You are on page 1of 27

FORM: HSE-HS-29-F01

Revision No. : 0
HSE RISK ASSESSMENT Page No. : 1 of 27

S/No. Activity Hazard/Aspect Consequences Groups Exposed Existing Control Measures Risk Additional Control Measures Residual
Evaluation (If required)
Risk Rating
(with additional
(With existing control measures)
control
measures)

S P R S P R
1. People 1. Ensure Job safety analysis Ensure provision of
1. Personnel 3 2 6 3 1 3
Mobilization / 1. Vehicle working on (JSA) is completed. flagman on
1 Demobilization injury
movement the site area 2. Area surveyed and reversing
2. Asset damage
of Equipment at 2. Bad weather 2. Employees underground/Expose machinery.
3. Fire
the Site 3. Unfamiliar involve in the facilities identified prior to
4. Environmental
area activity mobilization All plant and
damage
4. Buried 3. People 3. Maintained Safe vehicles will be
services passing distance from fitted with amber
nearby overhead flashing beacons
transmission line
(5.5m from 400kv Fire Extinguisher
,4m in case of shall be available at
220kv) the vehicles and
near equipment all
4. Only approved access and
time
crossing points utilized
First aider shall be
5. Minimum widths for
available.
moving traffic will be
maintained.
6. PTW system in
place
7. Valid UAE driving
license and
maintained speed
limit
8. Ensure Proper PPE
(safety shoes,
helmet, high
visibility vest,
gloves)

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 2 of 27

Ref: Legal and other applicable


requirement:
TRANSCO SSR-6.1 Table safety
clearances for OHTL

OSHAD SF – CoP – 21.0 Permit to


Work Systems

OSHAD SF – CoP –39.0


Overhead and underground
services

OSHAD SF – CoP - 15.0 - Electrical


Safety

1. Avoid working in
2 Mobilization of Uneven, untidy, Personnel Injuries due Employees involve 1. Cables crossing through 2 3 6 2 1 2
storm, windy
Workers slippery ground to Slip, trip & fall. in the activity. pedestrian routes is
conditions.
conditions avoided and cable guards
Other people
used to cover cables where 2. Avoid working
working on the site.
required. during low visibility
visitors 2. Area demarcation ensured hours.
and barricades and warning 3. Control working
signs in place hours as per local
3. Ensure proper requirements
housekeeping.
4. Check for any spillage, keep
the ground surface dry
5. First aider on site to
provide first aid
6. Suitable PPE footwear
provided.
7. Proper housekeeping
Ref: Legal and other applicable
requirement:
TRANSCO SSR-9.10 General
housekeeping
TRANSCO SSR-9.8 protective
clothing and equipment
OSHAD SF – CoP - 09 – workplace
wellness

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 3 of 27

OSHAD SF – CoP - 02 – personal


protective equipment

3
1. Musculoskeletal
Manual Handling Heavy load Workers involved in 3 2 6 Supply additional lighting in 3 1 3
injuries 1. Used of mechanical
manual handling poorly lit location.
Sharp edges of 2. Strains & sprains aid equipment.
load from lifting. People present (Trolley or lifting Level uneven floor.
3. Fractures & bruiser nearby equipment.)
Bulky load Ensure to maintain
caused by being struck 2. Ask for assistance and
housekeeping all time.
by the materials / by carry only maximum
being caught in pinch 20kg above waist. Attached handle or holders
point. 3. Break down heavy to the load.
4. Cuts & bruise caused load into smaller
by falling materials parts where possible.
4. Stabilize unstable
load by securing it or
putting it in container.
5. Housekeeping
ensured pathways
cleared for moving
around safely and
covering the shortest
distance.
6. Awareness created
about Proper Lifting
techniques.
7. Seek help for bulky
loads or used of
trolley or lifting
equipment.
8. Wear appropriate
PPE. (Safety shoes,
gloves, safety helmet)
Ref: Legal and other applicable
requirement:

