General Type of Cross Section

CL
Left side Right side
R.W 15m R.W 15m
10.0m
1.50m 3.50m 3.50m 1.50m
-4.00% -2.00% -2.00% -4.00% R.W

R.W -1:
:1 2.0
-2.0
11:56 AM

Asphalt Wearing Course 0.06 m


Asphalt Binder Course 0.1m
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

Base Course 0.15m


Sub Base Course 0.4 m
Sub Grade

NOTES:

1.In general,the side slope shown on the typical drawing


shall be applied only for small cut and fill areas.
For cut or fill of more than 2.0 meters, and considered
from topography survey data during the the construction
the exact side slope should reported and the side slope
should be determined based on the result of detailed soil
survey and approval of MPW authorities.
2.CBR for sub-grade shall be 8%
Sunday, February 5, 2023

3.CBR for sub-base course shall be 40%


4.CBR for road base course shall be 85%
5.Asphalt concrete Wearing Course 450000Psi
6.All dimensions are in METER

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:80 SHEET No 1
DATE :
3 APPROVED BY: (GCS)
11:56 AM
R.W

Typical Cross Section In cut Area

.70
1:0
CL

10.0m
11:56 AM

1.50m 3.50m 3.50m 1.50m


-4.00% -2.00% -2.00% -4.00%
-1:
2.0
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

0.6
7m
0.60m
0:1
-2.
R.W
Thursday, February 25, 2021

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:80 SHEET No
DATE :
3 APPROVED BY: (CUT)
11:56 AM

R.W
Typical Cross Section For LS Retaining Wall

CL
Detail B
10.0m
1.50m 3.50m 3.50m 1.50m
-2.00% -2.00% -2.00% -4.00%
-1:
2.0

R.W
11:56 AM
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

Detail B

-2.00%

Single Bitumen Surface Treatment (SBST)


Base Course =31cm
Sub Base =40cm
Sub grade
Thursday, February 25, 2021

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:100 SHEET No
DATE :
3 APPROVED BY: (RW)
11:56 AM

R.W
Masonry Drain Cross Section Left Side
16+620-17+130

CL
10.00m
1.50m 3.50m 3.50m 1.50m
R.W

1:0
.70
-4.00% -2.00% -2.00% -4.00%

.70
1:0
11:56 AM
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

NOTES:

1.In general,the side slope shown on the typical drawing


shall be applied only for small cut and fill areas.
For cut or fill of more than 2.0 meters, and considered
from topography survey data during the the construction
the exact side slope should reported and the side slope
should be determined based on the result of detailed soil
survey and approval of MPW authorities.
2.CBR for sub-grade shall be 8%
3.CBR for sub-base course shall be 40%
4.CBR for road base course shall be 85%
5.Asphalt concrete Wearing Course 450000Psi
6.All dimensions are in METER
Thursday, February 25, 2021

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: 1:100 SHEET No
DATE :
3 APPROVED BY: (DR (2))
11:56 AM

GENERAL NOTES PROJECT:Construction of (Arghandab to Khakriz) Road #02,


L= 13.00-27.00Km
DESIGN STANDARD:
GEOMETRIC DESIGN STANDARD: Design element Unit Level Rolling Mountain
1- INTERIM ROAD AND HIGHWAY NORM (MoPW)
2-AFGHAN HIGHWAY AND STREET GEOMETRIC DESIGN STANDARD 2012.AFGHAN NATIONAL Design Speed Km/h 100 80 50
AUTHORITY (ANSA)
3-AASHTO TECHNICAL COMMITTEE ON GEOMETRIC DESIGN -2004 A Policy on Geometric Design of Min.Stopping Sight Distance m 250 185 130

Highways and Streets 6th Min.Passing Sight Distance m 395 320 245
4-AASHTO-Roadside-Design-Guide-4th-ed-2011 Min.Horizantal Radius m 450 255 80
PAVEMENT DESIGN STANDARD :
1-AASHTO Guide for Design of Pavement Structures - 1993 Maximum Superelevation % 6 6 6
2-MUTCD2009edition
CONSTRUCTION SPECIFICATIONS: Min.Crest Vertical Radius m 85 65 55
11:56 AM

1-AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS


2-AMERICAN SOCIETY FOR MATERIALS TESTING (ASTAM) Maximum Longitudinal Grade % 8 8 8

SURVEY : Min.Sag Vertical Radius m 65 55 45


1- STANDARD COORDINATE SYSTEM USED FOR AFGHANISTAN IS WORLD GEOMETRIC SYSTEM Traffic Lane Normal Crossfall % 2 2 2
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

(WGS84) DATUM, UTM ZONES 41 NORTH. Shoulder Normal Crossfall % 4 4 4


2-THE MAIN POINT USED FOR THIS PROJECT HAVE BEEN CONNECT WITH HELP OF ACCURATE
Traffic Lane Normal width m 3.5 3.5 3.5
D-GPS.
Shoulder width m 1.5 1.5 1.5
3-TOPOGRAPHIC SURVEY HAS BEEN DONE WITH TOTAL STATION.
4-ALL EXISTING FEATURE HAVE BEEN SERVED BY TOTAL STATION. Right of Way m 15 15 15
HORIZONTAL AND VERTICAL ALIGNMENTS : Calculation vehicle (WB-12) m 13.87 13.87 13.87
5-ROAD DESIGN IS BASED ON THE RESULTS OF TOTAL STATION SURVEY.
6- ALL THE ALIGNMENT ARE ACTUAL AND THEY HAVE BEEN DESIGNED IN ACCORDANCE
WITH TOTAL STATION SURVEY.
Thursday, February 25, 2021

