You are on page 1of 85
Pyunghwa Engineering Consultants Ltd In association with — Resource Development Consultants (Pvt.) Ltd ‘ADB Funded - SRI: Integrated Road Investment Program Consulting Services for Project Implementation including Construction Supervision, Contract Management and other activities in North Western and North Central Provinces. OAD /PIC-02/PD/NWP/KUS-R/O4/L147 Date : 14.07.2021 Project Director NWP, Integrated Road Investment Project, Road Development Authority, No 27 Ganewatta Road, Horombuwa, Wariyapola. Dear Sir, INTEGRATED ROAD INVESTMENT PROGRAM REHABILITATION/IMPROVEMENT OF 104KM OF RURAL ROADS IN THE KURUNEGALA. DISTRICT - PACKAGE 5 INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS. Contract No. RDA/ADB/ROAD(NW)/NCBICP-RR (KUS-R) ion Report of Contractor’s EOT Claim No 02 for Delays Due to ionally Adverse Climate Condition: Subject: Submission of Eval xcey This refers to the Contractor’s letter Finite/K1U05/2020/049 dated 30 March 2021 regarding their EOT Claim No.02 (Annex B). ‘The Contractor has claimed 48 days of FOT for exceptionally adverse climatic weather conditions. Out of 48 days 34 calender days are recommended by the Engineer after evaluating their EOT claim No.02. ‘The completion date is 18° October 2021 due to previously approved EOT (EOT Nol) 1 ‘The new completion date due to this EOT recommendation (EOT Claim No.2) is 21** November 2021 Detail report of the evaluated EOT claim No 2 including its annexures is attached hereto. This is for your necessary approval please Thank you Yours Faithfully, For PEC, the Engineer ACTING TEAM LEADER /CRE ROAD PIC 02 NWA NC Provinces Pyunghwva Engineering Consultants Lt, In Association with RDC AP, Jayathissa ‘CRE/Acting Team Leader - PIC 02 Ce C&CS ARE (KU) CE (KUS-R) QS (KU) File Attachment: Evaluated EOT claim No 02 with its Annexes No. 180/6, Pubudu Mawatha a Telephone/Fax: 037 2225484 Colombo Road, Kurunegala E-mail: erepleO2iroadrtp@gmail.com EXTENSION OF TIME CLAIM NO.02 ARISING FROM EXCEPTIONALLY ADVERSE CLIMATIC CONDITIONS Contract No: RDA/ADB/ROAD(NW)/NCB/CP-RR (KUS-R) Contractor: Finite Lanka (Pvt) Ltd 1.0 PURPOSE OF THE REPORT. This report is being submitted in order to review and work out the Claim No.02 for EOT-2 submitted by the Contractor Finite Lanka (Pvt.) Ltd due to exceptionally adverse climatic conditions prevailing in the site from 01* of September 2020 up to 31" of December 2020. PI 2.0 CONTRA ‘The Contract package KUS-R consists of rchabilitation/improvement of 17 roads of which two belong to the Provincial Road Development Department and the balance fifteen to the Pradeshiya Sabhas including performance-based maintenance (PBM) for three years. ntract Det ‘The Rehabilitation’ Improvement and performance based maintenance (PBM) of 104km of rural roads in Kurunegala District of the North Western Province have been awarded to Finite Lanka (Pvt.) Ltd ‘The details of the Contract package are as follows Contract No : RDA/ADB/IROAD(NWY/NCBICP-RR(KUS-R) Accepted Contract Amount R5.2,296, 136,981.33, Date of commencement 20" February 2020 Contract Duration £547 days Original Date of Completion 19 August 2021 ‘Approved extension of time (EOTI) _: 60 days Contract completion date after EOT 1: 18 October 2021 3.0 PROCEDURAL REQUIREMENTS FOR A CLAIM, The following requirements for a Contractor's claim are set out in the G.C.C Sub-Clause 20.1 [Contractor's Claim]. ‘+ If the Contractor considers himself to be entitled to any extension of time for completion and/or any additional payment under any Clause of the Conditions of Contract or otherwise he should give a notice to the Engineer describing the event or circumstance giving the rise to claim within 28 days from the event or circumstance the Contractor became aware or should have become aware. © Contractor should also submit any other notices required by the Contract and supporting particulars for the claim all relevant to the event or circumstance, * Contractor should maintain all contemporary records required to substantiate any claim. * Within 42 days from the event or circumstance stated above or within a period proposed by Contractor and approved by Engineer the Contractor should submit a fully substantiated claim with full supporting particulars. ‘* Within 42 days or other period proposed by Engineer and approved by Contractor, Engineer should respond with approval or disapproval with comments, ‘© Further, Engineer should obtain Employer's approval for EOT or cost before agreeing or determining the EOT or additional cost under PCC Sub-Clause 3.1 4.0 DETAILS TOUS CLAIMS 4.1.0 Table 01 le 5 = Employer's EOT = Sub-Clause | Contractor's | Engineer's: Anpraval No. Claim (Days) _} Recommendation (ays) Site closure due to 1 _ | declaring curfew to sa 6a 60 60 prevent spread of Covid-19 _ Date of Completion after EOT-1 - 18% of October 2021 5 RACTOR’S SUBMISSION OF CLAIM NO 02 5.1 Contractor’s Notice of Present Claim ‘The following notice of the Contractor and Engineer's response are attached (Annex A). Table 02 Serial * 5 * ne Contractor's letter No. Event Engineer’s response letter : Olof | IROAD/PIC-02/FL/KUS-R/O1/381 Finite/PO/KUSR/PEC/316 oF 1 TA of September 2020 September 29 of September 2020 Contractor has notified on 14" of September 2020 that he is anticipating delay and disruption due to adverse ‘weather conditions continuing from 01* of September 2020 under Sub Clause 20.1 and refers to Sub Clause 8.4. The notice is within 28 days from start of adverse weather. Therefore, Contractor's notice requirement under Sub-Clause 20.1 has been substantially fulfilled, 5.3 Contractar’s Submission of Present Claim ‘The Contractor submitted his EOT 02 Claim by following letter which is attached as Annex B. Table 03 No. Deseription Contractor's letter Coatesetes Cate (Days) i Claim due to exceptionally Finite/KU05/2020/049 48 adverse climatic condition 30" March 2021 60 DETAIL ANALYSIS OF CONTRACTOR’S CLAIM In the analysis of EOT the delay is impacted on the revised programme prepared after EOT-1. 6.1 Methodology Engineer observes that by the Particular Application to Sub- the exceptionally adverse climatic conditions for the purposes the Contract as follows. “lause 8.4 [Extension of Time for Completion] of Sub-Section 8.4 (c) have been defined in For the purpose of Sub-Clause 8.4 (c) it is agreed that “exceptionally adverse climatic conditions” shall be exclusively where: i, On any single day the rainfall measured at the relevant meteorological station as given in the Contract data exceeds the 50-percentile value of the daily rainfall for that calendar month, as calculated using the last 120 calendar months of that station’s rainfall records or in case where the stations rainfall records do not extend back as far as 120 months then that station’s available records and fi, The rainfall measured at that meteorological station exceeds Smm (five millimeters) on the day in question and iii, Work activities are affected on that day in that station’s zone of influence. Any delay caused by exceptionally adverse climatic conditions will be “no fault delay” and costs will be deemed to lie where they fall. That is, in the case of such delay pursuant to the Contract the Contractor is entitled to an extension of time, the Engineer will approve an extension of time for the period of delay and the Contractor agrees to forgo any right to claim additional costs arising from such delay”. In “Contract data” Sub-Clause 8.4 the relevant meteorological station for the purpose of Sub-Clause 8.4 (0) is in the project area For the project area of the Contract, the Contractor has selected “Wariyapola” meteorological station as the relevant station and Engineer agrees with the selection as