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 4 of 27

OSHAD SF – CoP -14- manual


handling and ergonomics
OSHAD SF – CoP - 02 – personal
protective equipment

1. Approved method
4 Loading / 1. Fall of 1. Fatality 1) Workers 4 2 8 No work in bad weather 3 1 3
statement must be in
Offloading materials involved in condition
2. Personnel injury place prior to start
materials and operation
2. Crane failure the work activity Maintain a register of lifting
lifting operation 3. Property damage 2) Crane
2. Ensure Job safety tackles and appliance
3. Suspended operator
analysis (JSA) is
load 3) Other Keep red flags for as a line
completed
people not to cross
4. Ground 3. All lifting operations
nearby
stability must be under control Fire Extinguisher must be
of an ‘appointed available at the vehicles or
5. Weather
person’ who will be equipment all time.
condition
competent to take
First aider ensured to remain
6. unbarricaded overall responsibility
on site during activity
area 4. Plan must be
produced that
7. poor visibility
considers weight of
load, radius of lift,
overhead clearance,
ground conditions,
positioning of
crane/boom truck,
and lifting equipment
required.
5. The SWL must be
indicated and never
exceeded.
6. Certified Equipment,
operator and rigger /
banksman
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 5 of 27

7. Load must be
correctly slung and
secured.
8. Loosed materials
must be carried in
boxes/containers.
9. Conduct visual and
Pre use crane
inspection check list.
10. Crane must be
earthed if parallel to
energize OHL.
11. Proper
communication
between operator
and the rigger.
12. Standing below
suspended load
should strictly
prohibited,
13. No work in bad
weather condition
14. All lifting operation
will be suspended in
case wind speed
reaches 38 km/h or
above.
15. Ensure the surface is
always dry to avoid
slippery condition
16. PTW system ensured
17. Proper PPE such as
new anti-slip safety
boot, hand gloves etc.

Ref: Legal and other applicable


requirement:
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 6 of 27

OSHAD SF – CoP -36


Plant and equipment
OSHAD SF – CoP -34- safe use of
lifting equipment and lifting
accessories

TRANCO SSR.

5 Positioning and 1. Operation of 1. personal injuries. Worker working at 1. Approved method Ensure provision and proper 3 1 3
Operation of the puller machine or height statement must be in usage of fall arrest system
2.Property damage 3 2 6
stringing tensioner place prior to start where needed.
Worker/ people
equipment machine 3. Failure of the the work activity
present under the ensure emergency vehicle
equipment 2. Ensure Job safety
2. Struck-by working platform. present all the time during
analysis (JSA) is
moving working.
completed
equipment and
3. Area surveyed for the
materials
existing facilities
3. Roll-over by 4. Ensure working
materials and platform is secure for
equipment working
5. Puller
machine/tensioner
machine, chain block,
having valid Third-
party inspection
certificate.
6. Operating by a
competent person
7. Ensured that
Employees must be
trained prior to work
at height or using
work at height
devices
8. No personnel are
allowed under the
stringing

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 7 of 27

9. Established Proper
communication of
workers and foremen
or supervisor
10. Provision of walkie
talkie
11. Secured and use
appropriate tools for
the specific work
12. Equipment has stable
access and
emergency stop
button.
13. Ensure first aid kit on
site area
14. Ensure proper first
aider always present
on site
15. Standby Fire
extinguisher near the
petrol operated
equipment
Ref: Legal and other applicable
requirement:
TRANSCO SSR-8.13 WORK AT
HEIGHT
TRANSCO SSR-9.10 General
housekeeping
TRANSCO SSR-9.8 protective
clothing and equipment
OSHAD SF – CoP -23-working at
height

6 Lifting/Hoisting 1. Lifting 1. Fatality Workers performing 1. Approved method TBT must be conducted prior
4 2 8 3 1 3
of Materials Equipment 2. Property Damage activity statement must be in to work with specific
e.g., Aerial Failure 3. Personnel injury Workers working place prior to start topic related to the activity.
Rollers for 2. Unstable 4.Damaged Equipment. nearby the work activity

