RENCANA WAKTU PEKERJAAN


OM KOMING HOUSE

2023 2024

1 2 3 4 5 6 7 8 9 10 11 12 13 14
JUMLAH PROGRES
NO PENJELASAN PROGRES %
PEKERJAAN
OKTOBE
NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
1 PERSIAPAN 0.90% 0.08% 0.08% 0.08% 0.08% 0.09% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.90%
2 DINDING PAGAR 0.00%
SUB STRUKTUR 1.76% 0.59% 0.29% 0.30% 0.29% 0.29% 1.76%
STRUKTUR & PEKERJAAN DINDING 3.98%
0.26% 0.26% 0.26% 0.26% 0.30% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 3.98%
FINISHING 0.81% 0.27% 0.27% 0.27% 0.81%
PINTU GERBANG 1.34% 0.66% 0.68% 1.34%
3 STRUKTUR 0.00%
PERSIAPAN 0.29% 0.29% 0.29%
TANAH & PONDASI 3.17% 0.79% 0.79% 0.79% 0.79% 3.17%
STRUKTUR BETON 5.68% 1.14% 1.14% 1.14% 1.14% 1.14% 5.68%
STRUKTUR-LANTAI 1 8.05% 2.01% 2.01% 2.01% 2.01% 8.05%
STRUKTUR - LANTAI 2 3.15% 0.63% 0.63% 0.63% 0.63% 0.63% 3.15%
PEKERJAAN DINDING - LANTAI 1 2.05% 0.29% 0.29% 0.29% 0.29% 0.29% 0.29% 0.29% 2.05%
PEKERJAAN DINDING - LANTAI 2 4.33% 0.54% 0.54% 0.54% 0.54% 0.54% 0.40% 0.40% 0.40% 0.40% 4.32%
PEKERJAAN ATAP 6.72% 2.24% 1.49% 0.99% 0.99% 0.99% 6.70%
4 ARSITEKTUR 0.00%
PEKERJAAN FINISHING - LANTAI 1 0.00%
LANTAI 4.48% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 4.50%
DINDING 1.95% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 1.97%
PLAFOND 2.40% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 2.40%
WATERPROOFING 0.25% 0.12% 0.12% 0.25%
PEKERJAAN FINISHING - LANTAI 2 0.00%
LANTAI 1.93% 0.24% 0.24% 0.24% 0.24% 0.24% 0.24% 0.24% 0.24% 1.92%
DINDING 7.06% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 7.10%
PLAFOND 1.31% 0.26% 0.26% 0.26% 0.26% 0.26% 1.30%
WATERPROOFING 0.70% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.70%
PEKERJAAN PINTU & JENDELA 17.39% 1.74% 1.74% 1.74% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.87% 0.87% 0.87% 0.87% 0.87% 0.87% 0.87% 0.87% 0.87% 0.87% 17.42%

0.00%
5 KOLAM RENANG 0.00%
TANAH & PONDASI 0.30% 0.10% 0.10% 0.10% 0.30%
STRUKTUR BETON 3.59% 1.20% 1.20% 1.20% 3.59%
FINISHING KOLAM RENANG 1.37% 0.17% 0.17% 0.17% 0.17% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 1.41%
FINISHING POOL DECK 0.69% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.69%
POMPA KOLAM RENANG 1.58% 0.79% 0.26% 0.26% 0.26% 1.58%
MAINTENANCE 0.14% 0.14% 0.14%
PLUMBING 0.28% 0.14% 0.14% 0.28%
MEE 0.08% 0.04% 0.04% 0.08%
6 MEP 0.00%
AMPRAH PLN 0.41% 0.41% 0.41%
KABEL FEEDER 0.14% 0.00%
PENANGKAL PETIR 0.22% 0.07% 0.07% 0.07% 0.14% 0.36%
LANTAI 1 0.00%
PEMASANGAN 1.00% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 1.00%
PENCAHAYAAN ARMATURE OPTINAL 0.91% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.91%
AKESOSIR DARI ARCHITECT 0.17% 0.09% 0.09% 0.17%
LANTAI 2 0.00%
PEMASANGAN 0.78% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 1.21%
PENCAHAYAAN ARMATURE OPTINAL 0.17% 0.05% 0.05% 0.05% 0.15%
AKESOSIR DARI ARCHITECT 0.14% 0.05% 0.05% 0.05% 0.14%
LAYANAN MEKANIK (AC) 0.74% 0.25% 0.25% 0.25% 0.74%
PEKERJAAN PIPA AIR BERSIH 1.74% 0.44% 0.44% 0.22% 0.22% 0.22% 0.22% 1.75%
AIR KOTOR 1.61% 0.32% 0.32% 0.32% 0.21% 0.21% 0.21% 1.60%
AIR HUJAN 0.60% 0.12% 0.12% 0.12% 0.12% 0.12% 0.60%
PEMASANGAN SANITARY 0.25% 0.08% 0.05% 0.05% 0.05% 0.23%
SANITARY OPTIONAL 3.39% 0.56% 0.56% 0.56% 0.56% 0.56% 0.56% 3.36%
TOTAL 100%
RENCANA CAPAIAN MINGGUAN (%)
0.79%

2.52%

1.93%

2.47%

4.10%

2.51%

4.47%

2.31%

2.01%

2.10%

0.63%

1.17%

1.17%

3.25%

2.45%

4.36%

1.69%

1.48%

1.57%

1.70%

1.59%

1.58%

1.62%

0.00%

0.00%

0.00%

1.72%

1.66%

1.66%

1.70%

1.56%

1.50%

1.60%

1.64%

1.52%

1.67%

1.70%

1.62%

1.79%

1.67%

1.67%

1.77%

1.72%

1.79%

1.75%

1.56%

1.56%

1.73%

1.58%

1.58%

1.58%

1.54%

1.64%

1.63%

1.63%

1.68%

1.61%
100.00%

TOTAL CAPAIAN MINGGUAN (%)

100.46%
11.81%

14.32%

18.79%

21.09%

23.11%

25.20%

25.83%

27.00%

28.18%

31.42%

33.87%

38.24%

39.93%

41.41%

42.98%

44.68%

46.27%

47.85%

49.47%

49.47%

49.47%

49.47%

51.19%

52.85%

54.52%

56.22%

57.78%

59.28%

60.88%

62.52%

64.03%

65.71%

67.41%

69.03%

70.81%

72.48%

74.14%

75.91%

77.63%

79.43%

81.18%

82.73%

84.29%

86.01%

87.59%

89.16%

90.74%

92.28%

93.92%

95.55%

97.18%

98.86%
0.79%

3.30%

5.23%

7.70%

REALIASA CAPAIAN MINGGUAN (%)


10.88%

15.16%

17.17%

19.01%

20.49%

24.81%

26.98%

28.91%

29.62%
3.22%

4.09%

5.42%

6.11%

8.71%

DEVIASI (%)
-10.08%

-10.22%
-2.01%

-3.61%

-6.38%

-8.20%

-7.95%

-8.03%

-6.83%

-6.51%

-3.36%

-4.44%

-4.97%

-8.61%

PERSETUJUAN

Owner
CV. JENA DEVELOPMENT
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali
WA: 081805332431 EMAIL : jena.architect@gmail.com

