You are on page 1of 47

Summary of Emergency Works NWP/ i roads

No Packege Road ID Work Section Discription Work Cost

Completion the Culvert


Construction at CH 00+319 of
1 KU4-R1 7 00+319 Culvert Culvert need to be completed 22,882,566.75
Ihalagama Junction to Nochchiya
Across Wannikudawewa Road
Completion Surfacing Works from
CH 03+740 to CH 03+890 of
2 KU5-R 14 03+740 - 03+890 To be Asphalted 2,684,812.50
Madahapola Mahayaya
Madahapola Road
Completion Surfacing Works from
CH 01+850 to CH 02+140 of
3 KU5-R 14 01+850 - 02+140 To be Asphalted 3,621,375.00
Madahapola Mahayaya
Madahapola Road
Completion Surfacing Works from
CH CH 00+800 to CH 00+890 of
4 KU5-R 13 00+800 - 00+890 To be Asphalted 1,610,887.50
Hathpokuna Galkatayagama
Across Millagoda Road

Completion Surfacing Works from


CH 00+690 to CH 00+793 of
5 KU5-R 13 00+690 - 00+793 To be Asphalted 1,286,212.50
Hathpokuna Galkatayagama
Across Millagoda Road

Completion Surfacing Works from


00+097-00+124, CH 00+097 to 00+124, 02+750 to
02+750-02+808, 02+808, 03+915 to 03+932 &
6 KU5-R 99 To be Asphalted 2,720,610.00
03+915-03+932 & 04+135 to 04+185 of Wilbagedara
04+135-04+185 Junction to Dunupotha Rathmalla
Junction Road
Completion Surfacing Works from
01+650 - 01+670 & CH 01+650 to CH 01+670 & CH
7 KU5-R 95 To be Asphalted 474,525.00
02+312 -02+330 02+312 to CH 02+330 of
Makulpotha to Henawa Road
Completion Surfacing Works from
CH 01+800 to CH 02+100 of
8 KU5-R 13 01+800-02+100 To be Asphalted 8,478,180.00
Hathpokuna Galkatayagama
Across Millagoda Road
Completion Surfacing Works from
CH 04+065 to CH 04+160 of
9 KU5-R 62 04+065-04+160 To be Concrete 4,969,537.53
Werella Junction to Naramana,
Thambarawa Road
Completion Surfacing Works from
CH 00+420 to CH 00+660 of
10 KU5-R 89 00+420-00+660 Hakwatuna Oya Bridge to To be Concrete 12,560,094.00
Rathmale Road via Dagellagama
Kalawana Road
Completion Surfacing Works from
11 KU5-R 95 01+670-01+830 CH 01+670 to CH 01+830 of To be Concrete 8,373,396.00
Makulpotha to Henawa Road

Page 1 of 47
Summary of Emergency Works NWP/ i roads

Completion Surfacing Works from


CH 04+200 to CH 04+500 of Near
the Paduwasnuwara Temple
12 KU5-R 80 04+200-04+500 To be Concrete 15,697,065.00
Moragolla Sanasa to Pagahawela
School, Medagama Aranya
Senasana Road

Completion Surfacing Works from


CH 09+060-09+180 & 10+100-
09+060-09+180 &
13 KU5-R 29 10+250 of Kurikulama Junction to Hard Shoulder with Rip Rap 13,589,635.65
10+100-10+250
Kadigawa, Across Subasinghepura,
Across Magurankadawala Road

Completion the Drain


Construction from CH 06+050 to
CH 06+438 LHS of Kurikulama
14 KU5-R 29 06+050-06+438 LHS Drain need to be completed 13,776,735.40
Junction to Kadigawa, Across
Subasinghepura, Across
Magurankadawala Road
Completion the Drain
Construction from CH 02+530 to
15 KU5-R 65 02+530-02+700 RHS CH 02+700 RHS of Wariyapola to Drain need to be completed 6,036,198.50
Amunugama, Malasma,
Goluwawa Road
Provide Handrails to Bridge at CH
16 KU4-R1 8 06+760 06+760 of Giribawa Warawewa to To be Provide Handrails 740,000.00
Sandagala Road
Completion the Drain
Construction from CH 03+030 to
17 KU4-R1 91 03+030-03+280 RHS CH 03+280 RHS of Paluwewa Drain need to be completed 4,118,817.80
Junction to Giribawa via Ussana
Road
Completion Surfacing Works from
CH 03+870 to CH 03+978 of In
18 KU4-R2 10 03+870-03+978 front Atharagalla School To be Asphalted 2,060,437.50
Gurugoda Kothalawetiya
Kalegama Road
Maintain Surface from CH 10+720
to CH 10+750 & CH 13+450 to CH
10+720-10+750 & To be Pothole Patching with
19 KU4-R1 90 13+600 of Iginimitiya to 375,624.00
13+450-13+600 Gravel
Wannikudawewa via Nanneriya
junction Road