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 8 of 27

Stringing of ground. 5. Crane tips/turn over. 2. Ensure Job safety


Close Supervision by Lifting
OPGW with 3. Lifting gears. 6. Uncertified Lifting analysis (JSA) is
supervisor/Supervisor
Single ckt. 4. Load swing gears. completed
Outage on the 5. Ground 3. Ensure proper lifting Activity will be carried out/
existing 400/ Bearing Pressure plan prior to the completed during day light
220 kV OHLs activity
(Pulleys, Boom 4. Checking the ground Keep red flags for as a line
Truck and Winch stability, before not to cross
Machine starting activity.
Ensure provision of first aider
5. Boom Truck / Winch
along with first aid kit on the
Machine Operator
site all time
having third party
training certificate. Emergency vehicle remain in
6. Slinger/Rigger to be the site all the time
provided at site with
Appropriate signage must be
valid competency
installed
certificate for proper
e.g., lifting in progress
signaling and slinging.
No person should be allowed
7. Certified Banksman
to walk/stay under the
present at site for
suspended load.
safe maneuvering of
Only workers involve in
equipment.
activity should remain in the
8. Using double tag line,
work area.
to arrest swing.
9. Barricade with
appropriate signage
e.g., "Lifting in
Progress" will be
provided at the lifting
area (Boom Swing
Radius) in accordance
with the "OSHAD-SF
Code of Practice 22.0
Version 3.0 of July
2016. - Barricading of
Hazards.

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 9 of 27

10. ADWEA color coding


for lifting gears to be
followed.
11. To be followed the
safe usage of lifting
equipment and
accessories as per
OSHAD-SF Code of
Practice 34.0 Version
3.0 of July 2016.
12. To be followed the
Transco SSR.
13. Lifting Area Radius
for the lifting of
"Sheave roller" rollers
must be properly
barricaded. No one is
allowed to cross the
barricade cade and
stand under the
suspected loads.
14. Winch machine must
be having valid third-
party inspection
certificate.
15. Designated operator
must be provided in
the work place full
time.
16. Use of Personal
protective
equipment. (Safety
shoes, helmet, vest)
Ref: Legal and other applicable
requirement:

OSHAD SF – CoP - 02 – personal


protective equipment

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 10 of 27

OSHAD SF – CoP -34- safe use of


lifting equipment and lifting
accessories
OSHAD SF – CoP -22- barricading of
hazards
TRANSCO SSR- 18.14.2
Signs and barricades
TRANSCO SSR-8.9 Tools and
equipment
1. Approved method
7 Climbing tower 1. working at 1. Fatality 4 2 8 Provision of addition pulleys 3 1 3
Workers performing statement must be in
and working at height with neoprene – on rubber
2. Personnel injury activity place prior to start
height (for wheel, to be anchored by the
2. Falling of Worker working the work activity
Stringing of 3. Property damage non- conductive (nylon belt)
objects under/near the 2. Ensure Job safety
OPGW with Single in mid-section and lower
4. Electrocution tower analysis (JSA) is
ckt. Outage on 3. Slip, Trip and level of the tower.
completed
the existing Fall
3. Consider the worker Provision of rubber mat or
400/220 kV OHLs
4. Cut and fitness prior working wooden plank board for the
laceration 4. All workers should operator of tensioner and
properly train to puller to protect workers
5. Heat stress
carry work safely at from electrocutions and
6. Improper use height. shocks.
of PPEs 5. Ensure proper
Provision of tool lanyard for
/Equipment working platform
hand tools to the workers
where possible
working at height in order to
6. Ensured worker
avoid falling of tools.
awareness how to
wear / use properly Use of rope grab, life line and
the full body harness retractable life line.
while climbing and
Area under work at height
erection (100% tie
barricade, proper signage
off) anchored
posted
properly.
7. All operatives No one allowed to stay
working at height below where work at height
tied 100% tie-off. is ongoing
8. Restricted the
presence of people
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 11 of 27

