You are on page 1of 11

N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

1. NPS: 10 TEE , CS A234-WPB N , SMLS , BE 10X10 I6589058 1


, STD , B16.9
2. NPS: 10 FLG-WN , CS A105N , CL300 , RF 10 I6554303 1
, STD , B16.5
3. NPS: 10 FLG-BLND , CS A105N , CL300 , RF 10 I6555010 1
, B16.5
4. NPS: 10 VLV-GT , CS A216-WCB , CL300 , 10 I6553071 1
RF , B16.5 , B16.10 , API 600 , OS&Y ,
BB , FULL PORT , FLX WDG , API 600
TRIM 8 , CI FG PKG W/ ANTI-EXTR , API
600 BOLTING , GO
5. NPS: 10 GASKET , 304 SS-FG , SPIRAL 10 I6340938 2
WOUND , 3.2mm (81") THK , 304 SS
INNER RING , CS OUTER RING , CL300 ,
B16.B , B16.20
6. BLT-STUD , CR-MO A193-B7 , W/ 2 HVY HEX 1 PB1JC1C2PAWMG002 32
NUTS , CS A194-2H , LOW
ALLOY PCC-1-4 , B1.1 , MECH GALV B695
CL. 50 , DIA (IMP) x LEN (MET) -
170 mm Length

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 10 - 3 - 30
FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : CRUDE OIL INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 15 7.05 22.5 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:


TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
281 79
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 10/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-006
D-20-06A
CLASS/RATING 300

AREA WBS MATERIALS CS 21-DA-1(Sheet 1) DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 3CB1S02 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0062 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

1. NPS: 30 PIPE , CS API 5L-B-PSL2-, SAW , 30 I6397063 4M


BE , STD , B36.10M , DBL RANDOM LGTHS
2. NPS: 30 TEE , CS A234-WPBW N , WLD , 30X30 I6589171 1
100% X-RAY , BE , STD , B16.9
3. NPS: FLG-WN , CS A105N , CL150 , RF , 30 I6554163 1
, STD , B16,47A
4. NPS: FLG-BLND , S A105N , CL150 , RF 30 I6555039 1
, B16.47A
5. NPS: 30 VLV-GT , CS A216-WCB , CL150 , 30 I6536864 1
RF , B16.47-A , B16.10 , API 600 ,
OS&Y , BB , FULL PORT , FLX WDG , API
600 TRIM 8 , CI FG PKG W/ ANTI-EXTR ,
API 600 BOLTING , GO
6. NPS: 30 GASKET , 304 SS-FG , SPIRAL 30 I6971813 2
WOUND , 3.2mm (81") THK , 304 SS ,
INNER RING , CS OUTER RING , CL150 ,
B16.47A , B16.20
7. BLT-STUD , CR-MO A193-B7 , W/ 2 HVY HEX 1.1/4 PB1JC1C2PAWMG002 55
NUTS , CS A194-2H , LOW
ALLOW PCC-1-4 , B1.1 , MECH GALV B695
CL. 50 , DIA (IMP) x (MET) -
240 mm Length

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 20 - 1 - 20
2. 30 - 3 - 90 FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : CRUDE OIL INSULATION TYPE N
NOTES:
LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 3.5 0.96 5.25 STRESS ANALYSIS Y(NOTE 3) PROJECT TITLE:
TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
120 38
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 10/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 D-20-06A
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-008
CLASS/RATING 150

AREA WBS MATERIALS CS 21-DA-1(Sheet 1) 26075-120-P3-P17-H0009 26075-120-P3-P17-H0009 REV 003 DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 1CB1S02 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0063 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

