Acad-Typical Cross Secton 13-27km - Copy (2) .PDF Final 111
Acad-Typical Cross Secton 13-27km - Copy (2) .PDF Final 111
CL
Left side Right side
R.W 15m R.W 15m
10.0m
1.50m 3.50m 3.50m 1.50m
-4.00% -2.00% -2.00% -4.00% R.W
R.W -1:
:1 2.0
-2.0
11:56 AM
NOTES:
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:80 SHEET No 1
DATE :
3 APPROVED BY: (GCS)
11:56 AM
R.W
.70
1:0
CL
10.0m
11:56 AM
0.6
7m
0.60m
0:1
-2.
R.W
Thursday, February 25, 2021
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:80 SHEET No
DATE :
3 APPROVED BY: (CUT)
11:56 AM
R.W
Typical Cross Section For LS Retaining Wall
CL
Detail B
10.0m
1.50m 3.50m 3.50m 1.50m
-2.00% -2.00% -2.00% -4.00%
-1:
2.0
R.W
11:56 AM
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG
Detail B
-2.00%
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:100 SHEET No
DATE :
3 APPROVED BY: (RW)
11:56 AM
R.W
Masonry Drain Cross Section Left Side
16+620-17+130
CL
10.00m
1.50m 3.50m 3.50m 1.50m
R.W
1:0
.70
-4.00% -2.00% -2.00% -4.00%
.70
1:0
11:56 AM
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG
NOTES:
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:100 SHEET No
DATE :
3 APPROVED BY: (DR (2))
11:56 AM
Highways and Streets 6th Min.Passing Sight Distance m 395 320 245
4-AASHTO-Roadside-Design-Guide-4th-ed-2011 Min.Horizantal Radius m 450 255 80
PAVEMENT DESIGN STANDARD :
1-AASHTO Guide for Design of Pavement Structures - 1993 Maximum Superelevation % 6 6 6
2-MUTCD2009edition
CONSTRUCTION SPECIFICATIONS: Min.Crest Vertical Radius m 85 65 55
11:56 AM
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: Custom SHEET No
DATE :
3 APPROVED BY: (D Critaria)
11:56 AM
PLAN LEGEND
NORTH ARROW GREEN AREA ELECTRICAL POLES
LIGHTING DISTRIBUTION
SUB ROAD GROUTED PATCHING BOARD (ADB)
ABBREVIATIONS
OFF OFFSET
OFC OPTICAL FIBER CABLE
EP END PIONT OF ALIGNMENT
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: Custom SHEET No
DATE :
3 APPROVED BY: (ABR)
11:56 AM
LIST OF DRAWINGS
GENERAL NOTE 1
GENERAL PLAN 1
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG
LEGEND 1
TYPICAL SECTIONS 5
NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: Custom SHEET No
DATE :
3 APPROVED BY: (LD)