the station is central to the project area. As provided in PCC Sub-Clause 8.4(c) the Contractor has submitted rainfall records from year 2019 backwards for 120 months, that is as far back as 2010. These records are attached as Annex C. 6.2 Calculation of EOT ‘The 50® percentile value for 12 months of previous records depends on the number of records for a month. For months with 31 days the rank of the 50 percentile value is 155 and for months with 30 days itis 150 and for February it is 140 (considering the days in leap years 2012 and 2016). Since the rainfall for a particular month of 210 months records are less than 141 except for month of October which has 160 rainfall days the percentile value for all other months is 0 and for October itis 0.4 The calculation of the 50" percentile value is attached as Annex D. Combining PCC Sub-Clause 8.4 (c) (i) and (ji) the governing value of rainfall for exceptionally adverse climatic conditions is Smm, Rainfall figures from September 2020 to December 2020 are not available and the Contractor has obtained values from Wariyapola Govt farm, But here too records for October and November 2020 are not available. ‘Therefore, Contractor has used rainfall records at his laboratory at Kobeigane. Since these records have been checked by Engineer’s staff the records for October and November from Contractor's main laboratory were accepted by the Engineer. The rainfall records for year 2020 at Wariyapola Meteorological Station and records at Wariyapola Farm from’September 2020 and records from Contractor's main laboratory for October and November are attached as Annex E. On perusal of these records, itis identified that the rainfall on the following days of September, October, November and December 2020 are in excess of Smm which is the governing figure for adverse rainfall For September 2020 01,02,06,08,09,13,18,19,21,22,25,29 and 30, No. of days 13 For October 2020 15 and 29 No. of days 02 For November 2020 (04,05,06,07,08,09,10,13,14,16,19 and 25 No. of days 12 For December 2020 (02,03,04,20,21,23 and 27 No. of days 07 ‘The number of adverse rainfall days are tabulated below, Month/Year No. of adverse rainfall delay days |___ September 2020 3 ‘October 2020 02. November 2020 — 7 December 2020 12 ‘Total 34 To satisfy the condition (iii) in the PCC Sub-Clause 8.4 (c) Contractor has submitted contemporary records relevant to Road ID 95 which is on the critical path of the revised programme prepared after EOT-O1 which shows that work has been affected on the particular days. The revised programme after EOT — 01 is attached as Annex F , and the critical path runs from Road ID 95 to ID 89, The contemporary records relating to Road ID 95 are attached as Annex G. ‘The affected activities during the 4 months are as follows: September Sub-base final cut Sub grade preparation |. Culvert back filling iv. Sub base laying v. ABC laying vi. Culvert construction work October i, Culvert base concrete Culvert head wall i. ABC finishing Sub base laying i. Embankment filling i. Shoulder construction iv. Sub grade prepar vy. Culvert back filling vi, Screed concrete December i, Base concrete ii, Shoulder Construction iii, Rock fill iv. Culvert excavation v. Screed conerete December i, Base concrete ji, Shoulder Construction iii, Rock fill iv. Culvert excavation v. Screed concrete ‘The EOT of 34 calendar days is calculated as above. With this EOT-02 the new date of completion is 21" of November 2021 63 itractor’s Ei Since rainfall is a no-fault delay and as stated in the PCC Sub-Clause 8.4(C) the Contractor will not be entitled to any prolongation costs (Site Overheads). However, the Engineer recommends obtaining Employer's and Engineer's facilities during the extended period of 34 calendar days. The revised BOQ for providing these facilities is attached as Annex H. The revised programme as a result of this EOT is attached as Annex I Engineer notes that due to providing of Employer’s and Engineer's facilities there is no increase of contract price as only one office was provided to the Employer. 0 RECOMMENDATI¢ OF ENGINEER ‘The Engineer is recommending 34 calendar days as Extension of Time due to adverse climatic conditions as EOT-02 and the completion dated is extended from 18" of October 2021 (granted under EOT-1) to 21" of November 2021. 8.0 EMPLOYER’S APPROVAL FOR EOT - 02. As per PCC Sub-Cl, 3.1 Sub-Section (F) Engineer has to be obtain Employers approval before granting an EOT. Employer’s approval is sought to proceed under Sub-Cl. 3.5 [Determinations] for an EOT of 34 days as explained in the above report Gamini Wettewa ‘Contract & Claims Specialist ‘Road Project NWP/ NCP / RDC PEC/ Prepared by: Contracts & Claims Specialist wathanshs Pd. KOS Agreed by: Conttnitol ass. iOM0 U Recommended for approval: Chief Resident Engineer PIC-02 Agreed by the Employer. Project Director /NWP Additional Director General -Project/RDA Director General /RDA. Chairman /RDA Annex A Contractor’s Notice of claim « FINITE LANKA (PVT) LTD. Company Reg. No. PV 86 Seater, CONTRACTORS, ENGINEERS & CONSULTANTS caauennanne VAT. No, 114169661 - 7000 eo orrice: . Nor sitot, FLOOR, Tel :oxszzzao,os-234744 Pr, FINITE —kanoveoso, ss. 220098 a YARALA SOUTH, fax 2entee since 1996 Yaneata’ Etna Snake com Wut Sritanea Wet wl om My No: Finite/PO/KUSR/PEC/316 Date : 14" September 2020 Mr.A.P.Jayathissa CRE / Acting Team Leader (PIC 02) Pyunghwa Engineering Consultants Ltd 180/, Pubudu Mawatha Colombo Road, Kurunagala Dear Sir, REHABILITATION / IMPROVEMENTS OF 104 KM OF RURAL ROADS IN THE KURUNEGALA DISTRICT- CONTRACT 5 INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS Contract No: RDA/ADB/IROAD(NW)/NCB/CP-RR(KUS-R) Subject: - Notice on Adverse Climatic Conditions Pursuant to the Sub-clause 8.4 and 20.1, we herewith submit the notice on anticipated delay disruption due to the Adverse Weather condition continuing from 1" September 2020. Further, we anticipate that if the adverse weather conditions continue the Contractor may not be able to achieve the target progress in month of September 2020. Thus, we kindly request you to consider the situation in assessing the item? of ill No. 18 - “Establishment and Maintenance of Contractor's facilities and plants/Equipment.” Thank you. [GRE Office - (Road (PIC Oa] Date 22 Yours Faithfully Tinto | Aeon FINITE LANKA (PVT) LTD. ae * |caoe UClnese ceeteirin Me = [cenusa N. Thayaparan JCE KU3-R | Contractor's Representative jas ew :E Cc, Project Director, RDA, (NWP) iRoad package wo = Director Engineering — Finite Lanka [Ras (NCP) | Fre bop Se Cc hve a Claims Specialist cq 8 Cas St PEC/ RDC CIDAC1 GRADED COMPANY REGISTRATION NO. : 4724 'so.g001: 2018 |) Pyunghwa Engineering Consultants Ltd1 ( {In association with’ Resource Sevelopment Constant (Pv) Ls {i =EC ‘ADE Funded! - SRI: Integrated Road Investment Program Consulting Serviees for Project Implementation Including Construction Supervision, Contract Management and other ‘ctvitles in North Western and North Central Provinces. . Ref No: iROAD/PIC-02/FL/KUS-R/O1/381 Mr.N. Thayaparan, Contractor Representative, Finite Lanka (Pvt) Ltd, 8k post, Hiriwewa, Kobeigane INTEGRATED ROAD INVESTMENT PROGRAM REHABILITATION/IMPROVEMENT OF 104KM OF RURAL ROADS IN THE KURUNEGALA. DISTRICT - PACKAGE § INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS. Contract No, RDA/ADBAROAD(NW)/NCBICP-RR (KUS-1 This refers to your letter No, Finite/PO/KUSR/PECI316 dated 14* September 2020 regarding above subject ‘matter. ‘We acknowledge your notice in accordance with Sub - Clause 20.1 of the GCC. Please keep maintain all contemporary records to substantiate your claim in accordance with Sub~ Clause 8.4(¢) ‘of GCC and submit all the necessary documents within the