on ground level while No work in bad weather


other people were condition
working at height.
9. Watch man assigned
to alert people
passing or working at
the ground level
10. Proper PPE such as
new safety boots anti
slip hand gloves
helmet safety glass
etc. secured all tools
above ground level
properly tied of or
used of tools bag
double shock
absorbing lanyard.
11. Checking safety
harness condition in
daily basis before and
after of each use and
ensure it has valid
inspection certificate.
12. Use Rubber glove -
high voltage.
13. Emergency Rescue
Kit/Rescuer available
at Site.
14. All PPEs and fall
arrest materials and
equipment to be
worn and used at
working at Heights
activities must be
having valid 3rd party
inspection
certificates. e.g., full
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 12 of 27

body harness,
lifelines. All working
at heights operatives
must be having valid
working at heights
training certificates.
15. Rescuer/Rescue kit
present always on
site for rescue
operation for
suspended person in
case of any incident.
Approved first Aider
with first Aid kit shall
be present at side.
Emergency contact
numbers posted on
the work site
16. Emergency vehicle
shall remain on site
area to be use in case
of any emergency.
Ref: Legal and other applicable
requirement:
OSHAD SF – CoP -23-working at
height
OSHAD SF – CoP - 02 – personal
protective equipment

TRANSCO SSR-8.13 WORK AT


HEIGHT

TRANSCO SSR-8.14.3- Training


requirement and competency
assessment
TRANSCO SSR- 18.14.2 Signs and
barricades

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 13 of 27

Workers performing 1. Approved method


8 Dismantling of 1. Falling of 1. Fatality 3 2 6 Use of rope grab, life line and 3 1 3
activity statement must be in
fittings clipping persons retractable life line.
2. Personnel injury place prior to start
and de-clipping of Workers working
2. Falling of the work activity Don’t work in bad weather
the existing 3. Property damage nearby
objects 2. Ensure Job safety condition
OPGW to transfer
analysis (JSA) is
on the rollers of 3. Slip, Trip and Provide work at height
completed
OPGW, Fall refresher training for the
3. Provide proper
Installation of workers working at height
4. Cut and working platform
Vibration
laceration where possible. Restrict the presence of
dampers and
4. Consider the worker people on ground level while
downlead clamps 5. Heat stress
fitness prior working other people are working at
at jointing towers
5. Using full body height.
(Climbing in the
harness while
tower Working at secured all tools above
climbing and erection
height) ground level properly tied of
(100% tie off)
or used of tools bag
anchored properly.
6. Ensure worker aware first Aider remain on site all
how to wear / use time.
properly the full body
Emergency arrangement
harness with double
such as rescuer, rescue kit,
shock absorbing
and emergency vehicle
lanyard.
remain on site all time
7. Assign watch man to
alert people passing
or working at the
ground level
8. harness condition in
daily basis before and
after of each use and
insure it is certified.
9. Proper PPE such as
new safety boots
antis lip hand gloves
helmet heavy safety
glass etc.

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 14 of 27

Ref: Legal and other applicable


requirement:

OSHAD SF – CoP -23-working at


height
OSHAD SF – CoP - 02 – personal
protective equipment

TRANSCO SSR-8.13 WORK AT


HEIGHT

TRANSCO SSR-9.8 protective


clothing and equipment

Workers performing 1. Approved method


9 Stringing of new 1. Failure of the 1. Fatality 3 2 6 Use of rope grab, life line and 3 1 3
activity statement must be in
OPGW using Equipment while retractable life line.
2. Personnel injury place prior to start
Dielectric rope as pulling conductor Workers working
the work activity Don’t work in bad weather
pilot wire (Winch 3. Equipment/Property nearby
2. Failure or 2. Ensure Job safety condition
Machine) damage
collapse of the analysis (JSA) is
Provide work at height
conductor completed
refresher training for the
material. 3. Un 3. Ensured proper
workers working at height
safe act working platform
4. Barricade the Restrict the presence of
4. Unsafe
working area people on ground level while
condition limited
5. Provision of banks other people are working at
access while
man to ensure all height.
doing the work
personnel are
up in the tower secured all tools above
alerted.
ground level properly tied of
5. Working at 6. Assigned only
or used of tools bag
height competent person in
the operation of first Aider remain on site all
equipment machine time.
and workers working
Emergency arrangement
at heights.
such as rescuer, rescue kit,
7. Winch Machines
and emergency vehicle
(Puller &Tensioner)
remain on site all time
having a competent
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 15 of 27