LUAS BANGUNAN
OM KOMING HOUSE

NO DESKRIPSI AREA (sqm) TOTAL (sqm)


1 LUAS AREA 300
2 BANGUNAN
LANTAI 1 194.5
LANTAI 2 134
sub total 328.5
3 PERKERASAN
KOLAM RENANG 17.5
DEK KOLAM 10
sub total 27.5
CV. JENA DEVELOPMENT
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali
WA: 081805332431 EMAIL : jena.architect@gmail.com

RENCANA ANGGARAN BIAYA


OM KOMING HOUSE

TOTAL HARGA

NO RINCIAN PEKERJAAN QTY UNIT


1 PERSIAPAN 1 LS 1%
2 DINDING PAGAR 1 LS 8%
3 STRUKTUR 1 LS 33%
4 ARSITEKTUR 1 LS 37%
5 KOLAM RENANG 1 LS 8%
6 MEP 1 LS 12%
TOTAL 100%

Keterangan : harga diatas tidak termasuk


IMB :seluruh izin
Pajak bangunan
Meja dapur, kitchen set, meja washtafel, dipan
Funitur
AC unit
Kebun atau Tanaman

Approved by Approved by

Owner Contractor Party


RINCIAN
OM KOMING HOUSE

NO DESKRIPSI JML UNIT

I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23%

TOTAL PEKERJAAN PERSIAPAN 0.99%


RINCIAN
OM KOMING HOUSE

NO DESKRIPSI JML UNIT

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

TOTAL PEKERJAAN PAGAR 7.88%


RINCIAN
OM KOMING HOUSE

NO DESKRIPSI JML UNIT

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, 2.94 m3 0.71%
D8-100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19%

TOTAL SUB STRUKTUR 9.14%


IIIB STRUKTUR & PEKERJAAN DINDING
A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

TOTAL STRUKTUR & PEKERJAAN DINDING 17.59%


IIIC PEKERJAAN ATAP
1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%
TOTAL PEKERJAAN ATAP 6.72%
TOTAL PEKERJAAN STRUKTUR 33.45%
RINCIAN
OM KOMING HOUSE

NO DESKRIPSI JML UNIT

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras depan) 38.00 m2 1.37%
3 Granite Tile 60x60, bahan (ruang tamu, kitchen, 108.00 m2 0.77%
ruang tidur)
4 Granite Tile 60x60, pemasangan + semen (ruang 108.00 m2 0.92%
tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

TOTAL LANTAI 1 9.08%


IV B PEKERJAAN FINISHING - LANTAI 2
A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur utama, 86.00 m2 0.73%
kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika top 130.60 m2 0.21%
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

TOTAL LANTAI 2 11.00%


IV C PEKERJAAN PINTU & JENDELA
1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%
8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%
17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

TOTAL PEKERJAAN PINTU & JENDELA 17.39%


TOTAL PEKERJAAN ARSITEKTUR 37.46%
RINCIAN
OM KOMING HOUSE

NO DESKRIPSI JML UNIT

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00%
3 Pondasi batu kali 5.64 m3 0.25%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

TOTAL STRUKTUR 3.88%


V B ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

TOTAL ARSITEKTUR 2.07%


VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 mm 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

TOTAL POMPA 2.08%


TOTAL KOLAM RENANG & PEKERJAAN EKTERNAL 8.03%
RINCIAN
OM KOMING HOUSE

NO DESCRIPTION JML UNIT HARGA


SATUAN
VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis &
administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional Type 1.00 Unit 0.08%
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%
C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

TOTAL PEKERJAAN MEP 4.68%


VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material

2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%


m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
1 bersih & panas,
Pipa PPR termasuk
- class dengan
PN-10, DN semua
32/ dia. 1" 50.00 Mtr' 0.185%
2 bahan pendukung
Pipa PPR yang dibutuhkan)
- class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for maintenance 2.00 Unit 0.041%
A.2 AIR KOTOR
Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)

2 PVC AW dia. 4" 49.50 Mtr' 0.373%


3 PVC AW dia. 3" 45.10 Mtr' 0.271%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
1 PVC kelasdia.
PVC AW AW4"putih) dan materail pendukung 40.00 Mtr' 0.301%
2 lainnya
PVC AW dia. 3" 23.00 Mtr' 0.138%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

TOTAL PLUMBING 7.589%


TOTAL PEKERJAAN MEP 12.27%
C HOUSE Minggu ke : 3 (Tiga)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 6 November s/d 12 November 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 5.23% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 3.22% %
Deviasi : -2.01% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 0.25 0.25 0.50 5.00% 0.01%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 0.25 0.25 0.50 5.00% 0.01%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 28.07 28.07 60.00% 0.16%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 0.69 0.69 60.00% 0.00%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 0.69 0.69 60.00% 0.04%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
1.42 1.42 70.00% 0.32%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
6.91 6.91 80.00% 1.54%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
0.72 0.72 15.00% 0.16%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
0.44 0.44 15.00% 0.11%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00%
3 Pondasi batu kali 5.64 m3 0.25%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373%
3 PVC AW dia. 3" 45.10 Mtr' 0.271%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301%
2 PVC AW dia. 3" 23.00 Mtr' 0.138%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 3.22%


Presentase Total (%) 6.44%
C HOUSE Minggu ke : 4 (Empat)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 13 November s/d 19 November 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 7.70% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 4.09% %
Deviasi : -3.61% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 0.50 0.25 0.75 7.50% 0.01%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 0.50 0.25 0.75 7.50% 0.02%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 28.07 9.36 37.42 80.00% 0.22%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 0.69 0.23 0.92 80.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 0.69 0.23 0.92 80.00% 0.05%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
1.42 0.00 1.42 70.00% 0.32%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
6.91 1.73 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
0.72 0.72 1.44 30.00% 0.32%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.00 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
0.44 1.03 1.47 50.00% 0.36%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00%
3 Pondasi batu kali 5.64 m3 0.25%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373%
3 PVC AW dia. 3" 45.10 Mtr' 0.271%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301%
2 PVC AW dia. 3" 23.00 Mtr' 0.138%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 4.09%


Presentase Total (%) 8.19%
C HOUSE Minggu ke : 5 (Lima)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 20 November s/d 26 November 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 11.81% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 5.42% %
Deviasi : -6.38% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 0.75 0.25 1.00 10.00% 0.02%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 0.75 0.25 1.00 10.00% 0.02%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 37.42 9.36 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 0.92 0.23 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 0.92 0.23 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 2.68 2.68 20.00% 0.02%
5 Pasir bawah pondasi 1.68 m3 0.01% 0.34 0.34 20.00% 0.00%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 0.34 0.34 20.00% 0.02%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 4.69 4.69 20.00% 0.18%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
1.42 0.00 1.42 70.00% 0.32%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 0.00 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
1.44 3.36 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.00 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
1.47 1.18 2.65 90.00% 0.64%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00%
3 Pondasi batu kali 5.64 m3 0.25%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373%
3 PVC AW dia. 3" 45.10 Mtr' 0.271%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301%
2 PVC AW dia. 3" 23.00 Mtr' 0.138%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 5.42%