specified time period as per Sub ~ Clause 20.1 of Gee You are requested to refer the Claim No. when writing to usin the future with your detailed substantiation ‘This is for your information and necessary action please. "Thank you ‘Yours sincerely For PEC, the Engi reantzaner /cRe TROAD-PICO2 + NWA NCPavinoss "I ‘Fuunehwa Enginesring Constants Ltd. thi iesal® Association with RDC ‘CREVActing Team Leader - PIC 02, cc: PDANWP) ARE C&OE CE(KUS-R) Qs File No, 180/6, Pubudu Mawaths 1 Telephone/Fax: 037 2225484 Colombo Road, Kurunegala E-mail: crepicO2iroadrtp@gmall.com Annex B Contractor’s Claim Letter for EOT- 02 Annex-@) FINITE LANKA (PVT) LTD. {23 gous ‘Company Rag. No. PV 86 CONTRACTORS, ENGINEERS & CONSULTANTS so 90012015 contin. ‘VAT. No, 114168661 - 7000 OFFIce: NO; 260/01/02, 1" FLOOR, Tel 033-2222369, 033-2234744 FINITE Resbvinde Saas aoussot fx Suess Since 1996 YAKKALA, E-mail: info@finitelanka.com oN i Ninn son ese Ronde] Date G1 APR ie Ne: Finite/K1U05/2020/049 tet [cre cs [ARE 30" March 2021, Chief Resident Engineer / Acting Team 180/6, Pubudu Mawatha, Gon Colombo Rd, Gamini-Wettewa Contract & Claims Specialist Kurunegala, 2) iRoad Project — NWP/ NCP \ar' PEC/ RDC Dear Sir, a,\0% Fle No, PROJECT > REHABILIT eMENTS: oF 104 KM OF RURAL ROADS IN ‘THE KURUNEGALA DISTRICT ~ CONTRACT 5 INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS. CONTRACT NO: RDA/ADB/IROAD(NWYNCB/CP-RR(KUS-R) INTERGRATED ROAD. INVESTMENT PROGRAM. (ON OF TIME FOR SUBJECT: CONTRACTOR'S CLAIM ~ REQUEST FOR EXTENS COMPLETION - EXCEPTIONALLY ADVERSE Cl (ONS Ref. 1) Ourletter. Finite/PO/KUSR/PEC/811 dated 02% February 2021 Finite/ KU05/2020/041 dated 05" March 2021 Finite/ KU0S/2020/046 dated 23" March 2021 2) Your letter iROAD/PIC-02/F1/KUS-R/04/900 dated 19" March 2021 iROAD/PIC-02/FL/KUS-R/04/850 dated 24" February 2021 Pursuant to the sub-clause 8.4-Extension of time for Completion and sub-clause 20.1-Contractor’s Claims, forward you the request for 48 days Extension of time for completion based on the effect of subjected delay event for the period of February 2020 to December 2020. Your review and earliest approval is highly appreciated in this regard. Please be noted that we are collecting data and intend to submit the updated request for Extension of time based on other delay events already informed to you in due course. CIDA! GRADED COMPANY REGISTRATION NO. : 4724 180 9001: 2015 (@) ‘Thanking you and assuring you of our best services at all times. FINITE LANKA (PVT) LTD. ‘L.M Bogahawatta, ‘Director - Engineering) Co- 1, Project Director (NWP), Integrated Road Investment Programe, RDA, 27, Ganewatta Ra, Horambuws, Warlyapol 2. Projet Manager (Contractor Representative), Finite Lanka (Pyt) Led eee 19 pai: Request for Extension of Time for Completion POM oe Sen ‘30a ‘da Annex C Rainfall Records from year 2019 backwards for 120 months Ginn aoe elapones orl Com/CR/2021 ake | (Ba eee s | gon moti Sara | Serer) HE, ecemes Seen eecntseBabg® Bienes an }ganegns oP wert vaiucd Dense adaend am Hesaas DEPARTMENT OF METEOROLOGY Sep } emo srg #9, eal OT. eid) Gembentana wnaitons, Career 07. @orvens, /Baysanaicks Navies, Colombo OF, it Lanka. Daily Rainfall at Watiyapota— January 2010 to Decomber 2010 Pp Oct Aor. R ‘00. ir APR 00 Oi 00 10 72.0 0, 00 0 ul 10 0.0 43 26 oo. 06 “0.0 10 00 00 0 0.0 0.0 00. 10 0.0; 0.0. 85 oO ‘0.0 00. 36 ‘00 0 10 ‘Go 0.0. o iB 00) 0. 0.0) #25 6 Unit i rieters NA Not Available Note: The-rainfall ofthe day is considercd as the amount of rainfall mensured during the 24 hour period ending at 08.30 ‘am. ofthe following day: I do certify that the above data extracted from original records available. at this Department is issued in response to an application made by Finite Lanka (Pvt) Ltd, No. 260/01/02, 1" Floor, Kandy Road, Yakkala South, Yakkala. 188 On va 2 dL we 85 Chacked By: oe Tee TRIAS Priyadarshana| | 2021-01-01 NEVATLAW, @aice anit Surveyor Ruchira Erandi iRoad - NW! Cheeked By? = ‘Aifomey - at - Law, Notary Public PEC/ RDC | ‘Commissioner for Oaths & 2021-01 1 ‘Company Secretary D.G. Ferando Past ia, Etakitea ly Diracor No 2816, Heggala, Cio artment ot Mele”Por Directo General of Meteorology iy er} Com/CR/2021 iy a Sz} Bieter Sart eh] Sea ce reqs Ben ocerSoaBvig® —_BLarsjwnnmems ran )assees: eratinetorevesiusad Sener éaemid a = 7 DEPARTMENT OF METEOROLOGY BS" } smoot SPimik9 Om, eames 07, oneHd/ Guerisname oneysens. Ganapiby O7, Barivan, / Baukmuloks Mewatns, Colombo-07, GH Lanka, Daily Rainfall at Wariyapola— January 2011 to December 2011 DAY | JAN |"FEB | MAR | APR | MAY | JUN | JUL [AUG | SEP | OCT | NOV | DEC | 4 72 | 00 | 00 to fae 00 | 00 | 00 | 00 | 167 | 00 | 2 37.0 00 oo {99 -{-on faa {00 {30} 00 3 85 0.0, Go| 00 ‘00 | 00} ~09- | 00 | t 422 1.0 e 0:0 | 0.0, 3 ‘a0 | 0x 0 | 00 $ 2 o-oo | is {00 a [oe [oe {00 a0 | 6 63. oo es {on | 00 | 90 7 12 ‘0 | 0.0 HaHa 1-36 6 03 444_|~00-|~05~|—00- [00 |-o0 9 00, 2.1 [00 | "00 [00 | 00 | 30 70 00 ‘03 | 00 | 0.0 |~00 [00 | 204 a 0.0 0 oo oO | 00 | 00 | 20 2 00 7 00 |~00_|-0.0 | 100 [4s 00. 00} 00|-40-|-00 83 } 14 0.0, 10 | 23 | 00 [oo | os | ie 0.0 00 [93 [00 | 18 | 16 00 I 17 00, 00 18 0.0 ila 18 00 00. 20 53. ‘370 |-00= | "0.0 |> 21 243 ‘us| 00 | 00 22 [00 | 00 [75 |-7.0 | 00 2s_|-00 {00 | 00 | 10.1 | 00. i a 25 | 02 | 00 | 00 | 56 | 00 | 26 | 01 |-00 [44.0 | 0.0 | 262 a 2 | in0 [23 [00 | 29.0 |4 i (00 | 00 2000 00" |"00"|"G0 |"00 | "Go | "oo | 00 | 00. | 05 | ~o0 30 | 42 oo | 00 | 02 | 00 | 00 | 00 |"00 [69 | 00 | 00 31 [00 D0 80 00 | 80 4d Tots | 453.3 (7158 | 75.9 | 3239 | G04 | wBS | 114 | 195 | B49 | 1414 | 1909 | 48 Unit in millimeters NA- Nat Available | ‘Note: The ralnall of tie day is considered as the amount of rainfall measured during the 24 hour period ending at 0830 saan, of the following dey. 1 do certify that the above data extracted from otigitial récords available at this Department is issued in response to an application made by Finite Lanka (Pvi) Ltd, No. 260/01/02, 1 Floor, Kandy Road, Yakkala South, Yakkala. TRU ‘Chacked By: })W.K.A.S. Priyadarshana 2021-01-01 - Quantity Surveyor 2 ML Ruehiva Brandi Bue | Checked Hy; 25" Attomed -at- Law, Notary Public PEC / RDC | SSS issioner. slo Oabs 0.6. Famando. | 2021-01- (> ‘ompany Deputy Diredtor hal | vo. 2 tae Aire MOorplearector General of Meteorology | Bauiddhaloka Mi $n! Cando /Tlepene wee} Com/CR/2021 SSmotey Sa] 2604304 i Bim Sofa ml zogece Se} MEQes Sew egemmsdaiqo Bexce| L ranenoh ERs value enewrseond DEPARTMENT OF METEOROLOGY — Sf } reteoestik ‘seca 9B, eonsBOT.O aHO/ GurmtanOaina unarding, Garey OY, Desbuon. / Bauedinalcka Mantis, Oobribo 7, 6 Lanks, Daily Rainfall nt Warlyapols — January 2012 to Deceniber 2012 FEB | MAR [API ut _| AUG | SEP TN DEC i 10 | 00 | 00 2 @0_|-00 | 00 | 0. 0, ‘os | 00" [24 0. Le olen) s}enlen|fea}as} aisle 00 =00=|=01 46, G0. (oma | 428 [802 | 71. 00 00 0; 10.3 60 78 oa x x aT 10 BS 0.0 09 00 00 00 0 ‘00 16.4 | 49.2 | 60S ‘Goi in mallieters ‘NA- Not Avaliable ‘Note: The ralafall of the day Is considered as theminountof raiafall measured during the 24 hour period ending at 08.30 of the following day. | 1 do certify that the: above data extracted from original records availabe at this Department is issued in i response to an application made by Finite Lanka (Pyt) Ltd, No, 260/01/02, 1" Floor, Kandy Road, Yakkala Sout, Yak “iy yo Chacked By 2021-01-01 TORNEY-AT-LAW, S60, RY OAM, Ruchira Erandi Keene Checked By: _/etiomey - at - Lav, Notary Public | _/- Commissioner for Oaths#§,@, Fernando 2021-01-19. 7 ‘Company Secretary “Bepuly Director No. 26/0, Hagaet, jont of Molaorglogyirector ‘369, Bauddholoka Mawalha, Fal of Meteorolozy eoXGigln Ws aaug8 07. 