You are on page 1of 1

A B C D E F G H I J K L M N

2.00 3.10 1.90 3.10 1.90 4.00 4.00 1.90 3.10 1.90 3.10 2.00

20.00 20.00
3.00 14.00 3.00 14.00 3.00
1.00 11.00 (FIREWALL) 11.00 (FIREWALL) 1.00
2.00 3.10 0.90 1.50 1.50 4.00 1.50 1.50 1.50 1.50 4.00 1.50 1.50 0.90 3.10 2.00
C3 B3 C2 B3 C3 C3 B3 C2 B3 C3
1 1
2"x4"x1/4" RAFTERS 2"x4"x1/4" RAFTERS
TUBULAR BARS B3 B3 TUBULAR BARS
@ 2.00 M.O.C SLOPE 1:12 SLOPE 1:12
@ 2.00 M.O.C
C4 C4 C4 C4 C4 C4
2 2
B2 B2 B2 B2 B2 B2 B2
5.60

5.60
SLOPE 1:12 SLOPE 1:12
B3 B3
S1 S1 S1 S1 S1 S1
B2 B1 B1 B2 B2 B1 B1 B2

3.62 1.08 1.08 3.62


PC B1 B1 B1 B1 B1 PC
3 C3 PC C4 C4 C4 C4 PC C3 3
S1 S1
2" x 3" x 3/4" x 1/4" B1 B1 2" x 3" x 3/4" x 1/4"
9.50

9.50
2.50

2.50
STEEL C-PURLINS B2
STAIRWELL S2 B1 B1 S2 STAIRWELL
B2 STEEL C-PURLINS
AT 600 MM.O.C B1 B1 AT 600 MM.O.C
B1 B1
NEW BEAM TO BE INSTALLED
(W 10X88) B2 B2 NEW BEAM TO BE INSTALLED
(W 10X88)

4 B1 C4 C4 S1 S1 C4 C4 B1
4
B2 2.43 2.27 2.27 2.43
B2
OPEN OPEN

C4 B1 B1 C4
5 S1 S1 5
3.40

3.40
B1 PC PC B1
6 B1 PC PC B1 6
CB B2 B2 CB
7 S1
B2
S1 7
B2 B2
8 CB C4 B2 C4 B2 B2 C4 B2 C4 CB 8
3.00

3.00
3.00 2.80 2.20 5.00 4.00 3.00 4.00 5.00 2.20 2.80 3.00

14.00 14.00

THIRD FLOOR FRAMING PLAN

You might also like