operator to monitor
the tension of cable
wire to avoid cut-offs.
Emergency brake
available in every
winch machine in
case of sudden loose
of cable wires during
stringing.
8. Third party inspection
certificate of the
winch machine
available.
9. Thorough visual
safety Inspection of
the winch machine
ensured using pre
inspection check list
10. Inspection of the Full
Body Harness,
conducting as per pre
inspection check list
before workers
deploy working at
heights
11. Safety inspection of
the Lifting Hoist
12. Adequate use of PPE
Full Body Harness
100% Tie of policy
13. Secure Hand tools
properly, materials
use while lifting.
14. Valid Third-Party
inspection certificate
available for all di-
electric rope.
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 16 of 27

OSHAD SF – CoP -6 emergency


management requirement
OSHAD SF – CoP -4 First aid
and medical emergency treatment
OSHAD SF – CoP -23- working at
height
TRANSCO-18.13.5 Personal fall
arrest system
TRANSCO SSR-18.14.1 Signs and
barricades
TRANSCO SSR-9.8 protective
clothing and equipment

Lifting of 1. Lifting 1. Fatality Workers involve in 1. Ensure Job safety


10 4 2 8 3 1 3
Materials Equipment 2. Property Damage the activity analysis (JSA) is TBT must be conducted prior
(Boom Truck Failure 3. Personnel Damage Workers/people completed to work with specific
and Winch 2. Unstable 4. Major Injury present nearby 2. Ensure proper lifting topic related to the activity.
Machine) ground. plan prior to the
Close Supervision by Lifting
3. Lifting gears. activity
supervisor/Supervisor
4. Load swing 3. Valid 3rd party
5. Ground inspection certificates Activity will be carried out/
Bearing Pressure of boom completed during day light
6. Damaged truck/operator
Equipment. 4. SWL to be check prior Keep red flags for as a line
7. Crane to the activity and not to cross
tips/turn over. during the activity.
Ensure provision of first aider
8. Uncertified 5. Swing radius area
along with first aid kit on the
Lifting gears properly barricading.
site all time
6. Proper
Communication Emergency vehicle remain in
between the boom the site all the time
truck operator and
Appropriate signage must be
the rigger.
installed
7. Wind speed to be
e.g., lifting in progress
checked regularly by
No person should be allowed
Anemometer (with
to walk/stay under the
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 17 of 27

valid calibration suspended load.


certificate) during Only workers involve in
loading/unloading activity should remain in the
material. work area.
8. Close Supervision by
Lifting
supervisor/Supervisor
at all times.
9. Use double tag line,
to arrest swing.
10. No person is allowed
to walk/stay under
the suspended load.
11. Slinger/Rigger to be
provided at site with
valid competency
certificate for proper
signaling and slinging.
12. Banksman having
valid training
certificate must be
present at site for
safe maneuvering of
equipment.
13. Barricade with
appropriate signage
e.g. "Lifting in
Progress" will be
provided at the lifting
area (Boom Swing
Radius of the Crane)
in accordance with
the "OSHAD-SF Code
of Practice 22.0
Version 3.0 of July
2016. - Barricading of
Hazards. 10. ADWEA
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 18 of 27

color coding for


lifting gears to be
followed.
14. TBT must be
conducted prior to
work with specific
topic related to the
activity.
15. To be followed the
safe usage of lifting
equipment and
accessories as per
OSHAD-SF Code of
Practice 34.0 Version
3.0 of July 2016.

