You are on page 1of 9
000476 ASIAN DEVELOPMENT BANK FUNDED - INTEGRATED ROAD INVESTMENT PROGRAM REHABILITATION / IMPROVEMENTS OF 104 KM OF RURAL ROADS IN THE KURUNEGALA DISTRICT PACKAGE 5 INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS CONTRACT NO. : RDAVADB/road(NWYNCH/CY R) EMPLOYER ENGINEER CONTRACTOR RDA. PEC-RDC FINITE LANKA (PVT) LTD MAIN SUMMARY “Temporary by-passes for culverts, bridges and other structures lwano[ 4 [[Payiten _[tosa) eviod Ending [9232000 wien This Mouth | Camas rr vm edema, | MM | SRNR | sete 115 | temporary by pase fox culver bdge and other wa} “ozoi23 Tes : ae aaa rasa Talia? aces Pope Nee Guaty anger Yas Rae Bg Bisshtomyaa Nay wiehstapettaa Tania Tie tka ad ECAC eae 000477 ASIAN DEVELOPMUNT BANK FUNDED - INTEGRATED ROAD INVESTMENT PROGRAM, REIABILITATION / IMPROVEMENTS OF 104 KM OF RURAL ROADS IN THE KURUNEGALA DISTRICT PACKAGH S INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS CONTRACT NO.: KDVADB/ioad(NWYNCH/CP-RIE(KUS-R) ‘ EMPLOYER ENGINEER ‘CONTRACTOR RDA PEC- RDC FINITE LANKA (PV) LTD ACTUAL COST SUMMARY “Temporary by-passes for culveris, bridges and other structures No] Road No/Chainage/ Se Amount Rs} Remarks 1 | ors, cn-oveass us yeaaror] 239/3.02 — A ite weer! 93.4 /3-02 7 5 / oxen aaouee| Q] 505-19 “otal Cot wana} is 74B4|-23 4 Not tem mii ined ert acta sites Prepared by Submited by Cheded by. Avprlbed by: ie Wrens 3 a v oan one Cami Senmr [pun Reset Enon Patse tanya "hoyrate wicksrpeinion [Saja Ti Lana ak EC. RDC ot Weta 00047€ ¢ FINITE LANKA (PVT) LTD. Company Rp, Wo. PES CONTRACTORS, ENGINEERS & CONSULTANTS orrce FINITE — torn,” sce 1996 Yatra OU Sas My No: Finite/PO/KUSR/PEC/246 Date : 13% August 2020 Mr Jayathissa CRE / Acting Team Leader (PIC 02) Pyunghwa Engineering Consultants Ltd 180/6, Pubudu Mawatha Colombo Road, Kurunagala Dear Sir, REHABILITATION / IMPROVEMENTSOF104 KM OF RURAL ROADS IN THE KURUNAGALA DISTRICT- CONTRACT 5 INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS Contract No: RDA/ADB/IROAD(NW)/NCB/CP-RR(KUS-R) Subject: - Actual cost of by-pass road - 1D 95 We refer our previous letter No. Finite/PO/KUSR/PEC/120 dated 27" June 2020, regarding above subject. Accordingly, we herewith submit actual cost for by-pass roads prepared at following locations on road ID 95, Chainage ‘Amount 14355, Rs. 161,281.04 1744 Rs, 128,976.79 24080 Rs, 182,941.72 ‘This is for your review and approval please. Thank you. Yours Faithfully FINITE LANKA (PVT) LTD, eater N. Thayaparan Contractor's Representative Ce, Project Director, RDA, (NWP) IRoad package fi fi ei ee mew eeeeTRATON HL AT4 eomniae GD 0004749 MENT PROGRAM ASIAN