9 ot! GLerAgnOaina Uaipunp, Gainipby 97, Guninos /Bauddalcke Maya, Colombo O7, 8 Lanka. meqe Seu cgentimeSsiqQo aueRiveire aakuncd Pencmrsssonid DEPARTMENT OF METEOROLOGY vay ii he sh saw Sou. so 403 } mee} Com/CR/2021 Gresser} worwmetan govt abate Bag wee 35 } moun Daily Rainfall at Wariyapola January 2013 to December 2013 DAY_| JAN | Fes [MAR AFR WAY | JUN [JUL [AUG | SEP | oct 100} oo | 60 78 | $5 | 00 | 122 | 20 | 00 2 | 00 [60 | 0.0 ao 00 | 00 [65 | 0.0 | 00 | 46 S28 | 00 "oo |o0-|-30 | oo | a3 | 00 [09 | 00 410 Too | s6 117 | 00 foo | er fot} 76 | 00 & 00 {00 |"330 | 00 [oo [00 [oo [00 [11 | 00 § {700 \"06 | 00 | 00 | 10 | 00 | oo |-o0 [240 | 00 7 | 4807}-00 | 00. a a 8 [49 [00 |"00 [00 | 06 | 305 | 00 00_| 0.0 $a} oo- ee} stot tot ao [aot ooo 10 [05 | 00 {oe | 00 |" o0 | oa 1.0 [00 | to |" 0.0 | 00 [00 |-o0 [a0 |~o0 [11.0 | 00 | 00 | 74 |_27 ae 00 | 23 | a0 ag 00 | 42 "| 0 20 | 300 | 00 [as "00 [420 [0028 | 317 [34 | oo [ao | oo | 00 14 {00 [15 | 92 |-o0 | 00 [00 | 00 | 00 | oo | 00 is [0.0 |"49 [26 | oo | 09 | oo | oo {oo | 70 | 00 6 [00 [00 00 |-o0|00 |-24- | 0.0 [00 | 10_| 152 7 | 00 _|-a0 | 00 | 00 06 [00 23 | "00 is |0.0 | 00 | "00 |~00 |~09-|~00 [oo 00 728.0 i@ | 00 |"09 |-o0 | 00 | 105 [00 |~00 20 _|- 30.6 20 00 | 168 | 0. ee 00 [34.0 ar }-00-|-0o-|-eo-|-00-| te] 00 | 00 oo | 02 00 |-00 [00 | 68 |~00 | 00 |-oo 00 [0.0 23 |0.0 [00 | 28.0 | 19.0_|~0.0 [00 | 72 00, : Top ooo} 2 | 00 | 00} era | 77 | 00 | 00 | 00 09 _| 0.0 26_| 00 | 00 | 270 | 00 | 00 | 00 | 130 00/00 27 {00 |-00 "| "oo | "oo |~4z_|-oo [a0 00 | 0.0) 28 {00 |~00-|-00 | 00 | 00 [81 | 00 09 | 00 29 | 00 295 | 00 | 12 | 00 | 00 00 | 0.0 30 | 0.0 00 [126 [00 [00 | 00 505 31_| 00 0.0 157, 00 405 Total (90.1 | 488 | 20ee | 9.7 | 4354 | 688 | 404 | 347 | F409 | siae | 1134 response (0 an application South, Yakkala, 2021-01-01 Checked By: Chacked By: 7) 2021-01- >. ~ Unit In millimeters AORNEVAT-LAW, Ladi, Reniver Kewacti £ many Sexrstay INA- Not Available ‘Notes The rainfall ofthe day is considered as the amount of rainfall nicasured during the 24 hour period ending at 08:30 ‘.m ofthe following dry. 1 do certify that the above data extracted ftom original records available at this Department is igsyed in D.G. Fernando. Deputy Director Ltd, No. 260/01/02, 1" Floor, Kandy Rope 3ia} Seino Gis rmactoial PTelephoner: oe =} ‘Com/CR/2021 SES leser0s Wit! Ovreetor Ganerat SA eps’ S33 se) oeed e MEQ Hes eernnsdaqo Bcf enn sueilinstire oveSwied Penaer darth DEPARTMENT OF METEOROLOGY S53" } reo ane sag Ben, woot O76 wi0/ Oueiparaiina unarpng, Cen OF, Qavu./ Bousibaloke Mavata, Colombo 07, Bat Lia, Daily Rainfall at Wariyapola ~ January 2014 to December 2014 FES [MAR ‘MAY_|_JUN ‘AUG_[ SEP 00 | 0.0 [ 0 | 31.3 [a6 i 10 | 00 EK i 14. #20 Hoe |. [x 33 G0 24 [0 i 10. 00 |" Oo if ou i x 10. 0) 00. 0 . 0 0.0 {43.8 | 0 0 [0.0 rk 0.0 Oo |-2 2a7_| 00 | 707.8 121 ‘Unit in millimeters 'NA- Nat Available oor 624 90, 10 00 0 0.0 00 0 652 4.7 Ail 10: 69 1.0 0 152 Sr 72 a4 37.0 00 0.0 a 65 23 12 3 705 7 16 [Notes The rainfall ofthe day is considored as (he amount of rainfall measuved duriug the 24 hour period ending at 08:30 a.m: of the following day | i | 408.5 | 2467 | 5425 | | | I do certify that the above data extracted from original records available at this Department is issued in response to an application made by South, Yakkalo. Chacked By: py P< .. [= : 7 4, LH. Ruchira Brandi Checked By: =~, “Attorney - at - Law, Notary Pubif.G. Fernando i ‘Gommissioner for Oaths & — Depuly Director 2021-01. (2 ¥ 2Sompany Secreta-Dopartmont of Me oro] te Lanka (Pvt) Ltd, No, 260/01/02, 1" Floor, Kandy Road, Yakkala | | BIC, Hanaolla, Eini4Bea Baueaholokn Nawal Ditector General of Meteorology | Colombo _ss4ay/ Sarmhidon/ Telephon ue} Com/CR/2021 ovcnrrs omy] 2094 104 Gem ‘rotor Gone ft cee ‘ Sel MEQE Ben seB{oeBslgd — HEEihafwwananaown aie insiert aaSuied Penonr desert teal DEPARTMENT OF METEOROLOGY se } ‘oes soLoeG0 0, ig OT. @ 6-0i0/Cuegaitlare unaiseng, Ganges 07. Dartens /Bavechlcka Matin, Cilombo 07; SH Lanka. ‘Daily Rainfall at Wariyapola ~ January 2015 to December 2015 FEB Ri ¥ T DEC 0 | 395 | 39.3 | 00 IK 8 00 [371 0 au OS. 202 | o 0 | 0 i 2 [0.0 73. BS. i 280 a3 0 0 0. 0 | ‘00 00. aa. 36. 62.0, 0.0 0. - 3 00. i EA ‘Oo ‘OS. K io_| x i k X 2 0 36.4 0.0. 00. ‘0.0 0.0. 00. 0.0 0 ‘00. a0 43 17 | 0 1 (00. 00 | 00 | -00_| or i 0 00. 00} 0 00 [01 Ox 10, 0.0_| 26 | 04 00 | 8. 27 | 00] 2 i ‘Go| 0.000 19.7 | 23. m 0.0 | 0x G, (99.6 | 296.4 | 460.8 | 700 | 06 | 467.6 | 402 | 359.0 | 3044 | 240.4 Unit in millimeters NA- Not Available the day is considered as the amount of rainfill measured during the 24 hour period ending at 08.30, ofthe following day. I do certify that the above data extracted from original records available at this Department is issued in response to an application made by Finite Lanka (Pvt) Ltd, No. 260/01/02, 1“ Floor, Kandy Road, Yakkala >South, Yakkale. TRY OpP yams BOERS J Chacko BY fan 2021-01-01 FORNEV-AT-LAW, Be ’ LH. Ruchira Erandi Checked By: + Attgmay - at - Law, Notary Public no ‘Commissioner for Oaths #).G.. Femard? Company Secretary Depuly Dire 2021-01. 12 jteorology 0 i iment of Mele No 2816, Hoapola. ee ahtok® MEA or Dice il of Meteorology a a seo! etnamitntal Teephines: =} ConvCR/2021 Sees eeore ihe Shot ator pat scares | sgesaae wane een memes Seu egendoedaleo Fern fromm ewer wate Pener ewer ue DEPARTMENT OF METEOROLOGY a3" } mateoostuik seco 00, eaig@ 07.6 o-00/ Gumepandains woneipens. Ghayrity oF. Banden Bausch Mawatns, Colombo O7, 6 Lanka. Daily Rainfall at Wariyapola — January 2016 to December 2016 FEB [WAR | APR | MAY | JUN | JUL | AUG | SEP | OOT 00 4.8 | 452 | 39.0 | 00 00 | 00 0.0. 0.0 oo 90" 90 fea | 40 }-99fo0 f 90 | ao-|"ao-|90 | 90 [1s "| ae} 09 | 90 | 99 00| 00 | 38 [oo | 2s | 00 | 00 0 00" 00. 00 22 90 | 00 | 08 0.0 {0.0 00 oo 18-\ao {99 90} ao | 00 Be 00" [92.0 oe 46 | 0.0 | 00 ae a 0 | “00 | 0.0 ra 00 9 to] | 367 | 66" e ‘00 | 00 | 00 oo [07 | Os | 138 | e4 | 7.7 | 00 | 00 | 0.0 00 [00 [0.0 | 224 ao_|-00 | 00] "0.0 94. 0 |-00-| 00 | 456 | 45 | 00 | 00 | 00 | "00 b0-[-b0-[-oo-| at it 00 | 00 og 0 o 00 | 00 | 00 | 84 | 00 | 00 | 00 20.0 os | 81 | 68 | 62 | 60 | 00 | 00 | oo | 00 [oo {ea | 472 [973 00 | 00 | 00 | 00 | 60 13] 00 | 00 | 542 | 08 | 00 | 04 | 00 | 00 48 |00 | 00 |i29 | 00 | 00 | 90 | a0 | oo 0 | 00 | 00 | 380 | 82 | 00 | 00 | 00 | a0 | 00 oa [a0 {a0 [99-90 |-oesiroget oe | a0 | oe 90 | 00 | 00 00 [0 | 99 | 00 | 00 | "00 0.0 | 00 | 00 oo oo | o0 | 00 | 00 | 00 | 00 0, 00 | 00 | 0.0 | 0X 00 0.0 a [=oo= 00288} 0 | 0.0 | 00 | 00 | 00 Go| 00 |~o9 | 49 | 00 | 00 G0 | 00 | 00 | 295 | 00 | 00 | 00 | 00 | 00 i co_-oo tere { 00 {as} og | 90 foo | oof 90 | oo | tep 00. 00 G0 | 90 | 3217.0 | 22 | 20 | 00 | 00 00 | 0.0 | 06 00 | 00 | 32 | i97 [07 | 00 | 00 | 00 Go| 0.0 | 5.2. Siapssiaispsisisis) iS) 0.0 736-00 [147 [0.0 | 00 | 00. 0 {00 | 0.0 3f__| 00. 447 10.8 fo 88 25.8 0.0 Total | 0.0 | 6a | 4384 | 2929 | 601.4 | 37.9, Go [926 | i958 | 418 Unit in mileters Ser ie ‘Note: The rainfall ofthe day is considered as the amount of rafal ménsured during the 24 hour perlod ending at 08.30 sum. ofthe following day. : 1 do ertfy thatthe above data extacied ftom original records available at this Department is issued in regpionse to an application made by Finite Lanka (Pvt) Ltd, No. 260/01/02, 1 Floor, Kandy Road, Yd chira Erandi Law, Notary Public D.G. Fernando sioner for Oaths & —_Dopally Director fompany Secrotary Department of Meleoralos, ~ fate ages, Ean, UGONING MOY, coy Gonera or Meteorology Checked By: ARE 2021-01-\2 $600 ( Sanacocaeephones Seige] Comyer2021 prec aen ae Diecor Gonoral Co =} gow mean sane ict} ae megs Sen centineSsigod Boge fmneno amen ae yk avai store aveSuscd Penenr ssesorid bard Pax DEPARTMENT OF METEOROLOGY — 2a3)5 } mateoosik ‘SECO HD, eElC8 OT; A GOHD/ CumbanDana unaihies: Caruete OF. Daviwen, / Baudshalcé Mawatha, Colonbs O7, 8 Lanka. Daily Rainfall at Warlyapola — January 2017 to December 2017 DAY | JAN | FeB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OcT | Nov | DEC oo | 14 | 00 | 74 | 04 | 00 | 04 [tas | 00 | 00 | 20 00 00 [208 | 66 4.4 | 00 | 00 [tee | o7 | 63 | 39 oo |"37 [00 | oo | 08 |o0 | oo | 108 {00 [36 {02 Qo | 00 | 00 | 4061 00 | 00 | 00 | oo | 00 | 200 | 116 00 |~o0 | 00 | 00 | 00 | 00 | 00 |~o3 |00 | oo oo {00 | 00 | 00 | 22 | 00 | 00 | 78 | 0s [37 [27 00 | 811 | 00 | 212 |00 [oo | oo | oo | 00 | 133| 00 0.0. | 00 |~0.0 | 00 |~o0 |o0 | 00 | 462 |o0 | 4.1 [00 00 | 662 | 00 | 266 | 00 | oo | 00 | as [66 | 00 | 00 00 | 00 | 00 | 320 | 00 | 00 | 07 | a0 | 00 | 00 | oo 0.0, 0.0 0.0" Oo | 00 | 402 [00 |" 00 Go) 40 | ee 44 | 170" 00 00 00 |a70 | 160 | 00 | a0 9.0 00 | 00 [00 | 00 | 36 I 17_| 00 | 00 6.0 00 | 00 22 {08 | 36 | 00 [00 24 | 00 | 04 | 00 | 00 21 | 00 | 22 | i156 | 24 00 12 00 3 00 9.0 00 ‘02 -|-00-|-00 |-00 | 00 | 00 00] 00 [a3 | 1.7| 00 00 oo 0.0 00. 