You are on page 1of 1

B B B1 B1

A1

A1

DETAIL-1A
SECTION A-A
BOTTOM PLAN

DETAIL - 1B

B B

SECTION 2A-2A

SECTION B1-B1 SECTION A1-A1

TOP PLAN

1 1

PLAN 1-1
DETAILS-1B

SECTION B-B R1 20.03.2024 REVISED AS PER OBSERVATIONS ZAID RK MVS


SECTION 1-1 RO 14.02.2024 INITIAL SUBMISSION FOR APPROVAL ZAID RK MVS
NOTES :- REV. DATE PARTICULARS DRAWN BY DESIGNED APPROVED
CONTRACTOR :

CLIENT :

DETAILS-A
NAME DATE SCALE : UNIT No.
Designed By RK 14.02.2024 1:1 mm
Drawn By ZAID 14.02.2024 PACKAGE:
Checked By RK 14.02.2024 ADDITIONAL MAKE-UP WATER PIPING PACKAGE
FOR KHARGONE STPP (2 X 660 MW)
Approved By MVS 14.02.2024
DRG. TITLE:

Preliminary
PIPE SUPPORT STEEL BRIDGE -9.0M
For Construction
LENGTH FOR RIVER CROSSING AT CH 28.70
For Approval As Built Drawing DWG. No. REV. No.
ZECPL/NTPC/RC/37.5/01
JOB REF. N : RJ/23/05
. R1
CAD FILE : STEEL BRIDGE SHEET No. 01/03 SHEET SIZE: A3