1. NPS: 20 PIPE , CS API 5L-B-PSL2-, SAW , 20 I6589164 1M


BE , STD , B36.10M , DBL RANDOM LGTHS
2. NPS: 20 TEE , ITCS A420.WPL5W , 100% 20X20 I6554153 1
XRAY , BE , XS , B16.9
3. NPS: 20 FLG-WN , CS A105N , CL300 , RF 20 I6555039 1
, XS , B16.5
4. NPS: 20 FLG-BLND , CS A105N , CL300 , RF 20 I6537976 1
, B16.5
5. NPS: VLV-GT , CS A216-WCB , CL300 , 20 I6536864 1
RF , B16.5 , API 600 ,
OS&Y , BB , FULL PORT , FLX WDG , API
600 TRIM 8 , CI FG PKG W/ ANTI-EXTR ,
API 600 BOLTING , GO , NON-ASB
6. NPS: 20 GASKET , 304 SS-FG , W/ 2 WHY HEX 20 I6340925 2
NUTS , CS A194-2H , LOW
ALLOY PCC-1-4 , B1.1 , MECH GALV B695
CL. 50 , DIA (IMP) x LEN (MET) -
210 mm Length 1.1/4 PB1JC1C2PAWMG002 48

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 20 - 3 - 60
2. 12 - 1 - 12 FW (FIELD WELD)
3. 20 1 - - 20
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : CRUDE OIL INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 34.63 26.58 51.94 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:
TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
85 32
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 10/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 D-20-06A
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-009
CLASS/RATING 300

AREA WBS MATERIALS CS 21-DA-1(Sheet 1) 26075-120-P3-P17-H0009 26075-120-P3-P17-H0009 REV 003 DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 3CB1S02 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0099 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

1. NPS: TEE , CS A234-WPB N , SMLS , BE 8X8 I6589085 1


, STD , B16.9
2. NPS: 8 FLG-WN , CS A105N , CL150RF , 8 I6554317 1
STD , B16.5
3. NPS: 8 GASKET , 304 SS-FG , SPIRAL 8 I6340951 2
WOUND , 3.2mm (81") THK , 304 SS
INNER RING , CS OUTER RING , CL150
B16.5 , B16.20
4. BLT-STUD , CR-MO A193-B7 , W/ 2 HVY HEX
3
4
PB1JC1C2PAWMG002 16
NUTS , CS A194-2H , LOW
ALLOY PCC 1-4 , B1.1 , MECH GALV B695
CL. 50 , DIA (IMP) x LEN (MET) -
120mm Lenght
5. NPS: 8 VLV-GT , CS 216-WCB , CL150 , 8 I6536748 1
RF , B16.5 , B16.10 , API 600 , OS%Y ,
BB , FULL PORT , FLX WDG , API 600
TRIM 8 , CI PG PKG W/ANTI-EXTR , API
600 BOLTING , HW
6. NSP: 8 BLND-FLG , CS A105N , CL150 , RF , 8 I6554317 1
B16.5

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 8 - 2 - 16
2. 8 1 - - 8 FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : CRUDE OIL INSULATION TYPE N
NOTES:
LINE CONDITIONS INSULATION THICKNESS N
1. ALL DIMENSIONS ARE IN MILIMETER.
2. RADIOGRAPHY REFER TO NR-057 IN CASE ACTUAL PIPE NOT FOLLOW DOC. PIPING SPECIFICATION DESIGN OPERATING HYDROTEST HEAT TRACING N
(CASE USING SINGLE RANDOM INSTEAD OF DOUBLE RANDOM LENGHT).
PRESS KG/CM.³g 7.61 5.81 11.41 STRESS ANALYSIS N PROJECT TITLE:
3. STRESS ANALYSIS IS PART OF JO-SHRP, NEED TO BE VERIFIED
4. RT 100% MUST BE CONDUCTED SINCE THERE IS NO HYDROTEST. TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
85 32
5. AS PER EXISTING ACTUAL CONDITION.
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 10/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD
021-TP-010
CLASS/RATING 300

AREA WBS MATERIALS CS DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 1CB1S02 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0064 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 12 - 3 - 36
FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : HEAVY SLOP INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 43.4 1.51 65.1 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:
TEMP (C) 80 RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
280
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 21/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 G-320-07A/B
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-172
CLASS/RATING 150