00 0.0 0 i = —-08. 0.0 0.0 | 240 [38.0 | 20.4 00 00 0.0 5.0 57 93 0.0 8.0 . 22 85 0.0 4.0 0.0 72 | 35 | 00 0.0 47 0.0 05 0.0 0.0 38 0.0 66 | 00 | %57-| 00 | 00 | 21 | 00 | 61_| 96 |_00 59 . . 0.0. 00 | 235 | 03 0.0 0.0 0.0 O7 0.0 2276 G37 | Hoss | 1315 | 184 | 63S ‘Unit ti NA- Not Avaltabi 24 hour period ending at 08.30 the day is considered asthe umount of rafnall measured during e following day, 1 do certify that the above data extracted from original records available at this Department is issued in response to an application made by Finite Lanka (Pvt) Ltd, No. 260/01/02, 1* Floor, Kandy Road, South, Yakkala. TRUECOPY 6osDd hacked By: 7p (dhe, I, 2021-01,04 RNEV.ATLAW, Sse ra a |. Ruchira Brandi Checked By: =" « attorfey - at - Law, Notary Public missioner for Oaths & —-_D.G, Fer, are cemetin gate? 9. Fenanga No. 28/C. Haggalla, Eilaxk-Bapartment of Metelnsl 389, Bauddhaloka Mawath, sma] of Meteorology Bitte dnd sean ete ion Beater Gone mF arinn he gem eons SS Peee} Goren! Gitce at } geanne 209 Telphones: Wobate meQe Sem ecartnc®alna® Berna oremennann suet cosiore cvafiuad Benswr éesontb am DEPARTMENT OF METEOROLOGY sfc" } ‘otek soa ct, G9 0. @ GisiO/ Cum bnDavra wrnvdens, Canes OF, retnon, / Boudshwika Maite, Colombo 07, SA Lanka. Daily Ratntall at Waviyapola — January 2018 to December 2018 DAY | JAN | FEB [MAR [APR | WAY | JUN | JUL | AUG [SEP [ OT | NOV | DEC 4 00 | 09 [455 [oo [eo | 00 | 00 | oo | 12 | 182 | 00 z 06 {00 [00 | 0.0 |-17.5 | "00 | 00 {00 | 39 | 156 [00 a [oo _|-32|"00 [00 | 85 [00 [00 [00 | 120] 00 [71 4 “00 | 00 | G0 |i76 | 68 | 00 | 00 | 00 | 660 | 00 | 37 | 5 0.0 | "00 | @0 |"369 | 09 | 00 | "00 | 00 | 160 | 442 | 00 | 8 oo” |"oo | 230 {10 |" 46 | 00 [os | 00 | i390 [272° id 7 25 | 00 | 00 | 46 | 316 | 00 266 | 22 | & 4.1 [0.0 | 00] 010 2 a2 | 35 | 00. o 00 | 00 0 | 00 | 31. 412 [50 | 00 | 10 ‘00 [00 [00 | 362 | 45 00 | 00 [00 at oo | 00 [34 [49 |" 00 00 | 00 | 00 2 00 | 65 | 00 | 62 |"05 00 | 00 | 00 43 00 | 45 [46 | a0 00 | 06 | 14 00/116 | 6B 25 | 00 6 00 | 162 03 00) 0.0 16 00 | 00/00 00” | oe" 47 00 | 00 [00 00_| 00, 18 00 | 00 | 66 4a6_| 00. 48 00 | 00 | 00 325 | 00 20 0.0 [00 | 00 00 | ao 2 00 | 00.| 00 00 | 100 2 00 0.0 87_[ 123] a8 00. 24 78 | 00 — “ 25 D0 | 00 | 00 08 | 00 28 00 | 00 | 00. 20 [7.8 2 00 | 35.3"| 00 05_| 00 28 00 | 00 [355 ‘00_| 00 28 oo | 00 (00 | 00 30. 0.0 |~0.0 00} 0 | 0 0.0 0.0) Totat_|—44 | 36 | 96.3 (153.2 186.8 | att South, Yakkala, Chacked By: 2021-01-01 Checked By: == « Attordey — Ginmissaneriocoahs®,9;Famando 2021-01-\% ‘Unit Ia malimeters REV ATLAW eice” |. Ruchira Erandi = at - Law, Notary Pubit Company Secret NA- Not Available ‘Note: The rainfall ofthe day is considered as the amount of ralnfall measured during the 24 hour period ending at 08.30 ‘am, of the following day. I do certify that the above data extracted from original records available at this Department is issued in response to an application made by Finite Labka (Pvt) Ltd, No. 260/01/02, 1* Floor, Kandy Road, Yakkala No. 28/0, Haggalla, Ela Batra Nee DPE General of Meteorology 7. eoahe/Satinaehafai Telephones ont CREAT Send 200404 ‘ Director donor gon sos Satie) § ‘General Otice a g 2eonats Some }2estts meq Sen eeenimedalQn auohwairiaaiuie) Pensar seer DEPARTMENT OF METEOROLOGY ihe aa eo fy ae SeurNe? 08 qos noun We etve. govt } } sos Bye mae teen ema ES] ‘Com/CRI2021 sercamea Wo, sce 07.8 grand Guespsroaira ireipans, Canes.) 07; Dassen Bauddatcke Mavatht, Colombo 07, Sri Lanka, Daily Rainfall at Wariyapola~ Taniiary 2019 to December 2009 DAY | JAN Fee | MAR. APR MAY | JUN | JUL | AUG | SEP | OCT 1 00 00 60 13 0.0 00 00 45 54 2 00 | 00 0.0 0.0. 00. 0.0 0.0 0.0 0.0. 3 0.0 00 0.0 0.0 0.0 6.0 0.0 6.0 68 4 16 45) 0.0 0.0 272 0.0 0.0 25. 0.0 . 6 | 5 0.0 O5 0.0 0.0 0.0 00 36 3.6 83 0.0 4,2 6 0.0 0.0 0.0 35.5 0,0 00 1.8 68 K 7 00 00 0.0 19.9 0. 82 00 0.0 8 0.0 86 0.0 0.0 0.0 05 0.0 0.0 . 9 oo $2 00 22.0 $8 00 0.0 AT 60 0.0 10 0.0 00 00 00 0.0 26 44 00 60 0.0 a it 0.0 78. 0.0 42 00 60 0.0 20 0.0 34 0. 13 0.0 00 0.0 0.0 0.0 0.0 0.0 Aa 00 00 0.0 0.0 00 0.0 0.0 46 0.0 68 0.0 15 0.0 8a 0.0 16 0.0 a7 0.0 w 03 08 0.0 Ww 00 06 0.0 06 34 6.3 18 0.0 00 0.0 te 06 0.0 59 19 0.0 6.0 0.0 0.0 42 65 21 20 0.0 0.0 0. 0.0. 0.0 0.0 367 26.1 21 0.0 00. 0.0. 0.0 O05 0.0 46.7, 0.0 22 0.0 010. 0.0 0.0 75 | 00 32 44 23 0.0 80. 0.0 00 35. 57 at 0.0 a ot js 0.0—f 2 aso fog too | 26 00 50 0.0 0.0 14 52. 5.3. 9.5 0.0 26 00 45 0.0 0.0 0.0. 29 6.0 5.0 . 00 7 6.0 0.0 0.0" 00 0.0. 54 0.0 5 0.0 | 28 0.0. 0.0 0.0 00 00 0.0 2.0 - 0.0 2g 0.6 0.0 0.0 00 0.0 42 2.0 0.0 0.0 30. 0.0 0.0 0.0. 0.0 0.0 04 35 0.0 00 i 00 D0 0.0 3.9 0.0 00 Total 4.6 aia 144 0 | 216.0 AS 134.5 | 23.8 46.0 64.9 | 209.4 108.4 Unit in wlineters salnfall of the day ts considered as the smount of rainfall measured during the 24 hour period ending at 08.30 ‘amncof the following NA-Not Available I do certify that the above data extracted from original records available at this Department is issued in response to an application made by Finite Lanka (Pv?) Ltd, No, 26001/02, 1 Floor, Kandy Road, Yaldkala South, Yakkala. drocith By! Em -oF-oI oe Chebked By = 2021-01 1% ior Ruchira Brandi Atornéy - at - Law, Notary Public ‘Commissioner for Oaths & Company Seorstary No. 28/0, Hagaalla, Elnggig 383, Bauddhaloka Mawatha, D.G. Fernando Depuly Director iment of Mts bruiBlrector General of Meteorology Annex D Calculation of 50" percentile value Calculation of SOth Percentile Value for Previous 120 Months - Summary ‘50th Percentile Value SN Month Highest Rank | 50th Percentile - Rank cn : Jan 310 155 7 2 Feb 282 141. ° 3 Mar 310 155 7 ‘ Apr 300 150 7 . May 310 155 ° ° jun 300 150 7 ; Jul 310 155 a 5 Aug 310 155 0 ° ae 300 150 o 10 Oct 310 155 oO 4 Nov 300 150 7 12 Dec 310 155 0 oscar Ode jad AON AMIN ~ 199/044 Peoy! ssyepsedg suureig 7p PENUCS re, fae) [~ _ ce] z at 0 @ at | et | 6 ° ° 0 [ae te | se “ st_|_o | o | st | et | se ° ° o | ez ee | cs | ez z 0 ° st | st | tor | o o | 0 | sz ge | ce | 6x z 0 0 et | st | so | 0 0 o | vez ce ‘ £8 z 0 ° z st | om ° ° o| tee ve | es | es z 0 ° z a | sa fo ° 0 | zee se | es | ce z 0 o | z | re fsa |—o ° | ee ty | 6 | se | ve 0 3 z zz | ea | 0 ° o | vee er | re | ce | ee 0 ° zz | ee feo 0 0 | se uy | se | es | ze | ro ° sz | ve | er of 0 | se “s_|_o | e6 | ee | zo ° et | a | et ° of o | ee s [vor | se | se | eo ° ez «| cx | o 0 0 | see zs | vor | es | ez | 0 ° ev € ea ° 0 o | ez s_| sor] vor| ez | vo | o | ve | ve | wr [0 0 0 | ov es | | vor | 6z | v0 3 ve | vest ° zo 0 | we ss | en | en |e 50 ° st | ee | sr ° £0 0 | we | ss | em | a | ve | so ° se | se | ex | 0 €0 0 | eve 9 | st | a | ve | so ° ce | se | ea | o 50 o | we 9 | str ce SE 50 ° Lt ot sa | zo | 90 0 id eo | a | se | so ° ce | ee | sa | vo [so [0 | ove es | ea | ve | oe | $0 ° sz y | ea | vo | rr [0] ave | so | ve | cn | oe | s0 3 ez + st | co | et 0 | are vo |e | est_| ev | 90 | € zy ft T st 0 | oe «| ver | ea | sr] 90 o | te | ve | | zz o | ose ve | ve | es | s co o [ce | sv | goe | tr | ez o | tse ec_| eer | ssr | ts | go 3 re | sv | eoc | et | ez o | ese sc | ser | cst | es | wo ° ce | ev | w | st | sz o | ese sc] | est | es | 60 ° fe 5 z € € 0 | vse sc | er |e [vs | er | o ve | v9 | ew | ve * o | sez a | sr | 9 | es | er | o | ce | eo | oz | te | ve 0 | ase zs | osx | es | 9 a ° ve | vo |e | re | sv | 0 | ese |e foes | a | es z ° ve | eo | zee | ze | ov 0 | ase es | ser | sat | ee z ° * vo | sw | re | sy 0 | ese ve |_a|_# | se | ze ° zw | 99 | ex | se | es 0 | oz se | ea |—er Z Te 0 sv | te | ss | ce |—se 0 | 18 6 a | cer} ve | ve 0 sy | vv | vez | ce | e9 0 | ese ze | ver | eer | vz | ve 0 sv | 92 | 2 s soo | ts ze | ver | oc | 92 | zz | zo | sv 8 «| es | ss | 0 | tae ve | sr | soe | 92 | zz | eo | vs | ee |e | 9s | ec 0 | $92 ss | oz | ew | ex | vz | co |~vs | ss | se | os | zz | vo | 90 or | voc | st | ze | vz | so | es |—v6 | ee | ss 3 ro | as o | ew |e | ze [ve | so | ss | or | or | es | se | vo | ase 0 wz |-se | se | sz | eo | ss | sor | te 9 | 9¢ | 0 | es su | wz | se] ee | 9z | co | ss | oor | ste | eo 6 so | o su} zw | ex | ve | sz | 60 s | vor | ze | so | ve | so | te “cw [ew | ss] sa [ez T so | om | ve | s9 | ee | 90 | zz ra | vee | exe | ze t t s | sw [ze [ec | str | eo | eee | se | ox | vs | se | et | +e | ow [sve [se | zt 1 | we set | cee | ox | ce | oe | ot | 96 | cm | sse | 92 | tae | 1 | sa ser | ew | 8 ot | es | st | 66 | a | re | es | ex | er | oa wt | cs | ee | ot | ee | ot | ot | ect | coe | es | ex | st | uz ot | ese | oe | sor |e z mw | se | a | cs | esr | et | ace tr | sz | te | on | ev z | ew | em | se | ze | zoe | se |x vst [va | ve | zn | vy | re | on | cm | cee | oe | eve | oz | ome est | ew | sse | cer | zs | ez | ee | est | ee | eor | a | oz | tee st | ea | ose | wm | es | sz | ver | est_| eee | om | ooo | te | cw a sw | ese | ve | vs | sz | ve | ca | eee | crt re | ez a |e | vse | zor | és e | svt | zor | sor | sor ce | vee st | sor | exe | za | eo | ce | st | our | st [ver] ty _| see sve | sze | coe | cor | sc | ee | ear | ew | ew | ve zy | 98 vse | eve | ce | voc | sc | ee | sur | ree | cow |e sv | cee oz | ese | ce |e & se | ot [eee | rer | | sae sz | ve | se | zs | ry | eer | so | vo | su vs | 68 rec | sy | ee [re | es | er | e | sec | ssp | ose s9_| ose rec | a | ae | | se | ov | zee | ce | ea | 62 “se | tee vec | es | so | we [cs] cv | ee | eee | ees | a ‘sc_| eee te | vs | ver | oe | ee | ss | ree | see | res | ree sc | eee te | ew | ee | a | o | s3 | ze | cre | ves} sev re | ee | see | coo | eo |e | ot | 90 | vee | ze | 0s | tee | 96 | sez v9 so Sor oe | sor “9 SOE vee eb9 ee | sor | 962 eee |u| sey [ae fr fee | soe | reef yea | ese |} ett | cee “tae | |e | oe | ew | se | rte | ese roe | ese | [ere | aoe w | stor | ver | os | ea | ce | ste | ese | x |v “at | ese ey | suet _| os 23 | st a | sse | ee | zee | eve get | ooe ov ses wat | 16 ot | | see cst__| toe ou 55 sa | es | or a tor_| zoe or 65 sw | ve] t4s 7 a | e0e zs ses | ot | et “ess ser cee | voe | a res | ese | rst sus 735 ssc | soe t9s 799 fete | er 795 a) s9z__| 90 ss 99 sve | cer vTe “x | soe | Loe ews | | a w | 0 68 ze zee | a0 we “or sor ve | £6 Ts [ov | 60 Bez eer vse | see gorr sv0t or | of 280 TON PO as iy Tar wr eA | av Tew wa wer wey SWLUOW OZT SNoInaud Joy [[eJUIEY Jo ANjeq a[RUADIAg YIN Jo UOREIND|e> ond (oad JAAN — ¥2102d PRO! sseeedy sue 3 YRUED 0 0 o ° 0 o 0 fo | o 0 0 0 er 0 oO o | 0 o | o oO 0 oO ° 0 0 id es | 0 ° 0 0 ° ° ° ° 0 | ° o | est 0 “0 £0 0 o | o ° 0 0 ° 0 o EST ee re eee ee a 0 eo | vo | 0 o | o ° 0 0 3 ° 0 fat oe ee ee ee oO 0 $0 _o | 0 oO oO 0 oO 0 0 o ost | o so 0 0 0 0 o ° ° o 0 ° sr 0 t a 0 o | o 0 } 0 “0 ° 0 | ser se a eee Bee eee EER oft} ef ee ae tT te o | st te 0 0 o | o 0 €@ ° ° 0 T6t oO Lt ve oO oO o [0 oO ee oO oO 0 e6r zo | se | vv o |o | o | eo | o | e 0 0 0 | to 2S Se ee co ob Ss To o | o so 0 ss 0 0 0 oz SOPs ee to ee ee 4 ate ee tet ae te ee Dea TON! PO. @ag Ey in unr Zen Tay Te 77 ter puew SUIUOW OZT sNoINadg JO} IjeJUIeY Jo anJeA aj! UBDVEg YIOS Jo UO!EIND|e> Calculation of 50th Percentile Value of Rainfall for Previous 120 Months is z | eccloccocccocc occ cc oc coc coc coo coos oO Cl oC CC CC COC OCC oloo ooo CCC OCC OOOO S Jojo ocloo ooo ooo ole coo| | | | | | | | il elol ol flelaelelelelel ele lel elo fell eel ell lla lolol allel el elelalelelallclollolollolellolelallolollelolelolelelelelele Sep 0 o ° oO 0 0 ° o 0 eooccoocoe ecocc|oloco ccc occ oc oo Way eocccc occ cc coc coo Peeeerre eclocoe cococcocoo° f-oenceesseescecencceenponnseenne | | | | FPP PPlrrrlrlls r nn War lll effete lle lel elle lleellellellellle coo Feb. Ppave cee ececececdonenvashlenennsesenencnrnencnseee Tan Rank SRSeesasguagreneee ena, Contract & Claims Specialist ‘Road Project = NWP/ NCP PEC/ RDC Value of Rainfall for Previous 120 Months Calculation of SOth Percer Dee coco eco coco Coc c cc C CCDC SC SC COC CS eccoccocooe] Nov ecccococesoscs PEPPPPPPPFEPRPPe Pieler T loccocccjoco cco 0 | PPreer er rrrrrer rere locoo ccc CC OCC Co ecoccoocc ccc ccoccce Aug nevpoceenvenshoncsaneonacsccnnccenceenssanes lococ cco ccoccc] ecococcco coco ce occcocecc] eocccc cee ecco cco CS Tu ecoclecoococ] ecoclccocce ecocccocc coco clo0e May PPE PPPPPPPEE eecloloccoccco00 Apr Peeceololcicicccee ] | PPP PrrPrerrrrrrrrrrr rrr rere rrrrerrer errr’ ia ] ecoo eococcoocco] eecccoolccoc° PPPPeP re rrrre Feb loco coco ce clooco elelelelolelelelele olelolelelelelelelelelelalalelalelelo Tan eel ccc cc coe ccoccocecce] Rank 26 25 20 19 18 a7 16 15 a 1B 24 23 2 2 Annex E Rainfall records for 2020 at Wariyapola Meteorological Station (January to August), Wariyapola Farm (September to December) and Contractor’s main lab (October and November) 7s Sonn coh sosete won Kenran sual} 2894 104 Diceowr Gebel MEQs Sem ecarimedalqd nveiiooiere cated enswr deserts DEPARTMENT OF METEOROLOGY Annex-©) | ‘Com/CR/2021 ates #91 ei rman aif Bap | mascot sonora 90m, enc OF, Fermi QuerAsrOaca ionsipors, Gkmpit) a7. Goviaes Bauddholeka Niawats Cols 07; 4 Lan. Daily Ratatallat Warlyapala= Vauaey 2020 to AugUoe2020 % 0 co] ~1}cn}en}. | ca} ns} a} iN 0.0 00 0.0 0.0 X 0. O ‘00 Ou 00 00 ‘Oo. 0: UK os 0.0 2: cr Oi G0. PR ‘00 0 0.0 7 0. 00 0. 4 0.0 JUN 0) 0.0. 00 14.4 it 26 63 00 26 ‘a0. ‘00. ‘00 2.0. 00. og. 00. Oo [ 26 a 36 0.0 |_o1 ‘00 Tro | e285 NA- Not Available Note: The rial of he iy considered tthe cat of rata wensetd ‘during the 24 hour period ending at 08.30 ‘a.m, of the following day. 1 do certify that the above data, extracted from original records available at this Department is issued in response to an application made by Finite Lanka (Pvt) Ltd, No. 260/01/02, 1 Floor, Kandy Road, Yakkala South, Yakkala. ‘403% Checked Bye. 2021-01-12 Ato TRUI Chacked aay fe 2021-01-01, at - Law, Notary Pt Conran or Deputy Diractor ‘Company Secreta Wo, 28/6, Haggalia, El 8 2b. .G. Fernando y gars" aoe 3 Se WHA Ae iment of MoteorolPGyDirector General of Meteorology ‘983, Bauddhalok BRNEV-AT-LAW, 86cm Ferrando ADB FUNDED REHABILITATION / IMPROVEMENTS OF 164KMOF RURAL IN THE IRUNEGALA DISTRICT CONTRACT $8 ((RDAJADBY IROAD (1) 0/01 iS) INTRACTOR ener fee CONSULTANT _ Wecomom a Pinte rm ergo SD, esos Develupnent Consults (Pu) Ld RAINFALL GUAGE REPORT _ =| Locarion or wearin | |, MUSE Maia STATION: No, 20, Siytatigawniya, obegane RAINFALL GUAGE READING (w=) 4, Gi OP cblewaAg CONTRACTOR ADBFUNDED REHABILITATION _—_VEMENTS OF 104 KM OF RURAL ROADS INTHE KURUNEGALA DISTRICT: conta ((RDA/ADB/ROAD (NWYNCBICP-RR (KUS-R)) RAINFALL GUAC FUKUs-RROROrS TG. Glaymabes MABSLoymsume Motel echniian Meter Bagineer AR Aare ON-SA F099 & Claims Specialist Project - NWP/NCP PEC/ RDC Annex F