PROPOSED LOCATION FOR CONTRUCTION OF NEW RETAINING WALL AT 33 MLD STP DHANORI

BATTERY LIMIT
92.2601
North

BATTERY LIMIT
67.6538BATTERY LIMIT

85.1041
EX
IST
IN
GM

BATTERY LIMIT
99.2901
AI

N
NS

RL
RL 550.963
EW

550.969
ER
LIN

13.5601
E

D
EXISTING ROA
Gate 6m Wide
EX
IST
ING 2500

MA
IN
SEW
ER 17.8431 RL RL
LIN 550.922 550.449
E

A BATTERY LIMIT
180 M RETAINING WALL PROPOSED FOR
CONSTRUCTION
ENTRY BATTERY LIMIT
EX
B AFTER ROAD
IST WIDENING
ING
MA
IN
SE
WE
RL
INE B

L 202.7962 X
56.7268 RL
548.232
RL
548.567

EXISTING
TEMPLE

D
EXISTING ROA
X
EX
IST
ING
MA
IN
SE
A
WE
R
BATTERY LIMIT

ENTRY
RL
548.217 RL
548.342
LIN
E
3.4953

2.5 M EX
IST
CULVERT WING WALL
IN GM NA TBM AS PER TENDER
AIN LA 548.696

EXT. RW SECTION XX SE
WE
R LIN
E

NALA CULVERT

DISMANTLING QUANTITY OF EXISTING RETAINING WALL = Area of the cross section XX * Length of the wall to be Dismantled
=(1/2(0.5+2.5)*(7.76-2.5)+2.5*2.5)* 180
=2546 Cum
ADD 10% FOR MISCELLENOUS =2546*0.1 =254.6
TOTAL 2801 Cum

RL 550.00
RL 549.50
Weep Hole 110 OD @ 1800 MM C/C HORIZONTAL
WIDTH
F 600 MM

VOLUME OF RCC CONCRETE GRADE M30 FOR RAFT OF RETAINING WALL= Area of the cross section XX* Length of the wall
O

=(1/2(0.3+1.3)*4 +2.05*1.3)* 180


ASONRY

Mkd A =1055.7 Cum


M
RUBBLE

VOLUME OF RCC CONCRETE GRADE M30 FOR VERTICAL WALL OF RETAINING WALL= Area of the cross section XX* Length of the wall
=(1/2(1.3+0.3)*7.7 * 180
Mkd B =1108.8 Cum
ADD FOR SHEAR KEY CONCRETE =0.6 WX0.6D *180
Mkd C=64.8 Cum
TOTAL CONCRETE VOLUME (A+B+C) =2229.3 Cum

VOLUME OF ROCK EXCAVATION FOR RAFT = 6.5*1.5*180


PROP. RW SECTION XX =1755 Cum
VOLUME OF ROCK EXCAVATION FOR SHEAR KEY = 1.0*0.7*180
=126 Cum
TOTAL 1881 Cum

VOLUME OF PCC CONCRETE GRADE M15 OF RETAINING WALL= Area of the cross section XX* Length of the wall
=6.25 X 0.15 X180 = 168.75 Cum
ADD 5% FOR MISCELLENOUS =168.75*0.05 =8.43
TOTAL 177.18 Cum