Professional Documents
Culture Documents
018 Annex 2F Checklist Transmission Line
018 Annex 2F Checklist Transmission Line
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
____x ____
TRLWS-100-01 Survey area is clearly staked to the required ROW width /
=
Minor
Proper removal of undisputed stumps roots and non-
_____x_____
TRLWS-100-02 perishable solid objects/structures, vegetation, debris, /
trees and other obstruction. =
_____x_____
TRLWS-100-03 Conformance to proper disposal /
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
2F - 1
CPES CHECKLIST FOR WORKMANSHIP
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
Conformance to the approved foundation plans for lines, _____x_____
TRLWS-200-01 /
grades, dimensions, elevations. =
_____x_____
TRLWS-200-02 Adherence to proper construction methodology. /
=
Minor
_____x_____
TRLWS-200-02 Adherence to proper construction methodology. /
=
Conformance to the excavation support system. _____x_____
TRLWS-200-03 /
(i.e. shoring, bracing, sheet piling) =
_____x_____
TRLWS-200-04 Proper disposal of excavated materials. /
=
_____x_____
/
=
_____x_____
/
=
_____x_____
/
=
_____x_____
/
=
_____x_____
/
=
2F - 2
CPES CHECKLIST FOR WORKMANSHIP
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
Conformance of in-placed materials to plans and _____x_____
TRLWS-203-01 /
specifications. =
Conformance to the required density or degree of _____x_____
TRLWS-203-02 /
compaction =
Minor
_____x_____
TRLWS-203-03 Conformance to the required elevation of fill or backfill /
=
____x ____
TRLWS-203-04 Conformance to ground level restoration /
=
____x ____
TRLWS-203-05 Provision of rain water outlet. /
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
2F - 3
CPES CHECKLIST FOR WORKMANSHIP
2F-4
CPES CHECKLIST FOR WORKMANSHIP
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
_____x_____
TRLWS-207-01 No through cracks. /
=
_____x_____
TRLWS-207-02 No honeycomb (exposed rebars/aggregates). /
=
_____x_____
TRLWS-207-03 No sagging or bulging. /
=
_____x_____
TRLWS-207-04 Conformance to required quality of concrete mix /
=
_____x_____
TRLWS-207-05 Conformance to the required concrete cover for rebars. /
=
_____x_____
TRLWS-207-06 Conformance to the jointing requirement. /
=
Conformance to placing requirement that will not result _____x_____
TRLWS-207-07 /
segregation of aggregates, cold joints and misalignment. =
Minor
_____x_____
TRLWS-207-01 No cracks. /
=
_____x_____
TRLWS-207-02 No honeycomb. /
=
_____x_____
TRLWS-207-03 No sagging or bulging. /
=
_____x_____
TRLWS-207-05 Conformance to the required concrete cover for rebars. /
=
_____x_____
TRLWS-207-06 Conformance to the jointing requirement. /
=
Conformance to placing requirement that will not result _____x_____
TRLWS-207-07 /
segregation of aggregates, cold joints and misalignment. =
_____x_____
TRLWS-207-08 Proper and adequate vibration. /
=
_____x_____
TRLWS-207-09 Conformance to finishing/plastering requirement. /
=
_____x_____
TRLWS-207-10 No chipping off of concrete cover. /
=
Conformance to the batching, mixing, transporting and _____x_____
TRLWS-207-11 /
discharge time requirements. =
_____x_____
TRLWS-207-12 Proper curing. /
=
Conformance to required dimensions, lines. grades/ _____x_____
TRLWS-207-13 /
elevation, location. =
____x ____
/
=
Total Score (a) CAR Total
Was subcontractor used? If yes, name of company and owner: =
_____________________________ & _________________________________ No. of Indicators (b)
=
Entered by:_____________________ Date: / / Rate= (a) / (b)
=
Rate
=
2F - 5
/ /
R
e
s
u
_____x factor
l
t
s
/
/
/
2F - 5