Ref: Legal and other applicable


requirement:
OSHAD SF – CoP -36
Plant and equipment
OSHAD SF – CoP -34- safe use of
lifting equipment and lifting
accessories
TRANSCO SSR-6.5, 8.9, 18.14.1,
18.14.3

11 Use of tools and 1. Electric sock Personal injuries 1) Ensure the right 3 2 6 Ensure all electrical 3 1 3
Workers involve in
machines such as selection of tools and machines and equipment are
2. Wrong tools Electrocution may lead the activity
big spanner equipment properly earthed
to skin burn or electric
grinder, drill and 3. Striking with Workers/people 2) Ensure to review the
shock Portable tool operates with
generator tools present nearby operations
the supply volt of 110 or less.
procedures such as
4. Puncturing
nut tightening prior Use electrical sockets in
5. Entanglement starting appropriate number to avoid
3) Ensure proper overload
6. Cut &
rotating machines to
laceration
be guarded
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 19 of 27

7. Wrong tools 4) Ensure the all Demarcation of the area


selection machines are fitted with proper signage to warn
with spark arrestor people from hazard.
5) Ensure all exhaust
Fire Blankets and Fire
are heat resistance
Extinguisher should be
insulated
available near the petrol
6) Ensure proper
operated equipment
hoisting and
equipment by proper
selecting ropes and
pulleys.
7) Tool and equipment
maintained in safe
and effective
condition
8) Only competent
person will do the
task
9) No overloading of
electrical Load
10) Usage only of
approved industrial
electrical socket.
11) Follow the operation
manual.
12) Ensure to use proper
PPE such as heavy-
duty gloves, helmet,
glass safety boot

Ref: Legal and other applicable


requirement:

TRANSCO SSR- 8.9 Tool and


equipment
TRANSCO SSR- 8.9.6

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 20 of 27

TRANSCO SSR-9.8 protective


clothing and equipment

OSHAD SF – CoP -35


Portable power tools
OSHAD SF – CoP -28
Hot work operation (cutting,
welding)

Workers involve in 1. Ensure Job safety


12 Equipment Electrical Hazard 1. Major Injury 4 2 8 TBT carried out before 3 1 3
the activity analysis (JSA) is
working parallel working near activity starts
3. Equipment Damage completed
or near Energized Energized OHL Workers/people
2. Competent person Provide proper warning
OHL 4. Property Damage present nearby
Electrocution remains present signage
due to induction during the activity.
Ensure use of proper
3. Ensured to strictly
PPEs/insulated tools where
maintain safety
possible
clearness to
overhead First aider/ first aid kit
transmission line as presents in site area all
per TRANSCO SSR 6.1 working time.
table.
4. Any equipment,
machinery use near
energized OHL shall
be earthed properly
5. Provision of Height
Level Gantry
6. Ensured all worker
are trained for their
work with proper
training certificates.
7. Demarcation and
sufficient clearance
near the OHL
8. The boundary of safe
area shall be define

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 21 of 27

clearly using red and


white tape
9. Danger notice to be
displayed facing the
safe work area
10. PTW and NOC
obtained to
concerned
authorities
11. Provision of
banksman to alert
the driver and the
workers
12. 12.First aider, first aid
kit ensured at the
work site.
Ref: Legal and other applicable
requirement:
OSHAD SF – CoP -39
Overhead and underground
services
OSHAD SF – CoP – 21.0 Permit to
Work Systems
TRANSCO SSR-6.5 overhead line

TRANSCO SSR-8.14.3- Training


requirement and competency
assessment
TRANSCO SSR- 18.14.2 Signs and
barricades

13 Use of electrical Electrical Electric shock Worker using 1. Only competent 3 1 3 3 1 3


equipment Generator equipment person will do the
Burns
Electrical Power task
Other workers
Tools Personal injuries 2. Portable electric tools
working nearby.
operate with a supply
Fire volt of 110 or low, if
Explosion RCD not installed in
power supply, double
This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 22 of 27

insulation and metal


parts earthed
properly.

