Professional Documents
Culture Documents
COC Roofing 1-Elevations
COC Roofing 1-Elevations
G F E D C B A
18500
5000 5000
3000 3000 2900 2900 3350 3350
10000
6.02
1323
TOP OF GI PIPE
TOP OF GI PIPE
COLUMN + 4.70
3" GI PIPE TRUSS T-1 COLUMN + 4.70
SCH. 40
6023
6023
4700
4700
3" GI PIPE 3" GI PIPE 3" GI PIPE
3" GI PIPE 3" GI PIPE
SCH. 40 SCH. 40 SCH. 40
SCH. 40 SCH. 40
G F E D C B A 1 2 3
01
BC
04 Front Elevation 02 04
BC
Left Side Elevation
SCALE : DRAWN NOT TO SCALE SCALE : DRAWN NOT TO SCALE
3 1 A B C D E F G
2
10000 18500
5000 5000
3350 3350 2900 2900 3000 3000
PRE-PAINTED RIB TYPE ROOFING (10.55m) GA # 26 TOP OF ROOF + PRE-PAINTED RIB TYPE ROOFING (10.55m) GA # 26 TOP OF ROOF +
6.02 6.02
1323
1323
TOP OF GI PIPE TOP OF GI PIPE
TRUSS T-1 COLUMN + 4.70 COLUMN + 4.70
6023
6023
4700
4700
3" GI PIPE 3" GI PIPE
3" GI PIPE 3" GI PIPE 3" GI PIPE 3" GI PIPE
SCH. 40 SCH. 40
SCH. 40 SCH. 40 SCH. 40 SCH. 40
A B C D E F G
3 2 1
03 04
BC
Right Side Elevation 04 04
BC
Rear Elevation
SCALE : DRAWN NOT TO SCALE SCALE : DRAWN NOT TO SCALE
C I TY W
PROJECT TITLE: DRAWN BY: CHECKED AND REVIEWED BY: APPROVED BY: SHEET CONTENTS: SHEET NO.:
OS A
TE
E RA L S A N
AS SHOWN 04
D I ST R I
G
ENGR. JOHN KENNETH B. DEL VALLE ENGR. MARIA CELIA N. DANDAN ENGR. ROGELIO A. BESANA, JR. DATE:
1987 TEL. NO.: (083) 552 - 3824 REV. NO.
LOCATION : GENERAL SANTOS CITY JUNE 6, 2022
PDD - ENGINEERING ASSISTANT OIC - PLANNING AND DESIGN DIVISION AGM - OPERATIONS AND TECHNICAL SERVICES