Revised programme after EOT -01 __ Tag = > ——— — ee eon ‘ours fog 7 > —_— aes ch A540 | Ss i = = “Batt en we ae | it a “TS aie og eqs suet) EAUOD [log WAbY BhmWwaray, T2sinay GL CLAS) VANVT LINED '8OLIVBLNOD WV¥DOud FINGTHOS 19arOwd $ SVMOVd - LONLLSIO VIVOSNAUNY FAL NI SOVC™ TYAN AO WH POI AO SLNIWAAONAMI /NOLLVLITIT “Yak WYYOOWd LNIWISIANI GVOU GALVUOUSINT Ft 103 on ry eral sree seeesseg py ng a esa so ° a ees soto c hoot mmm Mamet eine Be aes goa : woe 3 ons sees Lan inns mt “geese! ON JAAN ~ P2f04d PROUE “epods sureig 3 PERIOD QU CLAS) VANVT LINE HOLVLNOD WYEOOUd TINGS L9arOwd § AOVAOVa — LORULSIO VIVOANMUNM FHL NISAVC TVET JO WH ¥01 AO SLNAWEAOUANI/ NOLLYLIUT 1H WVEOOUd LNAWISTANT GOW GALYEOUTINI a Loereren iS ——_ mo eee mines pit Uke fod + oma 1 2305 A005 244 mt use en 1298 step svorsousna, hep 6 ONDREVN VOU son gate oto Pea! stot over oe en O80 asqyeroeds suite 77 PED shep09 ‘S8300¥ 3SN10H ONION es step os ‘snivea AvMaGS1 ONV 3aISgyON as Step €xo¥1 ONANOM ONVN8 BLERONGO ATS sept 100 aa sept asve alvomiooy aaavio 39030 step 09 NOUDMWLSNOO BACON sept sasvaans ‘%sp0E —_NANNAL NOLLOMALSNOD LNSFORENE bald aw NOUYAVORG AVINGYON | BAS ES Sk ema Ta/tifyuns tevez ua step OB ‘Wl¥dTY MOVED ONLLSIXS ¥ ONT VS79 BIS. Aap hep e enc e/et/t ant OM T/ST/ELON KEPT ns 2/a/e von step ms 2/a/e vO SHEP ms 2/a/euon Shep G17 CLAD VANYT ALINE BOLDVULNOD WY¥DOUd WINGAHDs L9arowd $ SOVAOVE- LORLLSI VIVOINAUNY AHL NISGVE “TVAML IO WH PO AO SLNANAAOWAWL/ NOLLY.LITIE i ns _uoseng ‘OvOW 3H ¥2RO ONION ‘ONRRGNNN RENIN ‘SNOIS O14svaL NDR GVO ‘oNISS¥¥O GNY ONITIOS JOL ‘88300 36NOH ONIGIAOEL ‘suivua AVMSQVST ONY 3aIsqyOH ‘ONT NOUONALSNOO LNBYORNVEH sv NOUYAYONG AYMEVOR ONINWALa4 ¥ SAviiSENvD SaDqTUE SLAEATNO lyase YO¥EO ONUSICS # ONTO ALS ‘QVOW 341 ¥3RO ONION ‘ONRBENNN IATA ‘SNOIS OL4s¥eL NDR avOH THU WVUSOUA INAHLSAANI GVO" CALVEOUTINT ‘owawrs | EL OY SAH sre Fai SOHO toed Reagan Rewurg eae La fours | TELA BASAOH —— mitogen ‘oma 0u09g ——— dno rs omen moun eer + w ene Ph Seopa oa ato c ont fon mam a" i foplold a 7 topes 5 I eee cmawnso-d comm BS pao: ATR —— ~ — ~eSeuEIn O'S enefeont hep (0704 341840 ONION renefewns step ONnBENRW LIAO sonst are ‘eenoal weessl oat an ssyetoods su 3 EID Te/aelevon serTe/e Uns hep 6 ‘NDR GOH moten Tare Tefen es sep0s ‘onisgvto aN ONTOS dO paonyan fate rz/efepen sep os ‘592007 38N0H ONINOW “Say. reitfeuow sep os Suva AVMBOVR ONY BOISGYOR as W2/61/2114 SHEP OF ows ONOMON ONIOVSUNE SLELONOO LIVERY rentiemu step or sv09 ad WIst/euon sepoe eve aLvORuODY AQMD 3sN3 cx/ret pom shop 06 [NOWTRUSNOD waTINOHS repires sasvaens ms ox/tet ma ‘ONIWL NOLLOMLSNOD LNAFORYERE Fefefe nat e2/cset won sncsaw NOUVAYONS AYMGYON ‘Te/te/e on oz/ez/tt WOH vNivi3e 9 AvifSSTvD “S2OGINE SIAN AD Te/ee/t vs oz/6/t vow ony overt any ms oxfen/en3es QU 1 CLAd) VINVT ALINI HOLVEANOD WVEDOUd TINGS LIaOUd § SOVAOVa ~ LONLLSIG VIVOANAUNM FHL NISGVE TVANY AO WH POT AO SLNTWSAOWAWI/ NOLLVLITI 2a yoWRD ONLLSDS 9 ONRASTO 31S ‘Q¥OW 3H YaKO ONIONYH ‘ONRISBHINN LYBAINO ONY SSO ¥313NOTD snore Lave. ‘NDR a¥ON ‘ONISSvES ANY ONTOS dOL ‘88300 36710H ONIGIAONS ‘2005 via HLA /SNIVUO AYMBGVE1 ONY 301SQ¥O" ‘he 2 }0¥1 ONIGNTON' ONIOVUNS BLSHONOO LTWHLSY ‘2¥09 aNd 28¥8 gLYOSHOOY azavuO 3SN30 NowonuLsNoo waaNOHS ‘sagveens ONIN, NOILOMELENOO LNaHONENES ONINVISY ¥ SAVES S20GNE SLYBATNO 2arvg3ut YoWeD ONULSDG ¥ ONVTO 3.18 ‘QvOu 3H ¥aKO ONION ONRESBNN LANTINO 4 1AM WVYONd LNAWISTANI GVOU ALVEOLI SS <= QL1 CLA VANV1 ZUINLE BOLIVULNOD wWywoowd FINGAHDS I9aroud ‘Sonics ca ‘voi ‘enwuns os ea) yy Aaens poem eee Ly rang VE insist pri Gb joarneat nea A, sod e027 scan 2D SOM gy 1020 vio cos 0BENEH reais tepr ‘a 3 vaK0 wan erea/sws step ‘ownaannn Luang rekusws enor SND Osh eufswe shpat oon avou rik/e¥sshe05 ‘NSS MHD GN ONIOS OL sep 08 {83004 3670H ONaROLE 1 eps sna saavaT ony 20180¥08 {65 ep xovL OMaMTON! ONOWaLNS 31RUONOD LHS reise/sani Te/t/ena ep oot 1¥00 an ereeses e/et/tonk step ort asveaiyoRiooy asavuo 36N30 hod A2/es/eans step ont NoUDnalLsNoo waCTONS Weirlyans —se/s/tank_skepos re/ae/e uns ox/ez/er an hep 05 Te/sehe nL 02/92/et36s ep 06 Te/et/e and 02/8z/eT eS sep 08 Te/te/e pom oz/et/et eS shepozt ‘esr /ee es Shap aot weieerus kept 'SS00V 3SNCH ONIAINON ‘shiva AVMGOVa ONY 301S0¥0u TLILHE IML 4B SP row SNIOMION! ONIDVSUNS 3L3HONOD LTWHESY siren, shepoy -1¥09 ahd e/oT/e pam OZ/EL/eT POM SHED OS 36VB 31YOauOOV azavuO 3SNI0 RITES OZ/sT/AT PAM sep 96 GUT CLA) VANV LINED YOLDVALNOD Wvwooud TTNGIHDS L9arOUd § 3VNOVA~ IONUSIA VIVOANNAAN AHL NISGV( _TVAAY 40 KH POT IO SINAWAAOWANI /NOLLVLIT IW WVYDOU LNAISTANT GVOU GALYUOUALNT ~ mmwwsoee | IT La) OMSAOH | 5 eat TEE Neen uo pradii joid PaRwka «sem oma =e B oqu oad ON /4 MAN ~ 1fOud poouL asiersads sue[Q 7p WENO EMOTO TOHUE 11 CLAD VANVT SUNIL MOLIVULNOD WyDOwd TINGAHDS I9arowd ——. 7 smo c Ye Win wees eee, ——— sem come ty et —— aa tase tse func Oe dN ANY Bafa POU! ne Shrmoodg suet 3 E20] ONINWA3H ® SAviiaVa Sa5CI Te/Re/e DIM oz/6/TE UOH shepo9t taf 7 os ‘et we sano mente sumo ews es _vopmie os 11 (LAA VANVT SUINLE OLOVELENOD Wvwoowd FINGAHDs 19arowd $ SOVNOVA- LONUSIG VIVOANMUNA TAL NISGY( VU dO WA POL 40 SINAWHAOWANI/NOLLVLIT Ga WVEOOWd INAWISTANI GVOU CaLVEDUAINI ‘e/st/e WoW o2/St/Et UoW Shep ozt Te/6r/@muL O7/e/TTUOHK sheD O87 TRIStéS POM, OLLG/TE UN Shep coe Wist/ories te/st/or ies Apt QVOWIHLYIROONONYH ss ONAN ABN ocuyodd ON /A AN — 1fad PEM SNOIs sv asqeods suuie{g 3 EVO Supe avout ‘MONON TUTE, ssv¥0 OW ONTOS OL mM DEsES, ‘56300 Z6NOH ONOIAGHE wre ‘T2/6/9 BBM 02/82/CT YON SAEP OST yov ONIGITIONI ONIOWUNS 313HONOO 1 WHS e/t/9 2m o2/T2/eE YOM sep OBT oc/a/et ns shee o02 reie/s 00 {e/9t/S P9M or/ST/Or ML. shep Oz Te/stls pam o2/SK/6 a4 shep ost ‘TE/AT/OT eS ee/at/6onL shan coe = weret/r end reyerfeen APT ‘GYO¥ 3HL 43N0 OMONYH TEAT/EWOW or/eT/eT UNS Shep OF ‘ONEIEWAN LBNINO BATON ot sep of NOS ave Teir/tuew ot step 0¢ NDR vO cocrex/en es hep of ‘ONISSYEO ONY ONITIOS dOL Oz/E/2E vO ox/6z/0x MAL hep oF ‘88200 38N0H ONIGINOMS oeret/er es step of ‘Shiva AVNSQVST GN a0IsgyOy pe OzISR/TE PoM—Oz/0E/S VS SAP OST xOVL ONICTMIONI BNIOVSENS B1ZHONODUHESY qe OT/EC/TE VON OZ/A2/S MUL Shep ogT ayoo sis Hl aa oz/ee/t uns. o2/42/5 pam shep oat sve 31vORuOOY GaOVEO ZENG —— 2/8/25 o7/02/5 Pam shepooe NOUDMUSNOD wEaTIOHS 0! —EEEE ou/sttt uns or/e/e uns shep ost sssveans so 1 — ‘oefre/emun —02/t/e uns shep so ‘ONIWIAIL NOWONALSNOD INGHONVENS 5g —t | ox/ee/somi oz/ez/z mas shepo9t svNOUYAYORR AYGYOS LOL . a L, {6g —$—— os x/a/OTmL O7/L2/ePKL SAEPZSE ONINIVLZU-Y SAVINSSTIVO SESGIE SLESAIAO 9 me muro sumo wy eo uy oe veg - suey, | 17 CLAD VANVT ALINLE OLVALNOD | WywD0Ud FINGAHDS 19arowd $SOVIOVA~ LORUSHM VIVOANMUAN AL NISCV( IVAAY AO WH POL JO SINWIAOWANI/NOULVLITIC RVEDOUd INIKISTANI GVOU GHLYUOUAINT | A Ae | CLA AD sme SS LETT ltd ena: ate OU : Hyoplold Peetzbezo 1. ammoawa + apo ‘as ue cum om USNs fo ——n aH AUK ——— Soya HAR 000 ces go ewe} 399" 7 SFRTR Terer/orwon Teee/oTUON —Aept v0 34 ¥2H0 SHV rerctforuns reme/ours. step ze ‘ovnSenNW 2saNINO qu 93a eser/oruns weise/euns_ step SNOs ave SON JAAN — 390f04d POUL Teev/oruns wz/se/6 uns step zz ONDRAVHN GOR stood sueIo 7 PEBLOD TeAseI6ws 2/RC/LPOM. sep o8 ‘MGSMED ANY ONTOS OL rey D relsu/emis T2/r/9v0n step 09 '98300¥ 39N0H OHAIOU Wisfsmn—e/64 sens suivua Avaya aN 3080¥0u an ¥eib/e 201 W/SG/E AL EPO Yo¥s ONAMTON ENDS B1SUONDD WHER a ‘Te/6z/9 91 Te/BT/E ML Shep OOT weyeei9anL —/st/z4 shen zt Weisiemn Te/st/e =a. WeigysennTe/9/e wes Weler/smun rz/oert es T2/OT/S VOM T2/Cz/t POM. shePOOT Te/e/S OM T2/o2/T PAM skEP COT 2/91/suns_Yz/et/t aM Shep oct no ‘FR/aL/OT MAN TA/ET/E peed sop 522 ayo TNH Gu ZOGING VAD VNRLYADHVH fl TIST/6 PM Te/St/speM AEDT ‘vow 3K1 ¥3NO ONION ONRRRNN LAND NOS Ota ‘ONDRIVI a¥ON We/ei/6.uns 12/5/9385 shee oot ‘ONISS¥UD aNY ONIIOS dOL ‘efs/é mui Te/at/S 24 she sTT ‘88300 36N0H ONGNONS