DEVELOPMENT BANK FUNDED - INTEGRATED ROAD INVE RENABILITATION/ IMPROVEMENTS OF 104 KM OF RURAL ROADS IN THE KURUNEGALA DISTRICT PACKAGES INCLUDING PERFORMANCE BASED MAINTENANCE FOR THI CONTRACT NO. : RDA/ADBVltoad(NWYNCH/CP-RE(KUS-R) EMPLOYER ENGINEER ‘CONTRACTOR RDA PEC-RDC FINITE LANKA (PVT) LTD ACTUAL COST ~Only Construction) "Temporary by-passes for culverts, bridges and other structures Work Site/ Section :KU-05R BOQ Amount Rs 1,500,000.00 Road No. 2 095 Bill No 115: Steu.No/Chainage (CH 019355 LHS, HemNo 1032) No. ‘Description unt} Qty } Rate Amount Rs] | BOOReE Remarks CONSTRUCTION COST Ge ee ene es = ‘Sub Total [1] 424,980.00 | fara caper a : fll eee are ie | ao een| ae) on re 2 [Rotter 10: hes. 1.00” 2,608.70 2608.70% 9.2.13 | 9°*. wm [300 Aaanian| WTAGAS 5a, Yooon Be ae : : eT reg eer Sub Total {3} (Carted forward [1] + B1+15) Markup for cost 10% “Total Actual Amount ‘Quanity Surveyor [assistant eiden Engine ty Surveyor Pret Manager WKAS Priyadarhans “TAJayatilake EMSSthanayoha NThayaparan Finite Lanka i) Lad TPEC- RDC Joint Ventre 000480 INTEGRATED ROAD INVESWENT PROGRAM CONTRACT PACKAGE: RDA/ADB/I ROAD{NW)/NCB/CP-RR(KUSR) |CONTRACT PACKAGE. ILocaTION oF WoRK lwSTRUCTION / REFERENCES DESCRIPTION oF WoRK EMPLOYER ‘CONSULTANT ‘CONTRACTOR Road Development Authority PEC - ROC FINITE LANKA DAY WORK SHEET [RDA/ADB/IROAD(W)NCB/CP-RR(KUOSR) SHEET NO, 14385 pate-t¢[oé/ 20245 Description uf Me = aot ‘resnaths em a w EG = ows aa [someon | ur aia cise [ones [UG z alex = 1 fon at [gane7 [3004 | Sol ra = z fecp eri ya wre | Tippey z aks | | a ae as | yee | =| ExceNal ev Sant et 4 [MATERIALS lee Description of Materials unit ‘Quantity Remarks Gravel engi Deserition ‘Soba heed by Ceniea py a Ee Guewepn | RE Rae A | yag-atMelleroh. pane AE | EE S| a a lseatre AE : lowe te fol [7826 ed 2a Lis GT Malawaar ae “Technical Officer - KUO5-R Roads - Kurunegala ation Eng PECIRDC PECIRDC 0004¢) ASIAN DEVELOPMENT BANK FUNDED - INTEGRATED ROAD INVESTMENT PROGRAM. RPAH ITAYION/ IMPROVEMENTS OF 106 KM OF RURAL ROADS IN THE KURUNEGALA DISTRICT PACKAGE $ INCLUDING PERFORMANCE BASED MAINTENANCE FOR TAREE YEARS. CONTRACT NO.: RDMADIVIrod(NWYNCH/CP-RE(KUSR) TMPLOVER ENGINE CONTRACTOR DA PEC-RDC FINITE LANKA (9) LTD ‘ACTUAL COST (Only Construction) “Temporary by-peses or culvers, bridges and lhersiicarea Wen ie/Secion KUO HO Amount 1,0 ResdNo 5 TaN 73 ro /Ghahage1CHTISTATAS | temo 150) x Decin ee ee CONSTRUCTION COST ne ; cam | ae] zas| sem] oar | PASO wot Sunrouiny | amas] MACHINARY COST 13 | 1 focin Wet 5060 ws | sco} ammo) Pibsisorh 9230 2 etre wx | raf 2anz0 gb, oan : oi aaa rises ie RU ce es ws | aca ra9ia0 