Completion Surfacing Works from


10+000-10+400, CH 10+000-10+400, 11+278-
20 KU4-R1 90 11+278-11+615 & 11+615 & 15+550-16+090 of To be Asphalted 15,946,537.50
15+550-16+090 Iginimitiya to Wannikudawewa via
Nanneriya junction Road
Maintain Surface from CH 06+700-
06+700-06+760,
06+760, 06+850-07+000 & 07+350- To be Pothole Patching with
21 KU4-R1 8 06+850-07+000 & 751,248.00
07+500 of Giribawa Warawewa to Gravel
07+350-07+500
Sandagala Road

Page 2 of 47
Summary of Emergency Works NWP/ i roads

Maintain Surface from CH 03+030


to CH 03+280 of Paluwewa To be Pothole Patching with
22 KU4-R1 91 03+030-03+280 832,500.00
Junction to Giribawa via Ussana Cold Mix
Road
Maintain Surface from CH 00+890
to CH 01+180 & CH 06+660 to CH
00+890-01+180 & To be Pothole Patching with
23 KU5-R 13 09+400 of Hathpokuna 6,323,004.00
06+660-09+400 Gravel
Galkatayagama Across Millagoda
Road
Maintain Surface from CH 07+400
07+400-07+750 & to CH 07+750 & CH 04+800 to CH To be Pothole Patching with
24 KU5-R 14 1,356,420.00
04+800-05+100 05+100 of Madahapola Mahayaya Gravel
Madahapola Road
Completion the Pedestrian
Crossing with Road Sign Works at
Provide Pedestrian Crossing
25 KU5-R 65 02+180 CH 02+180 of Wariyapola to 265,939.35
with 4 Nos Sign Boards
Amunugama, Malasma,
Goluwawa Road
Completion the Pedestrian
Crossing with Road Sign Works at
Provide Pedestrian Crossing
26 KU5-R 70 01+627 & 05+940 CH 01+627 & 05+940 of Porapola 531,878.70
with 4 Nos Sign Boards
Junction to Talvita Siradunna
Junction Road

Completion the Pedestrian


Crossing with Road Sign Works at Provide Pedestrian Crossing
27 KU5-R 79 04+142 265,939.35
CH 04+142 of Madulla Junction to with 4 Nos Sign Boards
Ihalagama Road

Completion the Pedestrian


Crossing with Road Sign Works at
Provide Pedestrian Crossing
28 KU5-R 89 03+252 CH 03+252 of Hakwatuna Oya 265,939.35
with 4 Nos Sign Boards
Bridge to Rathmale Road via
Dagellagama Kalawana Road

Completion the Pedestrian


Crossing with Road Sign Works at
Provide Pedestrian Crossing
29 KU5-R 99 03+756 CH 03+756 of Wilbagedara 265,939.35
with 4 Nos Sign Boards
Junction to Dunupotha Rathmalla
Junction Road

Completion the Pedestrian


Crossing with Road Sign Works at
CH 00+015 & 01+956 of Provide Pedestrian Crossing
30 KU5-R 29 00+015 & 01+956 531,878.70
Kurikulama Junction to Kadigawa, with 4 Nos Sign Boards
Across Subasinghepura, Across
Magurankadawala Road
Completion the Pedestrian
Crossing with Road Sign Works at Provide Pedestrian Crossing
31 KU5-R 95 03+635 265,939.35
CH 03+635 of Makulpotha to with 4 Nos Sign Boards
Henawa Road

Page 3 of 47
Summary of Emergency Works NWP/ i roads

Completion the Pedestrian


Crossing with Road Sign Works at Provide Pedestrian Crossing
32 KU5-R 83 01+195 265,939.35
CH 01+195 of Kajuwatta Junction with 4 Nos Sign Boards
to Koonwewa, Balagolla Road

Completion the Pedestrian


Crossing with Road Sign Works at
CH 02+845 & 04+065 of Near the
Provide Pedestrian Crossing
33 KU5-R 80 02+845 & 04+065 Paduwasnuwara Temple 531,878.70
with 4 Nos Sign Boards
Moragolla Sanasa to Pagahawela
School, Medagama Aranya
Senasana Road
Completion the Pedestrian
Crossing with Road Sign Works at
34 KU5-R 70 08+140 CH 08+140 of Porapola Junction 4 Nos Sign Boards Fixing 185,000.00
to Talvita Siradunna Junction
Road
Maintain Surface from CH 01+040
to CH 01+290 & CH 02+110 to CH
02+550 of Near the
01+040-01+290 & To be Pothole Patching with
35 KU5-R 80 Paduwasnuwara Temple 1,439,892.00
02+110-02+550 Gravel
Moragolla Sanasa to Pagahawela
School, Medagama Aranya
Senasana Road

