
TOTAL Rp. 21,000,000.00

Terbilang : DUA PULUH SATU JUTA RUPIAH

Tenggarong, 22 Desember 2023


Diterima, Diserahkan,

I Nyoman Murda, ST. ADITYA GAUTAMA, ST


Site Engineer Direktur
Copy Sheet ini Ke File Anda
21,000,000 DUA PULUH SATU JUTA RUPIAH
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9
et anda

21000000 21000000
SATU
DUA 210 MILYARAN
TIGA 21 JUTAAN
EMPAT 000 RIBUAN
LIMA 000 RATUSAN
ENAM SATU JUTA
TUJUH DUA PULUH
DELAPAN DUA RATUS
SEMBILAN MILYAR
Sepuluh
DUA Ratus
SLIP GAJI

Nama : David Andera Putra, ST.

Jabatan : Ahli K3 Konstruksi

Penempatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang

Periode : 27 Oktober 2023 s/d 25 November 2023

Buat Pembayaran : Gaji Bulan ke 1 (Satu)

Upah Pokok Rp. 7,769,300.00


Tunjangan Rp. 2,719,255.00
Beban Biaya Sosial Rp. 5,826,975.00
Beban Biaya Umum Rp. 1,553,860.00
Keuntungan Rp. 1,630,610.00 +
TOTAL Rp. 19,500,000.00

Terbilang : SEMBILAN BELAS JUTA LIMA RATUS RIBU RUPIAH

Tenggarong, 25 November 2023


Diterima, Diserahkan,

David Andera Putra, ST. ADITYA GAUTAMA, ST


Ahli K3 Konstruksi Direktur
SLIP GAJI

Nama : David Andera Putra, ST.

Jabatan : Ahli K3 Konstruksi

Penempatan : Pengawasan Peningkatan Kapasitas Struktur Jalan Modang Menuju Balai Desa Sungai Bawang

Periode : 26 November 2023 s/d 22 Desember 2023

Buat Pembayaran : Gaji Bulan ke 2 (Dua)

Upah Pokok Rp. 7,769,300.00


Tunjangan Rp. 2,719,255.00
Beban Biaya Sosial Rp. 5,826,975.00
Beban Biaya Umum Rp. 1,553,860.00
Keuntungan Rp. 1,630,610.00 +
TOTAL Rp. 19,500,000.00

Terbilang : SEMBILAN BELAS JUTA LIMA RATUS RIBU RUPIAH

Tenggarong, 22 Desember 2023


Diterima, Diserahkan,

David Andera Putra, ST. ADITYA GAUTAMA, ST


Ahli K3 Konstruksi Direktur
Copy Sheet ini Ke File Anda
19,500,000 SEMBILAN BELAS JUTA LIMA RATUS RIBU RUPIAH
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9
et anda

19500000 19500000
SATU
DUA 195 MILYARAN
TIGA RIBU 19 JUTAAN
EMPAT 500 RIBUAN
LIMA LIMA RATUS 000 RATUSAN
ENAM JUTA
TUJUH SEMBILAN BELAS
DELAPAN SERATUS
SEMBILAN LIMA MILYAR
SEMBILAN PULUH
Seratus
BALAI WILAYAH SUNGAI KALIMANTAN III
SATKER OPERASI DAN PEMELIHARAAN SDA III