21 sob Towler | noma aaa Fy 11 JUnskitled Work man(tabour) 5 nos hrs. 60, 173.91, ate 9.1.10 saiveaipy | "fe (Carsed forward f+ 214151 avane| em 21739-1/ Mata rch cine 9178-4) "Total Actual Amount 2807620 | 413-02 7| Peeper Submited by. ‘Appadied oy ACR vevrmcmina fh | omnes Tastee masa Ts EMSSEaayala Nithayaparan WAS Poyadarsane rajpyamate Tae ai ADC Tn 000482 \TEGHATED ROAD INVESMENT PROGRANH CONTRACT PACKAGE: ROA/ADU/I ROADINWI/NCB/CP-RRIKUSAY —] INSTRUCTION / REFERENCES DESCRIPTION OF WORK ~__ EMPLOYER. “CONSULTANT ‘CONTRACTOR "Read Bevelopment Authority PEC-ROC FINITE LANKA DAY WORK SHEET CONTRACT PACKAGE, [RDA/ADI/IROAD(NW)NCB/CP-RR(KUOSR) SHEET NO. LOCATION OF WORK (A749 By Koad reparation pare. 3/06 ferns Exeavater lLawour 30a aa me Time Tora | Re item No. i oa oar tore. eal, Fae [Woo | babes \ : - ee | ao = a : = a | | i = = : | | ARN | ee Sees in Tid [wets fiend Devarpon of lant we a ae i TT Ralersie te Ff Six. & ate | Chee i ‘ ees e i Tippew 2 i) 4 i PECIRDC Descovon |" prepared by | _Sabmatetheckedby eerie py nae ae a woe | ge . 3 na, Mpa mle . swaarache! SR M.A... Males quo Roads - Kurune 9004¢3 ASIAN DEVELOPMENT BANK FUNDED - INTEGRATED ROAD INVESTMENT PROGRAM RUHABILIFASION /1PROVEMENTS OF 104 KM OF RURAL ROADS IN THE KURUNEGALA DISTRICT PACKAGES INCLUDING PERFORMANCE BASED MAINTENANCE FOR THREE YEARS CONTRACT NO.: RDMADI/Iroad(NWYNCB/CP-RR(KUS-R) EMPLOYER ENGINEER CONTRACTOR RDA PEC- RDC FINITE LANKA (PVT) LTD, "ACTUAL COST ~(Only Construction) “Temporary by-passes for culverts, bridges and other stractures ‘Work Site/ Section KU-05R BOQ Amount Rs 1,50000000 Road No. 2085 ill No ns ‘Sra No/ Chainage ‘CH 027081 RFS Wem No 1082) Ne. Description vot | ay | rae | Amowniter | noorer Remarks ‘CONSTRUCTION COST areRua.cost 1, fotirsub ime com | s0s@| 225000] eraisin | 931 2 |RC/Atume ine im_| soot 575000] gsoeatn | 9.12 ‘Sub Total (1 13e.00 | ‘acnnvany cost UGE 1 fescratr ws. | conf arene 9210 2 |Rotier. 1000 ws. | 2007 260870) B7SHABT 92.15 ee eee wus. | 4004” 190120, oa Sub Total Aree, TAROUR COST 121737 1 [ois manga) noe we | 200) inl Zarrarf 9a0 1217-3; Sub Tout a0o8 Gre oan BIBL seonat| fe Mika orcs -108 aesator | Ks “Tosa Actual Amount aaenn| me _ @ 214 =} Fapediye Sate Chesed Aarseed N (Gh ‘Quant Sareyor Proj Mange ‘Goan Surveyor poem oa Entestyae Tye WAS Peta a ania (a PEC’ RDC Font Venore INTEGRATED ROAD NVESMIENT PRG yee |conrmact packace LOCATION OF WORK INSTRUCTION / DRSCRIPTION oF Wot coat 20a, | Ue | | ~~ DAY WORK SHEET RDAADE/IRORDINW)NCB/CP-RRIKUOSR) ost ERENCES i by sill ' Desasotion Description of Pla Wo Roller te Ton ony Slee - ey | 3909.8

You might also like