Presentase Total (%) 10.85%
C HOUSE Minggu ke : 6 (enam)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 27 November s/d 4 Desember 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 14.32% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 6.11% %
Deviasi : -8.20% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 1.00 0.25 1.25 12.50% 0.02%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 1.00 0.25 1.25 12.50% 0.03%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 0.00 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 0.00 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 0.00 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 2.68 7.37 10.05 75.00% 0.06%
5 Pasir bawah pondasi 1.68 m3 0.01% 0.34 0.67 1.01 60.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 0.34 0.67 1.01 60.00% 0.06%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 4.69 9.38 14.07 60.00% 0.55%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
1.42 0.61 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 0.00 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 0.00 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.00 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.65 0.29 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 3.66 3.66 65.00% 0.02%
2 Pasir bawah pondasi 0.56 m3 0.00%
3 Pondasi batu kali 5.64 m3 0.25%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373%
3 PVC AW dia. 3" 45.10 Mtr' 0.271%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301%
2 PVC AW dia. 3" 23.00 Mtr' 0.138%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 6.11%


C HOUSE Minggu ke : 7 (tujuh)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 5 Desember s/d 12 Desember 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 18.79% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 8.71% %
Deviasi : -10.08% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 1.25 0.25 1.50 15.00% 0.03%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 1.25 0.25 1.50 15.00% 0.03%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 6.30 6.30 50.00% 0.04%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 0.79 0.79 50.00% 0.00%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 14.18 14.18 50.00% 0.55%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 5.00 5.00 10.00% 0.03%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 0.00 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 0.00 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 0.00 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 10.05 1.34 11.39 85.00% 0.07%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.01 0.42 1.42 85.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.01 0.42 1.42 85.00% 0.08%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 14.07 5.86 19.93 85.00% 0.78%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
92.00 92.00 80.00% 0.87%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
48.96 48.96 80.00% 0.46%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 86.80 86.80 40.00% 0.02%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 0.00 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 0.00 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 0.00 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.00 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 0.00 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 2.05 2.05 30.00% 0.04%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 3.66 1.69 5.36 95.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00%
3 Pondasi batu kali 5.64 m3 0.25%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373%
3 PVC AW dia. 3" 45.10 Mtr' 0.271%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301%
2 PVC AW dia. 3" 23.00 Mtr' 0.138%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 8.71%


C HOUSE Minggu ke : 8 (delapan)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 12 Desember s/d 18 Desember 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 21.09% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 11.05% %
Deviasi : -10.05% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 1.50 0.25 1.75 17.50% 0.03%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 1.50 0.25 1.75 17.50% 0.04%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 6.30 6.30 50.00% 0.04%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 0.79 0.79 50.00% 0.00%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 14.18 14.18 50.00% 0.55%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 5.00 15.00 20.00 40.00% 0.12%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 61.80 61.80 40.00% 0.38%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 11.39 2.01 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.42 0.25 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.42 0.25 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 19.93 3.52 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
92.00 23.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
48.96 6.12 55.08 90.00% 0.52%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 86.80 119.35 206.15 95.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
206.15 206.15 95.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 2.05 1.37 3.42 50.00% 0.07%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 10.85 10.85 50.00% 0.59%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.36 0.28 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.36 5.36 95.00% 0.23%
4 Urugan tanah kembali 5.64 m3 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 32.18 32.18 65.00% 0.24%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 4.51 4.51 10.00% 0.03%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 22.80 22.80 57.00% 0.17%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 11.50 11.50 50.00% 0.07%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 11.05%


C HOUSE Minggu ke : 9 (sembilan)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 19 Desember s/d 25 Desember 2023
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 23.11% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 15.16% %
Deviasi : -7.95% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 1.75 0.25 2.00 20.00% 0.04%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 1.75 0.25 2.00 20.00% 0.05%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 6.30 2.52 8.82 70.00% 0.05%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 0.79 0.31 1.10 70.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 14.18 2.84 17.01 60.00% 0.66%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 20.00 10.00 30.00 60.00% 0.17%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 61.80 23.18 84.98 55.00% 0.52%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
55.08 55.08 90.00% 0.52%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 206.15 206.15 95.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
206.15 206.15 95.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 3.42 3.08 6.50 95.00% 0.14%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 10.85 10.85 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 2.12 2.12 60.00% 0.51%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 31.68 31.68 20.00% 0.18%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 0.00 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.00 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.36 0.28 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 2.82 2.82 50.00% 0.00%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 0.60 0.60 50.00% 0.16%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 2.31 2.31 50.00% 0.58%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 2.89 2.89 50.00% 0.72%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 0.83 0.83 50.00% 0.21%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.12 0.12 50.00% 0.03%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18% 1.52 1.52 50.00% 0.09%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 0.50 0.50 50.00% 0.18%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 32.18 7.43 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 4.51 9.02 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 22.80 9.20 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 11.50 2.30 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 15.16%


C HOUSE Minggu ke : 10 (Sepuluh)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 26 Desember s/d 2 Januari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 25.20% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 17.17% %
Deviasi : -8.03% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 2.00 0.25 2.25 22.50% 0.04%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 2.00 0.25 2.25 22.50% 0.05%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 8.82 8.82 70.00% 0.05%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.10 1.10 70.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 17.01 17.01 60.00% 0.66%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 30.00 30.00 60.00% 0.17%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 84.98 7.72 92.70 60.00% 0.57%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
55.08 55.08 90.00% 0.52%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 206.15 206.15 95.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
206.15 206.15 95.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.50 6.50 95.00% 0.14%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 2.12 1.23 3.35 95.00% 0.81%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 1.78 1.78 20.00% 0.43%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 0.27 0.27 20.00% 0.06%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.14 0.14 20.00% 0.03%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 31.68 63.36 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 0.00 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.00 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 0.00 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 2.82 0.56 3.38 60.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 0.60 0.24 0.84 70.00% 0.23%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 2.31 0.92 3.23 70.00% 0.81%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 2.89 1.16 4.04 70.00% 1.01%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 0.83 0.33 1.16 70.00% 0.29%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.12 0.05 0.17 70.00% 0.04%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.60 0.60 10.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 0.50 0.50 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 0.00 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 0.00 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 0.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 0.00 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 17.17%


C HOUSE Minggu ke : 11 (Sebelas)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 3 Januari s/d 9 Januari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 25.83% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 19.01% %
Deviasi : -6.83% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 2.25 0.25 2.50 25.00% 0.05%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 2.25 0.25 2.50 25.00% 0.06%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 8.82 8.82 70.00% 0.05%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.10 1.10 70.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 17.01 17.01 60.00% 0.66%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 30.00 30.00 60.00% 0.17%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 92.70 92.70 60.00% 0.57%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
55.08 3.06 58.14 95.00% 0.55%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 206.15 4.34 210.49 97.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
206.15 206.15 95.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.50 6.50 95.00% 0.14%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 3.35 3.35 95.00% 0.81%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 1.78 0.89 2.68 30.00% 0.65%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 0.27 0.14 0.41 30.00% 0.09%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.14 0.07 0.21 30.00% 0.05%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42% 2.39 2.39 15.00% 0.51%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 95.04 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 0.00 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.00 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 0.00 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 3.38 1.13 4.51 80.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 0.84 0.36 1.20 100.00% 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 3.23 1.39 4.62 100.00% 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 4.04 1.73 5.78 100.00% 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 1.16 0.50 1.65 100.00% 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.17 0.07 0.24 100.00% 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.60 0.30 0.90 15.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 1.00 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 19.01%


