Lampiran 8. Analisis Upah Pekerjaan Shift Pagi

D u rasi Tenaga J u m la h T e n a g a K erja y g


N o. P e k erjaa n V olu me Satuan K o efisie n Upah @ U p a h T e n a ga Kerja
(h ari) K erja dibutuhkan

P e k erja 0.2 R p 5 5, 0 0 0. 0 0 4 7.292 7 48 or a n g/h ari Rp 2, 6 4 0, 0 0 0. 0 0


T u ka n g batu 0.1 R p 6 6, 5 0 0. 0 0 7.000 0 7 or a n g/h ari Rp 465,500.00
Pe masangan 1 K e pala
1 1 8 9 1.708 m3 8
m 2 A cian Tukang 0.01
Batu R p 7 1, 2 5 0. 0 0 2.364 6 3 or a n g/h ari Rp 213,750.00
M a ndor 0.01 R p 7 6, 0 0 0. 0 0 2.364 6 3 or a n g/h ari Rp 228,000.00

P e k erja 0.07 R p 5 5, 0 0 0. 0 0 8 9.366 5 90 or a n g/h ari Rp 4, 9 5 0, 0 0 0. 0 0


P e m b esian T u k a n g B esi 0.07 R p 6 6, 5 0 0. 0 0 8 9.366 5 90 or a n g/h ari Rp 5, 9 8 5, 0 0 0. 0 0
2 k olo m lantai 3 1 0 2 1 3.316 m3 8 K e pala
10kg 0.007
T u k a n g B esi R p 7 1, 2 5 0. 0 0 8.936 7 9 or a n g/h ari Rp 641,250.00
M a ndor 0.004 R p 7 6, 0 0 0. 0 0 5.106 7 6 or a n g/h ari Rp 456,000.00

0.66
P e k erja R p 5 5, 0 0 0. 0 0 3 2.868 0 33 or a n g/h ari Rp 1, 8 1 5, 0 0 0. 0 0
Pe masangan 1
Tukang
m 2 B e kistin g 0.33
Kayu R p 6 6, 5 0 0. 0 0 6.000 0 6 or a n g/h ari Rp 399,000.00
3 untuk Kolo m 3 9 8.4 m3 8
K e pala
digunakan 2
Tukang 0.033
k a li
Kayu R p 7 1, 2 5 0. 0 0 1.643 4 2 or a n g/h ari Rp 142,500.00
M a ndor 0.033 R p 7 6, 0 0 0. 0 0 1.643 4 2 or a n g/h ari Rp 152,000.00

1.65
P e k erja R p 5 5, 0 0 0. 0 0 1 0.271 3 11 or a n g/h ari Rp 605,000.00
M e m b uat 1 Tukang
0.275
m3 B eton Batu R p 6 6, 5 0 0. 0 0 1.711 9 2 or a n g/h ari Rp 133,000.00
4 4 9.8 m3 8
m u t u f'c = 2 6, 4 K e pala
M P a (K300) Tukang 0.028
Batu R p 7 1, 2 5 0. 0 0 0.174 3 1 or a n g/h ari Rp 7 1, 2 5 0. 0 0
M a ndor 0.083 R p 7 6, 0 0 0. 0 0 0.516 7 1 or a n g/h ari Rp 7 6, 0 0 0. 0 0
89

B o n gkar 1 m 2
0.05
B e k i sti n g P e k erja R p 5 5, 0 0 0. 0 0 1 9.920 0 20 or a n g/h ari Rp 1, 1 0 0, 0 0 0. 0 0
5 3 9 8.4 m3 1
S e c ar a H ati -
0.005
H ati M a ndor R p 7 6, 0 0 0. 0 0 1.992 0 2 or a n g/h ari Rp 152,000.00

0.66
P e k erja R p 5 5, 0 0 0. 0 0 5 6.119 8 57 or a n g/h ari Rp 3, 1 3 5, 0 0 0. 0 0
Pe masangan 1
Tukang
m 2 B e kistin g 0.33
Kayu R p 6 6, 5 0 0. 0 0 1 1.000 0 11 or a n g/h ari Rp 731,500.00
6 untuk Balok 3 4 0.12 m3 4
K e pala
digunakan 2
Tukang 0.033
k a li
Kayu R p 7 1, 2 5 0. 0 0 2.806 0 3 or a n g/h ari Rp 213,750.00
M a ndor 0.033 R p 7 6, 0 0 0. 0 0 2.806 0 3 or a n g/h ari Rp 228,000.00

0.07
P e m b esian P e k erja R p 7 6, 0 0 0. 0 0 6 0.655 1 61 or a n g/h ari Rp 3, 3 5 5, 0 0 0. 0 0

7 b alo k la ntai 3 4 3 3 2.510 4 m3 5 T u k a n g B esi 0.07 R p 5 5, 0 0 0. 0 0 6 0.655 1 61 or a n g/h ari Rp 4, 0 5 6, 5 0 0. 0 0


10kg K e pala
0.007
T u k a n g B esi R p 6 6, 5 0 0. 0 0 6.065 5 7 or a n g/h ari Rp 498,750.00
M a ndor 0.004 R p 7 1, 2 5 0. 0 0 3.466 0 4 or a n g/h ari Rp 304,000.00