CPES CHECKLIST FOR WORKMANSHIP
PROJECT ID/NO.: ______ PROJECT TYPE: Transmission Line ITEM: Slope Protection
_______VISIT LOCATION: ________________ DATE OF VISIT: / /
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
Conformance to plans and specifications (size, type, weight, _____x_____
TRLWS-30_-01 /
etc. of boulders.) =
_____x_____
TRLWS-30_-02 Sufficient grout/mortar. /
=
_____x_____
TRLWS-30_-03 Observance to proper placing of stones/boulders. /
=
Conformance to the approved/required tolerance for _____x_____
TRLWS-30_-04 /
slope and thickness. =
Compliance to the specified compaction and preparation _____x_____
TRLWS-30_-05 /
of bedding. =
_____x_____
TRLWS-30_-06 Compliance to design mix of mortar. /
=
_____x_____
TRLWS-30_-07 No through cracks /
=
_____x_____
TRLWS-30_-08 Provision of weepholes. /
=
Minor
_____x_____
TRLWS-30_-07 No cracks. /
=
_____x_____
TRLWS-30_-08 Adequate and proper spacing of weepholes. /
=
_____x_____
/
=
_____x_____
/
=
2F - 6
CPES CHECKLIST FOR WORKMANSHIP
PROJECT ID/NO.: ______ PROJECT TYPE: Transmission Line ITEM: Slope Protection
_______VISIT LOCATION: ________________ DATE OF VISIT: / /
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
Conformance to the required/approved tolerances for _____x_____
TRLWS-303-01 lines, grades, dimensions and arrangements as shown /
on the plans and designated locations. =
_____x_____
TRLWS-303-02 Observance to proper placing of stones/boulders. /
=
Conformance to specifications (size, type, weight, etc. of _____x_____
TRLWS-303-03 /
boulders, rocks). =
Minor
_____x_____
TRLWS-303-04 No misalignment, bulging. /
=
Conformance to the required wire mesh cage fabrication _____x_____
TRLWS-303-05 /
requirement. =
____x ____
/
=
Major*
Conformance of in-placed materials to plans and _____x_____
TRLWS-304-01 /
specifications. =
Conformance to the required density or degree of _____x_____
TRLWS-304-02 /
compaction =
Minor
Conformance to the required thickness of fill or backfill per _____x_____
TRLWS-304-03 /
layer. =
____x ____
/
=
2F - 7
CPES CHECKLIST FOR WORKMANSHIP
2F - 8
CPES CHECKLIST FOR WORKMANSHIP
2F - 9
CPES CHECKLIST FOR WORKMANSHIP
Item 500 Installation of Insulator String Assembly and Ground Wire Set
Major* * Refer to Section 11.4a of the CPES Guidelines for definition of Major Defects
Conformance to the specified insulator string assembly ____x ____
TRLWS-500-01 /
and ground wire set. =
____x ____
TRLWS-500-02 Free from any form of damage. /
=
Minor
____x ____
TRLWS-500-02 Free from any form of damage. /
=
____x ____
TRLWS-500-03 Conformance to required gap and alignment of arcing horns. /
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
____x ____
/
=
Total Score (a) CAR Total
Was subcontractor used? If yes, name of company and owner: =
_____________________________ & _________________________ No. of Indicators (b)
=
Entered by:_____________________ Date: / / Rate = (a) / (b)
=
Rate
=
2F - 10
CPES CHECKLIST FOR WORKMANSHIP
2F - 11
CPES CHECKLIST FOR WORKMANSHIP
2F - 12
CPES CHECKLIST FOR WORKMANSHIP
2F - 13
CPES CHECKLIST FOR WORKMANSHIP
PROJECT ID/NO.: ______ PROJECT TYPE: Transmission Line ITEM: Submarine Cable
_______VISIT LOCATION: ________________ DATE OF VISIT: / /
2F - 14
CPES CHECKLIST FOR WORKMANSHIP
PROJECT ID/NO.: ______ PROJECT TYPE: Transmission Line ITEM: Underground Cable
_______VISIT LOCATION: ________________ DATE OF VISIT: / /
2F - 15
CPES CHECKLIST FOR WORKMANSHIP
PROJECT ID/NO.: ______ PROJECT TYPE: Transmission Line ITEM: Underground Cable
_______VISIT LOCATION: ________________ DATE OF VISIT: / /
2F - 16
CPES CHECKLIST FOR WORKMANSHIP
2F - 17