C HOUSE Minggu ke : 12 (Dua Belas)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 6 Januari s/d 12 Januari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 27.00% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 20.49% %
Deviasi : -6.51% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 2.50 0.25 2.75 27.50% 0.05%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 2.50 0.25 2.75 27.50% 0.06%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 8.82 8.82 70.00% 0.05%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.10 1.10 70.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 17.01 17.01 60.00% 0.66%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 30.00 30.00 60.00% 0.17%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 92.70 92.70 60.00% 0.57%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
58.14 3.06 61.20 100.00% 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 210.49 6.51 217.00 100.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
206.15 10.85 217.00 100.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.50 0.34 6.84 100.00% 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 3.35 0.07 3.42 97.00% 0.83%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37% 0.10 0.10 10.00% 0.04%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 2.68 1.78 4.46 50.00% 1.08%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 0.41 0.27 0.68 50.00% 0.15%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.21 0.14 0.34 50.00% 0.08%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42% 2.39 3.99 6.38 40.00% 1.37%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 95.04 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 0.00 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.00 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 0.00 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 4.51 1.13 5.64 100.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 1.20 0.00 1.20 100.00% 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 4.62 0.00 4.62 100.00% 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 5.78 0.00 5.78 100.00% 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 1.65 0.00 1.65 100.00% 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.24 0.00 0.24 100.00% 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.90 0.90 15.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 1.00 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 20.49%


C HOUSE Minggu ke : 13 (Tiga Belas)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 13 Januari s/d 19 Januari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 28.18% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 24.81% %
Deviasi : -3.36% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 2.50 0.50 3.00 30.00% 0.06%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 2.50 0.50 3.00 30.00% 0.07%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 8.82 8.82 70.00% 0.05%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.10 1.10 70.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 17.01 17.01 60.00% 0.66%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 30.00 30.00 60.00% 0.17%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 28.50 50.00% 0.16%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 92.70 5.00 97.70 63.24% 0.60%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
58.14 3.06 61.20 100.00% 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 210.49 6.51 217.00 100.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
206.15 10.85 217.00 100.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.50 0.34 6.84 100.00% 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 3.35 0.18 3.53 100.00% 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37% 1.00 1.00 100.00% 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 2.68 6.24 8.92 100.00% 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 0.41 0.95 1.36 100.00% 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.21 0.48 0.69 100.00% 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42% 2.39 13.57 15.96 100.00% 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
100.00% 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 95.04 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 0.00 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.00 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 0.00 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 4.51 1.13 5.64 100.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 1.20 0.00 1.20 100.00% 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 4.62 0.00 4.62 100.00% 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 5.78 0.00 5.78 100.00% 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 1.65 0.00 1.65 100.00% 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.24 0.00 0.24 100.00% 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.90 0.90 15.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 1.00 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 24.81%


C HOUSE Minggu ke : 14 (Empat Belas)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 20 Januari s/d 26 Januari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 31.42% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 26.98% %
Deviasi : -4.44% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 3.00 0.25 3.25 32.50% 0.06%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 3.00 0.25 3.25 32.50% 0.07%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 8.82 3.78 12.60 100.00% 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.10 0.47 1.58 100.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 17.01 11.34 28.35 100.00% 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44% 20.80 20.80 40.00% 0.18%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 30.00 7.50 37.50 75.00% 0.22%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38% 22.80 22.80 40.00% 0.15%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 28.50 22.80 51.30 90.00% 0.30%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 97.70 18.17 115.88 75.00% 0.72%
6 Plester 269.00 m2 0.64%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
61.20 61.20 100.00% 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 217.00 217.00 100.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
217.00 217.00 100.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.84 6.84 100.00% 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 3.53 3.53 100.00% 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37% 1.00 1.00 100.00% 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 8.92 8.92 100.00% 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 1.36 1.36 100.00% 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.69 0.69 100.00% 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42% 15.96 15.96 100.00% 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
100.00% 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51% 2.12 2.12 100.00% 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 95.04 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89% 91.91 91.91 30.00% 0.57%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 5.64 5.64 100.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 1.20 1.20 100.00% 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 4.62 4.62 100.00% 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 5.78 5.78 100.00% 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 1.65 1.65 100.00% 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.24 0.24 100.00% 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.90 0.90 15.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 1.00 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 26.98%


C HOUSE Minggu ke : 15 (Lima Belas)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 27 Januari s/d 2 Februari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 33.87% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 28.91% %
Deviasi : -4.97% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 3.25 0.25 3.50 35.00% 0.06%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 3.25 0.25 3.50 35.00% 0.08%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 12.60 12.60 100.00% 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.58 1.58 100.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 28.35 28.35 100.00% 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44% 20.80 20.80 40.00% 0.18%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 37.50 7.50 45.00 90.00% 0.26%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38% 22.80 28.50 51.30 90.00% 0.34%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 51.30 51.30 90.00% 0.30%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 115.88 115.88 75.00% 0.72%
6 Plester 269.00 m2 0.64% 67.25 67.25 25.00% 0.16%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
61.20 61.20 100.00% 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 217.00 217.00 100.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
217.00 217.00 100.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.84 6.84 100.00% 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 3.53 3.53 100.00% 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37% 1.00 1.00 100.00% 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 8.92 8.92 100.00% 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 1.36 1.36 100.00% 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.69 0.69 100.00% 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42% 15.96 15.96 100.00% 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
100.00% 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51% 2.12 2.12 100.00% 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 95.04 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89% 91.91 137.86 229.77 75.00% 1.42%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74% 89.25 89.25 75.00% 0.56%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 5.64 5.64 100.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 1.20 1.20 100.00% 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 4.62 4.62 100.00% 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 5.78 5.78 100.00% 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 1.65 1.65 100.00% 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.24 0.24 100.00% 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15% 44.25 44.25 75.00% 0.11%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.90 0.90 15.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 1.00 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 13.80 60.00% 0.08%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 28.91%


C HOUSE Minggu ke : 16 (Enam Belas)
CV. JENA ARCHITECT DEVELOPMENT Tanggal : 3 s/d 9 Februari 2024
Jl. Raya Pemogan, gg. Nusa Indah blok A1 no 1, Denpasar - Bali Rencana : 38.24% %
WA: 081805332431 EMAIL : jena.development.bali@gmail.com Realisasi : 29.62% %
Deviasi : -8.61% %

BOBOT VOLUME PEKERJAAN PROGRESS PROGRESS THD.