1.65
M e m b uat 1 P e k erja R p 5 5, 0 0 0. 0 0 4 5.916 2 46 or a n g/h ari Rp 2, 5 3 0, 0 0 0. 0 0
m3 B eton T u k a n g B esi 0.275 R p 6 6, 5 0 0. 0 0 7.652 7 8 or a n g/h ari Rp 532,000.00
8 2 7.828 set 1
m u t u f'c = 2 6, 4 K e pala
0.028
M P a (K300) T u k a n g B esi R p 7 1, 2 5 0. 0 0 0.779 2 1 or a n g/h ari Rp 7 1, 2 5 0. 0 0
M a ndor 0.083 R p 7 6, 0 0 0. 0 0 2.309 7 3 or a n g/h ari Rp 228,000.00
B o n gkar 1 m 2
0.05
9 B e k i sti n g 3 4 0.12 m2 2 P e k erja R p 5 5, 0 0 0. 0 0 8.503 0 9 or a n g/h ari Rp 495,000.00
B alo k lantai 3 M a ndor 0.005 R p 7 6, 0 0 0. 0 0 0.850 3 1 or a n g/h ari Rp 7 6, 0 0 0. 0 0
B o n gkar 1 m 2
0.05
B e k i sti n g P e k erja R p 5 5, 0 0 0. 0 0 7.893 6 8 or a n g/h ari Rp 440,000.00
10 1 5 7.872 m2 1
K olo m L a ntai
0.005
3 M a ndor R p 7 6, 0 0 0. 0 0 0.789 4 1 or a n g/h ari Rp 7 6, 0 0 0. 0 0
89

Pe masangan 1
0.3
m 2 Dinding
P e k erja R p 5 5, 0 0 0. 0 0 4 8.626 1 49 or a n g/h ari Rp 2, 6 9 5, 0 0 0. 0 0
B ata M erah
Tukang
U kuran 0.1
11 9 7 2.522 m2 6 Batu R p 6 6, 5 0 0. 0 0 4.000 0 4 or a n g/h ari Rp 266,000.00
(5x11x22)c m
K e pala
T e b al 1/2 B atu
Tukang 0.01
C a m p. 1SP :
Batu R p 7 1, 2 5 0. 0 0 1.620 9 2 or a n g/h ari Rp 142,500.00
4PP
M a ndor 0.015 R p 7 6, 0 0 0. 0 0 2.431 3 3 or a n g/h ari Rp 228,000.00
P e k erja 0.3 R p 5 5, 0 0 0. 0 0 2 4.900 0 25 or a n g/h ari Rp 1, 3 7 5, 0 0 0. 0 0
Tukang
0.1
Batu R p 6 6, 5 0 0. 0 0 2.000 0 2 or a n g/h ari Rp 133,000.00
pasan ga n bata
12 249 m3 3 K e pala
tasra m
Tukang 0.01
Batu R p 7 1, 2 5 0. 0 0 0.830 0 1 or a n g/h ari Rp 7 1, 2 5 0. 0 0
M a ndor 0.015 R p 7 6, 0 0 0. 0 0 1.245 0 2 or a n g/h ari Rp 152,000.00

0.3
P e k erja R p 5 5, 0 0 0. 0 0 5 8.351 3 59 or a n g/h ari Rp 3, 2 4 5, 0 0 0. 0 0
Pe masangan 1
T u ka n g batu 0.15 R p 6 6, 5 0 0. 0 0 1 0.000 0 10 or a n g/h ari Rp 665,000.00
m 2 Plestera n 1
13 1 9 4 5.044 m3 10 K e pala
Pc : 4 Pp
Tukang 0.015
Tebal 15 m m
Batu R p 7 1, 2 5 0. 0 0 2.917 6 3 or a n g/h ari Rp 213,750.00
M a ndor 0.015 R p 7 6, 0 0 0. 0 0 2.917 6 3 or a n g/h ari Rp 228,000.00

0.3
P e k erja R p 5 5, 0 0 0. 0 0 3 7.350 0 38 or a n g/h ari Rp 2, 0 9 0, 0 0 0. 0 0
Pe masangan 1
T u ka n g batu 0.15 R p 6 6, 5 0 0. 0 0 7.000 0 7 or a n g/h ari Rp 465,500.00
m 2 Plestera n 1
14 498 m3 4 K e pala
Pc : 2 Pp
Tukang 0.015
Tebal 15 m m
Batu R p 7 1, 2 5 0. 0 0 1.867 5 2 or a n g/h ari Rp 142,500.00
M a ndor 0.015 R p 7 6, 0 0 0. 0 0 1.867 5 2 or a n g/h ari Rp 152,000.00

Pe masangan 1
15 2 4 4 3.044 m3 7 0.2
m 2 A cian
P e k erja R p 5 5, 0 0 0. 0 0 6 9.801 3 70 or a n g/h ari Rp 3, 8 5 0, 0 0 0. 0 0
89

T u ka n g batu 0.1 R p 6 6, 5 0 0. 0 0 1 3.000 0 13 or a n g/h ari Rp 864,500.00


K e pala
Tukang 0.01
Batu R p 7 1, 2 5 0. 0 0 3.490 1 4 or a n g/h ari Rp 285,000.00
M a ndor 0.01 R p 7 6, 0 0 0. 0 0 3.490 1 4 or a n g/h ari Rp 304,000.00