You are on page 1of 1

C.L.

No.
5
4
3
2
1

PATCH OF GREEN SITE LAYOUT


SG1A
25/09/2020
16/09/2020

DATE

SECURITY
4 . SOLID GALV. FENCING 3mH
3 . PALISADE FENCING 2mH
7 . PERIMETER LIGHTING AC/DC
6 . AUTOMATED GATE+ACCESS CONTR. SG5A
5 . ELECTRIC FENCING 2.4m&3mH

2 . CLEAR-MESH FENCING 1.8mH

TR1
1 . PROPOSED ACCESS ROUTES

TRAINING
CENTER
RL3

VP1
SITE ESTABLISHMENT
CARPORT STRUCTURE

C1
C8
(INTERIM MATERIALS STORE)

COM1
OFFICE COMPLEX
X1
SITE LAYOUT GCG01/2020-REVISION2
SITE LAYOUT GCG01/2020-REVISION1

<BOOM GATE>
C3
C6

C2
C7
REVISIONS

WP1

RL2

RL1
PACKAGING
WHOLESALE
200.00 m2
SECTION

C4
C5
RESERVE AREA-ALLOCATE

AB
LU

HOLDING
TIO
N
H1
SECURITY
FORTRESS NO. F1 48.000m
F1 FORTRESS NO. F2 48.000m
F2
<SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2 <SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2

FINAL PREP & DROP

FINAL PREP & DROP


P18 03 06 09 12 15 18 P36 03 06 09 12 15 18 21 24 27 30 33 36

11.900m

11.900m
VEGETATION

VEGETATION
02 05 08 11 14 17 02 05 08 11 14 17 20 23 26 29 32 35

<<2.4M WIDE UTILITY TUNNEL UNDERCOVER>>


12 HOUSING COMPLEX CABINS (HU)
13 CARPORT-STEEL STRUCTURE

11 OFFICE COMPLEX & TRAINING


10 FRESH PRODUCE TUNNELS (T1-T4)
14 RESERVE AREAS-TO BE CLASS.

ENTRANCE
9 . SUPER-STRUCT (DCU) S1-S26
8 . FORTRESS (SCU) F1-F30

01 04 07 10 13 16 01 04 07 10 13 16 19 22 25 28 31 34

GD1
DESPATCH
325.00 m2

GOODS
FORTRESS NO. F3 48.000m
F3 FORTRESS NO. F4 48.000m
F4
STRUCTURES

<SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2 <SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2
PLANNING NOTES: GREENCULTURE GLOBAL/CANBIGOLD

FINAL PREP & DROP

FINAL PREP & DROP


05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
P64 04 08 12 16 20 24 28 32 36 40 44 48 52 56 60 64
P100

11.900m

11.900m
04 09 14 19 24 29 34 39 44 49 54 59 64 69 74 79 84 89 94 99
03 07 11 15 19 23 27 31 35 39 43 47 51 55 59 63

VEGETATION

VEGETATION
ELEVATED LOADING BAY 03 08 13 18 23 28 33 38 43 48 53 58 63 68 73 78 83 88 93 98
02 06 10 14 18 22 26 30 34 38 42 46 50 54 58 62 02 07 12 17 22 27 32 37 42 47 52 57 62 67 72 77 82 87 92 97
01 05 09 13 17 21 25 29 33 37 41 45 49 53 57 61 01 06 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96

FORTRESS NO. F5 48.000m


F5 FORTRESS NO. F6 48.000m
F6
F1-F3
REFRIGERATION

<SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2 <SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2
106.00 m2

09 18 27 36 45 54 63 72 81 90 99 108 117 126 135 144 12 24 36 48 60 72 84 96 108 120 132 144 156 168 180 192 204 216 228 240 252 264 276 288

FINAL PREP & DROP

FINAL PREP & DROP


P144 08 17 26 35 44 53 62 71 80 89 98 107 116 125 134 143 P288 11
10
23
22
35
34
47
46
59
58
71
70
83
82
95 107 119 131 143 155 167 179 191 203 215 227 239 251 263 275 287
94 106 118 130 142 154 166 178 190 202 214 226 238 250 262 274 286