NO DESCRIPTION QTY UNIT PROGRES THD.TIAP BAG. SELURUH
RENCANA (%) S/D MINGGU S/D MINGGU PEKERJAAN (%) PEKERJAAN (%)
MINGGU INI
LALU INI
I PERSIAPAN
1 Izin membangun 0.00 SBO 0.09%
2 Pengukuran Ulang area Tanah 1.00 ls 0.09% 1.00 1.00 100.00% 0.09%
3 Pembersihan area sebelum pembangunan 1.00 ls 0.07% 1.00 1.00 100.00% 0.07%
4 Rumah tukang (bedeng) 1.00 ls 0.23% 1.00 1.00 100.00% 0.23%
5 Biaya Listrik selama proyek 10.00 Bulan 0.18% 3.50 0.25 3.75 37.50% 0.07%
6 Biaya angkut sampah 1.00 ls 0.09%
7 Pembersihan area proyek selama proyek 10.00 Bulan 0.23% 3.50 0.25 3.75 37.50% 0.09%

II PEKERJAAN PAGAR
A SUB STRUKTUR
1 Penggalian untuk struktur tembok pagar 12.60 m3 0.07% 12.60 12.60 100.00% 0.07%
2 Pasir bawah pondasi tembok pagar 1.58 m3 0.01% 1.58 1.58 100.00% 0.01%
3 Pondasi batu kali ; tinggi 1,2 m tembok pagar 28.35 m3 1.10% 28.35 28.35 100.00% 1.10%
4 Penggalian untuk struktur deck 1.20 m3 0.01% 1.20 1.20 100.00% 0.01%
5 Pasir bawah pondasi deck 0.15 m3 0.00% 0.15 0.15 100.00% 0.00%
6 Pondasi batu kali ; tinggi 1,2 m deck 3.15 m3 0.12% 3.15 3.15 100.00% 0.12%
7 Urugan tanah kembali area landscape 52.00 m3 0.44% 20.80 20.80 40.00% 0.18%

B STRUKTUR & PEKERJAAN DINDING


1 Plat beton deck ; 10 cm 1.10 m3 0.27%
2 Kolom Beton 10x10 ( 8", 6"-150) 50.00 m1 0.29% 45.00 45.00 90.00% 0.26%
3 Balok Beton 10x20 ( 8", 6"-150) 57.00 m1 0.38% 51.30 51.30 90.00% 0.34%
4 Sloof Beton 10x20 ( 8", 6"-150) 57.00 m1 0.33% 51.30 51.30 90.00% 0.30%
5 Dinding batako 2,5 m & 3 m 154.50 m2 0.95% 115.88 115.88 75.00% 0.72%
6 Plester 269.00 m2 0.64% 67.25 67.25 134.50 50.00% 0.32%
7 Aci 269.00 m2 0.56%
8 Finishing dinding ex. kayu bengkirai 15.60 m2 0.56%

C FINISHING
1 Cat dinding ex. Dulux weatershield 269.00 m2 0.81%

D PINTU GERBANG
1 MD 01 ex. Kayu Bengkirai 1.00 ls 1.15%
2 MD 01 ex. Kayu Bengkirai 1.00 ls 0.18%

III STRUKTUR
IIIA STRUKTUR BAWAH
A PERSIAPAN
1 Bouwplank 60.00 m1 0.29% 60.00 60.00 100.00% 0.29%

B TANAH & PONDASI


1 Pekerjaan galian pondasi telapak ; 2 meter 46.78 m3 0.27% 46.78 46.78 100.00% 0.27%
2 Pasir bawah pondasi telapak 1.15 m3 0.01% 1.15 1.15 100.00% 0.01%
3 Beton rabat bawah pondasi telapak 1.15 m3 0.07% 1.15 1.15 100.00% 0.07%
4 Pekerjaan galian batu kali, 40 cm 13.40 m3 0.08% 13.40 13.40 100.00% 0.08%
5 Pasir bawah pondasi 1.68 m3 0.01% 1.68 1.68 100.00% 0.01%
6 Beton rabat bawah pondasi 1.68 m3 0.10% 1.68 1.68 100.00% 0.10%
7 Pondasi batu kali, 120 cm 23.45 m3 0.91% 23.45 23.45 100.00% 0.91%
8 Urugan tanah ex. Batu kapur bangunan 115.00 m3 1.09%
115.00 115.00 100.00% 1.09%
utama ; 100 cm
9 Urugan tanah ex. Batu kapur teras dan 61.20 m3 0.58%
61.20 61.20 100.00% 0.58%
garasi ; 60 cm
10 Pekerjaan pemadatan tanah 217.00 m2 0.05% 217.00 217.00 100.00% 0.05%
11 Pekerjaan pemberian anti rayap untuk slab 217.00 m2 0.02%
217.00 217.00 100.00% 0.02%
(type Previel 100EC ex Indofullin)

C STRUKTUR BETON
1 Pondasi telapak F1 - 1500/1500/300 (18 2.03 m3 0.45%
2.03 2.03 100.00% 0.45%
D16, 18 D13)
2 Pondasi telapak F2 - 1200/1200/300 (12 8.64 m3 1.92%
8.64 8.64 100.00% 1.92%
D13, 12 D12)
3 Pondasi telapak F3 - 1000/1000/300 (12 4.80 m3 1.07%
4.80 4.80 100.00% 1.07%
D13, 12 D12)
4 Kolom alas beton C1 - 300/300 (14 D16, D8- 0.81 m3 0.20%
0.81 0.81 100.00% 0.20%
100)
5 Kolom alas beton C2 - 140/500 (16 D16, D8- 2.94 m3 0.71%
2.94 2.94 100.00% 0.71%
100)
6 Sloof TB1 - 200/300 (6 D13, D8-200) 6.84 m3 0.15% 6.84 6.84 100.00% 0.15%
7 Beton Lantai Rabatan, thk : 100mm 21.70 m3 1.19% 21.70 21.70 100.00% 1.19%

IIIB STRUKTUR & PEKERJAAN DINDING


A STRUKTUR-LANTAI 1
1 Kolom beton C1 -300/300 (14 D16, D8-150) 0.97 m3 0.24% 0.97 0.97 100.00% 0.24%
2 Kolom beton C2 - 140/500 (6 D13, D8-150) 3.53 m3 0.85% 3.53 3.53 100.00% 0.85%
3 Struktur anak tangga dari lt 1 1.00 ls 0.37% 1.00 1.00 100.00% 0.37%
4 Balok beton B1 - 200/400 (8 D16, D8-150) 8.92 m3 2.16% 8.92 8.92 100.00% 2.16%
5 Balok beton B2 - 200/300 (6 D13, D8-150) 1.36 m3 0.30% 1.36 1.36 100.00% 0.30%
6 Balok beton B3 - 130/600 (8 D13, D8-150) 0.69 m3 0.15% 0.69 0.69 100.00% 0.15%
7 Plat Lantai Beton 12cm - (D8 - 200) 15.96 m3 3.42% 15.96 15.96 100.00% 3.42%
8 Plat Lantai Beton area kebun 12cm - (D8 - 2.64 m3 0.57%
100.00% 0.57%
200)

B STRUKTUR - LANTAI 2
1 Kolom beton C3 - 130/300 (6 D13, D8-150) 2.12 m3 0.51% 2.12 2.12 100.00% 0.51%
2 Balok beton B4 - 150/300 (4 D13, D8-150) 2.43 m3 0.54%
3 Plat Lantai Beton 10cm - (D8 - 200) 7.30 m3 1.56%
4 Cor beton leheran atap 2.40 m3 0.53%

