PLINTH AREA RATE & FORMAT FOR PREPARATION OF PRELIMINARY/ROUGH

COST ESTIMATE ( ELECTRICAL WORKS ) [ With effect from 07-01-2020 ]

SL No DESCRIPTION OF WORKS RATE UNIT QTY AMOUNT

A. SERVICE CONNECTION CHARGES


Cost of Service Connection Charges payble to CESC /
WBSEDCL authority. [ The actual amount will be as
1 per quotation to be submitted by the CESC / LS
WBSEDCL authority ]

B. INTERNAL ELECTRICAL INSTALLATION


Internal Electrical Installation work
[ N.B. It Includes all electrical installation, like SITC of
Building panel, Rising Main, Cable from panel /
Rising Main to VTPNDB / TPNDB, Distribution wiring
to all the electrical utilities including TPNDB/ SPNDB, 20 % of the
Electrical fittings, Fans and other accessories etc Structural
2 Item
including Conventional Lightning Protection System Cost of the
and excluding the following ]. building

Supplying, installation, testing and commissioning of


lighting automation including occupancy sensors Per Sq-
2.1 179
mtr

C. COMPOUND LIGHTING SYSTEM

Supplying, installation, testing and commissioning of


Compound/ High mast/ Pathway/ Landscape Per Sq-
Lighting with LED Light Fittings including feeder mtr
3 134
pillar box, pole, fittings, lamp, cable etc including all ( Plot
accessories for the entire Campus for the Plot Area Area )
more than 1 Acre

Supplying, installation, testing and commissioning of


Compound/ High mast/ Pathway/ Landscape Per Sq-
Lighting with LED Light Fittings including feeder mtr
3.1 250
pillar box, pole, fittings, lamp, cable etc including all ( Plot
accessories for the entire Campus for the Plot Area Area)
less than 1 Acre

D. STREET LIGHTING SYSTEM

SITC of Street lighting System with HPSV /LED


4 Fittings including feeder pillar box, pole, fittings with
lamp & cable etc including all accessories.

Page 1 of 6
Per Sq-
mtr
4.1 Upto 7 Mtr Pole Height from GL 250.00
(Road
Area)

4.2 Above 7 Mtr Pole Height from GL 167.00 Do

E. INTELLIGENT FIRE ALARM SYSTEM


SITC of Intelligent addressable fire alarm system with
Per Sq-
FACF , detectors, MCP, sounders with all accessories
& wires including testing and getting statutory mtr
5 536.00
approvals. (Carpet
Area)
F. SUBSTATION EQUIPMENTS

Supplying, installation, testing and commissioning of


33kV/0.433kV substation equipments comprising HT
Panel, Dry type Transformers, HT cable, Bus trunking
from Transformer to LT Panel, LT Panel, Automatic
Power factor correction panel, Active Harmonic
6 Filters, TVSS (Transient Voltage suppression 8036 Per KVA
system),SPD ( Surge protection system), Essential
panel, Earthing, required inter-
connections,substation safety equipments including
LT cabling from sub station to the buildings fed by the
sub station.

SITC of Sub-Station Equipments ( 11 / 6 KV )


comprising of HT Panel, Transformer ( Cast Resin Dry
Type / Oil ), Substation LT Panels, APFC Panel, HT
cable,Active Harmonic Filters, TVSS (Transient
Voltage suppression system),SPD ( Surge protection
7 system), LT Cable / Bus Trunking within substation
including substation building wiring, Earthing and
safety equipments for the following Capacity.

7.1 1 X ( 250 to 315 ) KVA & 2 X ( 250 to 315 ) KVA 9000.00 Per KVA
7.2 1 X ( 400 to 500 ) KVA 8000.00 do
7.3 2 X ( 400 to 500 ) KVA 7500.00 do
7.4 1X 630 KVA & 2 X 630 KVA 7000.00 do
7.5 1X ( 750 to 1500 ) KVA 6500.00 do
7.6 2X ( 750 to 1500 ) KVA 6000.00 do

G. CABLES FROM SUBSTATION TO BUILDINGS

Page 2 of 6
Supplying of one number 1.1 KV Grade XLPE
insulated and PVC sheathed aluminium conductor
cable ( Armoured ) conforming to IS: 7098 / 1988 with
its latest amendment and laying those in
8 underground trenches incld. Socketing and finishing
the ends of the socket of following size

3.5 Core 400 Sq. mm


8.1 1700.00 Per metre

8.2 3.5 Core 300 Sq. mm 1400.00 do


8.3 3.5 Core 240 Sq. mm 1150.00 do

8.4 3.5 Core 185 Sq. mm 950.00 do

8.5 3.5 Core 150 Sq. mm 750.00 do

8.6 3.5 Core 120 Sq. mm 650.00 do


8.7 3.5 Core 95 Sq. mm 550.00 do
H. DG SET
Supplying, installation, testing and commissioning of
Silent Type DG Sets,AMF Panel, Bus Ducting/ Cables
from DG Sets to Essential Panel, Synchronizing Panel
where required, DG Set enclosure room sound
insulation/ventilation/smoke exhaust as required,
Earthing of DG Set system, control cabling, Fuel
tank/piping, DG set Exhaust piping/ Exhaust
9
Chimney as per CPCB norms, Civil works connected
with DG Sets including Foundation as required.