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: Custom SHEET No
DATE :
3 APPROVED BY: (D Critaria)
11:56 AM
PLAN LEGEND
NORTH ARROW GREEN AREA ELECTRICAL POLES

HORIZONTAL GRADE 1800


SID WALK SPLICE BOX

LIGHTING DISTRIBUTION
SUB ROAD GROUTED PATCHING BOARD (ADB)

PEDESTRIAN ELECTRICAL MANHOLE


CROSSING
HOUSE EM

BENCHMARK SCHOOL OFC - MANHOLE


11:56 AM

DIRECTION ARROW HOSPITAL OFC - HAND HOLE

BOX CULVERT POLICE STATION


C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

OPTICAL FIBER CABLE OFC OFC OFC OFC

SLAB CULVERT GRAVE YARD CUTTING

BRIDGE MOSQUE FILLING

BIKE WAY SIGN GARDEN KARIZ

POINT OF AGRICULTURE CENTER LINE


INTERSECTION LAND
ELECTRIC CABLE
TREE CASE WAY TRENCH ECT ECT ECT ECT
Thursday, February 25, 2021

WATER WELL SHOP DITCH

ELECTRICAL POLE WALL RIGHT OF WAY ROW ROW ROW ROW


NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: Custom SHEET No
DATE :
3 APPROVED BY: (LEG)
11:56 AM

ABBREVIATIONS

TC TANGENT LENGTH OF CURVE EX- ELE EXISTING ELEVATION


RC REDUCE OF HORIZONTAL CURVE FG- ELE FINISHED GROUND ELEVATION
LC LENGTH OF HORIZONTAL CURVE BVCS BEGINNING OF VERTICAL CURVE STATION
PI PIONT OF INTERSECTION STATION BVCE BEGINNING OF VERTICAL CURVE ELEVATION
E EXTERNAL DISTANCE SA SAG CURVE
M MIDDLE ORDINATE EVCS END OF VERTICAL CURVE STATION
BP BEGINNING OF ALIGNMENT EVCE END OF VERTICAL CURVE ELEVATION
TL TANGENT LENGTH LOW LOWEST POINT CURVE STATION
TD TANGENT DIRECTION LOW LOWEST POINT CURVE ELEVATION
TS TANGENT SPIRAL INTERSECT PVI POINT OF VERTICAL CURVE STATION
SC SPIRAL CURVE INTERSECT PVI POINT OF VERTICAL CURVE ELEVATION
CS CURVE SPIRAL INTERSECT PVT POINT OF VERTICAL TANGENCY
ST SPIRAL TANGENT INTERSECT PVC POINT OF VERTICAL CURVATURE
11:56 AM

PT TANGENT CURVE INTERSECT LVC LENGTH OF VERTICAL CURVE


PC CURVE TANGENT INTERSECT BVCS BEGINNING OF VERTICAL CURVE STATION
SN SPIRAL NUMBER BVCE BEGINNING OF VERTICAL CURVE ELEVATION
C PI INDEX HIGH PT HIGH POINT OF TANGENT STATION
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

D.A DELTA ANGLE HIGH PT HIGH POINT OF TANGENT ELEVATION


L LENGTH LC LENGTH OF VERTICAL CURVE
R REDUCE K K VOLUE
T TANGENT L PROFILE CURVE LENGTH
Ex.t EXTERNAL TANGENT R PROFILE CURVE RADIUS
Ex.sec EXTERNAL SECANT G GRADE
LC COORD LENGTH NC NORMAL CROWN
ST STATION INT INTERSECTION
E EASTING
N NORTHING
L.S FULL CROSS SLOPE LEFT
R.S FULL CROSS SLOPE RIGHT
BM BENCHMARK
ELE ELEVATION
RoW RIGHT OF WAY
Thursday, February 25, 2021

OFF OFFSET
OFC OPTICAL FIBER CABLE
EP END PIONT OF ALIGNMENT

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION
2 SURVEY & DESIGN DEPARTMENT Kandahar-Orzgan
CHECK BY: 24 July 2023 SCALE: Custom SHEET No
DATE :
3 APPROVED BY: (ABR)
11:56 AM

LIST OF DRAWINGS

DRAWING TITLE SHEET NO: DRAWING TITLE SHEET NO:

GENERAL DRAWING GENETAL DRAWING

GENERAL NOTE 1

INFORMATION AND ABBREVIATIONS 1


11:56 AM

GENERAL PLAN 1
C:\USERS\IT\DESKTOP\ACAD-TYPICAL CROSS SECTON 13-27KM - COPY (2).DWG

LEGEND 1

TYPICAL SECTIONS 5

BENCH MARK LIST 1

PLAN AND PROFILE 21

CROSS SECTIONS 252


Thursday, February 25, 2021

TOTAL PAGES 283

NO DESCRIPTION DATE SURVEYED BY: Survey Team PROJECT NAME: Construction of (Kandahar to Orzgan) Road #04,L= 33.00-47.100Km
ISLAMIC EMIRAT OF AFGHANISTAN
1 DESIGN 100% 5/5/1444 DESIGNED BY: Eng. Wahidullah CONTRACT NO: -
MINISTRY OF PUBLIC WORKS PROVINCE:
DWN BY: Eng. Sadiqullah SHEET CONTENT: TYPICAL CROSS SECTION