C PEKERJAAN DINDING - LANTAI 1


1 Dinding batako 158.40 m2 0.90% 95.04 95.04 60.00% 0.54%
2 Plester 316.80 m2 0.71%
3 Kolom beton 10x10 ( 8", 6"-150) 49.50 m1 0.29%
4 Balok beton 10x20 ( 8", 6"-150) 23.00 m1 0.15%

D PEKERJAAN DINDING - LANTAI 2


1 Dinding batako 306.36 m2 1.89% 229.77 61.27 291.04 95.00% 1.80%
2 Plester 612.72 m2 1.48%
3 Kolom beton 10x10 ( 8", 6"-150) 119.00 m1 0.74% 89.25 23.80 113.05 95.00% 0.70%
4 Balok beton 10x20 ( 8", 6"-150) 31.00 m1 0.22%

IIIC PEKERJAAN ATAP


1 Rangka baja ringan atap garasi 40.00 m2 0.38%
2 Atap garasi, ex alderon 40.00 m2 0.64%
3 Rangka pergola garasi 7.00 m2 0.24%
4 Penutup atap, polikarbonat 7.00 m2 0.18%
5 Rangka baja ringan atap rumah 140.00 m2 1.32%
6 Atap rumah, ex aspal maxxi 140.00 m2 3.37%
7 Kalsiplank 10 mm for the list plank 48.50 m1 0.16%
8 Plafond kalsiplank ex. Cat kayu 43.50 m2 0.44%

IV ARSITEKTUR
IV A PEKERJAAN FINISHING - LANTAI 1
A LANTAI
1 Pabble Wash, warna abu (area parkir) 73.00 m2 1.09%
2 Lantai kayu ex. bengkirai, bahan (teras 38.00 m2 1.37%
depan)
3 Granite Tile 60x60, bahan (ruang tamu, 108.00 m2 0.77%
kitchen, ruang tidur)
4 Granite Tile 60x60, pemasangan + semen 108.00 m2 0.92%
(ruang tamu, kitchen, ruang tidur)
5 Lantai kayu (area tangga ) 1.00 ls 0.32%

B DINDING
1 Pekerjaan Aci 292.80 m2 0.71%
2 Cat dinding dalam ex. Dulux Easyclean 171.60 m2 0.55%
3 Cat dinding luar r ex. Dulux Aqua Shield 97.20 m2 0.31%
4 Granite Tile, pemasangan + semen (powder 24.00 m2 0.17%
room, bathroom)
5 Granite Tile, bahan (powder room, bathroom) 24.00 m2 0.20%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 91.00 m2 0.00%
2 Plafond ex. WR Gypsum indoboard 9mm 113.00 M2 0.48%
3 Cat Plafond ex. Dulux Pentalite 204.00 m2 0.96%
4 Plafond ex. Kayu bengkirai 12.60 m2 0.52%
0.44%
D WATERPROOFING
1 Waterproofing - dinding toilet ex. Sika top 56.10 m2 0.09%
2 Waterproofing - dinding luar ex. Sika top 97.20 m2 0.16%

IV B PEKERJAAN FINISHING - LANTAI 2


A LANTAI
1 Granite Tile 60x60, bahan (Kamar tidur 86.00 m2 0.73%
utama, kamar tidur 01,02,03, koridor)
2 Granite Tile 60x60, pemasangan + semen 86.00 m2 0.61%
(Kamar tidur utama, kamar tidur 01,02,03,
koridor)
3 Granite Tile 60x60, bahan (Bathroom utama, 19.00 m2 0.16%
01,02,03)
4 Granite Tile 60x60, pemasangan + semen 19.00 m2 0.16%
(Bathroom utama, 01,02,03)
5 Pabble Wash, warna abu, (Padmasana) 17.00 m2 0.25%

B DINDING
1 Pekerjaan aci 513.72 m2 1.36%
2 Cat dinding dalam ex. Dulux Easy Clean 332.22 m2 1.07%
3 Cat dinding luar ex. Dulux Aqua Shield 181.50 m2 0.59%
4 Granite Tile 60x60, bahan (Bathroom utama, 99.00 m2 0.84%
01,02,03)
5 Granite Tile 60x60, pemasangan + semen 99.00 m2 0.84%
(Bathroom utama, 01,02,03)
6 Fasad Kayu, ex. Bengkirai 65.00 m2 2.35%

C PLAFOND
1 Plafond ex. Gypsum indoboard 9mm 115.00 m2 0.61%
2 Plafond ex. WR Gypsum indoboard 9mm 37.00 M2 0.32%
3 Cat Plafond ex. Dulux Pentalite 152.00 m2 0.39%

D WATERPROOFING
1 Waterproofing lantai & dinding toilet ex. Sika 130.60 m2 0.21%
top
2 Waterproofing - dinding luar ex. Sika top 181.50 m2 0.29%
3 Waterproofing - Balkon ex. Sika Top 18.00 m2 0.03%
4 Waterproofing - Balkon kebun ex. Sika Top 37.00 m2 0.06%
5 Waterproofing - dak atap ex. Sika Top 70.00 m2 0.11%

IV C PEKERJAAN PINTU & JENDELA


1 TD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit
Pintu kayu Bengkirai 2.00 unit
Hardware ex. Dekson 2.00 unit
Pemasangan pintu 2.00 unit

2 TD 02
Pintu kayu Bengkirai 1.00 unit 0.33%
Hardware ex. Dekson 1.00 unit 0.11%
Pemasangan pintu 1.00 unit 0.02%

3 TD 03
Kusen pintu, ex. Kayu Bengkirai 6.00 unit 0.37%
Pintu kayu Bengkirai 6.00 unit 1.14%
Hardware ex. Dekson 6.00 unit 0.36%
Pemasangan pintu 6.00 unit 0.12%

4 TD 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.15%
Hardware ex. Dekson 1.00 unit 0.05%
Pemasangan pintu 1.00 unit 0.02%

5 TD 05
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.07%
Pintu kayu Bengkirai 2.00 unit 0.70%
Hardware ex. Dekson 2.00 unit 0.31%
Pemasangan pintu 2.00 unit 0.04%

6 TD 06
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.06%
Pintu kayu Bengkirai 1.00 unit 0.19%
Hardware ex. Dekson 1.00 unit 0.06%
Pemasangan pintu 1.00 unit 0.02%

7 GD 01
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.25%
Pintu kayu Bengkirai + kaca 8 mm 3.00 unit 0.51%
Hardware ex. Dekson 1.00 unit 0.36%
Pemasangan pintu 3.00 unit 0.06%

8 GD 02
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.33%
Pintu kayu Bengkirai + kaca 8 mm 5.00 unit 0.94%
Hardware ex. Dekson 1.00 unit 0.81%
Pemasangan pintu 5.00 unit 0.10%

9 GD 03
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.15%
Pintu kayu Bengkirai + kaca 8 mm 1.00 unit 0.18%
Hardware ex. Dekson 1.00 unit 0.17%
Pemasangan pintu 1.00 unit 0.06%

10 GW 01
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.12%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.06%