3. If there will be any


dander of gas
exposure only non-
sparking tools shall
be used
4. Ensured that all tool
and equipment shall
be in good condition.
5. Electrical Earthing
shall be installed
6. Demarcation of the
area
7. No overloading of
electrical Load
8. Usage only of
approved industrial
electrical socket.
9. Follow the operation
manual
10. Standby Fire
Extinguisher
11. Ensure usage of dip
tray for all equipment
using chemicals
12. First aider/ first aid
kit presents in site
area
Ref: Legal and other applicable
requirement:
OSHAD SF – CoP -35
Portable power tools

TRANSCO SSR-8.9 Tools and


equipment

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 23 of 27

14 Managing Human 1. Human Factor 2. Personnel injury Workers working 1. Improved design provides a 3 1 3 3 1 3
Failure in Risk on/nearby site more error tolerant system.
3. Asset damage
Assessment
Other 2. Give proper training based
4. Environmental
2. Incident people/equipment on good procedures
Damage
Investigation present in
3. Designing violations out,
surrounding
3. Error taking steps to increase their
detection
4. Mistake
4. Use of Proper PPE such as
5. Safety
new safety boots anti slip
Violation
hand gloves helmet heavy
6. Unsafe acts safety glass etc.
1. Approved method TBT must be conducted with
15 Working under / 1. Equipment Major Injury Major Injury 4 2 8 3 1 3
statement must be in specific topic related to the
near live working near
Equipment Damage Fatality place prior to start activity prior to work.
conductor/ Energized OHL
the work activity Fire extinguishers must be
parallel to Property Damage Equipment Damage
2. Tripping of 2. Ensure Job safety placed on a strategic location
Energized OHL
nearby live Line Tripping Property Damage analysis (JSA) is
Keep red flags for as a line
Circuit completed
Line Tripping not to cross.
3. Goal post should be
3.Electrocution
provided for safety Area must be barricaded.
due to induction
clearances of
Ensure proper signage to
4. Tools fallen & equipment and
warn people about hazards
InContact / vehicle that will cross
passes nearby in the OHL. Fire Warden must be present
live circuit 4. Keep safety distance at site all the time.
from the live line as
mentioned in Provide nonconductive earth
TRANSCO SSR rules mats for operator of
6.1 table tensioner and pulling
5. Competent person as machines.
per approved by
TRANSCO should be
supervising the work
and present in the

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 24 of 27

work place at all the


time.
6. Keep earthing at
drum point and as
well as pulling point
7. Make sure earthing
wire is kept for
rollers.
8. Emergency
Instructions must
include in TBT and
other safety signage
must be posted at
the workplace on a
strategic location.
9. All equipment, tools
and machineries
must have a valid
third-party certificate
as well as operators.
10. Obtain safety
documents such as
LAP and PTW which is
applicable to activity.
11. Follow TRANSCO SSR.
12. In case of tripping
contact authorized
person and inform
about the tripping
incident. Take safe
action and stop all
the work till full
investigation and
further follow
authorized person
instruction

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 25 of 27

Preventive action to
avoid Tripping:
13. Appropriate and
Mandatory PPEs
must be worn at all
the times.
Ref: Legal and other applicable
requirement:
OSHAD SF – CoP -39
Overhead and underground
services
OSHAD SF – CoP – 21.0 Permit to
Work Systems
TRANSCO SSR -6.1 TABLE

TRANSCO SSR-6.5 Overhead


line

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 26 of 27

COVID- 19 Always follow the


preventive
measures and
protocols set by
our company and
Transco in parallel
with government/
authorities e.g.,
1. Social distancing
2. Wash/sanitize
hands with soap
for 20 seconds/
Frequently
Medical Surveillance
3. Wear Mask Protocol
4. Always fulfil the
daily COVID19
monitoring
checklist e.g., body
temperature
monitoring
5. all of these must
be cascaded to all
workforce through
daily tbt. Contingency Protocol against
6. All Operatives COVID-19 in
must be having 14 OHTL Projects -CCS- Abu Dhabi
days valid covid
test results and
must be fully
vaccinated.

Prepared by (UTEC Engineer) Reviewed by (Elect. Engineer) Apporved by (Project Manager)

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.
FORM: HSE-HS-29-F01
Revision No. : 0
HSE RISK ASSESSMENT Page No. : 27 of 27

This document is the property of TRANSCO and shall not be used by or given to any outside party without prior authorisation.