AREA WBS MATERIALS CS DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 1CB2881 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0117 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 8 - 3 - 24
FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : ATM RESIDUE INSULATION TYPE H

LINE CONDITIONS INSULATION THICKNESS 65

DESIGN OPERATING HYDROTEST HEAT TRACING Y

PRESS KG/CM.³g 1.4 1.04 2.1 STRESS ANALYSIS N PROJECT TITLE:


TEMP (C) 129 RADIOGRAPHY (NOTE 2) 100% (NOTE 3)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
157
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 21/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-224
G-320-07A/B/A
CLASS/RATING 150

AREA WBS MATERIALS CS DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 1CB1S02 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0220 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 4 - 3 - 12
FW (FIELD WELD)

CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : LP STEAM INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS 90

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 15 13.5 22.5 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:


TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
260 210
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 14/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 D-20-01A/B PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-215
CLASS/RATING #600

AREA WBS MATERIALS CS 21-DA-1(Sheet 1) DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 3CB2S07 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0138 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 6 - 2 - 12
FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : SWEET NAPTHA INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 31.5 ATM 47.25 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:
TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
160 40
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 17/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 D-20-03
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-254
CLASS/RATING 150

AREA WBS MATERIALS CS 21-DA-1(Sheet 1) DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 3CB1801 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0160 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1.
FW (FIELD WELD)
CLIENT:

THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : DIESEL INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 6 1.3 9 STRESS ANALYSIS N PROJECT TITLE:


TEMP (C) RADIOGRAPHY 100%
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
66 40
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 14/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 D-20-06B PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-268
CLASS/RATING 150

AREA WBS MATERIALS CS DRAWING No. SHEET No. REV.

NORTH SPEC (PIPING CLASS) 1CB2SO2 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0136 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 16 - 2 - 32
2. 8 3 - - 24 FW (FIELD WELD)
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : REFORMATE INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 15 9.45 22.5 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:


TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
85 40
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 17/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 A22 PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-278 & 277
CLASS/RATING 150

AREA WBS MATERIALS CS DRAWING No. SHEET No. REV.

SOUTH SPEC (PIPING CLASS) 1CB2S01 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0318 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb
N BILL OF MATERIALS

PT NPD
NO DESCRIPTION (IN) CMDTY CODE QTY

SIZE JOINT
NO (INCH) DIA IN
SW FW THRD SW (SHOP WELD)
1. 16 - 2 - 32
2. 8 - 5 - 40 FW (FIELD WELD)
3. 3 - 2 - 6
CLIENT:
THRD (THREADED JOINT)

CONTRACTOR:
SERVICE : REFORMATE/GASOLINE R92 INSULATION TYPE N

LINE CONDITIONS INSULATION THICKNESS N

DESIGN OPERATING HYDROTEST HEAT TRACING N

PRESS KG/CM.³g 9.67 6.5 14.5 STRESS ANALYSIS (NOTE 3) PROJECT TITLE:
TEMP (C) RADIOGRAPHY (NOTE 2) 100% (NOTE 4)
PEKERJAAN TIE IN PROJECT MODIFIKASI TANGKI RDMP RU V BALIKPAPAN (SUPPORT REVAMP)
66 38
PROJECT NUMBER SYSTEM / WORKPACK DYE PEN/MPI N 00A 17/03/2024 ISSUED FOR CONSTRUCTION MI LINE No.
STRESS CLIENT
L2407 A-24
PWHT N REV DATE DESCRIPTION OF REV. DRN CHKD APP'D APPD APPD 021-TP-281
CLASS/RATING 150# & 300#

AREA WBS MATERIALS CS DRAWING No. SHEET No. REV.

SOUTH SPEC (PIPING CLASS) 3CB2S01 & 1CB2S01 P&ID GENERAL ARRANGEMENTS ISOMETRIC DWG L2407-320-P3-P17-K0317 1 OF 1 00A
PAINTING REFECENCE DRAWINGS
SYSTEM Lb

You might also like