TIME SCHEDULE ADD-02


PROGRAM : #REF!
KEGIATAN : #REF!
LOKASI : #REF! Bulan Ke :06 (Enam)
SUMBER DANA : #REF! Periode : VI (Enam)
TAHUN ANGGAR : #REF! Tahun : 2019-2020
DURASI PELAKSANAAN PEKERJAAN 240 HARI KALENDER
KONTRAK
BOBOT BULAN - I BULAN - II BULAN - III BULAN - IV BULAN - V BULAN - VI BULAN - VII BULAN - VIII
No. URAIAN PEKERJAAN ADD - 02 KET.
22 Aug 2019 - 20 Sep 2019 21 Sep 2019 - 20 Oktober 2019
21 Okt 2019 - 19 Nopember 201920 Nop 2019 - 19 Des 2019 20 Des 2019 - 18 Januari 202019 Jan 2020 - 17 Februari 2020
18 Februari 2020 - 18 Maret 2020
19 Maret 2020 - 17 April 2020
(Rp) (%) M.1 M.2 M.3 M.4 M.5 M.6 M.7 M.8 M.9 M.10 M.11 M.12 M.13 M.14 M.15 M.16 M.17 M.18 M.19 M.20 M.21 M.22 M.23 M.24 M.25 M.26 M.27 M.28 M.29 M.30 M.31 M.32

### #REF!
1 #REF! 192,000,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! RENCANA
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! 16,000,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI
### #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! 4,000,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 1,600,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF!
3 #REF! 1,920,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF!
0.0
8 #REF! #REF! #REF! #REF! #REF!
9 #REF! #REF! #REF! 0.0 #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

A JUMLAH BOBOT RENCANA 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
B BOBOT RENCANA KUMULATIF 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
C JUMLAH BOBOT REALISASI 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 1.945 0.000 0.000
D BOBOT REALISASI KUMULATIF 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
E DEVIASI (+) / (-) 0.0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Diperiksa / Disetujui Oleh


Dibuat Oleh
Satker Operasi Dan Pemeliharaan SDA III
Konsultan Supervisi
BALAI WILAYAH SUNGAI KALIMANTAN III
CV. KARYA PRATAMA CONSULTANT
PEJABAT PEMBUAT KOMITMEN

.Fuad Gufransjah, ST
.A. Danur Pangilegau, ST
NIP. 19700910 200502 1 002
Team Leader
LAPORAN MINGGU KE 17
PERIODE (20 April 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D BULAN
BULAN INI S/D BULAN INI PROGRESS (%)
(%) LALU
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 22
PERIODE (23 Mei 2020 s/d 29 Mei 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSO


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 22
PERIODE (23 Mei 2020 s/d 29 Mei 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 23
PERIODE (30Mei 2020 s/d 06 Juni 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 24
PERIODE (07 Juni 2020 s/d 14 Juni 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! 2.580 27.315

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 25
PERIODE (15 Juni 2020 s/d 22 Juni 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! 2.580 #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL 0.000


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 26
PERIODE (22 Juni 2020 s/d 28 Juni 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 27
PERIODE (27 Juni 2020 s/d 06 Juli 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 28
PERIODE (07 Juli 2020 s/d 14 Juli 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 29
PERIODE (15 Juli 2020 s/d 21 Juli 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 30
PERIODE (22 Juli 2020 s/d 28 Juli 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 31
PERIODE (29 Juli 2020 s/d 05 Agustus 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! #REF! #REF!

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader
LAPORAN MINGGU KE 24
PERIODE (07 Juni 2020 s/d 14 Juni 2020 )

Kementerian : Pekerjaan Umum dan Perumahan Rakyat


Unit Eselon I : Direktorat Jenderal Sumber Daya Air
Program : Pengelolaan Sumber Daya Air
Hasil : Meningkatnya Kinerja Pengelolaan Sumber Daya Air
Unit Eselon II/ Satker : Satker Operasi dan Pemeliharaan SDA Kalimantan III
Kegiatan : Supervisi Peningkatan Keamanan Bendungan Binalatung Kota Tarakan

PERHITUNGAN BOBOT
KONTRAK RENCANA KEMAJUAN BOBOT
BOBOT PRESTASI
NO DESKRIPSI BOBOT S/D MINGGU S/D MINGGU PROGRESS (%)
MINGGU INI
(%) LALU INI
(%)

a b c d e f g=e+f h = g/c x 100

I BIAYA LANGSUNG PERSONIL


A TENAGA AHLI
1 Ketua Tim (Team Leader) #REF! #REF! #REF! #REF! #REF! #REF!
2 Ahli Jalan #REF! #REF! #REF! #REF! #REF! #REF!
3 Ahli Jembatan #REF! #REF! #REF! #REF! #REF! #REF!
4 Ahli Bangunan #REF! #REF! #REF! #REF! #REF! #REF!
5 Ahli Geoteknik #REF! #REF! #REF! #REF! #REF! #REF!

