one tome gue Remar Wl DiS a lg TT Ho rs
Seon o meet ess Pa Sao Neaar baz)
(Contractor |: Reyrose Construction & Supply Devt Corp. _ ae =
"HERD coe oF ESI
ep cee on
—ororaceommeer— ono
fe ‘CONTRACT COST DUE TO.
Jucr) gry | unrrpasce | Tora amounr ‘oOrnvE ‘DEDUETIWE ‘Datea work omen | SPMTRAGT COSTOUETO. | memanxs.
MO aR OT ora
Ce ees ee cm
I CC TT me
{me | aes] —2nanaat| ana tet
| ior] — seam] — sant — |
te | —t00| ica | — esa is
‘| — | sash a a) sai oa
Be eet ee [naan = oor
‘a-| tar — aaa | — Bary E |
Tem| mess] —""'aae| "ness — as] — san Sirsa] natn esa
cam) iar | sae est] | ae mn |
oT ts a
ee a iar a
ESPERER> Mei Mab ablesRepublic ofthe Philippines
Contract 10
Contract Name & Location
of Permanent Weak Bdges, Maraput bridge (8017284) slong Daang Meharika (Signe Agusan Sect.)
oe “Tibay, Agusen del Nate
wractor Feros Construcbon & Suppy DAVE Cap.
‘Yu are hereby dete to make herein describe changes frm the plans and specications ofthe following described werk not incsed inthe plans and specications:
DESCRIPTION OF WORK TO BE DONE; Tnereased
a “400(32)
REASON FOR CHANGE + Ts variation Order
‘CHANGE REQUESTED BY + The Project Engineer (OPWH Agusan de ore DSc Engineering fee)
ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN IN THE ATTACHED BILL OF QUANTITIES AND COST ESTIMATE
\We tne undersigned Contractors have ave careful consideration tothe change propose and hereby agree, hs ‘Diterence i Cost cet this Change
‘proposals approved that we wl provide all equipment furnish ll materials except a maybe others be noted and perform
Li services necessary for work above speofed and wl acept as ful payment eet the prices shown on the second page of
the attached sheet Bock to Original Contract Amount:
Percentage Change in Oral Contract Value (+) or:
(rina Conract Owain