Maintain Surface from CH 02+360


to CH 02+700 of Wilbagedara To be Pothole Patching with
36 KU5-R 99 02+360-02+700 709,512.00
Junction to Dunupotha Rathmalla Gravel
Junction Road

Maintain Surface from CH 02+240


to CH 02+930 & CH 03+900 to CH
02+240-02+930 & To be Pothole Patching with
37 KU4-R1 7 03+930 of Ihalagama Junction to 2,431,122.00
03+900-04+375 Gravel
Nochchiya Across
Wannikudawewa Road
Maintain Surface from CH 01+120
to CH 01+310 of Paluwewa To be Pothole Patching with
38 KU4-R1 91 01+798-02+695 1,871,859.60
Junction to Giribawa via Ussana Gravel
Road

Maintain Surface from CH 02+004-


02+430, 03+670-04+170 & 05+200-
02+004-02+430,
05+430 of Daladagama to To be Pothole Patching with
39 KU4-R2 94 03+670-04+170 & 2,412,340.80
Nikaweratiya Ambanpola Road via Gravel
05+200-05+430
Wathupalagama, Polpithigama,
Waduressa Road

Completion the Drain from CH


00+790 to CH 00+860 RHS of
40 KU5-R 13 00+790-00+860 RHS Drain need to be completed 1,686,802.25
Hathpokuna Galkatayagama
Across Millagoda Road

Page 4 of 47
Summary of Emergency Works NWP/ i roads

00+676-00+686, Completion Surfacing Works from


00+790-00+812, CH 00+676-00+686, 00+790-
01+150-01+180, 00+812, 01+150-01+180, 02+430-
41 KU5-R 70 02+430-02+435, 02+435, 03+750-03+760, 05+975- To be Asphalted 4,154,431.23
03+750-03+760, 06+035 & 06+780-06+790 of
05+975-06+035, Hathpokuna Galkatayagama
06+780-06+790 Across Millagoda Road

Completion Surfacing Works from


CH 02+780-02+890 & 07+585-
07+706 of Near the
02+780-02+890,
42 KU5-R 70 Paduwasnuwara Temple To be Concrete 12,089,366.13
07+585-07+706
Moragolla Sanasa to Pagahawela
School, Medagama Aranya
Senasana Road

Total Cost 181,438,018.34

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)

Page 5 of 47
Completion the Culvert Construction at CH 00+319 of Ihalagama Junction to Nochchiya Across
Wannikudawewa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

3.1 STRUCTURE EXCAVATION AND BACKFILL

3.1.1 302(5) Excavation for structures, unsuitable soil Cu.m 167.81 4,650.00 780,316.50

3.1.2 302(8) Backfill with granular material Cu.m 8.54 6,500.00 55,510.00

6.1 CULVERTS

6.1.1 705(1) Aggregate backfill Cu.m 1.96 8,500.00 16,660.00

6.1.2 705(2) Filter medium Cu.m 1.96 7,500.00 14,700.00

6.1.3 705(3) Impervious layer Cu.m 7,500.00 7,500.00

6.1.4 706(1) Weep hole, PVC pipe (Type 600) - 75mm diameter L.m 10.35 1,500.00 15,525.00

6.1.5 808(5) Guard stone Nr 14.00 4,500.00 63,000.00

6.1.6 1001(1) Concrete: Grade 15 Cu.m 22.88 23,500.00 537,680.00

6.1.7 1001(3) Concrete: Grade 25 Cu.m 85.71 26,500.00 2,271,315.00

6.1.8 1002(1) Tor steel reinforcement M.t 24.015 330,000.00 7,924,950.00

6.1.9 1008(1) Formwork smooth finish Sq.m 162.61 2,850.00 463,438.50

6.1.10 1008(2) Formwork rough finish Sq.m 82.40 2,650.00 218,360.00

12,368,955.00

Allow for Price Escalation = 85% 10,513,611.75

Total 22,882,566.75

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 03+740 to CH 03+890 of Madahapola Mahayaya
Madahapola Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.1 SUB BASES, CAPPING LAYERS AND BASES

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 45.00 5,200.00 234,000.00
aggregate 37.5 mm)

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 45.00 4,950.00 222,750.00

4.3 PRIME COAT AND TACK COAT

4.3.8 501(5) a Bituminous prime coat using MC 30 at rate of 1.0 ltr per sq.m Sq.m 450.00 210.00 94,500.00

4.3.9 501(5) c Blotting Material applied at the rate of 1 cum per 250 Sq.m. Sq.m 450.00 80.00 36,000.00

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 450.00 120.00 54,000.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 450.00 1,800.00 810,000.00