9.1 Upto 50 KVA 14000.00 Per KVA

9.2 Above 50 KVA and upto 100 KVA 12000.00 do

9.2 Above 100 KVA 9821.00 do


I. UPS

SITC of 3 Phase online UPS system with 30 minutes 20000.00


10 backup including batteries, interconnecting cables, do
battery rack etc.

10.1 Add for every additional 30 minutes backup 9000.00 do


J. AIR-CONDITIONING SYSTEM

Supplying, installation, testing and commissioning of


energy efficient central AC Plant including low side
11 works 75893.00 Per Ton

11.1 Extra for stand by chilling units High side 33929.00 do

Page 3 of 6
Supplying, installation, testing and commissioning of
VRV/VRF System including indoor /outdoor units,
piping, electrical power distribution/wiring, electrical
12 panel, treated fresh air system etc 49107.00 Per HP

SITC of Energy Efficient Air-conditioning System with


DUCTABE Air-Conditioner / Package Unit including
indoor unit, outdoor unit, piping, ducting, cabling ,
13 wiring,electrical panel with treated fresh air system. 40000.00 Per Ton

Supplying, installation, testing and co mmissioning of


PRECISION Air Conditioning System including piping,
14 electrical cabling, controller etc. required for the 98214.00 Per Ton
system

SITC of Room Air-conditioning system ( Split type /


Window ) i.e. indoor unit, outdoor unit, piping,
15 34000.00 do
cabling, electrical panel.

K. LIFT
SITC of gearless / geared Automatic Lift with
ACVVVF drive ( as per manufacturer design &
conforming to IS ) and putting into operation after
final testing in the existing lift shaft complete with
16 all accessories and repairing the damage wall / floor
if any etc complete as reqd including necessary civil
works having following capacity and speed. [ Make :
Category I ]

16.1 8 passenger (G+4), speed 1m/s 1428571.00 Per Set

16.1.1 For Each additional Floor 80357.00 Per Floor

16.2 8 passenger (G+5), speed 1.5m/s 1607143.00 Per Set

16.2.1 For Each additional Floor 80357.00 Per Floor

16.3 13 passenger (G+4), speed 1m/s] 1607143.00 Per Set

16.3.1 For Each additional Floor 80357.00 Per Floor

16.4 13 passenger (G+5), speed 1.5m/s 1785714.00 Per Set

16.4.1 For Each additional Floor 80357.00 Per Floor

16.5 16 passenger (G+4), speed 1m/s 2142857.00 Per Set

16.5.1 For Each additional Floor 98214.00 Per Floor

16.6 16 passenger (G+5), speed 1.5m/s 2321429.00 Per Set

16.6.1 For Each additional Floor 98214.00 Per Floor

16.7 16 passenger (G+12), speed 2.5m/s 6250000.00

Page 4 of 6
16.7.1 For Each additional Floor 98214.00 Per Floor

16.8 20 passenger (G+4), speed 0.75m/s [Bed Lift ] 2142857.00 Per Set

16.8.1 For Each additional Floor 98214.00 Per Floor

16.9 20 passenger (G+5), speed 1.5m/s 2410714.00 Per Set

16.9.1 For Each additional Floor 98214.00 Per Floor

16.1 20 passenger (G+12), speed 2.5m/s 6696429.00 Per Set

16.10.1 For Each additional Floor 98214.00 Per Floor

Goods Lift ( 2 Speed ) ( G + 4 ), speed 0.5m/s,


16.11 Capacity -1 Ton 2321429.00 Per Set

16.11.1 For Each additional Floor 75893.00 Per Floor

Goods Lift ( 2 Speed )( G + 4 ), speed 0.5m/s, Capacity


16.12 2946429.00 Per Set
- 2 Ton

16.12.1 For Each additional Floor 75893.00 Per Floor

Goods Lift ( 2 Speed ) ( G + 4 ), speed 0.25m/s,


16.13 Capacity - 3 Ton 3660714.00 Per Set

16.13.1 For Each additional Floor 89286.00 Per Floor

L. INTEGRATED BUILDING MANAGEMENT


SYSTEM
Supplying, installation, testing and commissioning of
Integrated Building Management System for
Digital/electronic display and monitoring of all E&M
systems like substation, DG sets, Ups, Solar power,
Lifts, AC Plants, Ventilation systems, Fire protection
systems, Pumps etc. to include cabling, monitors, Per Sq
17 357.00
recording, display system, hardware, software Mtr
support(upto 10,000 sq.m)

Add extra for built up area above 10, 0000 sq mtr. 112.00 PerSq
17.1
Mtr
M. SOLAR PHOTO VOLTAIC POWER GENERATION
SYSTEM
Supplying, installation, testing and commissioning of
Grid interactive roof top solar photo voltaic power
18 generation system including space frame 58036.00 Per KWp

N. SOLAR WATER HEATING SYSTEM

Page 5 of 6
Supplying, installation, testing and commissioning of
solar water heating system with heat exchanger type
including electrical heater backup , make up water 100 liters
19 tank but without piping. [ Note: For higher 20089.00
per day
capacity, multiply the rate ]

a. TOTAL
b. GST / WCT [ 12 % on a ]
c. TOTAL [ a+ b ]
d. Labour Welfare Cess [ 1 % on c ]
e. Contingency [ 3 % on c ]
TOTAL [ c + d +e ]