You are on page 1of 4

Group Name: Group 2

Members: Olbido, Abugan, Marcelo, Gabriel, Dimatulac, Domingo, Labajos, Boñon


HAZARD IDENTIFICATION, RISK ASSESSMENT and CONTROL (HIRAC)

1. Hazard Identification 2. Risk Assessment 3. Risk Control


(Initial Evaluation)
Residual Due Date/
Proposed Control Measure(s) Probability Severity
Work Activity Hazard(s) Possible Effects Probability Severity Risk Risk Status

1. Workplace Safety Hazard(s): E: 12-17-23


relocation A: Warning and signages and proper 1 2 2
1. Scattered box Head injury 3 3 9 briefing 1 2 2
Slipping 3 3 PPE:
2 unorganized
electrical wires Slipping 3 3 9 E: cover with Tapes, cable 1 2 2 12-17-2
Electric Shock 4 4 16 management, rewiring 1 4 4
Fire 4 4 16 A: warning signage and proper briefing 1 2 2
3 blocked exits PPE:
Stampede 4 4 16 E: relocation of boxes 1 2 2
Death due to 4 5 20 A:warning signages and proper 1 2 2
blockage briefing
PPE:
Health Hazard(s): E: air purifier with ion, frequent 12-19-23
allergies 3 2 6 cleaning, exhaust fans 2 2 4
1. Dust Harder breathing/ 3 4 12 A: reminders about wearing masks and 2 3 6
2. Improper sitting Lung problems disinfection
carrying position PPE: Masks
Back pain 4 2 8 E: New ergonomic chairs 1 2 2 12-20-23
Sprain 4 2 8 A: 10min Stretching/breaks, safety 2 2 4
Bruises 3 2 6 protocols 1 2 2
PPE:
2. Safety Hazard(s):
1.
2.
Health Hazard(s):
Group Name: Group 2
Members: Olbido, Abugan, Marcelo, Gabriel, Dimatulac, Domingo, Labajos, Boñon
1. Hazard Identification 2. Risk Assessment 3. Risk Control
(Initial Evaluation)
Residual Due Date/
Proposed Control Measure(s) Probability Severity
Work Activity Hazard(s) Possible Effects Probability Severity Risk Risk Status

1.
2.
3. Safety Hazard(s): ed
1.
2.
Health Hazard(s):
1.
2.
4. Safety Hazard(s):
1.
2.
Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
2.
Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
2.
Group Name: Group 2
Members: Olbido, Abugan, Marcelo, Gabriel, Dimatulac, Domingo, Labajos, Boñon
1. Hazard Identification 2. Risk Assessment 3. Risk Control
(Initial Evaluation)
Residual Due Date/
Proposed Control Measure(s) Probability Severity
Work Activity Hazard(s) Possible Effects Probability Severity Risk Risk Status

Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
2.
Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
2.
Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
2.
Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
Group Name: Group 2
Members: Olbido, Abugan, Marcelo, Gabriel, Dimatulac, Domingo, Labajos, Boñon
1. Hazard Identification 2. Risk Assessment 3. Risk Control
(Initial Evaluation)
Residual Due Date/
Proposed Control Measure(s) Probability Severity
Work Activity Hazard(s) Possible Effects Probability Severity Risk Risk Status

2.
Health Hazard(s):
1.
2.
Safety Hazard(s):
1.
2.
Health Hazard(s):
1.
2.

You might also like