1,451,250.00

Allow for Price Escalation = 85% 1,233,562.50

Total 2,684,812.50

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 01+850 to CH 02+140 of Madahapola Mahayaya
Madahapola Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 58.00 4,950.00 287,100.00

4.3 PRIME COAT AND TACK COAT

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 870.00 120.00 104,400.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 870.00 1,800.00 1,566,000.00

1,957,500.00

Allow for Price Escalation = 85% 1,663,875.00

Total 3,621,375.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH CH 00+800 to CH 00+890 of Hathpokuna
Galkatayagama Across Millagoda Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.1 SUB BASES, CAPPING LAYERS AND BASES

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 27.00 5,200.00 140,400.00
aggregate 37.5 mm)

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 27.00 4,950.00 133,650.00

4.3 PRIME COAT AND TACK COAT

4.3.8 501(5) a Bituminous prime coat using MC 30 at rate of 1.0 ltr per sq.m Sq.m 270.00 210.00 56,700.00

4.3.9 501(5) c Blotting Material applied at the rate of 1 cum per 250 Sq.m. Sq.m 270.00 80.00 21,600.00

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 270.00 120.00 32,400.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 270.00 1,800.00 486,000.00

870,750.00

Allow for Price Escalation = 85% 740,137.50

Total 1,610,887.50

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 00+690 to CH 00+793 of Hathpokuna Galkatayagama
Across Millagoda Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 20.60 4,950.00 101,970.00

4.3 PRIME COAT AND TACK COAT

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 309.00 120.00 37,080.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 309.00 1,800.00 556,200.00

695,250.00

Allow for Price Escalation = 85% 590,962.50

Total 1,286,212.50

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 00+097 to 00+124, 02+750 to 02+808, 03+915 to 03+932
& 04+135 to 04+185 of Wilbagedara Junction to Dunupotha Rathmalla Junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.1 SUB BASES, CAPPING LAYERS AND BASES

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 45.60 5,200.00 237,120.00
aggregate 37.5 mm)

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 45.60 4,950.00 225,720.00

4.3 PRIME COAT AND TACK COAT

4.3.8 501(5) a Bituminous prime coat using MC 30 at rate of 1.0 ltr per sq.m Sq.m 456.00 210.00 95,760.00

4.3.9 501(5) c Blotting Material applied at the rate of 1 cum per 250 Sq.m. Sq.m 456.00 80.00 36,480.00

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 456.00 120.00 54,720.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 456.00 1,800.00 820,800.00

1,470,600.00

Allow for Price Escalation = 85% 1,250,010.00

Total 2,720,610.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 01+650 to CH 01+670 & CH 02+312 to CH 02+330 of
Makulpotha to Henawa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 7.60 4,950.00 37,620.00

4.3 PRIME COAT AND TACK COAT

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 114.00 120.00 13,680.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 114.00 1,800.00 205,200.00

256,500.00

Allow for Price Escalation = 85% 218,025.00

Total 474,525.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 01+800 to CH 02+100 of Hathpokuna Galkatayagama
Across Millagoda Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 900.00 175.00 157,500.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 48.00 1,750.00 84,000.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 480.00 185.00 88,800.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 112.50 3,400.00 382,500.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 1500.00 165.00 247,500.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 112.50 4,700.00 528,750.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 112.50 5,200.00 585,000.00
aggregate 37.5 mm)

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 105.00 4,950.00 519,750.00

4.3 PRIME COAT AND TACK COAT

4.3.8 501(5) a Bituminous prime coat using MC 30 at rate of 1.0 ltr per sq.m Sq.m 900.00 210.00 189,000.00

4.3.9 501(5) c Blotting Material applied at the rate of 1 cum per 250 Sq.m. Sq.m 900.00 80.00 72,000.00

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 900.00 120.00 108,000.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 900.00 1,800.00 1,620,000.00

4,582,800.00

Allow for Price Escalation = 85% 3,895,380.00

Total 8,478,180.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 04+065 to CH 04+160 of Werella Junction to
Naramana, Thambarawa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 285.00 175.00 49,875.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 15.20 1,750.00 26,600.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 152.00 185.00 28,120.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 35.63 3,400.00 121,142.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 475.00 165.00 78,375.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 35.63 4,700.00 167,461.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 35.63 5,200.00 185,276.00
aggregate 37.5 mm)