11.900m

11.900m
07 16 25 34 43 52 61 70 79 88 97 106 115 124 133 142 09 21 33 45 57 69 81 93 105 117 129 141 153 165 177 189 201 213 225 237 249 261 273 285
06 15 24 33 42 51 60 69 78 87 96 105 114 123 132 141 08 20 32 44 56 68 80 92 104 116 128 140 152 164 176 188 200 212 224 236 248 260 272 284
VEGETATION

VEGETATION
07 19 31 43 55 67 79 91 103 115 127 139 151 163 175 187 199 211 223 235 247 259 271 283
05 14 23 32 41 50 59 68 77 86 95 104 113 122 131 140 06 18 30 42 54 66 78 90 102 114 126 138 150 162 174 186 198 210 222 234 246 258 270 282
04 13 22 31 40 49 58 67 76 85 94 103 112 121 130 139 05 17 29 41 53 65 77 89 101 113 125 137 149 161 173 185 197 209 221 233 245 257 269 281
03 12 21 30 39 48 57 66 75 84 93 102 111 120 129 138 04 16 28 40 52 64 76 88 100 112 124 136 148 160 172 184 196 208 220 232 244 256 268 280
03 15 27 39 51 63 75 87 99 111 123 135 147 159 171 183 195 207 219 231 243 255 267 279
02 11 20 29 38 47 56 65 74 83 92 101 110 119 128 137 02 14 26 38 50 62 74 86 98 110 122 134 146 158 170 182 194 206 218 230 242 254 266 278
01 10 19 28 37 46 55 64 73 82 91 100 109 118 127 136 01 13 25 37 49 61 73 85 97 109 121 133 145 157 169 181 193 205 217 229 241 253 265 277

FORTRESS NO. F7 48.000m


F7 FORTRESS NO. F8 48.000m
F8
<SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2 <SECURITY PATCH OF GREEN FLOWERING ALLOCATION-400m2

P576

FINAL PREP & DROP

FINAL PREP & DROP


P1152

11.900m

11.900m
VEGETATION

VEGETATION

PROJECT PHASE-01: SITE ESTABLISHMENT


FRESH PRODUCE -T01

GREENCULTURE GLOBAL / CANBIGOLD


T1
360.00 m2

F9

F10
F11

F12

SITE REF: GCG01/2020


UPDATE: 25 SEPT 2020
SITE LAYOUT REVISION-01
PROPOSED CONCRETE BASE+10mm STEEL ROD
ELEVATION TO BE MEASURED (A.M.S.L.)

SURVEY SYSTEM:
CONSTANTS: Y 0.00 X 0.00
WGS84 LO29°
SURVEY POINT/BENCHMARK

FRESH PRODUCE -T02


Y 0.000
CO-ORDINATES
CP-01

F13

F14

ACCESS SPECIAL LOADS ONLY

TRUCK STOP-SIDING
T2
360.00 m2
X 0.000

1
F15

F16
<<2.4M WIDE UTILITY TUNNEL UNDERCOVER>>
FRESH PRODUCE -T03

F17

F18
T3
360.00 m2
UPDATE: 25 SEPT 2020

-FORTRESS F1-F8 SHOWN WITH PROVISIONS.


-PATCH OF GREEN FORTRESS ALLOCATION
DRAFT REVISION-02

PROPOSED SITE ESTABLISHMENT

HU-01
F19

F20
PROJECT STATUS:

HOUSING-SECTION

HU-02
F21

F22
FRESH PRODUCE -T04
1:250

T4

HU-03
360.00 m2
LO-29

SCALE

F23

F24
PROCLAIMED ROUTE
OF AGRICULTURAL LAND IN EXTENT OF 3.8Ha.
PROPOSED PROJECT-SITE COVERING A PORTION

CONTRACT DESCRIPTION
PROPOSED SITE SITUATED IN LESOTHO REGION

PATCH OF GREEN LESOTHO

HU-04
STORE
F25

F26
EMERGENCY

UTIL
F27

F28
EMERGENCY
SIGNATURE & DATE

F29

F30
CLIENT PLAN NO.

ENGINEERS PLAN NO.


#GCG2
_____