11 GW 02
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.07%
Daun jendela kayu Bengkirai + kaca 8 mm 1.00 unit 0.10%
Hardware ex. Dekson 1.00 unit 0.03%
Pemasangan jendela 1.00 unit 0.02%

12 GW 03
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.22%
Kaca fix 8mm 5.00 unit 0.43%
Pemasangan kaca 5.00 unit 0.33%

13 GW 04
Kusen pintu, ex. Kayu Bengkirai 1.00 unit 0.16%
Pintu kayu Bengkirai 3.00 unit 0.51%
Kaca fix 8 mm 3.00 unit 0.33%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan pintu 3.00 unit 0.20%

14 GW 05
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.14%
Daun jendela kayu Bengkirai + kaca 8 mm 3.00 unit 0.26%
Hardware ex. Dekson 3.00 unit 0.73%
Pemasangan jendela 3.00 unit 0.17%

15 GW 06
Kusen jendela, ex. Kayu Bengkirai 1.00 unit 0.06%
Daun jendela kayu Bengkirai + kaca 8 mm 2.00 unit 0.11%
Hardware ex. Dekson 3.00 unit 0.66%
Pemasangan jendela 3.00 unit 0.17%

16 GW 07
Kaca temper 10mm 7.92 m2 0.35%
Pemasangan kaca 1.00 unit 0.03%

17 RG 01
Kaca temper 10mm 6.00 m2 0.26%
Pemasangan kaca 3.00 unit 0.08%

18 RG 02
Kaca temper 10mm 11.50 m2 0.51%
Irregular cut 1.00 ls 0.10%
bor & asesoris 1.00 ls 0.29%
Pemasangan kaca 3.00 unit 0.08%

19 RG 03
Kaca temper 10mm 4.00 m2 0.18%
Irregular cut 1.00 ls 0.15%
bor & asesoris 1.00 ls 0.20%
Pemasangan kaca 3.00 unit 0.12%

20 RG 04
Kaca temper 10mm 2.00 m2 0.09%
Pemasangan kaca 1.00 unit 0.03%

21 FRAME & DOOR FINISH


Cat pintu ex. Propan Lasur Natural 36.00 m2 0.20%
Cat pintu ex. Propan Lasur Natural 136.00 m1 0.41%
Cat pintu ex. Propan Lasur Natural 168.00 m1 0.50%

V KOLAM RENANG
VA STRUKTUR
A TANAH & PONDASI
1 Pekerjaan penggalian kolam 5.64 m3 0.04% 5.64 5.64 100.00% 0.04%
2 Pasir bawah pondasi 0.56 m3 0.00% 0.56 0.56 100.00% 0.00%
3 Pondasi batu kali 5.64 m3 0.25% 5.64 5.64 100.00% 0.25%
4 Urugan tanah kembali 5.64 m3 0.01% 5.64 5.64 100.00% 0.01%

B STRUKTUR BETON
1 Balok sloof B1 1.20 m3 0.32% 1.20 1.20 100.00% 0.32%
2 Plat lantai beton 20cm kolam renang 4.62 m3 1.16% 4.62 4.62 100.00% 1.16%
3 Plat dinding beton 15cm kolam renang 5.78 m3 1.45% 5.78 5.78 100.00% 1.45%
4 Plat beton 15cm Ruang pompa 1.65 m3 0.41% 1.65 1.65 100.00% 0.41%
5 Plat beton 12cm Ruang pompa 0.24 m3 0.06% 0.24 0.24 100.00% 0.06%
6 Plat beton lantai, thk : 100mm 3.04 m3 0.18%

VB ARSITEKTUR
A FINISHING KOLAM RENANG
1 Waterproofing - ex. Sika top 59.00 m2 0.15% 44.25 44.25 75.00% 0.11%
2 Batu Mozaic "dinding & lantai" 59.00 m2 1.21%
3 Pekerjaan aci "Ruang Pompa" 5.75 m2 0.01%

B FINISHING POOL DECK


1 Decking kayu bengkirai 11.00 m2 0.40%
2 Pintu metal ruang pompa 1.00 ls 0.12%
3 Decking area shower ex. kayu bengkirai 5.00 m2 0.18%

VC POMPA
A POMPA KOLAM RENANG
1 Pool Water Circulation pump 1HP Hayward 1 Unit 0.55%
2 Sand Filter Hayward 1 Unit 0.43%
3 Submersible Pump for sumpit 1 Unit 0.15%
4 Main drain 1 Nos 0.04%
5 Wall Inlet 2 Nos 0.04%
6 Vacuum connection fitting 1 Nos 0.01%
7 Lampu kolam kedap air LED 11 watt 3 Nos 0.24%
8 Waterproof Transformer -220V/12V 1 Nos 0.09%
9 Instalasi kabel lampu kolam NYYHY 2X2,5 m 2 Point 0.03%

B MAINTENANCE
1 Vacum house 30 fit 1.00 bh 0.04%
2 Vacum head 1.00 bh 0.02%
3 Telescope hendle 1.00 bh 0.03%
4 Leaf skimer 1.00 bh 0.01%
5 Algai brush 1.00 bh 0.01%
6 Nilon brush 1.00 bh 0.01%
7 Tes Kit 1.00 bh 0.01%

C PLUMBING
1 PVC AW dia. 2" 42.00 Mtr' 0.20%
2 PVC AW dia. 1,5" 6.00 Mtr' 0.02% 0.90 0.90 15.00% 0.00%
3 Fitting pipa Rucika class TS 1.00 Lot 0.06%

D MEE
1 Kabel NYY 2x2.5 34.00 m1 0.03%
2 Kabel 3x2.5 2.00 m1 0.00%
3 Timer 1.00 set 0.04%

VI MEP
VI A PEKERJAAN LISTRIK
A UMUM
A.1 AMPRAH PLN
1 PLN Hook Up / biaya penyambungan baru 1.00 unit 0.41%
(BP & UJL) 4,400 VA, termasuk biaya teknis
& administrasi to AKLI & Konsuil Bali untuk
persetujuan gambar

A.2 KABEL FEEDER


1 KWH meter ~ MDP; NYY 3 x 4 mm2 1.00 Mtr' 0.01%
2 MDP ~ PP.2; 2nd Floor; NYY 3 x 4 mm2 15.00 Mtr' 0.08%
3 MDP ~ PP. 4; Swimming Pool; NYY 3x4 mm3 8.00 Mtr' 0.04%

A.3 PENANGKAL PETIR


1 Lightning Protection Head, Konventional 1.00 Unit 0.08%
Type
2 Down conductor; NYY 1x50 Sqmm + HIC 10.00 Mtr 0.08%
3 Lightning Protection Grounding 1.00 Set 0.06%

B LANTAI 1
B.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.38%
2 Lampu (area luar) 15.00 unit 0.18%
3 Stop kontak 20.00 unit 0.32%
4 MCB 18 group 1.00 unit 0.04%
5 Main MCB 40 A 1.00 unit 0.01%
6 MCB 25 A (kolam) 1.00 unit 0.01%
7 MCB 25 A (lantai 2) 1.00 unit 0.01%
8 MCB 25 A (lantai 3) 1.00 unit 0.01%
9 MCB 16 A (AC) 1.00 unit 0.00%
10 MCB 16 A (stop kontak) 4.00 unit 0.02%
11 MCB 6 A (Lampu) 7.00 unit 0.03%