B TENAGA SUB AHLI


1 Inspector #REF! #REF! #REF! #REF! #REF! #REF!
2 Inspector #REF! #REF! #REF! #REF! #REF! #REF!

C TENAGA PENDUKUNG
1 Operator Komputer/ Administrasi 4.197 #REF! #REF! #REF! #REF! #REF!

II BIAYA LANGSUNG NON PERSONIL


A PERJALANAN
1 Samarinda - Job Site (PP) 9.444 #REF! #REF! #REF! 2.580 27.315

B KENDARAAN DAN OPERASIONAL


1 Sewa Kendaraan Roda empat 4.722 #REF! #REF! #REF! #REF! #REF!
2 Sewa Kendaraan Roda 2 1.469 #REF! #REF! #REF! #REF! #REF!

C BIAYA KANTOR
1 Sewa Base camp 1.574 #REF! #REF! #REF! #REF! #REF!
2 Sewa Komputer 0.525 #REF! #REF! #REF! #REF! #REF!
3 Sewa Printer 0.210 #REF! #REF! #REF! #REF! #REF!
4 Sewa GPS 0.157 #REF! #REF! #REF! #REF! #REF!
5 Biaya Komunikasi (Telepon, Fax, Internet) 0.262 #REF! #REF! #REF! #REF! #REF!
6 ATK (Alat Tulis Kantor) 0.525 #REF! #REF! #REF! #REF! #REF!
7 Biaya Foto Copy 0.525 #REF! #REF! #REF! #REF! #REF!
8 Hardisk 1 TB 0.087 #REF! #REF! #REF! #REF! #REF!

D PELAPORAN DAN GAMBAR SUPERVISI


1 Laporan Pendahuluan 0.035 #REF! #REF! #REF! #REF! #REF!
2 Laporan QA 0.035 #REF! #REF! #REF! #REF! #REF!
3 Laporan Bulanan 0.035 #REF! #REF! #REF! #REF! #REF!
4 Laporan Akhir 0.035 #REF! #REF! #REF! #REF! #REF!
5 Laporan Operasional & Pemeliharaan 0.035 #REF! #REF! #REF! #REF! #REF!
6 Album Dokumentasi Kegiatan Supervisi 0.039 #REF! #REF! #REF! #REF! #REF!
7 Presentasi 0.262 #REF! #REF! #REF! #REF! #REF!
8 Leaflet 0.087 #REF! #REF! #REF! #REF! #REF!
9 Roll Banner 0.210 #REF! #REF! #REF! #REF! #REF!
10 Album Gambar
- Gambar A3 (Asli) 0.044 #REF! #REF! #REF! #REF! #REF!
- Gambar A3 (Copy) 0.105 #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT KONTRAK #REF!
JUMLAH BOBOT RENCANA KOMULATIF BULAN INI #REF!
JUMLAH BOBOT s/d BULAN LALU #REF!
JUMLAH BOBOT BULAN INI #REF!
JUMLAH BOBOT s/d BULAN INI #REF!
DEVIASI #REF!

Diperiksa Oleh, Dibuat Oleh,


Kordinator Lapangan Operasi Dan Pemeliharaan SDA IV KONSULTAN SUPERVISI
Satker Operasi dan Pemeliharaan SDA Kalimantan III PT. ANTUSIAS RAYA
Balai Wilayah Sungai Kalimantan III

R. EDHI CAHYONO., ST. PILEO TANDI ALLO, ST


NIP. 19780319 201410 1 001 Team Leader