4.5 CONCRETE PAVEMENT

4.5.13 1008(1) Form work rough finish Sq.m 52.25 2,150.00 112,337.50

4.5.14 1002(1) Tor steel Reinforcement MT 0.21 330,000.00 69,300.00

4.5.15 901A(1) Concrete Grade 25 cum 23.75 26,500.00 629,375.00

4.5.15 901B(1) Concrete Grade 30 cum 42.75 28,500.00 1,218,375.00

2,686,236.50

Allow for Price Escalation = 85% 2,283,301.03

Total 4,969,537.53

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 00+420 to CH 00+660 of Hakwatuna Oya Bridge to
Rathmale Road via Dagellagama Kalawana Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 720.00 175.00 126,000.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 38.40 1,750.00 67,200.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 384.00 185.00 71,040.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 90.00 3,400.00 306,000.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 1200.00 165.00 198,000.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 90.00 4,700.00 423,000.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 90.00 5,200.00 468,000.00
aggregate 37.5 mm)

4.5 CONCRETE PAVEMENT

4.5.13 1008(1) Form work rough finish Sq.m 132.00 2,150.00 283,800.00

4.5.14 1002(1) Tor steel Reinforcement MT 0.54 330,000.00 178,200.00

4.5.15 901A(1) Concrete Grade 25 cum 60.00 26,500.00 1,590,000.00

4.5.15 901B(1) Concrete Grade 30 cum 108.00 28,500.00 3,078,000.00

6,789,240.00

Allow for Price Escalation = 85% 5,770,854.00

Total 12,560,094.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 01+670 to CH 01+830 of Makulpotha to Henawa Road

ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 480.00 175.00 84,000.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 25.60 1,750.00 44,800.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 256.00 185.00 47,360.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 60.00 3,400.00 204,000.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 800.00 165.00 132,000.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 60.00 4,700.00 282,000.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 60.00 5,200.00 312,000.00
aggregate 37.5 mm)

4.5 CONCRETE PAVEMENT

4.5.13 1008(1) Form work rough finish Sq.m 88.00 2,150.00 189,200.00

4.5.14 1002(1) Tor steel Reinforcement MT 0.36 330,000.00 118,800.00

4.5.15 901A(1) Concrete Grade 25 cum 40.00 26,500.00 1,060,000.00

4.5.15 901B(1) Concrete Grade 30 cum 72.00 28,500.00 2,052,000.00

4,526,160.00

Allow for Price Escalation = 85% 3,847,236.00

Total 8,373,396.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 04+200 to CH 04+500 of Near the Paduwasnuwara
Temple Moragolla Sanasa to Pagahawela School, Medagama Aranya Senasana Road

ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 900.00 175.00 157,500.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 48.00 1,750.00 84,000.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 480.00 185.00 88,800.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 112.50 3,400.00 382,500.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 1500.00 165.00 247,500.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 112.50 4,700.00 528,750.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 112.50 5,200.00 585,000.00
aggregate 37.5 mm)

4.5 CONCRETE PAVEMENT

4.5.13 1008(1) Form work rough finish Sq.m 165.00 2,150.00 354,750.00

4.5.14 1002(1) Tor steel Reinforcement MT 0.67 330,000.00 221,100.00

4.5.15 901A(1) Concrete Grade 25 cum 75.00 26,500.00 1,987,500.00

4.5.15 901B(1) Concrete Grade 30 cum 135.00 28,500.00 3,847,500.00

8,484,900.00

Allow for Price Escalation = 85% 7,212,165.00

Total 15,697,065.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 09+060-09+180 & 10+100-10+250 of Kurikulama
Junction to Kadigawa, Across Subasinghepura, Across Magurankadawala Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

3.3 STRUCTURE EXCAVATION AND BACKFILL

3.3.15 302(5) Excavation for structures, unsuitable soil Cu.m 97.81 4,650.00 454,816.50

4.5 CONCRETE PAVEMENT

4.5.13 1008(1) Form work rough finish Sq.m 51.75 2,150.00 111,262.50

4.5.15 901A(1) Concrete Grade 25 cum 51.75 26,500.00 1,371,375.00

6.1 CULVERTS

6.1.11 804(1) Rip Rap protection as approved by the engineer Cu.m 139.73 22,500.00 3,143,925.00

6.1.14 1001(1) Concrete: Grade 15 Cu.m 13.97 23,500.00 328,295.00

6.1.20 1006(1) Random rubble masonry Cu.m 83.84 21,500.00 1,802,560.00

6.1.22 1008(2) Formwork rough finish Sq.m 62.10 2,150.00 133,515.00

7,345,749.00

Allow for Price Escalation = 85% 6,243,886.65

Total 13,589,635.65

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Drain Construction from CH 06+050 to CH 06+438 LHS of Kurikulama
Junction to Kadigawa, Across Subasinghepura, Across Magurankadawala Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

3.1 STRUCTURE EXCAVATION AND BACKFILL

3.1.1 302(5) Excavation for structures, unsuitable soil Cu.m 124.16 4,650.00 577,344.00

5.1 ROAD SIDE AND LEADAWAY DRAINS

5.1.1 701(2) a Lining of drains with Concrete: Grade 15 (20) Cu.m 15.52 23,500.00 364,720.00