B.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 33.00 unit 0.14%
2 Outdoor/Garden spot light LED - 5W 13.00 unit 0.11%
3 LED strip light 40.00 m1 0.65%
4 Lampu gantung (disediakan owner) 1.00 unit -

B.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 1.00 unit 0.004%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 4.00 unit 0.019%
4 Stop kontak 14.00 unit 0.061%
5 Stop kontak luar anti air 2.00 unit 0.020%
6 Exhoust Fan 3.00 unit 0.037%
7 Stop kontak AC 1.00 unit 0.010%

C LANTAI 2
C.1 PEMASANGAN
1 Lampu (area dalam) 34.00 unit 0.384%
2 Lampu (area luar) 5.00 unit 0.061%
3 Stop kontak 16.00 unit 0.254%
4 MCB 12 group 1.00 unit 0.038%
5 MCB 16 A (AC) 3.00 unit 0.015%
6 MCB 16 A (stop kontak) 2.00 unit 0.010%
7 MCB 6 A (Lampu) 4.00 unit 0.016%

C.2 PENCAHAYAAN ARMATURE OPTINAL


1 Downlight LED - 5W 24.00 unit 0.105%
2 Outdoor/Garden spot light LED - 5W 5.00 unit 0.043%
3 Wall spot light 4.00 unit 0.021%
4 Lampu gantung (disediakan owner) 4.00 unit 0.000%
5 Lampu dinding (disediakan owner) 2.00 unit 0.000%

C.3 AKESOSIR DARI ARCHITECT


1 Saklar tunggal 2.00 unit 0.009%
2 Saklar seri 4.00 unit 0.019%
3 Saklar ganda hotel 3.00 unit 0.015%
4 Stop kontak 10.00 unit 0.044%
5 Exhoust Fan 3.00 unit 0.037%
6 Stop kontak AC 3.00 unit 0.015%

D LAYANAN MEKANIK (AC)


Pekerjaan pipa
1 Refrigerant pipe for IU-OU#01 ruang tamu 5.00 m 0.132%
Refrigerant pipe for IU-OU#02 kamar tidur 0.191%
2 10.00 m
utama
3 Refrigerant pipe for IU-OU#03 kamar 01 10.00 m 0.173%
4 Refrigerant pipe for IU-OU#03 kamar 02 10.00 m 0.173%
5 diameter 3/4" 19.00 m 0.074%

VI B PLUMBING
A.1 PEKERJAAN PIPA AIR BERSIH
Peralatan
1 Pengadaan & pemasangan Pompa sumur 1.00 Unit 0.230%
bor , cap. 2 m3/h, Head = 50 m; c/w support
material
2 Pengadaan & pemasangan Booster , cap. 3 1.00 Unit 0.138%
m3/h, Head = 30 m; c/w support material
3 Pengadaan & pemasangan Water Tank, cap 2.00 Unit 0.184%
800 Liter; c/w support material
4 Electric Water Heater, Cap. Storage 120 Ltr. 1.00 Unit 0.361%
5 Pemasangan untuk seluruh peralatan 1.00 Lot 0.069%
0.000%
Pemasangan Pipa 0.000%
(Pengadaan & pemasangan pipa instalasi air 0.000%
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
1 Pipa PPR - class PN-10, DN 32/ dia. 1" 50.00 Mtr' 0.185%
2 Pipa PPR - class PN-10, DN 20/ dia. 1/2" 16.00 Mtr' 0.027%
3 Pipa PPR - class PN-20, DN 32/ dia. 1" 30.00 Mtr' 0.134%
4 Pipa PPR - class PN-20, DN 20/ dia. 1/2" 14.00 Mtr' 0.026%
5 Sambungan pipa 1.00 Nos 0.093%
6 Gate / Ball Valve dia. 1" + Cover for 6.00 Unit 0.115%
maintenance
7 Gate / Ball Valve dia. 1/2" + Cover for 9.00 Unit 0.116%
maintenance
8 Floating Valve dia. 3/4" 1.00 Unit 0.020%
9 Garden Tap dia. 1/2" + Cover for 2.00 Unit 0.041%
maintenance

A.2 AIR KOTOR


Peralatan
1 Septictank ex. Concrete 1.00 Unit 0.355% 1.00 1.00 100.00% 0.35%

Pemasangan pipa
1 (Pengadaan & pemasangan pipa instalasi air
bersih & panas, termasuk dengan semua
bahan pendukung yang dibutuhkan)
2 PVC AW dia. 4" 49.50 Mtr' 0.373% 39.60 39.60 80.00% 0.30%
3 PVC AW dia. 3" 45.10 Mtr' 0.271% 13.53 13.53 30.00% 0.08%
4 PVC AW dia. 2" 8.00 Mtr' 0.039%
5 PVC AW dia. 1,5" 10.00 Mtr' 0.038%
6 PVC AW dia. 1 1/4" Vent Pipe 45.00 Mtr' 0.118%
7 Ven Cap dia, 1 1/4" 10.00 Mtr' 0.079%
8 Sambungan pipa Rucika class TS 1.00 Lot 0.210%
9 Smart Drain 8.00 Nos 0.131%

A.3 AIR HUJAN


Pengadaan, pemasangan, pengetesan (pipa
PVC kelas AW putih) dan materail
pendukung lainnya
1 PVC AW dia. 4" 40.00 Mtr' 0.301% 32.00 32.00 80.00% 0.24%
2 PVC AW dia. 3" 23.00 Mtr' 0.138% 13.80 3.45 17.25 75.00% 0.10%
3 Pipe fitting Rucika class TS 1.00 Lot 0.088%
4 Floor Drain dia. 2" 13.00 Mtr' 0.064%
5 Roof drain 2" 2.00 Nos 0.012%

A.4 SANITARY
PEMASANGAN SANITARY
1 Pemasangan Closet 4.00 Unit 0.064%
2 Pemasangan Jet washer 4.00 Unit 0.014%
3 Pemasangan Wastafel + Faucet 4.00 Unit 0.055%
4 Shower + mixer 4.00 Unit 0.051%
5 Buthtube + Faucet 1.00 Unit 0.023%
6 Floor drain 11.00 Unit 0.038%

SANITARY OPTIONAL
1 Closet duduk (CW431/SW431JP + TCW07S) 4.00 Unit 0.359%
2 Jet Sprey 4.00 Unit 0.023%
3 Wastafel ex. Terrazo 4.00 Unit 0.553%
4 Wastafel Tap Hot & Cold PALOMA (FCP 4.00 Unit 0.544%
9335)
5 Shower PALOMA (FCP 9308) 2.00 Unit 0.875%
6 Hand Shower "maid bathroom" 1.00 Unit 0.069%
7 Shower "pool" 1.00 Unit 0.115%
8 Bathtube ex. Terrazo 1.00 Unit 0.322%
9 Bathtube tap PALOMA (FCP 9305) 1.00 Unit 0.525%

Presentase Total (%) 29.62%