Heyer /6uns 12/5/9385 shep.OT nina AvMaQVa ONY 2a;BayOR Te/BT/e Uns 02/91/E1 UOH Shep OSt NOLLYAYOXS AVMaWON eng _voneng um U1 CLA@ VANVT ALIN OLIVULNOD WYNDOWd TINGIHOS 19arONd $ SOVMOVA~ LORUSIG VIVOSNAUAM HHL NISCY! IVY JO YOK Ot AO SLNAWZAOWANI/NOLLVLITK RH WVEDOWA LNAWISSANT GVOU GALVEOUAINT Annex G Contemporary records relating to Road ID 95 908 |p es Sonthesa oawoad eeBauniny - speoy | Y-SONY - 480440 feoIlUyoa, eueuplemuig “dadeueW Deloag Aindeg -eswses oS C Ra EA TT pap apr 3a steve PRP poe PS pert Aone qoorel | iy 20 Poe PS wot op COL 7 mba] ahany tenors] hy af qo | Hor Pen TT PT | a? pee pay sk perp h sae Steve! ey PAD a men RP Te PNY weet peut hha OTS] eo eo ee x ox’ TENT Pag prop tap Seeht Tp? > ax - “ps Ap | mee oone ape oe 5] ve Aeah poln) oho ET Mest peste baypa PHT go Coste] AW z rs ire a reg pel fare pm ped Xe wopense ay Dpto) | lee anes DhG pe a ey ape ees ema oy St > hy oa 15] go 60 OCT] ? apap Sea) poten yn| > Fa ome epee ae ra eT] EN ve Pa ap | Baroy ged PubMS| coco ee] ae RAS ePID co _| Ud eereeq ects hPa] aw DS I Of HE ONPNG PT) wccpeegcon py ATS | lo eo CLOT syewioy ssaiBoud ou 0} aBeuleg Jo 10x09 ‘Ayano pauueid area aot a ageadey _: QUOW) 19 _:ON juauinsoq| SG “On peoy Prok _omves\ a extodinay WW OWEN PeOu| “PYT sueynsuog Buyeoui6ug emyBunkg , : ‘jueyinsuoo| seis s0ueoM PHT (34d) EAUET OBULY : JO,9eNIUOD| ((a-sny) ae. ‘dO/BON/(MN) CVON!V/va4) YS NY LOVALNOD - LOINLSIG VIVOANNUNY SHL NI SQVOU¥ WN JO WH 0} 4O SLNAWSAONdINI / NOILVLMIVHaY G3GNN4 sav oauio3d eyeGaumany) - SPeOR | ¥-SOMDi = F90HO IPMUPAL JaBeuEW W9a[01g Aindag / seuss eas — Te Seo rien apnea sap | See meeeyen sett RE PD FIR [aliecccew opens opimens | etea ae [ [seve a wore me peeled apd ars Te S| epecre nap pmo apr | m0 PRP e rae Ph Ul anacopouet hy organs | see ort @ C Soetd : Pas ying mh wee qe pp Se TL TRaTO 7 promt arog SEE peg HeTT® tae) hy paynlu | steoer TOPIA BM [teyeq cot pled opel oS Benya WIR ook: lasses obceee SpeaS PP ape | wort ey eet t TENS | le eoreeet f SOF Op econe ne pend md apoE am5 SNS Se semper 904 mont oy nent * hey 25mm aus Cree eee] TI SES 1 FS PP IPO > papi apa 7 zagiot PRE rYR Wer ot uewoy sseiBosd oun 0} oBeureg Jo fone ‘faynnoy pauuela ea aver pea — Aeqs7S MUON) eo _-ON wSUINDOG| SE {ON peoy ee Ve op eedevy_“ouren peoy| “PY syueynsuog BuyeouiBug emyBunkg , : ‘queynsuo5| smeIS EYEE PHT (34g) EYULT |BUY : 40}9eRU0D) ) | Til ((4-SNy) Ya-do/GON/(MN) AVONNEAV/VAe) YS NY LOVALNOD - LORLSIG VIVOANNYNY SHL NI SQVOY WUNY 40 WH PO} JO SLNSWSAOXAINI / NOLLWIITIEWH3Y GAGNN4 sav oausoad e1e6our JSBeUEW Da[o1g AINdEG Bees | 1 L ae Ci ee ee a ppl aapm pa ee Tena ere pry Dau | ee et eted ran : zAgtO! IRs yy mM aoe SA a Pe rT 1904) t agente) png | Sy obotot sysewoy ssasBoud yy 04 oBeweg jo 10x07 ‘Aunnoy pouueig avea ater pagayrPo HUM Zo {ON WeUIndog] ‘S6_0N peoy ae Tren) _“eueN peow| p17 sjueynsuoy BuyeeuiBug emybunkg oo -pyT (ind) eqUe] only : 10}eUOD| ue}INSUOD| (SN) Ye-dO/BONAMN) GVONNEAV/VAY) Ys NY LOVYLNOD - LORLSIG VIVOANNUN HL NI SQVOY WUNY 40 WH ¥Ob JO SLNSWSAONAMI / NOLLVLITIGVHaY G3GNN4 sav oauoad ejeGauninyy~ speow | 49m yn og} assrospoutto : Big aay tiers e3eH 7 APE pam, ise gy pemot per BY eset: ead eer? ops ny ober T OORT ¢ poms cy aeateiews pam O7Y lessee ay atte Nap pies | __e Netee TRA IP es tara eyort + dar proves mY apie pen ob Ateheng pa MPL ne C fonetey OIE megeerdeud ape vs TR Ege Ne Papa pes oT seeped ony ORs) OTIS Oty ) [eet cpagest pes aeppenS Taye = prep SE cure qcotee 7 bahay oy OS {seit oy ote smapeyened zane aye pop iaaem 7 ey hg aS | co ore] ne ara Roreaeont: ily PPI D AIO PH OTE T | astse gp o8t4d: omihey veg PE | Soworet gene mow @ wert MA PT me aanpeiem TAS eFC] asgrotetive: ih ong aS | ao eee ‘ssou6oud otf) 04 eBeweg Jo j0n07 faumnoy pouuela aa @xet 29" 2AOAY = aqUOH| ho _:ON wauINdoG| “S6__-ON PeOY Pere me ap Mged nyo ‘OWEN peoa| “py SqUEYNSUOD BuyeoUBUg eMyBUNAY , . ueynsuo9| SmeIS 4ouTEOM ‘PHT (Ad) EXUET YUL : 10}9eQUOD| (SN) Me-dO/AON/MN) GVOUVEAV/VaY) Us NY LOVALNOS - LOMISIC VIVOANNUNY 3HL NI SOVOY WUNY 40 WH 70} JO SLNSWSAONAINI / NOLLWLMIGVHaY GaGNNs sav aadeueyy peloag Aindog BE P_ [Rae ante pas Ryne eye AT _| nee ome | FHT AN | ae eee Te yen ne gent PS pas mi { % pape pape | ee [ FStcey cere mpmw MEPS Z yee Hy Om OF Peep 90H + 989 momipory cop | oeeeoporte | bay pere”g SsseuBoud ou 0} oBewleg 40 j9A97 ‘Aunnoy pouueid syewoy, "ED _otet aqme WuOM SE__ ON peow i “pY1 sjueyinsuog Buyesujbug emyBunkg| , . “jueynsuc5| ‘SMHEIS JENEEM PHT (34g) EYULT BYULY : 40}9e47U0| ((a-SNy) Ya-dO/GON/(MN) GVOUUEGV/VaY) US NY LOVHLNOD - LOILSIG VIVOANNUNY SHL NI SQVOY WNY JO WH FOL 4O SLNSWSAONAINI | NOLLWIITIaVvHaY G3GNNd sav Taaeuey 5 & Byans AO pap Ee Zope PRO POS | a ae ae 9pt ane POPs yO Saal v ee wre | Teepe Pree ROD Tapa SRE EEE BH, ajerl 4 opaines ving | ne thewat y Tepe PPA wap RAT Ga Te perp aE opt open ang | peat ewe ae Tee pe e_ [aor Sp osede payne Pre S a T Resex 3 2564 127 we wot TEs peep o eae UT sive of oniee | Vapy Poy Soe - ean" etd Yee CSF [ocgae oh acsee APM Spray a — TI aster oy ones: SH PY AG sane 7a apn ¢ Bayet 3 o00q i? [con eh over J TREE: 7 ih efeafie (PMH? HPRME ane ee Tf S84T) pene hE | co epee sqewoy ‘ssaiBoid oun 0} aB2ur0g jo (0A07 Annoy pouueld eva zoe 2oqver7g MUON Jo ON WeuIndog SG ON peoy pees Stl Te)_“OWeN peoy “pr squeynsuog BuLeouug emyBunkg fee aee “prt Gnd) exue7 oyury : soroenued| sjueynsuo9| mM yung: (SN) Med O/ONMN) GVOMVEAWIVGY) YS NY LOVYLNOS - LOIWLSIC VIVOANNUYN SHL NI SQVOU WNY JO WH FOL JO SLNSWSAONAINI / NOLLWLITIGVHaY G3GNN4 sav Annex H Revised BOQ REVISI ED BILL OF QUANTITIES SUMMARY SHEET WAS. Priyadarshana Quantity Surveyor iRoad - NWP i PEC/ RDC. Item Description Bill No I : Preliminary and {General (Common) Bill No 3 : Earthworks [Bill No 4 : Road Pavement Bill No 5 : Drainage ill No 6 : Culverts, Retaining, Structures and Bus Bays Bill No 7 : Bridges Bill No 8 : Incidental Construction] Bill No 9 : Day Works 3,726,471.31 6,331,290.00 1,809,121,073.23, Amount as in Original {Revised Amount after this| BOQ (LKR) EOT2 261,249,800.29 257,388,341.67 39,206,447.46 32,060,675.71 182,446,574.44 168,153,971.70 799,548,655.08 (638,664,877.03 246,689,406.00 415,285,052.65 156,629,957.51 105,293,746.38 113,292,471.14 105,866,096.82 1,747,676,408.51 18,632,356.55 6,331,290.00 [Bill No 10 : Total of Performance [Based Maintenance Works Bill No 11 : Total of Provisional otal (Bills 1-11) 57,600,000.00 1,913,447,489.23 46,726,416.00 46,726,416.00 1,860,502,824.51 66,100,000.00 Physical Contingencies (Atiow 5%) Price Contingencies |(Allow 3%) 382,689,492.10 Accepted Contract Amount 2,296,136,981.33 2,009,343,080.47 93,025,141.23, 55,815,084.74 oA PAE! 1 SSOE6T6L'9RT LY OSO'EDE'600'T PE TS69ET‘96TT @ pus [- BOL LE 199°6ZS‘SEL ‘PL P80°S 18°SS (%€ MOlTY) S8!DUaBUDWOD 20144) rls | Z8PO9‘6IE'86 ET IPI'SZ0'E6 SO'9PL'PPE LEI (%§ Moity) -sa}ouaBustUED [BO1SKYd MST | TL'v99'bbO'TS Ts'vz8'zos‘o98't EC ORY LP ETE'T (OD H(v) POL, 8'vI- 00°000'001'99 00'000'009'zs (a) suing peuosstaoig| IL “00 ~ 00°91Y'92L'9F OO'91¥'9ZL'9h (q) soueuaruyeur paseq soueuuopiog | OF re TL'999'rb'TD. TS BOP9L9LPL'T ETELOITI 608'T C¥) 914044 pounseay, Jo [#0], %40°0 = 00'06z"1¢¢'9 som keg) 6 4x9 | ZERLE ORL Pr TLy eee wonannsuoy yewuapiou) %0'00r- _{(ve's88'so6'1) SS9SE'ZES'SI TELLP9CLE (uing Jeuosstroug) s98piug L wee | eriiveecis | se oec'e6z'sor 1S'1S6'629°9S1 skog sng 7 soumonng Buiuieioy ‘swanjnd| 9) %E'89- _|(s9'9¥9'ses‘a91) | SozsOsaz'sIF 00'90'689'9r7 aBeureiq sl wor | soreLe'ess‘oo | cO-LLa*p99'8e9 80°SS9°81S°66L WaWOABA PBOY) ¥L'209'67'F1 OL'TL6'ES 1891 ‘Spomyueg) ——e SLILLSHU'L 1'se9'090°7e Sy Lyv'907'6E Buea aus) T 19° 1vE'BBELST 67'008'6¥2'197 Jesouep pue Areun L | crwpsenoay | cap snomy Gna) vmomy eas swt “ ‘LOT 498 Afuo sopiouy 6r20u1dUg pur s,1e

You might also like