5.1.3 701(2) c Lining of drains with Concrete: Grade 25 (20) Cu.m 85.36 26,500.00 2,262,040.00

5.1.12 1002(1) Tor steel reinforcement M.t 3.492 330,000.00 1,152,360.00

5.1.13 1008(1) Formwork smooth finish Sq.m 543.20 2,850.00 1,548,120.00

5.1.14 1008(2) Formwork rough finish Sq.m 582.00 2,650.00 1,542,300.00

7,446,884.00

Allow for Price Escalation = 85% 6,329,851.40

Total 13,776,735.40

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Drain Construction from CH 02+530 to CH 02+700 RHS of Wariyapola to
Amunugama, Malasma, Goluwawa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

3.1 STRUCTURE EXCAVATION AND BACKFILL

3.1.1 302(5) Excavation for structures, unsuitable soil Cu.m 54.40 4,650.00 252,960.00

5.1 ROAD SIDE AND LEADAWAY DRAINS

5.1.1 701(2) a Lining of drains with Concrete: Grade 15 (20) Cu.m 6.80 23,500.00 159,800.00

5.1.3 701(2) c Lining of drains with Concrete: Grade 25 (20) Cu.m 37.40 26,500.00 991,100.00

5.1.12 1002(1) Tor steel reinforcement M.t 1.530 330,000.00 504,900.00

5.1.13 1008(1) Formwork smooth finish Sq.m 238.00 2,850.00 678,300.00

5.1.14 1008(2) Formwork rough finish Sq.m 255.00 2,650.00 675,750.00

3,262,810.00

Allow for Price Escalation = 85% 2,773,388.50

Total 6,036,198.50

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Provide Handrails to Bridge at CH 06+760 of Giribawa Warawewa to Sandagala Road

ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 Provide Handrails to Bridge at CH 06+760 Item 1.00 P.S 400,000.00

400,000.00

Allow for Price Escalation = 85% 340,000.00

Total 740,000.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Drain Construction from CH 03+030 to CH 03+280 RHS of Paluwewa Junction
to Giribawa via Ussana Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

3.1 STRUCTURE EXCAVATION AND BACKFILL

3.1.1 302(5) Excavation for structures, unsuitable soil Cu.m 37.12 4,650.00 172,608.00

5.1 ROAD SIDE AND LEADAWAY DRAINS

5.1.1 701(2) a Lining of drains with Concrete: Grade 15 (20) Cu.m 4.64 23,500.00 109,040.00

5.1.3 701(2) c Lining of drains with Concrete: Grade 25 (20) Cu.m 25.52 26,500.00 676,280.00

5.1.12 1002(1) Tor steel reinforcement M.t 1.044 330,000.00 344,520.00

5.1.13 1008(1) Formwork smooth finish Sq.m 162.40 2,850.00 462,840.00

5.1.14 1008(2) Formwork rough finish Sq.m 174.00 2,650.00 461,100.00

2,226,388.00

Allow for Price Escalation = 85% 1,892,429.80

Total 4,118,817.80

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 03+870 to CH 03+978 of In front Atharagalla School
Gurugoda Kothalawetiya Kalegama Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.1 SUB BASES, CAPPING LAYERS AND BASES

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 40.50 5,200.00 210,600.00
aggregate 37.5 mm)

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 37.80 4,950.00 187,110.00

4.3 PRIME COAT AND TACK COAT

4.3.8 501(5) a Bituminous prime coat using MC 30 at rate of 1.0 ltr per sq.m Sq.m 324.00 210.00 68,040.00

4.3.9 501(5) c Blotting Material applied at the rate of 1 cum per 250 Sq.m. Sq.m 324.00 80.00 25,920.00

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 324.00 120.00 38,880.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 324.00 1,800.00 583,200.00

1,113,750.00

Allow for Price Escalation = 85% 946,687.50

Total 2,060,437.50

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 10+720 to CH 10+750 & CH 13+450 to CH 13+600 of Iginimitiya to
Wannikudawewa via Nanneriya junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 203,040.00

203,040.00

Allow for Price Escalation = 85% 172,584.00

Total 375,624.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 10+000-10+400, 11+278-11+615 & 15+550-16+090 of
Iginimitiya to Wannikudawewa via Nanneriya junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 255.40 4,950.00 1,264,230.00

4.3 PRIME COAT AND TACK COAT

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 3831.00 120.00 459,720.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 3831.00 1,800.00 6,895,800.00

8,619,750.00

Allow for Price Escalation = 85% 7,326,787.50

Total 15,946,537.50

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 06+700-06+760, 06+850-07+000 & 07+350-07+500 of Giribawa
Warawewa to Sandagala Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 406,080.00

406,080.00

Allow for Price Escalation = 85% 345,168.00

Total 751,248.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 03+030 to CH 03+280 of Paluwewa Junction to Giribawa via Ussana
Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 450,000.00

450,000.00

Allow for Price Escalation = 85% 382,500.00

Total 832,500.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 00+890 to CH 01+180 & CH 06+660 to CH 09+400 of Hathpokuna
Galkatayagama Across Millagoda Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 3,417,840.00

3,417,840.00

Allow for Price Escalation = 85% 2,905,164.00

Total 6,323,004.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 07+400 to CH 07+750 & CH 04+800 to CH 05+100 of Madahapola
Mahayaya Madahapola Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 733,200.00

733,200.00

Allow for Price Escalation = 85% 623,220.00

Total 1,356,420.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 02+180 of Wariyapola to
Amunugama, Malasma, Goluwawa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 13.06 3,350.00 43,751.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

143,751.00

Allow for Price Escalation = 85% 122,188.35

Total 265,939.35

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 01+627 & 05+940 of
Porapola Junction to Talvita Siradunna Junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 26.12 3,350.00 87,502.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 8.00 25,000.00 200,000.00

287,502.00

Allow for Price Escalation = 85% 244,376.70

Total 531,878.70

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 04+142 of Madulla Junction
to Ihalagama Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 13.06 3,350.00 43,751.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

143,751.00

Allow for Price Escalation = 85% 122,188.35

Total 265,939.35

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 03+252 of Hakwatuna Oya
Bridge to Rathmale Road via Dagellagama Kalawana Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 13.06 3,350.00 43,751.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

143,751.00

Allow for Price Escalation = 85% 122,188.35

Total 265,939.35

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 03+756 of Wilbagedara
Junction to Dunupotha Rathmalla Junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 13.06 3,350.00 43,751.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

143,751.00

Allow for Price Escalation = 85% 122,188.35

Total 265,939.35

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 00+015 & 01+956 of
Kurikulama Junction to Kadigawa, Across Subasinghepura, Across Magurankadawala Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 26.12 3,350.00 87,502.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 8.00 25,000.00 200,000.00

287,502.00

Allow for Price Escalation = 85% 244,376.70

Total 531,878.70

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 03+635 of Makulpotha to
Henawa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 13.06 3,350.00 43,751.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

143,751.00

Allow for Price Escalation = 85% 122,188.35

Total 265,939.35

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 01+195 of Kajuwatta
Junction to Koonwewa, Balagolla Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 13.06 3,350.00 43,751.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

143,751.00

Allow for Price Escalation = 85% 122,188.35

Total 265,939.35

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 02+845 & 04+065 of Near the
Paduwasnuwara Temple Moragolla Sanasa to Pagahawela School, Medagama Aranya Senasana
Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.4 ROAD MARKINGS

8.4.9 810(1) d Pedestrian crossing Sq.m 26.12 3,350.00 87,502.00

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 8.00 25,000.00 200,000.00

287,502.00

Allow for Price Escalation = 85% 244,376.70

Total 531,878.70

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Pedestrian Crossing with Road Sign Works at CH 08+140 of Porapola Junction
to Talvita Siradunna Junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

8.5 TRAFFIC SIGNS

8.5.11 811(1) Single pole, sign area up to 0.5m2 nr 4.00 25,000.00 100,000.00

100,000.00

Allow for Price Escalation = 85% 85,000.00

Total 185,000.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 01+040 to CH 01+290 & CH 02+110 to CH 02+550 of Near the
Paduwasnuwara Temple Moragolla Sanasa to Pagahawela School, Medagama Aranya Senasana
Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 778,320.00

778,320.00

Allow for Price Escalation = 85% 661,572.00

Total 1,439,892.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 02+360 to CH 02+700 of Wilbagedara Junction to Dunupotha
Rathmalla Junction Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 383,520.00

383,520.00

Allow for Price Escalation = 85% 325,992.00

Total 709,512.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 02+240 to CH 02+930 & CH 03+900 to CH 03+930 of Ihalagama
Junction to Nochchiya Across Wannikudawewa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 1,314,120.00

1,314,120.00

Allow for Price Escalation = 85% 1,117,002.00

Total 2,431,122.00

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 01+120 to CH 01+310 of Paluwewa Junction to Giribawa via Ussana
Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 1,011,816.00

1,011,816.00

Allow for Price Escalation = 85% 860,043.60

Total 1,871,859.60

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Maintain Surface from CH 02+004-02+430, 03+670-04+170 & 05+200-05+430 of Daladagama to
Nikaweratiya Ambanpola Road via Wathupalagama, Polpithigama, Waduressa Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

9.1 PROVISIONAL SUMS

1 103.2(1) Initial maintenance of existing road Item 1.00 P.S 1,303,968.00

1,303,968.00

Allow for Price Escalation = 85% 1,108,372.80

Total 2,412,340.80

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion the Drain from CH 00+790 to CH 00+860 RHS of Hathpokuna Galkatayagama
Across Millagoda Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

3.1 STRUCTURE EXCAVATION AND BACKFILL

3.1.1 302(5) Excavation for structures, unsuitable soil Cu.m 22.40 4,650.00 104,160.00

5.1 ROAD SIDE AND LEADAWAY DRAINS

5.1.1 701(2) a Lining of drains with Concrete: Grade 15 (20) Cu.m 2.80 23,500.00 65,800.00

5.1.3 701(2) c Lining of drains with Concrete: Grade 25 (20) Cu.m 10.50 26,500.00 278,250.00

5.1.12 1002(1) Tor steel reinforcement M.t 0.560 330,000.00 184,800.00

5.1.13 1008(1) Formwork smooth finish Sq.m 49.00 2,850.00 139,650.00

5.1.14 1008(2) Formwork rough finish Sq.m 52.50 2,650.00 139,125.00

911,785.00

Allow for Price Escalation = 85% 775,017.25

Total 1,686,802.25

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 00+676-00+686, 00+790-00+812, 01+150-01+180, 02+430-
02+435, 03+750-03+760, 05+975-06+035 & 06+780-06+790 of Hathpokuna Galkatayagama
Across Millagoda Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 441.00 175.00 77,175.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 23.52 1,750.00 41,160.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 235.20 185.00 43,512.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 55.13 3,400.00 187,442.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 735.00 165.00 121,275.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 55.13 4,700.00 259,111.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 55.13 5,200.00 286,676.00
aggregate 37.5 mm)

4.2 SHOULDERS

4.2.4 409(1) Earthen shoulders as compacted in position Cu.m 51.45 4,950.00 254,677.50

4.3 PRIME COAT AND TACK COAT

4.3.8 501(5) a Bituminous prime coat using MC 30 at rate of 1.0 ltr per sq.m Sq.m 441.00 210.00 92,610.00

4.3.9 501(5) c Blotting Material applied at the rate of 1 cum per 250 Sq.m. Sq.m 441.00 80.00 35,280.00

4.3.11 502(2) Tack coat using CRS 1 at rate of 0.25 - 0.55 ltr per sq.m Sq.m 441.00 120.00 52,920.00

4.4 ASPHALTIC CONCRETE SURFACING

4.4.11 506(1)a Asphalt concrete in wearing course 50mm thick Sq.m 441.00 1,800.00 793,800.00

2,245,638.50

Allow for Price Escalation = 85% 1,908,792.73

Total 4,154,431.23

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)
Completion Surfacing Works from CH 02+780-02+890 & 07+585-07+706 of Near the
Paduwasnuwara Temple Moragolla Sanasa to Pagahawela School, Medagama Aranya Senasana
Road
ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (Rs)
Bill Pay

2.1 CLEARING AND GRUBBING

Clearing and grubbing inclusive of backfilling holes and


2.1.1 201(1)a Sq.m 693.00 175.00 121,275.00
trenches caused by removal of stumps

3.1 ROADWAY EXCAVATION

3.1.5 301(11) Roadway excavation, unsuitable soil Cu.m 36.96 1,750.00 64,680.00

3.1.7 301(16) Preparation of sub grade in cut areas Sq.m 369.60 185.00 68,376.00

3.4 EMBANKMENT CONSTRUCTION

3.4.19 304(2) a Embankment construction using borrow material, Type I Cu.m 86.63 3,400.00 294,542.00

3.4.21 304(3) Trimming, leveling and compaction of original ground Sq.m 1155.00 165.00 190,575.00

4.1 SUB BASES, CAPPING LAYERS AND BASES

4.1.1 401(1) a Sub base as compacted in position (Upper sub base) Cu.m 86.63 4,700.00 407,161.00

Dense graded aggregate base (Nominal maximum size of


4.1.3 405(1) Cu.m 86.63 5,200.00 450,476.00
aggregate 37.5 mm)

4.5 CONCRETE PAVEMENT

4.5.13 1008(1) Form work rough finish Sq.m 127.05 2,150.00 273,157.50

4.5.14 1002(1) Tor steel Reinforcement MT 0.52 330,000.00 171,600.00

4.5.15 901A(1) Concrete Grade 25 cum 57.75 26,500.00 1,530,375.00

4.5.15 901B(1) Concrete Grade 30 cum 103.95 28,500.00 2,962,575.00

6,534,792.50

Allow for Price Escalation = 85% 5,554,573.63

Total 12,089,366.13

Prepared by Checked by Recommended by

………………………………………. ……………………………………… …………………………………………………


I.M.S.K.Bandara (AQS) M.A.G.T.Mallawaarachchi (CE) T.I.Jayathilaka (ARE)